THE MAGNETIC MODEL OF THE LARGE HADRON COLLIDER

Size: px
Start display at page:

Download "THE MAGNETIC MODEL OF THE LARGE HADRON COLLIDER"

Transcription

1 THE MAGNETIC MODEL OF THE LARGE HADRON COLLIDER B. Auchmann, L. Bottura, M. Buzio, L. Deniau, L. Fiscarelli, M. Giovannozzi, P. Hagen. M. Lamont, G. Montenero, G. Mueller, M. Pereira, S. Redaelli, V. Remondino, F. Schmidt, R. Steinhagen, M. Strzelczyk, R. Tomas Garcia, E. Todesco, W. Venturini Delsolaro, L. Walckiers, J. Wenninger, R. Wolf, F. Zimmermann, CERN, Geneva, Switzerland. Abstract The beam commissioning carried out in 2009 has proved that we have a pretty good understanding of the behaviour of the relation field-current in the LHC magnets and of its reproducibility. In this paper we summarize the main issues of beam commissioning as far as the magnetic model is concerned. An outline of what can be expected in 2010, when the LHC will be pushed to 3.5 TeV, is also given. INTRODUCTION During the three weeks of beam commissioning in 2009, the LHC has been operated at a maximum energy of 1.18 TeV. In a very short time circulating beams have been established, and then ramps to 1.18 TeV and collisions, both at injection and high energy, have been successfully tried [1]. During the last days of beam commissioning, the operation crew even managed to successfully squeeze [2] the beam at 1.18 TeV from 11 to 7 m in CMS! In this paper we outline the main result of the beam commissioning as far as the magnetic model [3-5] is concerned. The first aim is to reconstruct from beambased measurements an assessment of the precision of the model. The second one is to identify areas where the knowledge of the magnets is not sufficient for operation, and how to improve it. Throughout the paper we will use two words coming from the slang of the magnet community: (i) by transfer function we indicate the ratio between the field generated by a magnet and the current flowing in its coils; (ii) most of the quantities are expressed as a relative value in units, one unit being 0.01%. ORBIT How much strength of the arc orbit correctors did we use? The orbit correctors in the arc have a nominal current of 55 A. At the injection energy of 450 GeV they have been typically powered with less than 1 A (see Fig. 1). Applying a scaling factor, one expects a powering below 15 A at 7 TeV, i.e., we have nearly a factor 4 of margin. This is not completely correct since the powering at injection is so low that the magnet could behave in a non linear way (see Fig. 2, where magnetic measurements are shown). Therefore one should expect that the current to be used in the orbit correctors during ramp and at top energy will not be a simple scaling of the values used at injection. Anyway, the first results show that the orbit correction is using only a small fraction of the budget available. This confirms the high homogeneity of the transfer function in the main dipoles and the good alignment of the main quadrupoles. I (A) at 450 GeV Beam1 Beam Corrector progressive number Figure 1: Current used in orbit correctors MCB, on December 15 at TF (Tm/A) Block4 SM Figure 2: Measured transfer function of the orbit correctors, in block4 and in SM18. Difference between sectors The eight sectors of the LHC arcs are powered with slightly different currents which are tuned on the ground of the room temperature magnetic measurements. The difference in the transfer function of each arc reflects the tolerances of the magnet components and manufacturing. According to magnetic measurements, one has a 10 units peak to peak difference between the transfer function of the sectors. Due to a slight decrease of the transfer function during the production (of the order of less than 10 units [6]), sector 7-8, containing the magnets of the beginning of the production, has 6 units larger transfer function than average. This is compensated by using a 6

2 units smaller current in the sector (see Table 1). On the other hand, sectors 6-7 and 1-2 have 4 units lower transfer function, and they are powered with 4 units larger current (see Table 1). Beam measurements showed that using these settings, the peak to peak difference in the transfer function between sectors is reduced to 5 units in both beams. This is a valuable cross-check of the loop magnetic measurements beam measurements (see Table 1). Table 2). This corresponds to having an absolute precision of 15 units in the ratio between quadrupole field and the dipole field at injection B2/B1, which is a rather remarkable result. Tune trims are done through MQTF and MQTD, i.e. two families of quadrupoles per beam. These magnets, which have a nominal current of 550 A, were used at injection with values below 5 A. A simple scaling suggests that at high field the magnets will be powered with less than 80 A, i.e., at 15% of nominal. Table 1: Current in the main dipoles, and difference between sectors transfer functions estimated through beam measurements [7]. Current Measured (units) (A) (units) Sector Beam1 Beam Bumps around spectrometers Both Alice and LHCb have magnetic spectrometers providing horizontal and vertical magnetic field respectively, that need to be compensated by means of three orbit correctors each (compensators belonging to four families: 2 MBXWT, 2 MBXWS, 1 MBXWH, 1 MBWMD). During operation in 2009, the non closure of the bump around the experiments was found to be larger than expected. Unfortunately, there is no possibility of finding a unique solution from beam measurements, since the problem is under-constrained. The possible errors [8] are of the order of 0.5 to 2 % (see Figure 3). This effect can be corrected and it has not been a severe limit to operation, but it would be worth to be investigated. Two issues have been pointed out. The spectrometers are long magnets with a large gap, hence generating a non uniform field with non-negligible stray field components. A mapping along the longitudinal axis is available. This could be included in the beam dynamics model. The compensators have not been precycled in This could change the transfer functions of few percent, but only at low currents. Two magnets (MBXWT and MBXWS) have been remeasured in fall 2009 [9], confirming the transfer function values at high current within few per mil (see Figure 5). Trims at injection TUNE Using the nominal settings of dipoles and quadrupoles, the tunes agree with the nominal tunes within 0.1 (see Figure 3: Correction in the Alice spectrometer transfer function needed to close the bump vs. current [8]. Figure 4: Correction in the MBWMD compensator transfer function needed to close the bump vs. current [8]. TF (units) TF FiDeL TF HALL TF SSW Figure 5: Measurements of MBXWS using stretched wire in fall 2009 (SSW) compared tohall probe measurements used for the FiDeL model (dashed line).

3 Table 2: Tune trim and current in the tuning quadrupoles at the beginning of the 6 th ramp [10]. Trim Beam1 Beam2 dqh dqv QTD (A) QTF (A) The two beams have the same tune within 0.1. The MQT have a low hysteresis, and operation confirms that this is not a limiting factor for steering the tune. In Figure 6 we show the experiment where the trim was applied to increase and then reduce the horizontal tune by 0.1 [11]. The measured tunes went back exactly on the previous values, showing that the MQT hysteresis is negligible for tune trimming. which is the fingerprint of an error in tracking B2/B1. Then, the variation of the horizontal plane is different from the vertical one, suggesting that the source is not a wrong modelling of the dipole and quadrupole main components. A second source can be an uncorrected b 3 plus an orbit offset. No orbit feedback has been used during the ramp, so this could be the effect of a constant error in the b 3 tracking with a changing offset during the ramp, or a systematic misalignment of the spool pieces w.r.t. the dipoles [12]. A wrong precycling of the MQWA, MQWB, MQXA and MQXB has been shown to have a large impact on tune at injection, and disappears during the ramp. This effect (see next sections) will be corrected in 2010: therefore these patterns are likely to be different for the next machine run. Figure 6: Tune trim applied on the horizontal plane back and forward to estimate the impact of hysteresis. Behaviour during ramp At the beginning of the ramp, i.e. during the snapback, the tune is stable within [10]; this implies that the tracking of the quadrupole over the dipole is stable within 1 unit. This impressive result confirms the magnetic measurements, showing that the decay (and associated snapback) of the main components of dipoles and quadrupoles are within one unit, i.e., negligible. During the ramp up to 1.18 TeV one observes a tune drift, which has been corrected through the feed-forward and the feedback systems. The drift is clearly systematic, and is somewhat different in the two beams. The tune drifts of about -0.1 in the horizontal plane and of 0.02 in the vertical one. Beam 2 horizontal tune has a horizontal drift of half of what observed in Beam1. This translates into a capability of tracking B2/B1 within 15 units. Even though this drift has posed no problems to operation, it is worth to analyse the probable sources [12]. Initially the drift is pretty parallel to the diagonal, i.e. both planes have the same drift, Figure 5: Tune drift during ramps 5 and 6 reconstructed from data of the feedback system [10] (red is Beam1, blue Beam2). Figure 6: Tune drift during ramps 7 and 8 reconstructed from data of the feedback system [10] (red is Beam1, blue Beam2).

4 CHROMATICITY Trims at injection Chromaticity has been trimmed at injection typically by units [10]. This corresponds to an absolute precision of the b 3 correction in the dipoles of units. This is about a factor 3 larger of the precision of the measurement system, i.e., it is a pretty good result for an early stage of the beam commissioning, but in principle there should be some room for improvement. This also includes the decay of b 3, since we inject the beam when the decay has already fully taken place (typically a few hours after establishing the injection currents). Behaviour during ramp At the end of the ramp the chromaticity has lowered by 3-15 units (see Table 3). This corresponds to tracking the b 3 in the main dipole within 0.3 units. Also in this case the result is encouraging, but there is room for improvement. There are known uncorrected effects that influence chromaticity during ramp. According to the recent measurements carried out in fall 2009 and winter , we believe that there are 0.2 units of uncorrected b 3 (see next section). This gives about 8 units in horizontal and -8 units in the vertical chromaticity, i.e. justifying the horizontal drift but doubling the vertical one. Table 3: Chromaticity change during the ramp to 1.18 TeV [10]. strategy (see next sections), placing the MQXA and MQXB around IR1 and IR5, and the MQWA around IR3 and IR7 on the wrong branch of the hysteresis. The effect is particularly relevant for the MQWA, whose transfer function is 4% larger on the ascending branch of the hysteresis (see Figure 10). For the MQXA and MQXB, based on the magnetic measurements, the wrong precycling should give a about 0.5% lower transfer function at injection. This is in good agreement with what foreseen on the ground of beta beating measurements. The lack of precycling for the MQTLH (Q6 in IR3 and IR7) should not have a large impact since the magnetization is low. Figure 7: Reproducibility of beta beating measurement at 450 GeV, with and without precycling [13]. ΔQ'H ΔQ'V ramp4 B ramp5 B ramp6 B ramp6 B BETA BEATING Beta beating has been measured a few times at injection energy and once at 1.18 TeV. The first measurement has been done without precycling. Data show that one has a very poor reproducibility if the precycling is not carried out (see Figure 7). On the other hand, if the magnet precycling is carried out, the beta beating is reproducible within a few percent (see Figure 8). A beta beating of 20-40% is observed in both planes at injection ([13], see Figure 8). The measurement at 1.18 TeV gives a beta beating within 20%, i.e. within specifications (see Figure 9). Optics simulations suggest that there are imperfections in the interaction regions quadrupole of the order of a few percent in the MQWA, and a half percent in the triplets, that disappear during the ramp [13]. Relevant sources of beta beating have been identified by the end of January 2010 [13] as a wrong precycling Figure 8: Reproducibility of beta beating measurement at 450 GeV in two runs with precycling [13]. ESTIMATES FOR RAMP AT 3.5 TEV At the beginning of the ramp some field component rapidly (within A) snapback to their original values before the beginning of the decay. The effect is negligible for the dipole and quadrupole main components. The largest effect is on the first order harmonic in the dipoles, i.e. b 3. At the end of the prototype phase, the amplitude of the average snapback in the dipoles was estimated at about 2.5 units [3,4]. Successive measurements showed that the precycle ramp rate was a relevant parameter.

5 Since during the series tests this parameter was fixed at 50 A/s to speed up measurements instead of 10 A/s, the decay to be expected was much lower, i.e. about 1 unit [5]. Having a precycle at much lower currents (i.e. 2 ka instead of 11.8 ka) further reduces the snapback amplitude [5]. Figure 9: Beta beating measurement at 450 and at 1180 GeV [12]. TF (units w.r.t. 200 A value) % Figure 10: Transfer function of the MQWA versus current measured on the ascending and descending hysteresis branch [14]. Two equations have been proposed to model this effect [4] [5]; they give similar results at 11.8 ka, but rather different values at 2 ka, ranging from 0.1 to 0.3 units (see Figure 10). In 2009, the [4] version has been implemented. Magnetic measurements carried out in winter has shown that the [5] model reveals to be more precise (see Figure 11). Therefore we expect that during 2009 about 0.2 units of b 3 were not corrected at the beginning of the ramp. The same model foresees a snapback for 2010 of units, i.e. about the double of what we had at 2 ka in PRECYCLING ISSUES Missing precycles The following magnets have not been precycled in 2009: (i) the MQTLH in Q6, left and right of IR3 and IR7 and (ii) the spectrometers compensators MBXWT, MBXWS, MBXWH, MBWMD. All the other magnets have been precycled according to prescriptions. This should have a relatively low impact, since the hysteresis of the MQTLH is small, and the compensators were used at high currents, where the precycling strategy has no influence. b3 decay (units) Ref. [4] Ref. [5] Measurements - scaling 1 Measurements - scaling Figure 11: Expected amplitude of the b 3 snapback versus precycle current: scaled measurements (markers) and models present in Refs. [4] and [5]. Lowest precycle current By the end of January 2010 it has been found [14] that the minimum current used in the precycle is sometimes larger than the injection current. This implies that the magnet at injection is still on the descending branch of the hysteresis. This effect is present in MQWA, MQXA, MQXB, MBXW (see Table 4). These wrong settings have been corrected in February Table 4: Minimum precycle current and injection current in red values that have been corrected in Magnet Min. precycle current (2009) Min. precycle current (2010) Inj. Current MB 350/ / MQY MQM 4.5 K MQM 1.9 K MBX MBRC /385 MBRS MBRB MQ MQXA /452 MQXB /776 MBXW MBW MQWA /38.0 Magnets with negative currents nominal settings Some magnets have a negative current as a nominal setting. This is the case for half of the MQTL and half of the MQWB. In this case the precycle should be first on negative currents, and then on positive to place the magnets on the descending branch of the hysteresis. On the other hand, in 2009 this effect has been not taken into

6 account. For the MQTL the impact is negligible, since the FiDeL model does not take magnetization into account. For the MQWB, which are powered with very low current and which have a relevant residual magnetization, the effect can be rather important. A down-up precycle has been implemented for MQWB with negative current settings. CONCLUSIONS The beam commissioning experience of 2009 has shown that the reproducibility of the machine is well ensured if the precycling strategy is followed, and that the knowledge of the relation current.-magnetic field is in general very good. We quote the following issues, rated by order of relevance for beam operation. The beta beating at injection is around 40% in some sections of the machine. Even though this is a pretty impressive result for an early stage of commissioning, this is not yet within specifications. Inverse simulations suggest that some quadrupoles in the IR regions have a mismatch in the transfer function of the order of 1%. It has been recently found out that this could be partially due to a wrong precycling. On the other hand, the beta beating at 1.18 TeV is not far from the 20% specification, thus suggesting that the problems in the field model are at injection level, i.e. are related to the magnetization components. This is consistent with the hypothesis of a wrong precycling. With the revised precycles, we should expect a pretty different pattern of beta beating in The non closure of the bump around the spectrometer compensators is suggesting errors of the order of 1% either in the spectrometer or in the compensator transfer functions. Compensators have been measured again showing consistency with previous results within a few per mil. A more precise model of the spectrometers is being implemented to take into account of the variation of the field along the axis. Contrary to 2009, the compensators will be precycled in 2010; this could have some impact on the settings at low field, but not when the spectrometers are fully powered. There is a drift of chromaticity during the ramp which is not understood. A part of it is systematic for all ramps: this corresponds to about 0.3 units of uncorrected b 3. According to measurements one should be able to track at least with a factor 3 higher precision (within 0.1 units). This drift could pose problems for operation. According to our best knowledge of the field model, in 2009 we had about 0.3 units of b 3 snapback, and a correction of 0.1 units has been implemented. Tune: o o o There is a tune drift during the ramp (well after the snapback) whose origin is not understood. The drift is systematic for all ramps, with a striking difference between beam1 and beam2. This does not pose problems for operation since the feedback system can cope with it easily. The tune steering is successful, showing that the hysteresis of the MQT is not an issue for operation. Small trims are necessary to obtain nominal tune. Due to the correction of the precycling for MQWA, MQXA and MQXB, it is likely that the tune trims and drifts during the ramp will be pretty different from Orbit correction has been successful, and the cell correctors are used with a pretty low current, suggesting a safety factor 4 at 7 TeV. The ramp in 2010 will reach 3.5 TeV. The main change induced by this larger energy is that the precycle current will be higher, and this should double the b 3 snapback from 0.3 to 0.6 units. REFERENCES [1] M. Lamont, these proceedings. [2] S. Redaelli, these proceedings. [3] N. Sammut, et al., Phys. Rev. STAB , [4] N. Sammut, et al., Phys. Rev. STAB , [5] N. Sammut, et al., Phys. Rev. STAB , [6] E. Todesco, et al., IEEE Trans. Appl. Supercond , [7] J. Wenninger, private communication, and K. Fuchsberger, these proceedings. [8] J. Wenninger, talk given at FiDeL team on 11 January 2010, [9] P. Hagen, talk given at FiDeL team on 16 February 2010, [10] R. Steinhagen, these proceedings. [11] W. Venturini Delsolaro, private communication, [12] W. Venturini Delsolaro, these proceedings. [13] R. Tomas Garcia, these proceedings. [14] P. Hagen, private communication, January 2010.

LHC ORBIT SYSTEM, PERFORMANCE AND STABILITY

LHC ORBIT SYSTEM, PERFORMANCE AND STABILITY LHC ORBIT SYSTEM, PERFORMANCE AND STABILITY Kajetan Fuchsberger Abstract During the LHC run period in 2009 the Orbit system proved to be very reliable. In the following the analysis results of the first

More information

BETATRON SQUEEZE: STATUS, STRATEGY AND ISSUES

BETATRON SQUEEZE: STATUS, STRATEGY AND ISSUES BETATRON SQUEEZE: STATUS, STRATEGY AND ISSUES M. Lamont, G. Müller, S. Redaelli, M. Strzelczyk CERN, Geneva, Switzerland Abstract The betatron squeeze will be one of the most critical manipulation of the

More information

Turn-around improvements

Turn-around improvements LHC Performance Workshop - Chamonix 2012 Hotel Les Aiglons, Chamonix, France February 6 th -10 th, 2012 Turn-around improvements S. Redaelli, BE-ABP (formerly BE-OP) and W. Venturini Delsolaro, BE-RF (formerly

More information

Main aim: Preparation for high bunch intensity operation with β*=3.5 m and crossing angle (-100 µrad in IR1 and +100 µrad in IR5)

Main aim: Preparation for high bunch intensity operation with β*=3.5 m and crossing angle (-100 µrad in IR1 and +100 µrad in IR5) Week 24 Main aim: Preparation for high bunch intensity operation with β*=3.5 m and crossing angle (-100 µrad in IR1 and +100 µrad in IR5) Commission systems required for guaranteeing beam stability as

More information

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN-TOTEM-NOTE-17- March 17 LHC optics determination with proton tracks measured in the CT-PPS detectors in 16, before TS F. Nemes 1,) 1 CERN, Geneva, Switzerland

More information

LHC commissioning. 22nd June Mike Lamont LHC commissioning - CMS 1

LHC commissioning. 22nd June Mike Lamont LHC commissioning - CMS 1 LHC commissioning Mike Lamont AB-OP nd June 005.06.05 LHC commissioning - CMS 1 Detailed planning for 7-87 8 and 8-18 005 006 Short Circuit Tests CNGS/TI8/IT1 HWC LSS.L8.06.05 LHC commissioning - CMS Sector

More information

HE-LHC Optics Development

HE-LHC Optics Development SLAC-PUB-17224 February 2018 HE-LHC Optics Development Yunhai Cai and Yuri Nosochkov* SLAC National Accelerator Laboratory, Menlo Park, CA, USA Mail to: yuri@slac.stanford.edu Massimo Giovannozzi, Thys

More information

INITIAL ESTIMATES OF DYNAMIC APERTURE AND FIELD QUALITY SPECIFICATIONS *

INITIAL ESTIMATES OF DYNAMIC APERTURE AND FIELD QUALITY SPECIFICATIONS * SLAC PUB 16087 September 2014 INITIAL ESTIMATES OF DYNAMIC APERTURE AND FIELD QUALITY * Y. Nosochkov, Y. Cai, M.-H. Wang SLAC National Accelerator Laboratory, Menlo Park, CA 94025, USA S. Fartoukh, M.

More information

2008 JINST 3 S Main machine layout and performance. Chapter Performance goals

2008 JINST 3 S Main machine layout and performance. Chapter Performance goals Chapter 2 Main machine layout and performance 2.1 Performance goals The aim of the LHC is to reveal the physics beyond the Standard Model with centre of mass collision energies of up to 14 TeV. The number

More information

RF System Calibration Using Beam Orbits at LEP

RF System Calibration Using Beam Orbits at LEP EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN SL DIVISION CERN-SL-22-28 OP LEP Energy Working Group 2/1 RF System Calibration Using Beam Orbits at LEP J. Wenninger Abstract The target for beam energy

More information

DYNAMIC APERTURE STUDIES FOR HL-LHC V1.0 *

DYNAMIC APERTURE STUDIES FOR HL-LHC V1.0 * SLAC PUB 17366 December 2018 DYNAMIC APERTURE STUDIES FOR HL-LHC V1.0 * Y. Cai, R. De Maria, M. Giovannozzi, Y. Nosochkov, F.F. Van der Veken ;1 CERN, CH-1211 Geneva 23, Switzerland SLAC National Accelerator

More information

New LSS optics for the LHC (status)

New LSS optics for the LHC (status) New LSS optics for the LHC (status) 23-03-2012 R.B. Appleby The University of Manchester/Cockcroft Institute, UK Many thanks to Riccardo, Bernhard, Stephane Motivation The optics limitations of the nominal

More information

Large Hadron Collider momentum calibration and accuracy

Large Hadron Collider momentum calibration and accuracy PHYSICAL REVIEW ACCELERATORS AND BEAMS 20, 081003 (2017) Large Hadron Collider momentum calibration and accuracy E. Todesco and J. Wenninger * CERN, CH-1211 Geneva 23, Switzerland (Received 1 March 2017;

More information

Field Errors Decay and Snap-Back in LHC Model Dipoles

Field Errors Decay and Snap-Back in LHC Model Dipoles EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics LHC Project Report 55 Large Hadron Collider Project Field Errors Decay and Snap-Back in LHC Model Dipoles L. Bottura,

More information

Beam losses versus BLM locations at the LHC

Beam losses versus BLM locations at the LHC Geneva, 12 April 25 LHC Machine Protection Review Beam losses versus BLM locations at the LHC R. Assmann, S. Redaelli, G. Robert-Demolaize AB - ABP Acknowledgements: B. Dehning Motivation - Are the proposed

More information

AC dipole based optics measurement and correction at RHIC

AC dipole based optics measurement and correction at RHIC BNL-1132-213-CP AC dipole based optics measurement and correction at RHIC X. Shen, S. Y. Lee Indiana University of Bloomington, IN 4745, USA M. Bai, S. White, G. Robert-Demolaize, Y. Luo, A. Marusic BNL,

More information

Practical Lattice Design

Practical Lattice Design Practical Lattice Design Dario Pellegrini (CERN) dario.pellegrini@cern.ch USPAS January, 15-19, 2018 1/17 D. Pellegrini - Practical Lattice Design Lecture 5. Low Beta Insertions 2/17 D. Pellegrini - Practical

More information

LHC APERTURE AND COMMISSIONING OF THE COLLIMATION SYSTEM

LHC APERTURE AND COMMISSIONING OF THE COLLIMATION SYSTEM LHC APERTURE AND COMMISSIONING OF THE COLLIMATION SYSTEM S. Redaelli, R. Aßmann, G. Robert-Demolaize, CERN, Geneva, Switzerland Abstract The design LHC aperture and its dependence on various optics imperfections

More information

HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study. Deliverable Report. Corrector magnets specifications

HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study. Deliverable Report. Corrector magnets specifications CERN-ACC-2014-0296 HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study Deliverable Report Corrector magnets specifications Fartoukh, S (CERN) et al 28 November 2014 The HiLumi LHC Design

More information

Gianluigi Arduini CERN - Beams Dept. - Accelerator & Beam Physics Group

Gianluigi Arduini CERN - Beams Dept. - Accelerator & Beam Physics Group Gianluigi Arduini CERN - Beams Dept. - Accelerator & Beam Physics Group Acknowledgements: O. Brüning, S. Fartoukh, M. Giovannozzi, G. Iadarola, M. Lamont, E. Métral, N. Mounet, G. Papotti, T. Pieloni,

More information

THE ALIGNMENT OF THE LHC DURING THE SHUT-DOWN D. Missiaen, CERN, Geneva, Switzerland. Fiducialisation

THE ALIGNMENT OF THE LHC DURING THE SHUT-DOWN D. Missiaen, CERN, Geneva, Switzerland. Fiducialisation THE ALIGNMENT OF THE LHC DURING THE SHUT-DOWN 2008-2009 D. Missiaen, CERN, Geneva, Switzerland. Abstract The first run of the LHC took place in September 2008 and, after only two weeks, was brutally interrupted

More information

Correction of β-beating due to beam-beam for the LHC and its impact on dynamic aperture

Correction of β-beating due to beam-beam for the LHC and its impact on dynamic aperture Correction of β-beating due to beam-beam for the LHC and its impact on dynamic aperture WEOAB2 Luis Medina1,2, R. Toma s2, J. Barranco3, X. Buffat1, Y. Papaphilippou1, T. Pieloni3 1 Universidad de Guanajuato,

More information

OPTICS CONTROL IN 2016

OPTICS CONTROL IN 2016 OPTICS CONTROL IN 2016 T. Persson, G. Baud, F. Carlier, J. Coello de Portugal, E. Fol, A. Garcia-Tabares Valdivieso, M. Gasior, A. Langner, E. H. Maclean, L. Malina, I. Olexa, P. Skowronski, R. Tomas D.

More information

LHC Run 2: Results and Challenges. Roderik Bruce on behalf of the CERN teams

LHC Run 2: Results and Challenges. Roderik Bruce on behalf of the CERN teams LHC Run 2: Results and Challenges Roderik Bruce on behalf of the CERN teams Acknowledgements A big thanks to all colleagues involved across various teams! Special thanks for material and discussions G.

More information

Field Quality Measurements in a Single-Aperture 11 T Nb 3 Sn Demonstrator Dipole for LHC Upgrades

Field Quality Measurements in a Single-Aperture 11 T Nb 3 Sn Demonstrator Dipole for LHC Upgrades 1LPN-03 FERMILAB-12-547-TD 1 Field Quality Measurements in a Single-Aperture 11 T Nb 3 Sn Demonstrator Dipole for LHC Upgrades N. Andreev, G. Apollinari, B. Auchmann, E. Barzi, R. Bossert, G. Chlachidze,

More information

LHC Commissioning in 2008

LHC Commissioning in 2008 LHC Commissioning in 2008 Mike Lamont AB/OP Schedule slides c/o Lyn Evans (MAC 14/6/07) Status: Installation & equipment commissioning LHC commissioning - CMS June 07 2 Procurement problems of remaining

More information

THE MAGNET EVALUATION BOARD

THE MAGNET EVALUATION BOARD THE MAGNET EVALUATION BOARD L. Bottura, M. Giovannozzi, S. Fartoukh, S. Gilardoni, J.-B. Jeanneret, A. Lombardi, K.-H. Meß, D. Missiaen, M. Modena, R. Ostojic, P. Pugnat, S. Ramberger, S. Sanfilippo, W.

More information

TRANSVERSE DAMPER. W. Höfle, CERN, Geneva, Switzerland. Abstract INTRODUCTION AND HIGHLIGHTS IN Controlled Transverse Blow-up

TRANSVERSE DAMPER. W. Höfle, CERN, Geneva, Switzerland. Abstract INTRODUCTION AND HIGHLIGHTS IN Controlled Transverse Blow-up TRANSVERSE DAMPER W. Höfle, CERN, Geneva, Switzerland Abstract Plans for the operation of the transverse damper in 2012 at bunch spacings of 50 ns and 25 ns and at increased collision energy will be reviewed.

More information

LHC operation in 2015 and prospects for the future

LHC operation in 2015 and prospects for the future LHC operation in 2015 and prospects for the future Moriond Workshop La Thuile March 2016 Jörg Wenninger CERN Beams Department Operation group / LHC For the LHC commissioning and operation teams 1 Moriond

More information

Signaling the Arrival of the LHC Era December Current Status of the LHC. Albert De Roeck CERN Switzerland

Signaling the Arrival of the LHC Era December Current Status of the LHC. Albert De Roeck CERN Switzerland 1970-1 Signaling the Arrival of the LHC Era 8-13 December 2008 Current Status of the LHC Albert De Roeck CERN Switzerland Status of the LHC Albert De Roeck CERN and University of Antwerp and the IPPP Durham

More information

HL-LHC OPERATIONAL SCENARIOS

HL-LHC OPERATIONAL SCENARIOS CERN-ACC-NOTE-2015-0009 2015-05-19 Elias.Metral@cern.ch HL-LHC OPERATIONAL SCENARIOS G. Arduini, N. Biancacci, O. Brüning, R. De Maria, M. Giovannozzi, W. Höfle, K. Li, E. Métral, J.E. Muller, Y. Papaphilippou,

More information

Luminosity Goals, Critical Parameters

Luminosity Goals, Critical Parameters CAS Zürich 22 nd February 2018 Luminosity Goals, Critical Parameters Bruno Muratori, STFC Daresbury Laboratory & Cockcroft Institute Werner Herr, CERN Goals At the end of this lecture you should be able

More information

Energy Calibration of the LHC Beams at 4 TeV

Energy Calibration of the LHC Beams at 4 TeV EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN ACCELERATORS AND TECHNOLOGY SECTOR CERN-ATS-213-4 Energy Calibration of the LHC Beams at 4 TeV J. Wenninger Abstract The mixed proton and lead ion run in

More information

CORRECTION OF THE BETATRON COUPLING IN THE LHC

CORRECTION OF THE BETATRON COUPLING IN THE LHC Particle Accelerators, 1996, Vol. 55, pp. [429-437] /183-191 Reprints available directly from the publisher Photocopying permitted by license only 1996 OPA (Overseas Publishers Association) Amsterdam B.Y.

More information

LHC Optics Measurement with Proton Tracks Detected by the Roman Pots of the TOTEM Experiment

LHC Optics Measurement with Proton Tracks Detected by the Roman Pots of the TOTEM Experiment CERN-TOTEM-NOTE-215-1 13 May 215 LHC Optics Measurement with Proton Tracks Detected by the Roman Pots of the TOTEM Experiment F. Nemes, H. Niewiadomski May 13, 215 Abstract Precise knowledge of the beam

More information

IMPLEMENTATION AND EXPERIENCE WITH LUMINOSITY LEVELLING WITH OFFSET BEAM

IMPLEMENTATION AND EXPERIENCE WITH LUMINOSITY LEVELLING WITH OFFSET BEAM IMPLEMENTATION AND EXPERIENCE WITH LUMINOSITY LEVELLING WITH OFFSET BEAM F. Follin, D. Jacquet, CERN, Geneva, Switzerland Abstract The practice of luminosity levelling with an offset beam has been used

More information

Operational Experience with HERA

Operational Experience with HERA PAC 07, Albuquerque, NM, June 27, 2007 Operational Experience with HERA Joachim Keil / DESY On behalf of the HERA team Contents Introduction HERA II Luminosity Production Experiences with HERA Persistent

More information

Are we ready for the 2009 beam operation?

Are we ready for the 2009 beam operation? LHC Performance Workshop - Chamonix 2009 Centre de Congrès Le Majestic, Chamonix, France 2 nd -6 th February 2008 Are we ready for the 2009 beam operation? S. Redaelli, R. Alemany, R. Bailey, V. Kain,

More information

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH BEAM-BASED ALIGNMENT IN CTF3 TEST BEAM LINE

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH BEAM-BASED ALIGNMENT IN CTF3 TEST BEAM LINE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CLIC Note 956 BEAM-BASED ALIGNMENT IN CTF3 TEST BEAM LINE Sterbini, G (CERN) ; Dӧbert, S (CERN) ; Marín, E (CERN) ; Lillestol, RL (CERN) ; Schulte, D (CERN)

More information

Analysis of KEK-ATF Optics and Coupling Using Orbit Response Matrix Analysis 1

Analysis of KEK-ATF Optics and Coupling Using Orbit Response Matrix Analysis 1 Analysis of KEK-ATF Optics and Coupling Using Orbit Response Matrix Analysis 1 A. Wolski Lawrence Berkeley National Laboratory J. Nelson, M. Ross, M. Woodley Stanford Linear Accelerator Center S. Mishra

More information

The HL-LHC Accelerator Physics Challenges

The HL-LHC Accelerator Physics Challenges Chapter 4 The HL-LHC Accelerator Physics Challenges S. Fartoukh and F. Zimmermann CERN, BE Department, Genève 23, CH-1211, Switzerland The conceptual baseline of the HL-LHC project is reviewed, putting

More information

Will LHCb be running during the HL-LHC era? Burkhard Schmidt for the LHCb Collaboration

Will LHCb be running during the HL-LHC era? Burkhard Schmidt for the LHCb Collaboration Will LHCb be running during the HL-LHC era? Burkhard Schmidt for the LHCb Collaboration Helpful discussions with L. Rossi and several other colleagues from the machine acknowledged Outline: Introduction

More information

TRAINING AT 7 TEV IN THE LHC

TRAINING AT 7 TEV IN THE LHC Chamonix workshop, 25 th January 2010 TRAINING AT 7 TEV IN THE LHC C. Lorin, E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN Acknowledgements: all the colleagues involved

More information

Commissioning of the LHC collimation system S. Redaelli, R. Assmann, C. Bracco, M. Jonker and G. Robert-Demolaize CERN, AB department

Commissioning of the LHC collimation system S. Redaelli, R. Assmann, C. Bracco, M. Jonker and G. Robert-Demolaize CERN, AB department 39 th ICFA Advance Beam dynamics Workshop High Intensity High Brightness Hadron Beams - HB 2006 Tsukuba, May 29 th - June 2 nd, 2006 Commissioning of the LHC collimation system S. Redaelli, R. Assmann,

More information

Status of the LHC Beam Cleaning Study Group

Status of the LHC Beam Cleaning Study Group Status of the LHC Beam Cleaning Study Group R. Assmann, SL BI Review 19.11.2001 BI Review 19.11.01, R. Assmann 1 LHC Beam Cleaning Study Group: Mandate: Study beam dynamics and operational issues for the

More information

Limits to high field magnets for particle accelerators

Limits to high field magnets for particle accelerators IEEE/CSC & ESAS EUROPEAN SUPERCONDUCTIVITY NEWS FORUM, No. 19, January 212 Submitted to ESNF Nov. 16, 211; accepted Nov. 3, 212. Reference No. ST286, Category 6 The published version of this manuscript

More information

A Luminosity Leveling Method for LHC Luminosity Upgrade using an Early Separation Scheme

A Luminosity Leveling Method for LHC Luminosity Upgrade using an Early Separation Scheme LHC Project Note 03 May 007 guido.sterbini@cern.ch A Luminosity Leveling Method for LHC Luminosity Upgrade using an Early Separation Scheme G. Sterbini and J.-P. Koutchouk, CERN Keywords: LHC Luminosity

More information

LHC accelerator status and prospects. Frédérick Bordry Higgs Hunting nd September Paris

LHC accelerator status and prospects. Frédérick Bordry Higgs Hunting nd September Paris LHC accelerator status and prospects 2 nd September 2016 - Paris LHC (Large Hadron Collider) 14 TeV proton-proton accelerator-collider built in the LEP tunnel Lead-Lead (Lead-proton) collisions 1983 :

More information

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics. Normal Form Analysis of the LHC Dynamic Aperture

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics. Normal Form Analysis of the LHC Dynamic Aperture EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 119 Normal Form Analysis of the LHC Dynamic Aperture F. Schmidt, CERN,

More information

STATUS OF LHC COMMISSIONING

STATUS OF LHC COMMISSIONING Proceedings of PAC9, Vancouver, BC, Canada MO1BCI3 STATUS OF LHC COMMISSIONING J. Wenninger, CERN, Geneva Abstract Beam commissioning of the LHC started with injection tests in August 28, and a circulating

More information

Beam-beam issues for LHC upgrade phases 1 and 2

Beam-beam issues for LHC upgrade phases 1 and 2 Beam-beam issues for LHC upgrade phases 1 and U. Dorda, F. Zimmermann, CERN, Geneva, Switzerland Abstract While long-range beam-beam interaction will not be the limiting effect in the first ears after

More information

LUMINOSITY LEVELLING TECHNIQUES FOR THE LHC

LUMINOSITY LEVELLING TECHNIQUES FOR THE LHC Published by CERN in the Proceedings of the ICFA Mini-Workshop on Beam Beam Effects in Hadron Colliders, CERN, Geneva, Switzerland, 18 22 March 2013, edited by W. Herr and G. Papotti, CERN 2014 004 (CERN,

More information

Year- 1 (Heavy- Ion) Physics with CMS at the LHC

Year- 1 (Heavy- Ion) Physics with CMS at the LHC Year- 1 (Heavy- Ion) Physics with CMS at the LHC Edwin Norbeck and Yasar Onel (for the CMS collaboration) University of Iowa For the 26 th Winter Workshop on Nuclear Dynamics Ocho Rios, Jamaica 8 January

More information

Plans for 2016 and Run 2

Plans for 2016 and Run 2 Plans for 2016 and Run 2 Mike Lamont An attempt at synthesis Acknowledgements all round After LS1 It s going to be like after a war Serge Claudet Evian 2012 Where are we? 1/2 6.5 TeV, 2*80 cm, 2*levelled

More information

AFP - TCL collimator studies

AFP - TCL collimator studies AFP - TCL collimator studies LHC Collimation Study Group, 24-Aug-2009 F. Roncarolo The University of Manchester/Cockcroft Institute CERN BE/ABP/LCU Many thanks to C. Bracco, K.Potter, R.Appleby and R.

More information

FCC-hh Final-Focus for Flat-Beams: Parameters and Energy Deposition Studies

FCC-hh Final-Focus for Flat-Beams: Parameters and Energy Deposition Studies FCC-hh Final-Focus for Flat-Beams: Parameters and Energy Deposition Studies Jose L. Abelleira, Leon Van Riesen Haupt, Andrei Seryi, Emilia Cruz Alaniz (JAI-FCC team) Thanks to the CERN FLUKA team 10 th

More information

Lattice Cell/Girder Assembly

Lattice Cell/Girder Assembly SPEAR3 Magnets Jack Tanabe, Nanyang Li, Ann Trautwein, Domenico Dell Orco, Dave Ernst, Zach Wolf (SLAC Magnet Measurements), Catherine L Coq (SLAC Alignment), Jeff Corbett, Bob Hettel (SPEAR3 Physics)

More information

Overview of LHC Accelerator

Overview of LHC Accelerator Overview of LHC Accelerator Mike Syphers UT-Austin 1/31/2007 Large Hadron Collider ( LHC ) Outline of Presentation Brief history... Luminosity Magnets Accelerator Layout Major Accelerator Issues U.S. Participation

More information

COMBINER RING LATTICE

COMBINER RING LATTICE CTFF3 TECHNICAL NOTE INFN - LNF, Accelerator Division Frascati, April 4, 21 Note: CTFF3-2 COMBINER RING LATTICE C. Biscari 1. Introduction The 3 rd CLIC test facility, CTF3, is foreseen to check the feasibility

More information

2 Closed Orbit Distortions A dipole kick j at position j produces a closed orbit displacement u i at position i given by q i j u i = 2 sin Q cos(j i ;

2 Closed Orbit Distortions A dipole kick j at position j produces a closed orbit displacement u i at position i given by q i j u i = 2 sin Q cos(j i ; LHC Project Note 4 March 2, 998 Jorg.Wenninger@cern.ch Quadrupole Alignment and Closed Orbits at LEP : a Test Ground for LHC J. Wenninger Keywords: CLOSED-ORBIT ALIGNMENT CORRECTORS Summary A statistical

More information

Emittance preservation in TESLA

Emittance preservation in TESLA Emittance preservation in TESLA R.Brinkmann Deutsches Elektronen-Synchrotron DESY,Hamburg, Germany V.Tsakanov Yerevan Physics Institute/CANDLE, Yerevan, Armenia The main approaches to the emittance preservation

More information

Experience on Coupling Correction in the ESRF electron storage ring

Experience on Coupling Correction in the ESRF electron storage ring Experience on Coupling Correction in the ESRF electron storage ring Laurent Farvacque & Andrea Franchi, on behalf of the Accelerator and Source Division Future Light Source workshop 2012 Jefferson Lab,

More information

The LHC. Part 1. Corsi di Dottorato Corso di Fisica delle Alte Energie Maggio 2014 Per Grafstrom CERN and University of Bologna

The LHC. Part 1. Corsi di Dottorato Corso di Fisica delle Alte Energie Maggio 2014 Per Grafstrom CERN and University of Bologna The LHC Part 1 Corsi di Dottorato Corso di Fisica delle Alte Energie Maggio 2014 Per Grafstrom CERN and University of Bologna Organizzazione Part 1 Part 2 Part 3 Introduction Energy challenge Luminosity

More information

Status and Outlook of the LHC

Status and Outlook of the LHC Status and Outlook of the LHC Enrico Bravin - CERN BE-BI J-PARC visit seminar 6 July 2017 Outlook Overview of LHC Objectives for run2 Parameters for 2016/2017 and differences w.r.t. 2015 Summary of commissioning

More information

LHC Beam Operations: Past, Present and Future

LHC Beam Operations: Past, Present and Future LHC Beam Operations: Past, Present and Future Maria Kuhn CERN, Geneva, Switzerland Abstract A brief overview of LHC operations over the last 3 years is provided. Luminosity performance has been satisfactory

More information

The TESLA Dogbone Damping Ring

The TESLA Dogbone Damping Ring The TESLA Dogbone Damping Ring Winfried Decking for the TESLA Collaboration April 6 th 2004 Outline The Dogbone Issues: Kicker Design Dynamic Aperture Emittance Dilution due to Stray-Fields Collective

More information

Update on Optics Modeling for the ATF Damping Ring at KEK Studies for low vertical emittance

Update on Optics Modeling for the ATF Damping Ring at KEK Studies for low vertical emittance Update on Optics Modeling for the ATF Damping Ring at KEK Studies for low vertical emittance 2009.05.08. K. Kubo, S. Kuroda, T. Okugi (KEK) M.D. Woodley (SLAC), A. Wolski, K. Panagiotidis (U. Liverpool

More information

Transverse dynamics Selected topics. Erik Adli, University of Oslo, August 2016, v2.21

Transverse dynamics Selected topics. Erik Adli, University of Oslo, August 2016, v2.21 Transverse dynamics Selected topics Erik Adli, University of Oslo, August 2016, Erik.Adli@fys.uio.no, v2.21 Dispersion So far, we have studied particles with reference momentum p = p 0. A dipole field

More information

Ultra-Low Emittance Storage Ring. David L. Rubin December 22, 2011

Ultra-Low Emittance Storage Ring. David L. Rubin December 22, 2011 Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011 December 22, 2011 D. L. Rubin 2 Much of our research is focused on the production and physics of ultra-low emittance beams. Emittance is

More information

The LHC: the energy, cooling, and operation. Susmita Jyotishmati

The LHC: the energy, cooling, and operation. Susmita Jyotishmati The LHC: the energy, cooling, and operation Susmita Jyotishmati LHC design parameters Nominal LHC parameters Beam injection energy (TeV) 0.45 Beam energy (TeV) 7.0 Number of particles per bunch 1.15

More information

Muon reconstruction performance in ATLAS at Run-2

Muon reconstruction performance in ATLAS at Run-2 2 Muon reconstruction performance in ATLAS at Run-2 Hannah Herde on behalf of the ATLAS Collaboration Brandeis University (US) E-mail: hannah.herde@cern.ch ATL-PHYS-PROC-205-2 5 October 205 The ATLAS muon

More information

Beam Dynamics. D. Brandt, CERN. CAS Bruges June 2009 Beam Dynamics D. Brandt 1

Beam Dynamics. D. Brandt, CERN. CAS Bruges June 2009 Beam Dynamics D. Brandt 1 Beam Dynamics D. Brandt, CERN D. Brandt 1 Some generalities D. Brandt 2 Units: the electronvolt (ev) The electronvolt (ev)) is the energy gained by an electron travelling, in vacuum, between two points

More information

LHC Collimation and Loss Locations

LHC Collimation and Loss Locations BLM Audit p. 1/22 LHC Collimation and Loss Locations BLM Audit Th. Weiler, R. Assmann, C. Bracco, V. Previtali, S Redaelli Accelerator and Beam Department, CERN BLM Audit p. 2/22 Outline Introduction /

More information

TUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER

TUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER TUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER B. Mikulec, A. Findlay, V. Raginel, G. Rumolo, G. Sterbini, CERN, Geneva, Switzerland Abstract In the near future, a new

More information

A Method for Greatly Reduced Edge Effects and Crosstalk in CCT Magnets

A Method for Greatly Reduced Edge Effects and Crosstalk in CCT Magnets Wed-Af-Po3.01 1 A Method for Greatly Reduced Edge Effects and Crosstalk in CCT Magnets M. Koratzinos, ETH Zurich, G. Kirby, J. Van Nugteren, CERN, E. R. Bielert, Univ. Illinois at Urbana Abstract Iron-free

More information

Measurement of global and local resonance terms

Measurement of global and local resonance terms PHYSICAL REVIEW SPECIAL TOPICS - ACCELERATORS AND BEAMS 8, 241 25 Measurement of global and local resonance terms R. Tomás, M. Bai, R. Calaga, and W. Fischer Brookhaven National Laboratory, Upton, New

More information

CERN-ATS HiLumi LHC. FP7 High Luminosity Large Hadron Collider Design Study PUBLICATION

CERN-ATS HiLumi LHC. FP7 High Luminosity Large Hadron Collider Design Study PUBLICATION CERN-ATS-2012-290 HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study PUBLICATION INTRA-BEAM SCATTERING AND LUMINOSITY EVOLUTION FOR HL-LHC PROTON BEAMS MICHAELA SCHAUMANN (RWTH AACHEN &

More information

Applications of Accelerators. Prof Rob Edgecock Rutherford Appleton Laboratory and University of Huddersfield

Applications of Accelerators. Prof Rob Edgecock Rutherford Appleton Laboratory and University of Huddersfield Applications of Accelerators Prof Rob Edgecock Rutherford Appleton Laboratory and University of Huddersfield Outline Introduction to particle accelerators - at CERN - used for applications Summary of accelerator

More information

Retraining of the 1232 Main Dipole Magnets in the LHC

Retraining of the 1232 Main Dipole Magnets in the LHC Retraining of the 1232 Main Dipole Magnets in the LHC A. Verweij, B. Auchmann, M. Bednarek, L. Bottura, Z. Charifoulline, S. Feher, P. Hagen, M. Modena, S. Le Naour, I. Romera, A. Siemko, J. Steckert,

More information

EFFECT OF THE FIRST AXIAL FIELD SPECTROMETER IN THE CERN INTERSECTING STORAGE RINGS (ISR) ON THE CIRCULATING BEAMS

EFFECT OF THE FIRST AXIAL FIELD SPECTROMETER IN THE CERN INTERSECTING STORAGE RINGS (ISR) ON THE CIRCULATING BEAMS EFFECT OF THE FIRST AXIAL FIELD SPECTROMETER IN THE CERN INTERSECTING STORAGE RINGS (ISR) ON THE CIRCULATING BEAMS P.J.Bryant and G.Kantardjian CERN, Geneva, Switzerland Introduction and General Description

More information

Beam. RF antenna. RF cable

Beam. RF antenna. RF cable Status of LEP2 J. Wenninger, SL Operation for the SL division LEPC September 1998 Outline Optics and RF for 1998 Beam current limitations Injection and ramp Performance at high energy Conclusions LEPC/15-09-98

More information

LEP 2 Energy Calibration and the Spectrometer

LEP 2 Energy Calibration and the Spectrometer LEP 2 Energy Calibration and the Spectrometer Goals of LEP 2 m W measurement LEP 2 Energy Model the Magnetic Extrapolation Cross-checking with the Flux Loop (no details!) Cross-checking with the Synchrotron

More information

LHC Upgrade Plan and Ideas - scenarios & constraints from the machine side

LHC Upgrade Plan and Ideas - scenarios & constraints from the machine side LHC Upgrade Plan and Ideas - scenarios & constraints from the machine side Frank Zimmermann LHCb Upgrade Workshop Edinburgh, 11 January 2007 Frank Zimmermann, LHCb Upgrade Workshop time scale of LHC upgrade

More information

MAGNETS AND INSERTION DEVICES FOR THE ESRF II

MAGNETS AND INSERTION DEVICES FOR THE ESRF II MAGNETS AND INSERTION DEVICES FOR THE ESRF II OUTLINE Magnetic design R&D and Magnetic measurements IDs & BM sources Summary J. Chavanne G. Lebec C. Benabderrahmane C.Penel On behalf the accelerator upgrade

More information

3.5 / E [%] σ E s [km]

3.5 / E [%] σ E s [km] ZDR - Simulation Studies of the NLC Main Linacs R. Assmann, C. Adolphsen, K. Bane, K. Thompson, T. O. Raubenheimer Stanford Linear Accelerator Center, Stanford, California 9439 May 1996 Abstract This study

More information

Beam-Beam DA Simulations for HL-LHC

Beam-Beam DA Simulations for HL-LHC Beam-Beam DA Simulations for HL-LHC N. Karastathis G. Arduini, X. Buffat, S. Fartoukh, R. de Maria, Y. Papaphilippou on behalf of the HiLumi LHC WP2 Outline: Brief recap of baseline scenario at collisions

More information

Beam Optics for Parity Experiments

Beam Optics for Parity Experiments Beam Optics for Parity Experiments Mark Pitt Virginia Tech (DHB) Electron beam optics in the injector, accelerator, and transport lines to the experimental halls has a significant impact on helicitycorrelated

More information

The Large Hadron Collider Lyndon Evans CERN

The Large Hadron Collider Lyndon Evans CERN The Large Hadron Collider Lyndon Evans CERN 1.9 K 2.728 K T The coldest ring in the universe! L.R. Evans 1 The Large Hadron Collider This lecture. LHC Technologies Magnets Cryogenics Radiofrequency Vacuum

More information

Large Hadron Collider at CERN

Large Hadron Collider at CERN Large Hadron Collider at CERN Steve Playfer 27km circumference depth 70-140m University of Edinburgh 15th Novemebr 2008 17.03.2010 Status of the LHC - Steve Playfer 1 17.03.2010 Status of the LHC - Steve

More information

Polarised e ± at HERA

Polarised e ± at HERA olarised e ± at HERA D.. Barber, E. Gianfelice Deutsches Elektronen-Synchrotron DESY, Notkestrasse 85, D 223 Hamburg, Germany After a short summary of experience with e ± polarisation at the preupgraded

More information

Alignment in Circular Colliders and Specific Requirements for LHC

Alignment in Circular Colliders and Specific Requirements for LHC Alignment in Circular Colliders and Specific Requirements for LHC J-B. Jeanneret CERN AB/ABP IWAA 2004, CERN October 2004 Outline Closed orbit and tolerances Magnetic issues at LHC Aperture issues Survey

More information

BEAM DYNAMICS STUDIES FOR HILUMI LHC

BEAM DYNAMICS STUDIES FOR HILUMI LHC BEAM DYNAMICS STUDIES FOR HILUMI LHC BARBARA DALENA IN COLLABORATION WITH: J. PAYET, A. CHANCÉ, O. GABOUEV The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded

More information

LAYOUT AND SIMULATIONS OF THE FONT SYSTEM AT ATF2

LAYOUT AND SIMULATIONS OF THE FONT SYSTEM AT ATF2 LAYOUT AND SIMULATIONS OF THE FONT SYSTEM AT ATF J. Resta-López, P. N. Burrows, JAI, Oxford University, UK August 1, Abstract We describe the adaptation of a Feedback On Nano-second Timescales (FONT) system

More information

Operation and Performance of the LHCb experiment

Operation and Performance of the LHCb experiment 1 on behalf of the LHCb Collaboration CERN Geneva, Switzerland E-mail: federico.alessio@cern.ch -1 The LHCb experiment collected 37.7 pb of integrated luminosity during the first year of proton collisions

More information

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. First Physics at CMS

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. First Physics at CMS Available on CMS information server CMS CR -2009/034 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 04 February 2009 First Physics at CMS

More information

F. Zimmermann and M.-P. Zorzano, CERN, Geneva, Switzerland

F. Zimmermann and M.-P. Zorzano, CERN, Geneva, Switzerland LHC Project Note 244 11.12.2000 Touschek Scattering in HERA and LHC F. Zimmermann and M.-P. Zorzano, CERN, Geneva, Switzerland Keywords: Touschek effect, beam loss, coasting beam Summary We estimate the

More information

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC Lattice Design for the Taiwan Photon Source (TPS) at NSRRC Chin-Cheng Kuo On behalf of the TPS Lattice Design Team Ambient Ground Motion and Civil Engineering for Low Emittance Electron Storage Ring Workshop

More information

6D weak-strong beam-beam simulations with SixTrack: theory and simulations

6D weak-strong beam-beam simulations with SixTrack: theory and simulations 6D weak-strong beam-beam simulations with SixTrack: theory and simulations Javier Barranco Garcia Ackowledgements: T. Pieloni, R. De Maria, D. Banfi, R. Tomas, A. Valishev, K. Ohmi,... HSC Meeting 13/08/14

More information

Transverse beam stability and Landau damping in hadron colliders

Transverse beam stability and Landau damping in hadron colliders Work supported by the Swiss State Secretariat for Educa6on, Research and Innova6on SERI Transverse beam stability and Landau damping in hadron colliders C. Tambasco J. Barranco, X. Buffat, T. Pieloni Acknowledgements:

More information

Progress on the Large Hadron electron Collider. O. Brüning, E. Nissen, D. Pellegrini, D. Schulte, A. Valloni, F. Zimmermann 1

Progress on the Large Hadron electron Collider. O. Brüning, E. Nissen, D. Pellegrini, D. Schulte, A. Valloni, F. Zimmermann 1 O. Brüning, E. Nissen, D. Pellegrini, D. Schulte, A. Valloni, F. Zimmermann 1 CERN Meyrin, Switzerland E-mail: oliver.bruning@cern.ch, edward.nissen@cern.ch, dario.pellegrini@cern.ch, daniel.schulte@cern.ch,

More information