'l:l1w m:q;n: government of India. ~~gtf'~ Central Electricity Authority. ~m~~

Size: px
Start display at page:

Download "'l:l1w m:q;n: government of India. ~~gtf'~ Central Electricity Authority. ~m~~"

Transcription

1 'l:l1w m:q;n: government of India ~~gtf'~ Central Electricity Authority ~m~~ ~~I Western Regional Power Committee IS/ISO: q;:fi-3, t:;i1.~ Wr, 3iirfr(' ), ~ F-3, MIDC Area, Andheri (East), Mumbai ~ Phone: , ; ; ~ Fax: Website: prc-wrpc@nic.il!protectionwrpc@tgail.com NO. WRPC/Protection/2017/ To, - _ B (2 0 ~~ Date: or Executive Director, WR-I, NTPC Ltd., WR HQ-I, Mumbai Fax Executive Director, (WR-I), PGCIL, Sampriti Nagar, Nagpur , Fax ~ GM(CTU-Plg.), PGCIL, Saudamini Plot No.2, Sector-29, Gurgaon Fax GM, WRLDC, POSOCO Mumbai. 5. ChiefEngineer(SLDC), MSETCL, Airoli. Sub: SPS for evacuation of power from Mouda STPS(Unit#2 of Stage-II). Sir, Please find enclosed herewith record notes of the meeting on review of SPS for evacu tion of power from Mouda STPS,held on at WRPC Mumbai/or further necessary action. Enc!': as above. J.K.Rathod, OLJ - J Engineer (P) 0 j I ")

2 'lffi(l "fficfir ~ qovernment of India ~ ~~~ Central Electricity Authority mq-q m ~ ~ ~~m g 9001 : 2008 Western Regional Power Committee ISO: 9001:2008 t:;ql-3, ~,~~, ~ (~), ~ - 93 F-3, MIDC Area, Andheri (Easfc), Mumbai -93 ~ Phone: ; 195 ; 196 ~ Fax: Website: prc-wrpc@nic.in Wrrat 1. ChI;6chl:ft ~~Jq), qaj-i, QCitl41ti'>l ~., qaj ~.-I, tfic:r:r ChI;6Cf)I:ft ~~Jq) (qaj-i), 41\J11ti\3IT~'~, frcr1r1 CldR, , tfic:r:r Ji >lqj~(~-~.) cl'1\j11til~, ~igfr ~ Cf. 2 ~-29, "!SJIICl , m Ji >IQJ~, qaj~i~~c;-a, q)mch), ~. 5. ~ ~ (U~I~~~), Ji >FUfclQI~ch~~., ~ru<;fr Ji('»C\4, ~ q:r c)l m~, mar Q'Htlci'JQ'H ~ ~ ~ ~ Q'H41Q'H c1n"~ c:ntqah~'h~ffi, ~ at 31141Gl<"l~ c)l ~ ~ 3lm~ ~~I I tr~ ChltClI$ ~

3

4

5

6

7

8

9 Record notes of the meeting on Review of SPS for evacuation of power from Mouda STPS held on at WRPC Mumbai A meeting on review of SPS for evacuation of power from Mouda STPS was held at WRPC Mumbai on The list of participants is enclosed at Annex Shri Satyanarayan S., SE(C & O), WRPC welcomed the participants. He welcomed Shri A. Balan Member Secretary WRPC and requested him to chair the meeting. He informed that the SPS for evacuation of power on declaration of Commercial Operation (CoD) of NTPC Mouda Stage-2 Unit No.1 (Unit No.1 capacity 660MW and the total Installed capacity at NTPC Mouda after CoD of Unit No. 1 of Stage -2 became 1660MW), through 400kV Mouda-Wardha D/c, was finalized in the meeting held on 01 st Feb.2017 at Diu (enclosed at Annex-2). 2. NTPC vide letter dated (copy enclosed at Annex-3), have informed that the 2 nd Unit (660MW) of Mouda Stage-2 have been successfully commissioned and they are in the advance stage for trial run operation of the unit prior to CoD of the Unit. 3. The total Installed Capacity after CoD of 2 nd Unit of Stage-2 at NTPC Mouda would become 2320MW and the ex-bus capacity would be around 2120MW. The ATS for Mauda State-2 evacuation i.e 400kV Mouda-Betul D/c lines are expected to be commissioned by June 2017 end. Since there is a restriction to inject infirm power from 2 nd unit of Mouda Stage-2 during testing including full load testing and trial run of this unit, the trial run and the CoD of this unit may be affected. 4. In response to the above NTPC letter, CTU vide letter dated (Annex-4) have intimated that system studies were carried out by them for evacuation of power from Mouda STPS (2x500+2x660MW) through the existing 400kV Mouda-Wardha D/c(quad) line(ats for Mouda Stage-1). It has been observed that with evacuation of about 2120 MW, the line loadings are generally in order under normal conditions. Further based on the stability studies, it has been observed that the system remains stable even under the outage of one circuit of 400kV Mouda-Wardha D/c line after a line fault close to the bus is cleared in 100ms with opening of faulted line.

10 5. In view of the CTU letter following facts and issues were discussed; a) PGCIL representative stated that the ATS for Mouda Stage-II, i.e. 400kV Mouda-Betul D/c lines would be commissioned in July b) The existing evacuation system i.e. 400kV Mouda-Wardha D/c (quad) is in service for more than 2 years and the line length is 124km/circuit. The maximum conductor design temperature is 75 degree Centigrade. The thermal loading limit of the single ckt line is 1748MW, as per CEA Transmission Planning Criteria document. c) The CTR at Mouda end has been changed to 3000/1A. d) As per the stability studies carried out by CTU, the system remains stable even under the outage of one circuit of 400kV Mouda-Wardha D/c line, after a line fault close to the bus is cleared in 100ms with opening of faulted line. e) The CTU study suggests that there is no need of instantaneous tripping of the generating units, since even after a fault on one of the 400kV Mouda-Wardha circuits, the system remains stable if the line trips and isolates the fault within 100msec. The thermal loading limit of the single circuit is 1748MW and therefore it can carry the full dispatch of Mouda STPS for shorter periods. f) Therefore there is no need of instantaneous tripping of generating units at Mouda STPS. However NTPC is required to back down the generation to a tune of MW immediately through coal mill tripping. 6. Till the start of the trial run of the 2 nd Unit of Stage-2, the SPS formulated on (enclosed at Annex-2) would continue. 7. The following SPS scheme shall be implemented by NTPC at Mouda STS before the commencement of the trial run of the 2 nd Unit of Stage-2. If felt necessary the same would be reviewed after commissioning of the 400kV Mouda-Betul D/c lines; a) Under normal conditions when both the circuits are in service there is no backing down required. b) If the Ex-bus generation is more than 1500MW (the SPS would be active) and one of the 400kV kv Mouda-Wardha line trips, the Ex-bus generation at Mouda should be restricted to 1500MW immediately by backing down the quantum over and above 1500MW before tripping of the line. For simplicity if the Ex-bus generation is more than 1500MW and one of the

11 400kV kv Mouda-Wardha line trips, then automatic backing down of around MW should be done immediately through coal mill tripping (NTPC may take an appropriate call of either immediate automatic back down of generation or trip the unit, whichever is convenient to them). The loss of line sensing logic to be implemented would be fulfillment of either of the 400kV Mouda-Wardha breaker tripping of any line or the flow on the 400 kv Mouda-Wardha tripped line is less than 100MW. After the automatic action of the SPS, WRLDC would advice NTPC further action required to control the Ex-bus generation at Mouda depending on the real time system condition. 8. The SPS for Wardha gate flow already implemented would remain unchanged. The above SPS would be implemented by NTPC at Mauda before commencement of the trial run operation of the 2 nd unit of Stage-2 of Mouda STPS. The same shall be reviewed, if felt necessary after commissioning of the 400kV Mouda-Betul D/c lines. 9. In view of extreme loading of the healthy circuit of 400kV Mouda- Wardha for a short duration after tripping of other faulty 400kV Mouda-Wardha circuit, NTPC and POWERGRID shall ensure that there is no load encroachment in Z-3 settings of Main-I & Main-II line protections at both ends of the 400kV Mouda-Wardha D/c. The meeting ended with the thanks to the chair. *********************

Performance Evaluation and Review of System Protection Scheme Design with the help of Synchrophasor Measurements

Performance Evaluation and Review of System Protection Scheme Design with the help of Synchrophasor Measurements Performance Evaluation and Review of System Protection Scheme Design with the help of Synchrophasor Measurements P. Mukhopadhyay V. Pandey Rajkumar Anumasula Chandan Kumar Sunil Patil Srinivas Chitturi

More information

Agenda for Long Term Access NVVNL Solar Power Projects

Agenda for Long Term Access NVVNL Solar Power Projects Agenda for Long Term Access NVVNL Solar Power Projects NTPC Vidyut Vyapar Nigam Ltd. (NVVNL) vide letter dated 04/11/2014 had applied for Long term Access (LTA) for transfer of 150MW power i.e. 100MW from

More information

Agenda for the meeting to discuss Revision of LTA quantum in respect of Kudgi STPS

Agenda for the meeting to discuss Revision of LTA quantum in respect of Kudgi STPS Agenda for the meeting to discuss Revision of LTA quantum in respect of Kudgi STPS 1. LTA pertaining to Kudgi STPS a. KSEB vide letter dated 25-09-2017 (ANNEXURE A) had stated that with installed capacity

More information

Case Study on Fault Analysis Using PMU

Case Study on Fault Analysis Using PMU Case Study on Fault Analysis Using PMU Prithwish Mukhopadhyay General Manager, WRLDC prithwish.mukhopadhyay@posoco.in Abhimanyu Gartia Deputy General Manager, WRLDC agartia@posoco.in Pushpa Seshadri Chief

More information

C60N circuit breakers0 B, C and D curves IEC 60898: 6000 A, IEC : 10 ka

C60N circuit breakers0 B, C and D curves IEC 60898: 6000 A, IEC : 10 ka C0N circuit breakers0 B, C and s IEC 0898: 000 A, IEC 097-: 0 ka Function b The circuit-breakers combine the following functions: v protection of circuits against short-circuit currents v protection of

More information

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s PJM Interconnection 2750 Monroe Boulevard Norristown, PA 19403-2497 Steven R. Pincus Associate General Counsel 610.666.4370 fax 610.666.8211 steven.pincus@pjm.com July 31, 2017 Honorable Kimberly D. Bose

More information

NPCIL ISGS. Units Units Capacity in MW Stage-I&II Stage-III Stage- II Stage- II 1&2 3&4 Unit-1. Stage -II

NPCIL ISGS. Units Units Capacity in MW Stage-I&II Stage-III Stage- II Stage- II 1&2 3&4 Unit-1. Stage -II ANNEXURE ( Page 1 of 3) REVISED PERCENTAGE ALLOCATION ( FIRM+UNALLOCATED ) FROM ISGS OF SR w.e.f.26.02.2015 From 18:00 hrs to 22:00 hrs. NTPC NLC NTECL NPCIL ISGS Ramagundam Talcher Simhadri TPS-II @ TPS-

More information

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF

More information

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Section 5 TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Rev. 5/10/2010 1 Section 5 Form for Event ID and Event Type Number Data TO s

More information

Module 6 : Preventive, Emergency and Restorative Control. Lecture 27 : Normal and Alert State in a Power System. Objectives

Module 6 : Preventive, Emergency and Restorative Control. Lecture 27 : Normal and Alert State in a Power System. Objectives Module 6 : Preventive, Emergency and Restorative Control Lecture 27 : Normal and Alert State in a Power System Objectives In this lecture you will learn the following Different states in a power system

More information

Alectra Utilities List of Station Capacity

Alectra Utilities List of Station Capacity lectra Utilities List of Station Capacity s per Distribution System Code this list represents the llocated Capacity on stations owned by lectra Utilities (formerly PowerStream) as of July 1st, 2018. llocated

More information

'+fl"«phcfli «Government of India ~JOj?tI~4 Ministry of Power. ~~~~ Northern Regional Power Committee

'+fl«phcfli «Government of India ~JOj?tI~4 Ministry of Power. ~~~~ Northern Regional Power Committee '+fl"«phcfli «Government of India ~JOj?tI~4 Ministry of Power ~~~~ Northern Regional Power Committee No: NRPCIOPRJI03/02/201S13179-3204 Dated:01.03.201S ('Q'1f J!. ~. tft. flr~') ttch-4 ~ 18-n:,"Tth- ~

More information

System Impact Assessment Addendum #2 Greenfield & St. Clair Energy Centres

System Impact Assessment Addendum #2 Greenfield & St. Clair Energy Centres IESO_REP_0292 System Impact Assessment Addendum #2 Greenfield & St. lair Energy entres onnection Assessment & Approval Process Issue 3.0 Greenfield Energy entre AA I 2004-167 Applicant: Greenfield Energy

More information

C120N circuit-breakers B, C and D curves EN 60898/EN 61009: IEC : 10 ka

C120N circuit-breakers B, C and D curves EN 60898/EN 61009: IEC : 10 ka C0N circuit-breakers B, C and D curves EN 09/EN 009: 0000 - IEC 097-: 0 ka function # protection of cables against overloads and short-circuits in final distribution # manual control and isolation # earth

More information

THE DIMENSIONING OF ELECTRICAL CONDUCTORS FOR USE IN "PANEL BOARDS" ADDRESSED TO HAZARDOUS AREAS - PART THREE

THE DIMENSIONING OF ELECTRICAL CONDUCTORS FOR USE IN PANEL BOARDS ADDRESSED TO HAZARDOUS AREAS - PART THREE July 04 THE DIMENSIONING OF ELECTRICAL CONDUCTORS FOR USE IN "PANEL BOARDS" ADDRESSED TO HAZARDOUS AREAS - PART THREE In this third part. we want to speak about how important is the correct sizing of the

More information

THIRD GENERATION SYSTEM PROTECTION SCHEME PROJECT FOR ZEYA HYDRO POWER PLANT

THIRD GENERATION SYSTEM PROTECTION SCHEME PROJECT FOR ZEYA HYDRO POWER PLANT THIRD GENERATION SYSTEM PROTECTION SCHEME PROJECT FOR ZEYA HYDRO POWER PLANT Andrey GROBOVOY Power System Emergency Control Laboratory Ltd. - Russia andrey.grobovoy@ieee.org Elena DEDUKHINA Zeya Hydro

More information

5SJ4...-.HG Circuit Breakers to IEC and UL 489

5SJ4...-.HG Circuit Breakers to IEC and UL 489 Siemens AG 009 5SJ...-.HG Circuit Breakers to IEC and UL 89 BETA Low-Voltage Circuit Protection Compliance with industry standards is a must in today's manufacturing environment. Worldwide acceptance is

More information

Conductor Requirements for Superconducting Fault Current Limiters

Conductor Requirements for Superconducting Fault Current Limiters superior performance. powerful technology. Conductor Requirements for Superconducting Current Limiters Chuck Weber, Director HTS Applications Coated Conductors in Applications 2008 Houston, Texas - December

More information

Chapter 2. Planning Criteria. Turaj Amraee. Fall 2012 K.N.Toosi University of Technology

Chapter 2. Planning Criteria. Turaj Amraee. Fall 2012 K.N.Toosi University of Technology Chapter 2 Planning Criteria By Turaj Amraee Fall 2012 K.N.Toosi University of Technology Outline 1- Introduction 2- System Adequacy and Security 3- Planning Purposes 4- Planning Standards 5- Reliability

More information

SUMMARY. Executive Summary: NAVAREA VIII provides the paper of MSI Self Assessment for CPRNW 10

SUMMARY. Executive Summary: NAVAREA VIII provides the paper of MSI Self Assessment for CPRNW 10 CPRNW Meeting 10 Agenda Item 3.2.1 CPRNW10/3/2/VIII MSI Self Assessment - NAVAREA VIII Submitted by INDIA SUMMARY Executive Summary: NAVAREA VIII provides the paper of MSI Self Assessment for CPRNW 10

More information

16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots. David Mueller

16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots. David Mueller 1 16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots David Mueller 2 Transmission System Harmonics Studies In the US, the closure of older coal fired plants is a driver

More information

URTDSM Initiative in India and Controlled Islanding using PMU Measurements

URTDSM Initiative in India and Controlled Islanding using PMU Measurements URTDSM Initiative in India and Controlled Islanding using PMU Measurements Akhil Raj Gopal Gajjar Meenal Chougule Narayanan Rajagopal Prashant Navalkar Rajeev Gajbhiye S. A. Soman PowerAnser Labs, IIT

More information

Current protection I 2 t long-time protection

Current protection I 2 t long-time protection I 2 t long-time protection The long-time protection function protects cables against overloads. This function is based on true rms measurements. It is possible to select either I 2 t long-time protection

More information

SOUTHERN REGIONAL POWER COMMITTEE

SOUTHERN REGIONAL POWER COMMITTEE SOUTHERN REGIONAL POWER COMMITTEE BENGALURU Minutes of the Meeting of Protection System Analysis Group - 14 (PSAG-14) held on 16 th December, 2015 at MAPS, Kalpakkam a) The Protection System Analysis Group

More information

Power System Security. S. Chakrabarti

Power System Security. S. Chakrabarti Power System Security S. Chakrabarti Outline Introduction Major components of security assessment On-line security assessment Tools for contingency analysis DC power flow Linear sensitivity factors Line

More information

16 Appendix 16 Electrical Research Association Report

16 Appendix 16 Electrical Research Association Report Guide to the Wiring Regulations 16 Appendix 16 Electrical Research Association Report (ERA) report on armoured cables with external CPCs The attached report was commissioned by the ECA and is copyright

More information

Outage Coordination and Business Practices

Outage Coordination and Business Practices Outage Coordination and Business Practices 1 2007 Objectives What drove the need for developing a planning/coordination process. Why outage planning/coordination is crucial and important. Determining what

More information

Request Ensure that this Instruction Manual is delivered to the end users and the maintenance manager.

Request Ensure that this Instruction Manual is delivered to the end users and the maintenance manager. Request Ensure that this Instruction Manual is delivered to the end users and the maintenance manager. 1 -A - Introduction - Thank for your purchasing MITSUBISHI ELECTRIC MELPRO TM D Series Digital Protection

More information

Simulating a Power System

Simulating a Power System Simulating a Power System Presented by Prof. Tyrone Fernando School of Electrical and Electronic Engineering (EECE), University of Western Australia (UWA) 1. Motivations In an actual power system, it is

More information

MCB NB1-63H Miniature Circuit Breaker

MCB NB1-63H Miniature Circuit Breaker NB-H Miniature Circuit Breaker. General. Function protection of circuits against short-circuit currents, protection of circuits against overload currents, switch, isolation, NB-H circuit-breakers are used

More information

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. January 2018

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. January 2018 भ रत सरक र GOVERNMENT OF INDIA उज म लय MINISTRY OF POWER क य व त धकरण CENTRAL ELECTRICITY AUTHORITY द ण य व त स म त SOUTHERN REGIONAL POWER COMMITTEE य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT January

More information

SWITCHGEAR: design concepts, testing, standards and safety of persons and installations

SWITCHGEAR: design concepts, testing, standards and safety of persons and installations MEDIUM AND LOW VOLTAGE Part 1 SWITCHGEAR: design concepts, testing, standards and safety of persons and installations Presented by: Sergio Feitoza Costa COGNITOR Consultancy, R&D & training Ltd www.cognitor.com.br

More information

Chapter 8: Unsymmetrical Faults

Chapter 8: Unsymmetrical Faults Chapter 8: Unsymmetrical Faults Introduction The sequence circuits and the sequence networks developed in the previous chapter will now be used for finding out fault current during unsymmetrical faults.

More information

GWRL:GTFL:2018 September 12, 2018

GWRL:GTFL:2018 September 12, 2018 ~ " GARWARE TECHNICAL FIBRES GWRL:GTFL:2018 September 12, 2018 BSE Limited Corporate Relationship Department, New Trading Ring, Rotunda Building, P. J. Towers, Dalal Street, Fort, Mumbai 400001. (Company

More information

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF

More information

1 Unified Power Flow Controller (UPFC)

1 Unified Power Flow Controller (UPFC) Power flow control with UPFC Rusejla Sadikovic Internal report 1 Unified Power Flow Controller (UPFC) The UPFC can provide simultaneous control of all basic power system parameters ( transmission voltage,

More information

Role of Synchronized Measurements In Operation of Smart Grids

Role of Synchronized Measurements In Operation of Smart Grids Role of Synchronized Measurements In Operation of Smart Grids Ali Abur Electrical and Computer Engineering Department Northeastern University Boston, Massachusetts Boston University CISE Seminar November

More information

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9 PUB NLH 1 Page 1 of 1 Q. Provide Hydro s list of outage cause codes and indicate how troublemen are managed and trained to properly use the codes. Explain the method used to report outage causes. A. Hydro

More information

SCHEDULING ERROR 3 AND 4 JULY 2011

SCHEDULING ERROR 3 AND 4 JULY 2011 PREPARED BY: Electricity Market Performance DATE: 30 November 2011 FINAL Disclaimer Purpose This report has been prepared by the Australian Energy Market Operator Limited (AEMO) for the purpose of detailing

More information

Technical Requirements. Version No. 1.0 Effective Date 10/1/2008

Technical Requirements. Version No. 1.0 Effective Date 10/1/2008 PURPOSE This document applies to wind Generators and describes technical standards that such wind Generators must satisfy to be qualified as a Participating Intermittent Resource (PIR) under the CAISO

More information

POWER SEMICONDUCTOR BASED ELECTRIC DRIVES

POWER SEMICONDUCTOR BASED ELECTRIC DRIVES POWER SEMICONDUCT BASED ELECTRIC DRIVES [Time: 3 Hrs] [Max. Marks: 80] Instructions: Solve any six questions from Q.No (1 or 2), Q.No (3 or 4), Q.No (5 or 6), Q.No (7 or 8), Q.No (9 or 10), Q.No (11 or

More information

ISO 7730 INTERNATIONAL STANDARD

ISO 7730 INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 7730 Third edition 2005-11-15 Ergonomics of the thermal environment Analytical determination and interpretation of thermal comfort using calculation of the PMV and PPD indices

More information

VKES. Contents. Page 2 No 213, 13th Main RBI Layout JP Nagar 7th Phase, Bangalore Vidyuth Kanti Engineering Services

VKES. Contents. Page 2 No 213, 13th Main RBI Layout JP Nagar 7th Phase, Bangalore Vidyuth Kanti Engineering Services Contents What is earthing... 4 Why do we do earthing... 4 What is the Scope of this guideline... 4 How to protect a person in a substation against electrical shock... 4 What happens during a fault... 4

More information

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 Peterborough Distribution Inc. 1867 Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 November 15, 2017 Ontario Energy Board PO Box 2319 27 th Floor, 2300 Yonge St Toronto ON M4P 1E4

More information

Public Disclosure Copy

Public Disclosure Copy SOUTH ASIA South Asia Energy and Mining Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 01-Jun-2015 ISR18947 Implementing Agencies: Key Dates Key Project Dates Board Approval

More information

February Industry Communique

February Industry Communique February 2019 Industry Communique Important notice PURPOSE This communique is to inform on the planned outages required in the North-West Victorian and South-West New South Wales transmission network and

More information

Discrimination of the direct current circuit breakers

Discrimination of the direct current circuit breakers Discrimination of the direct current circuit s DB124247 Continuity of service of the solutions Discrimination of the direct current protection devices Discrimination is a key element that must be taken

More information

POWER SYSTEM STABILITY

POWER SYSTEM STABILITY LESSON SUMMARY-1:- POWER SYSTEM STABILITY 1. Introduction 2. Classification of Power System Stability 3. Dynamic Equation of Synchronous Machine Power system stability involves the study of the dynamics

More information

Faults on Electrical System. A Research

Faults on Electrical System. A Research Faults on Electrical System A Research Presented to Electrical Engineering School of Engineering and Architecture Mindanao University of Science and Technology Cagayan de Oro City In partial fulfilment

More information

Transient Stability Assessment of Synchronous Generator in Power System with High-Penetration Photovoltaics (Part 2)

Transient Stability Assessment of Synchronous Generator in Power System with High-Penetration Photovoltaics (Part 2) Journal of Mechanics Engineering and Automation 5 (2015) 401-406 doi: 10.17265/2159-5275/2015.07.003 D DAVID PUBLISHING Transient Stability Assessment of Synchronous Generator in Power System with High-Penetration

More information

Phone : ; FAX : ; ; web site:

Phone : ; FAX : ;   ; web site: WEBSITE भ त स क क न द र य व द य त प र व क ण दवक षण क ष त र य व द य त सव वत 29, स क सस क र स ड ब गल - 560 009 Government of India Central Electricity Authority Southern Regional Power Committee 29, Race

More information

Quad 2-input NAND gate

Quad 2-input NAND gate Quad 2-input NAND gate BU40B / BU40BF / BU40BF The BU40B, BU40BF, and BU40BF are dual-input positive logic NAND gates. Four circuits are contained on a single chip. An inverter-based buffer has been added

More information

Grid Issues and Challenges Addressed by High Temperature Superconductor (HTS) Technology

Grid Issues and Challenges Addressed by High Temperature Superconductor (HTS) Technology CIGRÉ US National Committee 21, rue d Artois, F-75008 PARIS Grid of the Future Symposium http : //www.cigre.org Kansas City, October 28-30, 2012 Grid Issues and Challenges Addressed by High Temperature

More information

Electrical installation solutions for buildings Technical details Arc Fault Detection Devices

Electrical installation solutions for buildings Technical details Arc Fault Detection Devices /1 Electrical installation solutions for buildings Technical details Arc Fault Detection Devices Index Functions and classification criteria for AFDD /2 Power loss, derating and performance in altitude

More information

EA-10/14. EA Guidelines on the Calibration of Static Torque Measuring Devices. Publication Reference PURPOSE

EA-10/14. EA Guidelines on the Calibration of Static Torque Measuring Devices. Publication Reference PURPOSE Publication Reference EA-10/14 EA Guidelines on the Calibration of Static Torque Measuring Devices PURPOSE This document has been produced by EA to improve harmonisation in determining the calibration

More information

Economic Operation of Power Systems

Economic Operation of Power Systems Economic Operation of Power Systems Section I: Economic Operation Of Power System Economic Distribution of Loads between the Units of a Plant Generating Limits Economic Sharing of Loads between Different

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 8426 Second edition 2008-02-01 Hydraulic fluid power Positive displacement pumps and motors Determination of derived capacity Transmissions hydrauliques Pompes et moteurs volumétriques

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 17322 First edition 2015-06-01 Fertilizers and soil conditioners Analytical methods for Sulfur Coated Urea (SCU) Matières fertilisantes Méthodes analytiques pour l urée enrobée

More information

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail sldcmpjbp@gmail.com Corporate office:

More information

LUSTRON V3 LUSTROUS GREEN TECHNOLOGY OF LIGHTINGS LUSTRON V3. High Power Solid-State LED Light Source

LUSTRON V3 LUSTROUS GREEN TECHNOLOGY OF LIGHTINGS LUSTRON V3. High Power Solid-State LED Light Source Technical Datasheet LS45 High Power Solid-State LED Light Source Introduction For a brighter solid-state light source, Lustrous Technology is proud to release the new. Ideal for your high concentration

More information

EXCITATION CONTROL OF SYNCHRONOUS GENERATOR USING A FUZZY LOGIC BASED BACKSTEPPING APPROACH

EXCITATION CONTROL OF SYNCHRONOUS GENERATOR USING A FUZZY LOGIC BASED BACKSTEPPING APPROACH EXCITATION CONTROL OF SYNCHRONOUS GENERATOR USING A FUZZY LOGIC BASED BACKSTEPPING APPROACH Abhilash Asekar 1 1 School of Engineering, Deakin University, Waurn Ponds, Victoria 3216, Australia ---------------------------------------------------------------------***----------------------------------------------------------------------

More information

Adaptive Distance Relaying Scheme for Power Swing Tripping Prevention

Adaptive Distance Relaying Scheme for Power Swing Tripping Prevention Adaptive Distance Relaying Scheme for Power Swing Tripping Prevention 1 NOR ZULAILY MOHAMAD, AHMAD FARID ABIDIN, 3 ISMAIL MUSIRIN Centre of Electrical Power Engineering Studies Universiti Teknologi MARA

More information

08/072 PKZ2 Motor-Protective Circuit-Breakers Tripping Characteristics

08/072 PKZ2 Motor-Protective Circuit-Breakers Tripping Characteristics 0/07 PKZ Tripping Characteristics Moeller HPL0-00/00 S-PKZ high-capacity contact module, SEA-PKZ contact module Normal switching duty AC-/00V kw A Rated output of three-phase motors 0...0 Hz. 7..... 0.7

More information

Power System Seminar Presentation Wind Forecasting and Dispatch 7 th July, Wind Power Forecasting tools and methodologies

Power System Seminar Presentation Wind Forecasting and Dispatch 7 th July, Wind Power Forecasting tools and methodologies Power System Seminar Presentation Wind Forecasting and Dispatch 7 th July, 2011 Wind Power Forecasting tools and methodologies Amanda Kelly Principal Engineer Power System Operational Planning Operations

More information

ISO/TR TECHNICAL REPORT. Gears Thermal capacity Part 1: Rating gear drives with thermal equilibrium at 95 C sump temperature

ISO/TR TECHNICAL REPORT. Gears Thermal capacity Part 1: Rating gear drives with thermal equilibrium at 95 C sump temperature TECHNICAL REPORT ISO/TR 14179-1 First edition 2001-07-15 Gears Thermal capacity Part 1: Rating gear drives with thermal equilibrium at 95 C sump temperature Engrenages Capacité thermique Partie 1: Capacité

More information

Cascading Outages in Power Systems. Rui Yao

Cascading Outages in Power Systems. Rui Yao Cascading Outages in Power Systems Rui Yao yaorui.thu@gmail.com Outline Understanding cascading outages Characteristics of cascading outages Mitigation of cascading outages Understanding cascading outages

More information

Renewables and the Smart Grid. Trip Doggett President & CEO Electric Reliability Council of Texas

Renewables and the Smart Grid. Trip Doggett President & CEO Electric Reliability Council of Texas Renewables and the Smart Grid Trip Doggett President & CEO Electric Reliability Council of Texas North American Interconnected Grids The ERCOT Region is one of 3 North American grid interconnections. The

More information

Chapter 9: Transient Stability

Chapter 9: Transient Stability Chapter 9: Transient Stability 9.1 Introduction The first electric power system was a dc system built by Edison in 1882. The subsequent power systems that were constructed in the late 19 th century were

More information

Reducing Contingency-based Windfarm Curtailments through use of Transmission Capacity Forecasting

Reducing Contingency-based Windfarm Curtailments through use of Transmission Capacity Forecasting Reducing Contingency-based Windfarm Curtailments through use of Transmission Capacity Forecasting Doug Bowman Southwest Power Pool Jack McCall Lindsey Manufacturing Co. CIGRE US National Committee 2017

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60287-1-3 First edition 2002-05 Electric cables Calculation of the current rating Part 1-3: Current rating equations (100 % load factor) Current sharing between parallel single-core

More information

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA Document Prepared By: Cauvery Hydro Energy Limited Contact Information Cauvery Hydro Energy Limited 67, Lavina Courts,

More information

O Plus Dry Bushing 69 kv system, 350 kv BIL, 3000 A. Table of contents

O Plus Dry Bushing 69 kv system, 350 kv BIL, 3000 A. Table of contents Type test report O Plus Dry Bushing 69 kv system, 0 kv BIL, 000 A Table of contents Abstract... 2 2 Certification... 2 Introduction.... Description and ratings....2 Overview of tests.... Applicable standards....4

More information

Stator Thermal Time Constant

Stator Thermal Time Constant Stator Thermal Time Constant Jon Steinmetz, Subhash C. Patel, and Stanley E. Zocholl Schweitzer Engineering Laboratories, Inc. 13 IEEE. Personal use of this material is permitted. Permission from IEEE

More information

TeSys circuit-breakers

TeSys circuit-breakers Presentation Thermal-magnetic motor circuit-breakers types GV2, GV and GV7 GV2-ME, GV2-P, GV-ME and GV7-R motor circuit-breakers are -pole thermal-magnetic circuit-breakers specifically designed for the

More information

URD Cable Fault Prediction Model

URD Cable Fault Prediction Model 1 URD Cable Fault Prediction Model Christopher Gubala ComEd General Engineer Reliability Analysis 2014 IEEE PES General Meeting Utility Current Practices & Challenges of Predictive Distribution Reliability

More information

The Effect of the Harmonics, the Fault Location and the Fault Resistance on the Performance of the Impedance-Type Distance Relay

The Effect of the Harmonics, the Fault Location and the Fault Resistance on the Performance of the Impedance-Type Distance Relay American Journal of Applied Sciences 6 (4): 788-796, 2009 SSN 1546-9239 2009 Science Publications The Effect of the Harmonics, the Fault Location and the Fault esistance on the Performance of the mpedance-type

More information

1SDC007004D0201. Discrimination tables

1SDC007004D0201. Discrimination tables 1SDC007004D0201 Discrimination tables tables Introduction Index Introduction... I Back-up...1/1 Discrimination...2/1 tables Introduction Introduction... II Choosing the type of coordination for the protection

More information

SSC-JE EE POWER SYSTEMS: GENERATION, TRANSMISSION & DISTRIBUTION SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL

SSC-JE EE POWER SYSTEMS: GENERATION, TRANSMISSION & DISTRIBUTION SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL 1 SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL Power Systems: Generation, Transmission and Distribution Power Systems: Generation, Transmission and Distribution Power Systems:

More information

4 Fault Calculations. Introduction 4.1. Three phase fault calculations 4.2. Symmetrical component analysis 4.3 of a three-phase network

4 Fault Calculations. Introduction 4.1. Three phase fault calculations 4.2. Symmetrical component analysis 4.3 of a three-phase network ault Calculations ntroduction 4. Three phase fault calculations 4. Symmetrical component analysis 4.3 of a three-phase network Equations and network connections 4.4 for various types of faults Current

More information

Turbines and turbine sets Measurement of emitted airborne noise Engineering/survey method

Turbines and turbine sets Measurement of emitted airborne noise Engineering/survey method INTERNATIONAL STANDARD ISO 10494 Second edition 2018-04 Turbines and turbine sets Measurement of emitted airborne noise Engineering/survey method Turbines et groupes de turbines Mesurage du bruit aérien

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Interconnection for Wind Energy ) Docket No. RM

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Interconnection for Wind Energy ) Docket No. RM UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Interconnection for Wind Energy ) Docket No. RM05-4-000 REQUEST FOR REHEARING OF THE NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL

More information

Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation

Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation Adesina, Lambe Mutalub Department of Engineering & Standardization, Eko Electricity Distribution Plc, 24/25, Marina, Lagos Island,

More information

SUBJECT TO CHANGE WITHOUT NOTICE

SUBJECT TO CHANGE WITHOUT NOTICE EARTH LEAKAGE RELAY ELR VI Programmable Multi-function Relay www.sifamtinsley.co.uk Multifunction Meters Transducers & Isolators Temperature Controllers Converters & Recorders Digital Panel Meters Current

More information

Min-max Transfer Capability: A New Concept

Min-max Transfer Capability: A New Concept roceedings of the 34th Hawaii International Conference on System Sciences - 00 Min-max Transfer Capability: A New Concept D. Gan X. Luo D. V. Bourcier dgan@iso-ne.com xluo@iso-ne.com dbourcie@iso-ne.com

More information

The Study of Overhead Line Fault Probability Model Based on Fuzzy Theory

The Study of Overhead Line Fault Probability Model Based on Fuzzy Theory Energy and Power Engineering, 2013, 5, 625-629 doi:10.4236/epe.2013.54b121 Published Online July 2013 (http://www.scirp.org/journal/epe) The Study of Overhead Line Fault Probability Model Based on Fuzzy

More information

Determination of particle size distribution Single particle light interaction methods. Part 4:

Determination of particle size distribution Single particle light interaction methods. Part 4: Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO 21501-4 Second edition 2018-05 Determination of particle size distribution Single particle light interaction methods Part 4: Light scattering airborne

More information

MEMORANDUM OF UNDERSTANDING. between the ASSOCIATION OF AMERICAN STATE GEOLOGISTS. and the U.S. DEPARTMENT OF THE INTERIOR OFFICE OF SURFACE MINING

MEMORANDUM OF UNDERSTANDING. between the ASSOCIATION OF AMERICAN STATE GEOLOGISTS. and the U.S. DEPARTMENT OF THE INTERIOR OFFICE OF SURFACE MINING MEMORANDUM OF UNDERSTANDING between the ASSOCIATION OF AMERICAN STATE GEOLOGISTS and the U.S. DEPARTMENT OF THE INTERIOR OFFICE OF SURFACE MINING MEMORANDUM OF UNDERSTANDING between the ASSOCIATION OF

More information

Considerations in Choosing Directional Polarizing Methods for Ground Overcurrent Elements in Line Protection Applications

Considerations in Choosing Directional Polarizing Methods for Ground Overcurrent Elements in Line Protection Applications Considerations in Choosing Directional Polarizing Methods for Ground Overcurrent Elements in Line Protection Applications Technical Report to the Line Protection Subcommittee of the PES, Power Systems

More information

Fault Calculation Methods

Fault Calculation Methods ELEC9713 Industrial and Commercial Power Systems Fault Calculation Methods There are two major problems that can occur in electrical systems: these are open circuits and short circuits. Of the two, the

More information

Thermal-Magnetic Circuit Breaker 2210-S2..

Thermal-Magnetic Circuit Breaker 2210-S2.. Thermal-Magnetic Circuit Breaker -S.. Description One, two and three pole thermal-magnetic circuit breakers with trip-free mechanism and toggle actuation (S-type TM CBE to EN 60934/IEC 934). Designed for

More information

Vegetation Related Transmission Outage Report

Vegetation Related Transmission Outage Report Vegetation Related Transmission Outage Report Third 2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Executive Summary The NERC Board of Trustees Compliance

More information

Winter Season Resource Adequacy Analysis Status Report

Winter Season Resource Adequacy Analysis Status Report Winter Season Resource Adequacy Analysis Status Report Tom Falin Director Resource Adequacy Planning Markets & Reliability Committee October 26, 2017 Winter Risk Winter Season Resource Adequacy and Capacity

More information

1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-cur

1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-cur 1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-current carrying part) or some electrical part of the

More information

Thermal-Magnetic Circuit Breaker 2210-S2..

Thermal-Magnetic Circuit Breaker 2210-S2.. Thermal-Magnetic Circuit Breaker -S.. Description One, two and three pole thermal-magnetic circuit breakers with trip free mechanism and toggle actuation (S-type TM CBE to EN 6094/IEC 94). Designed for

More information

Hard coal and coke Mechanical sampling. Part 7: Methods for determining the precision of sampling, sample preparation and testing

Hard coal and coke Mechanical sampling. Part 7: Methods for determining the precision of sampling, sample preparation and testing INTERNATIONAL STANDARD ISO 13909-7 Second edition 016-07-01 Hard coal and coke Mechanical sampling Part 7: Methods for determining the precision of sampling, sample preparation and testing Houille et coke

More information

Thermal-Magnetic Circuit Breaker 2210-T2...

Thermal-Magnetic Circuit Breaker 2210-T2... Thermal-Magnetic Circuit Breaker 0-T... Description One, two and three pole thermal-magnetic circuit breakers with trip-free mechanism and toggle actuation (S-type TM CBE to EN 6094/IEC 94). Featuring

More information

Operations Report. Tag B. Short, Director South Region Operations. Entergy Regional State Committee (ERSC) February 14, 2018

Operations Report. Tag B. Short, Director South Region Operations. Entergy Regional State Committee (ERSC) February 14, 2018 Operations Report Tag B. Short, Director South Region Operations Entergy Regional State Committee (ERSC) February 14, 2018 1 Winter Operations Highlights South Region Max Gen Event Regional Dispatch Transfer

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL REPORT ISO/TR 19473 First edition 2015-09-01 Space systems Best practices for orbit elements at payload LV separation Systèmes spatiaux Meilleures pratiques pour les éléments en orbite à charge

More information

Vegetation Related Transmission Outage Report

Vegetation Related Transmission Outage Report Vegetation Related Transmission Outage Report Third Quarter 0 5 Peachtree Road NE Suite 00, North Tower Atlanta, GA 0 404-44-50 www.nerc.com The NERC Board of Trustees Compliance Committee has reviewed

More information

Asset Life and pricing the use of infrastructure: the case of Electricity Transmission in Chile

Asset Life and pricing the use of infrastructure: the case of Electricity Transmission in Chile Asset Life and pricing the use of infrastructure: the case of Electricity Transmission in Chile USAEE - IAEE Houston - Texas 17-19 September 2007 Ricardo Raineri rraineri@ing.puc.cl / www.ricardoraineri.com

More information