1 SPIRAL 2 phase 1/DESIR Laurent Serani On behalf of SFRE

2 Outline Perimeter of PHASE1 Development program Status of Design of equipment Status of building definition Time schedule

3 Perimeter of SPIRAL2 / phase1 Ø Incorporation of DESIR in the SPIRAL2 Phase 1 project as a and delay in the construction of SPIRAL2 Phase 2 u DESIR EQUIPEX embedded in the SFRE group: ü Building & beam lines work packages managed by SFRE (Tech. coord.) u Integration of the purification tool (RFQ-SHIRaC2&HRS) in the beam transport tunnels u New specifications of the DESIR hall to reduce costs (Dec 2013)

4 Beam lines : WBS Perimeter of Phase 1 WP 8534 HRS CENBG WP 8537 DESIR hall IPNO CENBG WP 8533 SHIRaC LPC WP 8535 MIPPS GANIL WP 8531 S3- DESIR IPNO CENBG WP 8532 S1- DESIR IPNO CENBG

5 Outline Perimeter of PHASE1 Development program Status of Design of equipment Status of building definition Time schedule

6 Development plan Organisation SPIRAL2 Management SFRE Division DESIR tech. coord. DESIR EQUIPEX DESIR Collaboration DESIR scientific coord. Steering Committee DECA Scientific program Experimental equipment DESIR facility coord. French Partners: IPNO - Optics design and mechanical design - In charge of the coordination of beam line production CENBG - Control system - HRS LPC - RFQ-SHIRaC International partners: BARC-India- part of beam line construction - under discussion

7 Operational chart for SP2 / SFRE / ph.1 Development plan Responsable / Resp. adj : F.Varenne / L.Serani - Beam Transp. Coord. : H.Franberg - System Engeneering : F.Varenne (equipment) / L.Serani (transverse) Interface transverse projet SPIRAL2 Interface group system / AMOA : System Engeneering phase 1 (SYS) Interface group SRE : Resp. Nuclear safety ph.1 (SRE) Interface building / MOE : Building construction Engeneer (BIS)

8 Outline Perimeter of PHASE1 Development program Status of Design of equipment Status of building definition Time schedule

9 Status of equipment design Beam lines Main caracteristics electrostatic lines, point-to-point transport beams of kev, 3-80 π.mm.mrad (2 RMS) S3-LEB->DESIR: 44 m, 2 levels SPIRAL1 -> DESIR: 50 m, 1 level Beam envelop simulations IPN Orsay 60 kev 80 π.mm.mrad - Revue of Preliminary Optical Design made on last September. Résultats lignes comp - Consolidation will be made until March S3-DESIR : - Start of donc detailed Nous allons comparerdesign dans un 1er phase temps les configurations tout hard-edge et ce progressivement et alternativement : 1. Tous éléments d optiques (déflecteurs, quadrupôles et steerers) à bords droits (hard-edge) Résultats lignes complètes 2. Déflecteurs avec cartes de champs (pas 5mm) et quadrupôlessteerers à bords droits 3. Déflecteurs à bords droits avec quadrupôlessteerers en cartes de champs (pas 5mm) S3-DESIR : er temps les configurations tout hard-edge et celle introduisant les cartes deen 4. un 1Tous éléments d optiques (déflecteurs, quadrupôles et steerers) cartes de champs (pas 5m Nous allons donc comparer dans champ progressivement et alternativement : Tous éléments d optiques (déflecteurs, quadrupôles et steerers) à bords droits (hard-edge) Déflecteurs avec cartes de champs (pas 5mm) et quadrupôlessteerers à bords droits Déflecteurs à bords droits avec quadrupôlessteerers en cartes de champs (pas 5mm) Tous éléments d optiques (déflecteurs, quadrupôles et steerers) en cartes de champs (pas 5mm) 1 S3-LEB -> DESIR (44 m)spiral1 -> DESIR (50 m) 2 Prototype of a quad triplet steerer sectiondesign of a 45 deflector 3 4 Courtesy of L. Perrot IPNO L. Perrot, SPIRAL2 Week 2014 Oct. 6/9, 2014 CAEN SPIRAL2 phase 1, lignes de transfert DESIR -18/09/2014 SPIRAL2-Phase 1/DESIR L. Perrot, Page 34 Laurent Serani SPIRAL2 phase 1, lignes de transfert DESIR -18/0

10 Status of equipment design-production site Objective: take care of optical interface according building design and transportation with as low as possible lose of RIB GANIL production site: SPIRAL1 upgrade ECR: Ne, Ar, Kr, N, O, F Surface Ionization : Li, Na, K, Rb FEBIAD: Mg, Al, P, S, Cl, Fe, Cu <10-8 mbar SPIRAL2 production site: S 3 -LEB Isotopic selection (Z) Gas Thermalizat cell ion Neutralizati on 500 mbar S 3 beams S-shaped RFQ buncher Pulsed drift HT=5-10kV H T DESIR Pulsed drift tube 4keV beam Quad deflect or S 3 Decay station HT=40-60kV Courtesy of B. Bastin Courtesy of P. Delahaye MR- ToF-MS Extraction RFQ RFQ DC repulsion QMS tension Gas jet Laser beam (in-gas-jet mode) Laser beam (in-gas-cell mode) H T

11 Status of equipment design Purification tool DESIR Building S1 beam line S3 beam line Purification tool area SPIRAL2 Week 2014 Oct. 6/9, 2014 CAEN SPIRAL2-Phase 1/DESIR Laurent Serani 11

12 Status of equipment design RFQ-SHIRaC2 RFQ- SHIRAC2 To be done: - New design of a «ALARA» vacuum chamber - Continue performance test New diagnostics set-up New design of CEM shielding for 60 kv

13 RFQ- SHIRaC2 Latest development Status of equipment design RFQ-SHIRaC2 Energy spread measurement with a new detector. Goal: Better sensitivity Beam Beam Detector principle Detector Results Specification for HRS - energy spread of 1eV sensitivity~0.6ev

14 Status of equipment design HRS HRS-Construction phase More or less 50% of investment are done HRS Magnets delivered to GANIL last July Pumping system Integration and test of an EMS SP2 at Bordeaux HV power supply Stability of Vnom PLC system SPIRAL2 Week 2014 Oct. 6/9, 2014 CAEN SPIRAL2-Phase 1/DESIR Laurent Serani

15 Outline Perimeter of PHASE1 Development program Status of Design of equipment Status of building definition Time schedule

16 Status of Building Definition December 2013 Modification of DESIR building Program June D plans produce by INGEROP June/September 2014 Analyse of propositions October 2014 executive summary by the SFRE and DESIR collaboration supplies, technical rooms, accesses building infrastructure: pillars? equipment handling (cranes) Expected: Beginning of APS Phase in January 2015

17 Outline Perimeter of PHASE1 Development program Status of Design of equipment Status of building definition Time schedule

18 Time Schedule

19 Thank you for listening

Status of the DESIR facility

Status of the DESIR facility Status of the DESIR facility P. Ascher, for the DESIR collaboration and the SPIRAL2 Phase 1+ management CEN Bordeaux-Gradignan Introduction of DESIR (physics motivations, instrumentation) Status and timeline

More information

Bertram Blank CEN Bordeaux-Gradignan. Germanium detector calibration experimental studies: decay mirror decay future work

Bertram Blank CEN Bordeaux-Gradignan. Germanium detector calibration experimental studies: decay mirror decay future work Bertram Blank CEN Bordeaux-Gradignan Germanium detector calibration experimental studies: 0 + -0 + decay mirror decay future work 20 th Colloque de GANIL, Amboise, October 15th 20th, 2017 Nuclear beta

More information

HIGH INTENSITY ION BEAMS AT GANIL F. Chautard, September 6th, Cyclotron 2010 Lanzhou, China, september F. Chautard

HIGH INTENSITY ION BEAMS AT GANIL F. Chautard, September 6th, Cyclotron 2010 Lanzhou, China, september F. Chautard HIGH INTENSITY ION BEAMS AT GANIL F. Chautard, September 6th, 2010 OUTLINE Operation modes at GANIL Statistics Stable beams Exotic beams ISOL In Flight Beam developments Stable beams Exotic beams Machine

More information

Performance of the ANL ECR Charge Breeder. with Low Mass Beams. Investigations with low mass species. Review of charge breeder design

Performance of the ANL ECR Charge Breeder. with Low Mass Beams. Investigations with low mass species. Review of charge breeder design Review of charge breeder design Investigations with low mass species Injection simulations Richard Vondrasek, Sergey Kutsaev, Richard Pardo, Robert Scott Argonne National Laboratory Pierre Delahaye, Laurent

More information

TAMU-TRAP facility for Weak Interaction Physics. P.D. Shidling Cyclotron Institute, Texas A&M University

TAMU-TRAP facility for Weak Interaction Physics. P.D. Shidling Cyclotron Institute, Texas A&M University TAMU-TRAP facility for Weak Interaction Physics P.D. Shidling Cyclotron Institute, Texas A&M University Outline of the talk Low energy test of Standard Model T =2 Superallowed transition Facility T-REX

More information

GANIL STATUS REPORT. B. Jacquot, F. Chautard, A.Savalle, & Ganil Staff GANIL-DSM/CEA,IN2P3/CNRS, BP 55027, Caen Cedex, France.

GANIL STATUS REPORT. B. Jacquot, F. Chautard, A.Savalle, & Ganil Staff GANIL-DSM/CEA,IN2P3/CNRS, BP 55027, Caen Cedex, France. GANIL STATUS REPORT B. Jacquot, F. Chautard, A.Savalle, & Ganil Staff GANIL-DSM/CEA,IN2P3/CNRS, BP 55027, 4076 Caen Cedex, France Abstract The GANIL-Spiral facility (Caen, France) is dedicated to the acceleration

More information

Bertram Blank CEN Bordeaux-Gradignan. Germanium detector calibration experimental studies: b decay mirror b decay future work

Bertram Blank CEN Bordeaux-Gradignan. Germanium detector calibration experimental studies: b decay mirror b decay future work Bertram Blank CEN Bordeaux-Gradignan Germanium detector calibration experimental studies: 0 + - 0 + b decay mirror b decay future work Beta-Decay Weak Interaction Studies in the Era of the LHC International

More information

Report on novel techniques for the production and selection of ECRionized radioactive ions beams

Report on novel techniques for the production and selection of ECRionized radioactive ions beams Report on novel techniques for the production and selection of ECRionized radioactive ions beams Different novel techniques were studied or tested for the production of pure metallic radioactive ion beams

More information

P. Delahaye, F. De Oliveira, M. Fadil, H. Franberg - Delahaye, N. Lecesne, A. Pichard, MG Saint Laurent, JC Thomas, L. Serani, B.

P. Delahaye, F. De Oliveira, M. Fadil, H. Franberg - Delahaye, N. Lecesne, A. Pichard, MG Saint Laurent, JC Thomas, L. Serani, B. First beams from SPIRAL 2 Phase 2 P. Delahaye, F. De Oliveira, M. Fadil, H. Franberg - Delahaye, N. Lecesne, A. Pichard, MG Saint Laurent, JC Thomas, L. Serani, B. Blank and GANISOL DESIR workshop, 26

More information

SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme. Bertram Blank CEN Bordeaux-Gradignan

SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme. Bertram Blank CEN Bordeaux-Gradignan SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme Bertram Blank CEN Bordeaux-Gradignan Arctic FIDIPRO-EFES Workshop, Saariselkä, Finland April

More information

Recent developments at ISOL-based facilities. Piet Van Duppen KU Leuven, Belgium

Recent developments at ISOL-based facilities. Piet Van Duppen KU Leuven, Belgium Recent developments at ISOL-based facilities Piet Van Duppen KU Leuven, Belgium 1 Introductory remarks on RIB research Target materials Ion Sources Laser Resonance Ionization Ion manipulation Hg laser

More information

The NFS project. Part of the SPIRAL-2 project built on the GANIL site, Caen, France. NFS is one of the two facilities of the LINAG Experimental Area

The NFS project. Part of the SPIRAL-2 project built on the GANIL site, Caen, France. NFS is one of the two facilities of the LINAG Experimental Area The NFS project Part of the SPIRAL-2 project built on the GANIL site, Caen, France NFS is one of the two facilities of the LINAG Experimental Area Neutron beam between 100 kev and 40 MeV Irradiation station

More information

Opportunities with collinear laser spectroscopy at DESIR:

Opportunities with collinear laser spectroscopy at DESIR: Opportunities with collinear laser spectroscopy at DESIR: the LUMIERE facility GOALS of LUMIERE experiments: Gerda Neyens, K.U. Leuven, Belgium (1) measure ground state properties of exotic isotopes: (see

More information

Status & Plans for the TRIUMF ISAC Facility

Status & Plans for the TRIUMF ISAC Facility Status & Plans for the TRIUMF ISAC Facility P.W. Schmor APAC 07, Jan 29-Feb 2 Indore, India TRIUMF ISAC Schematic Layout of TRIUMF/ISAC with H- Driver, ISOL Production & Post Accelerators ISAC-II High

More information

System Integration. E. Fagotti

System Integration. E. Fagotti System Integration E. Fagotti Outline Starting status Interface Management Workflow & Documentation PBS interfaces Some results 2 Dec 14 SPES TAC2 2 Starting Status (February 2014) Interfaces identification

More information

STATUS REPORT ON SPIRAL1 F. Chautard October 2 nd, 2007

STATUS REPORT ON SPIRAL1 F. Chautard October 2 nd, 2007 STATUS REPORT ON SPIRAL1 F. Chautard October 2 nd, 2007 Assessment of GANIL/SPIRAL operation Technical achievements Present R&D Possible developments SPIRAL: Radioactive ion beams with «ISOL» method since

More information

The SPIRAL2 Project and experiments with high-intensity rare isotope beams

The SPIRAL2 Project and experiments with high-intensity rare isotope beams The SPIRAL2 Project and experiments with high-intensity rare isotope beams Marek Lewitowicz GANIL, CEA/DSM-CNRS/IN2P3, BP 55027, 14076 Caen Cedex, France Lewitowicz@ganil.fr Abstract. The SPIRAL2 facility

More information

Review of ISOL-type Radioactive Beam Facilities

Review of ISOL-type Radioactive Beam Facilities Review of ISOL-type Radioactive Beam Facilities, CERN Map of the nuclear landscape Outline The ISOL technique History and Geography Isotope Separation On-Line Existing facilities First generation facilities

More information

Charge State Breeding for the. at TRIUMF

Charge State Breeding for the. at TRIUMF CANADA S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada

More information

Report on PIAVE G. Bisoffi

Report on PIAVE G. Bisoffi Report on PIAVE G. Bisoffi International Scientific Committee, Legnaro February 10th, 2005 Context: Upgrade of the LNL Nuclear Physics Facility 3. CRYOGENIC SYSTEM UPGRADE 5. ALPI Energy Upgrade 4 3 4.

More information

HIGH INTENSITY ION BEAMS AT GANIL. ECOS facility meeting, may 16th 2013 GANIL - F. Chautard

HIGH INTENSITY ION BEAMS AT GANIL. ECOS facility meeting, may 16th 2013 GANIL - F. Chautard HIGH INTENSITY ION BEAMS AT GANIL ECOS facility meeting, may 16th 2013 GANIL - F. Chautard The first beam of GANIL was sent to an experimental room in 1983. Since then, the variety (116) and intensity

More information

OPERATION STATUS OF HIGH INTENSITY ION BEAMS AT GANIL

OPERATION STATUS OF HIGH INTENSITY ION BEAMS AT GANIL OPERATION STATUS OF HIGH INTENSITY ION BEAMS AT GANIL F. Chautard, G. Sénécal, GANIL, Caen, France Abstract The Grand Accélérateur National d s Lourds (GANIL, Fig. ) facility (Caen, France) is dedicated

More information

Development of the RFQ Cooler SHIRaC: beam transport and nuclearization

Development of the RFQ Cooler SHIRaC: beam transport and nuclearization Development of the RFQ Cooler SHIRaC: beam transport and nuclearization Ramzi Boussaid a*, G.Ban a, G.Quéméner a, Y.Merrer a, J.Lorry a. a LPC-IN2P3, ENSICAEN, 6 Boul. Maréchal Juin, 14050 Caen, France.

More information

Physics with stopped beams at TRIP-TRAP Facility. P.D. Shidling Cyclotron Institute, Texas A&M University

Physics with stopped beams at TRIP-TRAP Facility. P.D. Shidling Cyclotron Institute, Texas A&M University Physics with stopped beams at TRIP-TRAP Facility P.D. Shidling Cyclotron Institute, Texas A&M University Physics with stopped beams Experiments require high purity low energy ions for studying various

More information

Jlab FEL Photoemission DC Guns

Jlab FEL Photoemission DC Guns Jlab FEL Photoemission DC Guns Fay Hannon On behalf of the FEL team FLS 2010, 2 nd March 2 Operational Guns 1. FEL Gun 60m Gun Test Stand (GTS) 2. Backup gun, test stand with beam characterization beamline

More information

SPIRAL-2 FOR NEUTRON PRODUCTION

SPIRAL-2 FOR NEUTRON PRODUCTION SPIRAL-2 FOR NEUTRON PRODUCTION X. Ledoux and the NFS collaboration Outline The SPIRAL-2 facility The Neutrons For Science Facility OUTLINE SPIRAL-2 The Neutrons For Science facility The SPIRAL-2 project

More information

Refurbishment of the Electrostatic Accelerators of ithemba LABS

Refurbishment of the Electrostatic Accelerators of ithemba LABS Refurbishment of the Electrostatic Accelerators of ithemba LABS SNEAP 2012 INFN Legnaro, Italy, 1-5 October J.L. Conradie, G. Badenhorst, F. Balzun, A. Crombie, G. De Villiers, H. Delsink, C. Doyle, C.

More information

two-proton radioactivity discovery of two-proton radioactivity experimental results with TPC s future studies

two-proton radioactivity discovery of two-proton radioactivity experimental results with TPC s future studies two-proton radioactivity discovery of two-proton radioactivity experimental results with TPC s future studies Bertram Blank CEN Bordeaux-Gradignan EPS European Nuclear Physics Conference 2009 Spring meeting

More information

EBSS: Hands-on Activity #8. Operation of an electromagnetic isotope separator (EMIS) Dan Stracener Jon Batchelder

EBSS: Hands-on Activity #8. Operation of an electromagnetic isotope separator (EMIS) Dan Stracener Jon Batchelder EBSS: Hands-on Activity #8 Operation of an electromagnetic isotope separator (EMIS) Dan Stracener Jon Batchelder Schematic of RIB Production at the HRIBF ISOL: Isotope Separation On-Line 2 Managed by UT-Battelle

More information

Il progetto SPES: produzione di fasci di ioni radioattivi ai Laboratori Nazionali di Legnaro.

Il progetto SPES: produzione di fasci di ioni radioattivi ai Laboratori Nazionali di Legnaro. Il progetto SPES: produzione di fasci di ioni radioattivi ai Laboratori Nazionali di Legnaro. Alberto Andrighetto LNL-INFN Congresso SIF 2012 - Napoli Talk Overview -Introduction - The SPES layout & devices.

More information

Ion-atom interactions in a gas jet coupling of a gas catcher to a linear RFQ cooler. Emil Traykov SIMION day GANIL, 11/06/2015

Ion-atom interactions in a gas jet coupling of a gas catcher to a linear RFQ cooler. Emil Traykov SIMION day GANIL, 11/06/2015 Ion-atom interactions in a gas jet coupling of a gas catcher to a linear cooler Emil Traykov SIMION day GANIL, 11/06/015 10-1 mbar 10 - mbar 10-5 mbar 10 - mbar MR-TOF-MS S spectrometer and the low energy

More information

DEVELOPMENT OF JINR FLNR HEAVY-ION ACCELERATOR COMPLEX IN THE NEXT 7 YEARS

DEVELOPMENT OF JINR FLNR HEAVY-ION ACCELERATOR COMPLEX IN THE NEXT 7 YEARS Ó³ Ÿ. 2010.. 7, º 7(163).. 827Ä834 ˆ ˆŠ ˆ ˆŠ Š ˆ DEVELOPMENT OF JINR FLNR HEAVY-ION ACCELERATOR COMPLEX IN THE NEXT 7 YEARS G. Gulbekyan, B. Gikal, I. Kalagin, N. Kazarinov Joint Institute for Nuclear

More information

Operation of the Coupled Cyclotron Facility at Michigan State University

Operation of the Coupled Cyclotron Facility at Michigan State University Operation of the Coupled Cyclotron Facility at Michigan State University Andreas Stolz Workshop on Accelerator Operations Head, Operations Department SLAC National Accelerator Laboratory NSCL / Michigan

More information

The SPIRAL 2 Project at GANIL

The SPIRAL 2 Project at GANIL Primary heavy ion beam accelerator:100 MeV/u Cascade of 3 cyclotrons Secondary beam accelerator: CIME Cyclotron OUTLINE Ganil: Stable and RI Beam Facility Sissi: in flight fragmentation Spiral : Isol +

More information

Introduction Frankfurt Neutron Source at Stern-Gerlach-Zentrum FRANZ Development of new accelerator concepts for intense proton and ion beams. High in

Introduction Frankfurt Neutron Source at Stern-Gerlach-Zentrum FRANZ Development of new accelerator concepts for intense proton and ion beams. High in 2009/12/16 Proton Linac for the Frankfurt Neutron Source Christoph Wiesner Introduction Frankfurt Neutron Source at Stern-Gerlach-Zentrum FRANZ Development of new accelerator concepts for intense proton

More information

Status of the EBIT in the ReA3 reaccelerator at NSCL

Status of the EBIT in the ReA3 reaccelerator at NSCL Status of the EBIT in the ReA3 reaccelerator at NSCL ReA3 concept and overview: - Gas stopping EBIT RFQ LINAC EBIT commissioning National Science Foundation Michigan State University S. Schwarz, TCP-2010,

More information

Pushing the boundaries of Penning trap mass spectrometry

Pushing the boundaries of Penning trap mass spectrometry Canada s national laboratory for particle and nuclear physics Laboratoire national canadien pour la recherche en physique nucléaire et en physique des particules Pushing the boundaries of Penning trap

More information

OVERVIEW OF THE BEAM DIAGNOSTICS FOR THE DRIVER OF SPIRAL2

OVERVIEW OF THE BEAM DIAGNOSTICS FOR THE DRIVER OF SPIRAL2 OVERVIEW OF THE BEAM DIAGNOSTICS FOR THE DRIVER OF SPIRAL2 Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud 11 91406 Orsay cedex Tél. : +33 1 69 15 73 40 Fax : +33 1 69 15 64 70 http://ipnweb.in2p3.fr

More information

Trap assisted decay spectroscopy setup at ISOLTRAP

Trap assisted decay spectroscopy setup at ISOLTRAP Trap assisted decay spectroscopy setup at ISOLTRAP Motivation Penning traps: masses and isobaric selectivity ISOLTRAP mass spectrometer at ISOLDE/CERN Decay spectroscopy at ISOLTRAP: setup and 1 st run

More information

SPPS: The SLAC Linac Bunch Compressor and Its Relevance to LCLS

SPPS: The SLAC Linac Bunch Compressor and Its Relevance to LCLS LCLS Technical Advisory Committee December 10-11, 2001. SPPS: The SLAC Linac Bunch Compressor and Its Relevance to LCLS Patrick Krejcik LCLS Technical Advisory Committee Report 1: July 14-15, 1999 The

More information

ISCC meeting, February 16, ISCC meeting, February 16, ISOLDE ISOLDE scientific scientific coordinator s s report

ISCC meeting, February 16, ISCC meeting, February 16, ISOLDE ISOLDE scientific scientific coordinator s s report ISOLDE ISOLDE scientific scientific coordinator s s report report ISCC meeting, February 16, 2009 ISCC meeting, February 16, 2009, CERN PH-SME SME-IS Running period 2008 Status of INTC shifts Status of

More information

Laser Spectroscopy on Bunched Radioactive Ion Beams

Laser Spectroscopy on Bunched Radioactive Ion Beams Laser Spectroscopy on Bunched Radioactive Ion Beams Jon Billowes University of Manchester Balkan School on Nuclear Physics, Bodrum 2004 Lecture 1. 1.1 Nuclear moments 1.2 Hyperfine interaction in free

More information

Progress of SPIRAL2 project

Progress of SPIRAL2 project Progress of SPIRAL2 project IPAC 2011 San Sebastian, 5-9 September 2011 Progress of SPIRAL2 project: description of SPIRAL2 facility organization progress of the first phase of SPIRAL2 progress of the

More information

SuperNEMO Double Beta Decay Experiment. A.S. Barabash, ITEP, Moscow (on behalf of the SuperNEMO Collaboration)

SuperNEMO Double Beta Decay Experiment. A.S. Barabash, ITEP, Moscow (on behalf of the SuperNEMO Collaboration) SuperNEMO Double Beta Decay Experiment A.S. Barabash, ITEP, Moscow (on behalf of the SuperNEMO Collaboration) 1 OUTLINE NEMO-3 SuperNEMO DEMONSTRATOR: present status and plans for the future 2 NEMO-3 Collaboration

More information

In-trap decay and trap-assisted decay spectroscopy at ISOLTRAP

In-trap decay and trap-assisted decay spectroscopy at ISOLTRAP In-trap decay and trap-assisted decay spectroscopy at ISOLTRAP ISOLTRAP experimental setup In-trap decay: principle application for mass measurements Trap-assisted decay spectroscopy: principle and purpose

More information

The Neutrons For Science facility

The Neutrons For Science facility The Neutrons For Science facility X. Ledoux and the NFS collaboration OUTLINE Presentation Status of construction First experiments and commissioning The NFS project Part of the SPIRAL-2 project built

More information

IAP NAN of Ukraine activity in. Possible areas of cooperation in. Roman Kholodov, PICS Meeting, Basivka, Ukraine,

IAP NAN of Ukraine activity in. Possible areas of cooperation in. Roman Kholodov, PICS Meeting, Basivka, Ukraine, 1 IAP NAN of Ukraine activity in field of High Energy Physics. Possible areas of cooperation in frame of PICS and beyond. Institute of Applied Physics National Academy of Sciences of Ukraine 2 The Institute

More information

The Accelerator System for ReA3 the New Re-accelerated RIBs Facility at MSU

The Accelerator System for ReA3 the New Re-accelerated RIBs Facility at MSU The Accelerator System for ReA3 the New Re-accelerated RIBs Facility at MSU Xiaoyu Wu National Superconducting Cyclotron Laboratory Michigan State University on behalf of the NSCL ReA3 team X. Wu, Cyclotrons

More information

Lecture 22 Ion Beam Techniques

Lecture 22 Ion Beam Techniques Lecture 22 Ion Beam Techniques Schroder: Chapter 11.3 1/44 Announcements Homework 6/6: Will be online on later today. Due Wednesday June 6th at 10:00am. I will return it at the final exam (14 th June).

More information

RNB at GANIL from SPIRAL to SPIRAL 2

RNB at GANIL from SPIRAL to SPIRAL 2 RNB at GANIL from SPIRAL to SPIRAL 2 GANIL/SPIRAL facility Recent highlights Future SPIRAL 2 facility Layout of the facility Scientific opportunities Letters of Intent for SPIRAL 2 See also talks of: Y.

More information

High efficiency 3 He neutron detector TETRA for DESIR.

High efficiency 3 He neutron detector TETRA for DESIR. DESIR workshop, May 2010 High efficiency 3 He neutron detector TETRA for DESIR. Yuri Penionzhkevich Joint Institute for Nuclear Research, Dubna Beta Decay of Exotic Nuclei: Goal to study Neutron emission

More information

Dependency of Gabor Lens Focusing Characteristics on Nonneutral Plasma Properties

Dependency of Gabor Lens Focusing Characteristics on Nonneutral Plasma Properties Dependency of Gabor Lens Focusing Characteristics on Nonneutral Plasma Properties Kathrin Schulte HIC for FAIR Workshop Riezlern, 14.03.2013 Outline 1. 2. 3. 4. 1. 1.1. Relevant to know about Gabor lenses...or

More information

LIGO workshop What Comes Next for LIGO May 7-8, 2015, Silver Spring, MD KAGRA KAGRA. Takaaki Kajita, ICRR, Univ. of Tokyo for the KAGRA collaboration

LIGO workshop What Comes Next for LIGO May 7-8, 2015, Silver Spring, MD KAGRA KAGRA. Takaaki Kajita, ICRR, Univ. of Tokyo for the KAGRA collaboration LIGO workshop What Comes Next for LIGO May 7-8, 2015, Silver Spring, MD KAGRA KAGRA Takaaki Kajita, ICRR, Univ. of Tokyo for the KAGRA collaboration Outline Introduction: Overview of KAGRA Status of the

More information

A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU

A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU IWAA2004, CERN, Geneva, 4-7 October 2004 A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU D. P. Sanderson, NSCL-MSU, 1 Cyclotron Lab, East Lansing, MI 48824, USA 1. INTRODUCTION The Rare Isotope Accelerator

More information

The FAIR Accelerator Facility

The FAIR Accelerator Facility The FAIR Accelerator Facility SIS300 existing GSI proton linac SIS18 UNILAC SIS100 HESR pbar target SuperFRS goals: higher intensity (low charge states) higher energy (high charge states) production of

More information

SPIRAL 2 Commissioning Status

SPIRAL 2 Commissioning Status SPIRAL 2 Commissioning Status Jean-Michel Lagniel (GANIL) for the SPIRAL 2 Team With thanks to the SPIRAL 2 team Page 1 Menu 1- SPIRAL 2 facility (Phase 1) presentation 2- Injector commisionning (Sources

More information

LHC Status and CERN s future plans. Lyn Evans

LHC Status and CERN s future plans. Lyn Evans LHC Status and CERN s future plans Lyn Evans Machine layout L. Evans EDMS document no. 859415 2 Cryodipole overview 1250 1000 Equivalent dipoles 750 500 250 0 01-Jan-01 01-Jan-02 01-Jan-03 01-Jan-04 01-Jan-05

More information

Experience on Coupling Correction in the ESRF electron storage ring

Experience on Coupling Correction in the ESRF electron storage ring Experience on Coupling Correction in the ESRF electron storage ring Laurent Farvacque & Andrea Franchi, on behalf of the Accelerator and Source Division Future Light Source workshop 2012 Jefferson Lab,

More information

DIANA A NEXT GENERATION DEEP UNDERGROUND ACCELERATOR FACILITY

DIANA A NEXT GENERATION DEEP UNDERGROUND ACCELERATOR FACILITY DIANA D. Leitner for the DIANA collaboration Michigan State University PAC 2011 New York, April 2011 A NEXT GENERATION DEEP UNDERGROUND ACCELERATOR FACILITY Outline of the Talk Why underground? Brief science

More information

TRIUMF The TITAN EBIT: Status & Research Plans

TRIUMF The TITAN EBIT: Status & Research Plans The TITAN EBIT: Status & Research Plans A. Lapierre, T. Brunner, C. Champagne, P. Delheij, and J. Dilling for the TITAN collaboration Canada s National Laboratory for Nuclear and Particle Physics, Vancouver,

More information

Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans. Upgrade Injector

Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans. Upgrade Injector Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans RI Beam Factory (1997-) Heavy Ion Beams (2007-) Low intensity Beam now (2008) (Goal: 1pμA U-ion beam) Upgrade Injector H. Okuno, et. al.

More information

Alex M Imai, Y. Ohta and A. Itoh Department of Nuclear Engineering, Kyoto University

Alex M Imai, Y. Ohta and A. Itoh Department of Nuclear Engineering, Kyoto University Alex M Imai, Y. Ohta and A. Itoh Department of Nuclear Engineering, Kyoto University Joint IAEA-NFRI Technical Meeting on Data Evaluation for Atomic, Molecular and Plasma-Material Interaction Processes

More information

Present ISOLDE facility Aims of HIE-ISOLDE upgrade First steps towards HIE-ISOLDE

Present ISOLDE facility Aims of HIE-ISOLDE upgrade First steps towards HIE-ISOLDE The HIE-ISOLDE ISOLDE Project Alexander Herlert, CERN Present ISOLDE facility Aims of HIE-ISOLDE upgrade First steps towards HIE-ISOLDE Hirschegg Workshop 2008 B. Jonson s talk at the last ISOLDE workshop

More information

DUBNA CYCLOTRONS STATUS AND PLANS

DUBNA CYCLOTRONS STATUS AND PLANS DUBNA CYCLOTRONS STATUS AND PLANS B.N. Gikal *, S.L. Bogomolov, S.N. Dmitriev, G.G. Gulbekyan, M.G. Itkis, V.V. Kalagin, Yu.Ts. Oganessian, V.A. Sokolov Joint Institute for Nuclear Research, Dubna, Moscow

More information

Mass Analyzers. mass measurement accuracy/reproducibility. % of ions allowed through the analyzer. Highest m/z that can be analyzed

Mass Analyzers. mass measurement accuracy/reproducibility. % of ions allowed through the analyzer. Highest m/z that can be analyzed Mass Analyzers Double Focusing Magnetic Sector Quadrupole Mass Filter Quadrupole Ion Trap Linear Time-of-Flight (TOF) Reflectron TOF Fourier Transform Ion Cyclotron Resonance (FT-ICR-MS) Mass Analyzers

More information

ATLAS Tile Calorimeter Calibration and Monitoring Systems

ATLAS Tile Calorimeter Calibration and Monitoring Systems ATLAS Calibration and Monitoring Systems June 19 th -23 rd, 217 Arely Cortes-Gonzalez (CERN) On behalf of the ATLAS Collaboration ATLAS Detector Trigger Hardware based L1 ~1kHz Software based HLT ~1kHz

More information

GANIL/SPIRAL2 The adventure continues

GANIL/SPIRAL2 The adventure continues GANIL/SPIRAL2 The adventure continues ISOL Smoking Gun-Discovery-Precision Look for new signals of simplicity in complexity in the new phase space of E* J T ESFRI list A. Navin Grand Accélérateur National

More information

LIST - Development at Mainz for ISOLDE

LIST - Development at Mainz for ISOLDE LIST - Development at Mainz for ISOLDE K. Wendt, T. Gottwald, Ch. Mattolat, C. Ohlert, F. Schwellnus, K. Wies & K. Blaum, Universität Mainz V. Fedoseyev, F. Österdahl, M. Menna, ISOLDE, CERN, Geneva Ch.

More information

ECOS-LINCE PROJECT: A highintensity light- and heavy-ion facility for nuclear structure and reactions

ECOS-LINCE PROJECT: A highintensity light- and heavy-ion facility for nuclear structure and reactions ECOS-LINCE PROJECT: A highintensity light- and heavy-ion facility for nuclear structure and reactions Ismael Martel & Muhsin N. Harakeh For the ECOS collaboration NuPECC Meeting, 10-11 October 2014; Edinburgh,

More information

Measurements of liquid xenon s response to low-energy particle interactions

Measurements of liquid xenon s response to low-energy particle interactions Measurements of liquid xenon s response to low-energy particle interactions Payam Pakarha Supervised by: Prof. L. Baudis May 5, 2013 1 / 37 Outline introduction Direct Dark Matter searches XENON experiment

More information

Progress of the interaction between e - and molecule in Fudan University

Progress of the interaction between e - and molecule in Fudan University Progress of the interaction between e - and molecule in Fudan University B. Wei, Z. Chen, X. Wang, R. Hutton, Y. Zou Fudan University, Shanghai The 2nd Research Coordination Meeting (RCM) of the CRP, 23-25

More information

Introduction to REX-ISOLDE concept and overview of (future) European projects

Introduction to REX-ISOLDE concept and overview of (future) European projects Introduction to REX-ISOLDE concept and overview of (future) European projects Thanks to: Y. Blumenfeld, P. Butler, M. Huyse, M. Lindroos, K. Riisager, P. Van Duppen Energetic Radioactive Beam Facilities

More information

Towards TASCA

Towards TASCA TASCA Workshop 2009 Towards SHIPTRAP @ TASCA Michael Block SHIPTRAP Physics Program High-Precision Mass Measurements Trap-Assisted Nuclear Spectroscopy In-Trap Nuclear Spectroscopy Laser Spectroscopy Chemistry?

More information

In-Flight Fragment Separator and ISOL Cyclotron for RISP

In-Flight Fragment Separator and ISOL Cyclotron for RISP In-Flight Fragment Separator and ISOL Cyclotron for RISP Jong-Won Kim Daejeon, May 9, 2012 Scope of Presentation in the RI Science Project Area of the IF Separator and ISOL cyclotron Two kinds of beam

More information

Low slice emittance preservation during bunch compression

Low slice emittance preservation during bunch compression Low slice emittance preservation during bunch compression S. Bettoni M. Aiba, B. Beutner, M. Pedrozzi, E. Prat, S. Reiche, T. Schietinger Outline. Introduction. Experimental studies a. Measurement procedure

More information

Laser spectroscopy and resonant laser ionization atomic tools to probe the nuclear landscape. Iain Moore University of Jyväskylä, Finland

Laser spectroscopy and resonant laser ionization atomic tools to probe the nuclear landscape. Iain Moore University of Jyväskylä, Finland Laser spectroscopy and resonant laser ionization atomic tools to probe the nuclear landscape Iain Moore University of Jyväskylä, Finland Nordic Conference on Nuclear Physics 2011 Outline Introduction to

More information

Development of Large Scale Optimization Tools for Beam Tracking Codes

Development of Large Scale Optimization Tools for Beam Tracking Codes Development of Large Scale Optimization Tools for Beam Tracking Codes 42 nd ICFA Advanced Beam Dynamics Workshop: High-Intensity, High-Brightness Hadron Beams HB-2008, August 25-29, 2008 Nashville, Tennessee,

More information

NSCL and Physics and Astronomy Department, Michigan State University Joint Institute for Nuclear Astrophysics

NSCL and Physics and Astronomy Department, Michigan State University Joint Institute for Nuclear Astrophysics National Superconducting Cyclotron Laboratory An overview Ana D. Becerril NSCL and Physics and Astronomy Department, Michigan State University Joint Institute for Nuclear Astrophysics University of North

More information

The accelerators at LNS - INFN and diagnostics aspects of the radioactive beams

The accelerators at LNS - INFN and diagnostics aspects of the radioactive beams The accelerators at LNS - INFN and diagnostics aspects of the radioactive beams L. Cosentino, P. Finocchiaro, A. Pappalardo LNS INFN Catania J. Harasimowicz Univ. of Liverpool Cockroft Institute LNS INFN

More information

G SI Darmstadt. TASCA TransActinide Separator and Chemistry Apparatus

G SI Darmstadt. TASCA TransActinide Separator and Chemistry Apparatus TransActinide Separator and Chemistry Apparatus 1st Workshop on Recoil Separator for Superheavy Element Chemistry, March 2002, GSI ==> community formed (> 70 participants, 10 countries, > 20 institutes)

More information

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI) Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI), 2003, A dedicated proton accelerator for 1p-physics at the future GSI Demands facilities for

More information

Ion Polarization in RHIC/eRHIC

Ion Polarization in RHIC/eRHIC Ion Polarization in RHIC/eRHIC M. Bai, W. MacKay, V. Ptitsyn, T. Roser, A. Zelenski Polarized Ion Sources (reporting for Anatoly Zelenski) Polarized proton beams in RHIC/eRHIC Polarized He3 for erhic (reporting

More information

Recent SPIRAL 2 News (1)

Recent SPIRAL 2 News (1) Recent SPIRAL 2 News (1) Call for tender for the construction of SPIRAL 2 buildings of Phase 1 (LINAC+AEL) : 3 candidates selected Drafts produced by the 3 companies will be evaluated in June 2008 -> selection

More information

PIP-II Injector Test s Low Energy Beam Transport: Commissioning and Selected Measurements

PIP-II Injector Test s Low Energy Beam Transport: Commissioning and Selected Measurements PIP-II Injector Test s Low Energy Beam Transport: Commissioning and Selected Measurements A. Shemyakin 1, M. Alvarez 1, R. Andrews 1, J.-P. Carneiro 1, A. Chen 1, R. D Arcy 2, B. Hanna 1, L. Prost 1, V.

More information

Fission Fragment characterization with FALSTAFF at NFS

Fission Fragment characterization with FALSTAFF at NFS EPJ Web of Conferences 42, 01001 (2013) DOI: 10.1051/ epjconf/ 20134201001 C Owned by the authors, published by EDP Sciences, 2013 Fission characterization with FALSTAFF at NFS D. Doré 1, F. Farget 2,

More information

CHAPTER VI RIB SOURCES

CHAPTER VI RIB SOURCES CHAPTER VI RIB SOURCES 6.1 General criteria for target and ion-sources The ion-sources dedicated to the production of Radioactive Ion Beams (RIB) have to be highly efficient, selective (to reduce the isobar

More information

Overview of the EURISOL post-accelerator design and studies

Overview of the EURISOL post-accelerator design and studies Overview of the EURISOL post-accelerator design and studies Patrick BERTRAND On behalf of the TASK 6 team First EURISOL User Group Workshop January 28, Firenze 1 Task 6 Team : EURISOL Post Accelerator

More information

1.1 Atomic structure

1.1 Atomic structure 1.1 Atomic structure History of the atom The model of the atom has changed as our observations of its behavior and properties have increased. A model is used to explain observations. The model changes

More information

DEVELOPMENT OF LARGE SCALE OPTIMIZATION TOOLS FOR BEAM TRACKING CODES*

DEVELOPMENT OF LARGE SCALE OPTIMIZATION TOOLS FOR BEAM TRACKING CODES* Proceedings of Hadron Beam 8, Nashville, Tennessee, USA DEVELOPMENT OF LARGE SCALE OPTIMIZATION TOOLS FOR BEAM TRACKING CODES* B. Mustapha # and P. N. Ostroumov Argonne National Laboratory, 97 S. Cass

More information

The ACTAR project at SPES Status and perspectives

The ACTAR project at SPES Status and perspectives The ACTAR project at SPES Status and perspectives Riccardo Raabe Instituut voor Kern- en Stralingsfysica, KU Leuven SECOND SPES INTERNATIONAL WORKSHOP The active target concept Time-Projection Chamber

More information

BALKAN PHYSICS LETTERS Bogazici University Press 15 November 2016 BPL, 24, , pp , (2016)

BALKAN PHYSICS LETTERS Bogazici University Press 15 November 2016 BPL, 24, , pp , (2016) 139 BALKAN PHYSICS LETTERS Bogazici University Press 15 November 2016 BPL, 24, 241016, pp. 139 145, (2016) VACUUM STUDIES ON ELECTRON GUN AND INJECTOR LINE OF TARLA FACILITY E. COŞGUN, E.P. DEMİRCİ, Ö.

More information

Diagnostics Requirements for the ARIEL Low Energy Beam Transport

Diagnostics Requirements for the ARIEL Low Energy Beam Transport Document-121991 Diagnostics Requirements for the ARIEL Low Energy Beam Transport Document Type: Requirement Document Release: 02 Release Date: 2017-03-22 Authors: S. Saminathan, M. Marchetto, C. Barquest

More information

The KATRIN experiment

The KATRIN experiment The KATRIN experiment Status and SDS comissioning Philipp Chung-On Ranitzsch for the KATRIN collaboration Insitute for Nuclear Physics, Westfälische Wilhelms-Universität, Münster The KATRIN experiment

More information

BEAM DYNAMICS ISSUES IN THE SNS LINAC

BEAM DYNAMICS ISSUES IN THE SNS LINAC BEAM DYNAMICS ISSUES IN THE SNS LINAC A. Shishlo # on behalf of the SNS Accelerator Group, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract A review of the Spallation Neutron Source (SNS) linac beam dynamics

More information

Recycling Ring. on behalf of the Recycling Ring Design Group (Quasar, Musashi & Ullrich groups) TCP 2010 Conference 12 April 2010

Recycling Ring. on behalf of the Recycling Ring Design Group (Quasar, Musashi & Ullrich groups) TCP 2010 Conference 12 April 2010 Electrostatic Low-Energy Antiproton Recycling Ring Michele Siggel-King on behalf of the Recycling Ring Design Group (Quasar, Musashi & Ullrich groups) 1 Now Motivation Low-Energy Antiproton Research CERN

More information

DARWIN: dark matter WIMP search with noble liquids

DARWIN: dark matter WIMP search with noble liquids DARWIN: dark matter WIMP search with noble liquids Physik Institut, University of Zurich E-mail: laura.baudis@physik.uzh.ch DARWIN (DARk matter WImp search with Noble liquids) is an R&D and design study

More information

Gamma Spectroscopy at IPN Orsay Present and Future

Gamma Spectroscopy at IPN Orsay Present and Future Gamma Spectroscopy at IPN Orsay Present and Future 1. The TNA Tandem-ALTO facility at Orsay 2. The ORGAM array 3. The ORGAM campaigns: 2009-2011 4. Near future ORGAM2 5. Perspectives ORGAM3 EGAN 2011 Workshop

More information

GSI. Overview of last years activities: technical developments and investigations mass measurements. TRAPSPEC related tasks and issues

GSI. Overview of last years activities: technical developments and investigations mass measurements. TRAPSPEC related tasks and issues SHIPTRAP @ GSI Overview of last years activities: technical developments and investigations mass measurements TRAPSPEC related tasks and issues Conclusion and outlook Frank Herfurth for the SHIPTRAP collaboration

More information

THE ACCULINNA AND ACCULINNA-2 RADIOACTIVE ION BEAM FACILITY AT DUBNA: STATUS AND PERSPECTIVES

THE ACCULINNA AND ACCULINNA-2 RADIOACTIVE ION BEAM FACILITY AT DUBNA: STATUS AND PERSPECTIVES THE ACCULINNA AND ACCULINNA-2 RADIOACTIVE ION BEAM FACILITY AT DUBNA: STATUS AND PERSPECTIVES Grzegorz Kamiński for the ACCULINNA group FLNR, JINR, DUBNA International Nuclear Physics Conference (INPC2016)

More information

Beam Dynamics and Emittance Growth

Beam Dynamics and Emittance Growth 2010/03/09 Beam Dynamics and Emittance Growth Christoph Wiesner 1. Solenoidal Focusing and Emittance Growth 2. Beam Deflection and Emittance Growth 3. Time-dependent Kicker Fields, Electron Effects and

More information