1 The letter below is the Third Supplementary Target s Statement issued by Marathon Resources Ltd (Marathon). It supplements Marathon s Target s Statement dated 6 November 2013 relating to the on-market bid for all issued shares in the capital of Marathon by Bentley Capital Limited ACN This Supplementary Target s Statement is to be read together with the Target s Statement as supplemented by the first Supplementary Target s Statement issued by Marathon on 3 December 2013 and the second Supplementary Target s Statement issued by Marathon on 9 December Terms used below have the meanings given in section 8 of the Target s Statement. THIRD SUPPLEMENTARY TARGET S STATEMENT Dear Marathon Shareholder, Marathon issues this Third Supplementary Target s Statement to advise of developments in respect of Marathon s exploration activities and the on-market bid by Bentley Capital Limited. SUMMARY Oakvale Native Title Agreement signed Airborne Electromagnetic Survey completed at Walparuta Bentley Capital Will Not Extend Bid Board Confirms Prior Recommendation OAKVALE NATIVE TITLE AGREEMENT Marathon advises that a Native Title Mining Agreement for Exploration under Part 9B of the Mining Act (SA) in respect of the Oakvale Project (EL5202) has been signed between Australian Desalinated Water Pty Ltd and the Wilyakali People s traditional owner representatives. Marathon, which has an option to acquire Australian Desalinated Water Pty Ltd and the right to explore EL5202 (and other tenements) during the option period which runs until 30 June 2017, has sought approval for a 30 hole (615 metre) drilling program with DMITRE and expects to commence drilling for mineral sands in January Native Title clearance for the drilling program is already in place. The total cost of this drilling program is estimated to be $20,000. 1

2 AIRBORNE ELECTROMAGNETIC SURVEY COMPLETED AT WALPARUTA Marathon Resources Ltd (MTN) is pleased to advise that an airborne electromagnetic (REPTEM) survey at the Walparuta Project Area has identified multiple conductive features. Two of these features are considered high priority:- One feature occurs along strike and/or adjacent to outcropping copper mineralisation (Copper Ridge); One occurs within psammitic and chemical metasediments (Creagh Dhubh). South Australia The Walparuta Project Area is located 30 kilometres north of Mannahill (Figure 1) and lies within the Olary Domain of the Curnamona Province. The Project Area is comprised of two tenements (EL s 5306 and 4520) and these tenements encapsulate the majority of the Walparuta Inlier (Figure 2). These two tenements are subject to a Letter of Intent with SAEX Pty Ltd under which Marathon may conduct exploration within SAEX s tenements and acquire a 75% interest. The REPTEM survey was flown on 100 metre spaced flight lines over three key areas within the Walparuta Inlier (Figure 2 Areas 1,2 & 3). Broken Hill Walparuta Adelaide Figure 1 Walpurata Project Area Copper Ridge In its Targets Statement at para 3.1 Marathon stated; Copper Ridge Previous explorers have located a coincidental geochemical and a magnetic anomaly. The largest Cu-Au geochemical anomaly covers an area of 500 x 500 metres. The largest magnetic anomaly is a semi-circular feature with similar dimensions to the geochemical anomaly. Previous mapping has identified haematite (IOCG) type alteration over the area. The target area is located in proximity to the major Walter Outalpa Shear Zone. This prospect has never been drilled and represents a highly prospective Cu-Au target. Contained within this area described in the Target s Statement as an area of 500 x 500 metres and identified by the REPTEM survey (see figure 3) are two anomalies which occur on the margin of a skarn-like feature. The skarn forms a low lying dome shaped feature containing magnetite, garnet and epidote-rich rocks. The area will be mapped in detail 2

3 ahead of ground magnetic and soil geochemical surveys. This field program will commence in mid-january 2014 and targets will be confirmed for a drilling program in Q1 of Creagh Dhubh Project The Creagh Dhubh anomaly occurs within psammitic and chemical metasediments of the Toraminga Formations. Figure 4 is the Conductive Depth Image (CDI) of the anomaly and Figure 5 is the Conductive Depth Slice (CDS) of the anomaly. The geology in the area of the anomaly is complex, with isoclinal folding and faulting. Drill site locations on this anomaly will be determined by detailed geological mapping which will commence in Q1 of If the detailed geological mapping identifies suitable drill site locations drilling is expected to be carried out during BENTLEY CAPITAL WILL NOT EXTEND BID On Thursday 12 December 2013 Bentley Capital Limited (Bentley) announced it would NOT extend the period of its unconditional on-market takeover offer for Marathon at 2.5 cents per share beyond the close of trade on ASX on 18 December 2013 and will not increase the Offer Price, except in circumstances specified, namely Bentley reserves its right to extend the Offer Period, with or without an increase in the Offer Price, if a competing bid is announced during the Offer Period. MARATHON DIRECTORS CONFIRMATION OF RECOMMENDATION TO REJECT OFFER The Directors take this opportunity to confirm their recommendation that you REJECT the Offer. To do this you should simply do nothing and do not sell your Marathon Shares at the Offer Price of 2.5 cents per Marathon Share. The reasons for your Director s recommending that you REJECT the Offer are set out in Section 2 of the Target s Statement. Your Directors continue to believe that the Offer remains inadequate and highly opportunistic. It does not reflect Marathon s prospects. The Offer Price remains at a substantial discount to the current cash backing per Marathon Share and remains below the current market price for Marathon Shares. For further details and discussion see section 2 of the Target s Statement. 3

4 The risks associated with accepting the Offer, selling Marathon Shares in the market or continuing to hold Marathon Shares are outlined and discussed in section 5 and 6 of the Target s Statement. APPROVAL Signed for and on behalf of Marathon Resources Limited by Peter Williams being a Director authorised to sign this Supplementary Target s Statement pursuant to a resolution passed by the Directors. Dated: 13 December 2013 Peter L Williams Chairman Marathon Resources Ltd For Further Information Contact; Marathon Resources Ltd Dr Shad Linley, Managing Director ABN Unit 8, Glen Osmond Road Eastwood, South Australia T: (61 8) F: (61 8) John Field Managing Director Field Public Relations T: (61 8) M(61) (0) Competent Persons Statement The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information reviewed 1 and compiled by Dr. John (Shad) Linley. Dr. Linley is the Managing Director of and a full-time employee of Marathon Resources Ltd and is a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM). Dr. Linley has sufficient experience relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Reserves and Ore Reserves. Dr Linley consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. 1 The geophysical information on which part of this report was based resulted from an airborne electromagnetic survey conducted by a private contractor Geosolutions PtyLtd and its Principal Mr Graham Boyd. 4

5 REPTEM Airborne TDEM Survey Area AREA 1 AREA 2 AREA 3 Adelaide 330kms Olary Broken Hill 140kms REPTEM Airborne TDEM Survey Area 5 Figure 2 - Walparuta Inlier

6 Creagh Dhubh Copper Ridge 6 Figure 3 - EM Flight Lines within Walparuta Inlier

7 Creagh Dhubh WALPARUTA Prospect In-Loop EM Survey PROFILES OF EM RESPONSE Line Figure 4 - Conductive Depth Image, Creagh Dhubh Project 7

8 Creagh Dhubh Figure 5 - Conductive Depth Slice Creagh Dhubh Project 8

Aurora Tank Gold Drilling Update

Aurora Tank Gold Drilling Update ASX ANNOUNCEMENT 19 December 2016 Marmota Limited (ASX: MEU) ( Marmota ) Aurora Tank Gold Drilling Update Marmota is pleased to advise that 31 RC holes at Aurora Tank have now been completed. KEY POINTS

More information

Airborne EM Survey Confirms Multiple VMS Targets at Collerina

Airborne EM Survey Confirms Multiple VMS Targets at Collerina ASX Announcement 2 February 2017 Airborne EM Survey Confirms Multiple VMS Targets at Collerina A 600 line kilometre VTEM Max helicopter borne geophysics survey has been completed over the 25 kilometres

More information

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA HIGHLIGHTS New claims staked covering ~9km 2 to secure a 100% interest in the McCleery Copper-Cobalt Project in the Yukon Territory, Canada ABN

More information

SILVER CITY MINERALS LIMITED ABN Silver City Minerals

SILVER CITY MINERALS LIMITED ABN Silver City Minerals ABN 68 130 933 309 ASX Code: SCI Silver City Minerals Annual General Meeting 20 November 2014 SILVER CITY MINERALS SNAPSHOT BROKEN HILL (Ag-Pb-Zn) Project Review and Prioritization: Focus and Plan Razorback

More information

ASX ANNOUNCEMENT 4 March 2019 VTEM SURVEY COMMENCED OVER LORRAINE AND ADZ PROJECT AREAS

ASX ANNOUNCEMENT 4 March 2019 VTEM SURVEY COMMENCED OVER LORRAINE AND ADZ PROJECT AREAS ASX ANNOUNCEMENT 4 March 2019 VTEM SURVEY COMMENCED OVER LORRAINE AND ADZ PROJECT AREAS The Company is pleased to announce the commencement of a detailed airborne electromagnetic geophysical survey over

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ASX: WIN 16 January 2014 Six- Month Work Programme For Immediate Release Programme CORPORATE DIRECTORY Non Executive Chairman George Cameron- Dow Managing Director & CEO David J Frances

More information

ASX Announcement. FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX: AX8 HIGHLIGHTS. Market Data. Board and Management.

ASX Announcement. FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX: AX8 HIGHLIGHTS. Market Data. Board and Management. FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX Announcement Market Data ASX Code: AX8 Shares on Issue: 47,620,000 Board and Management Grant Mooney Non-Executive Chairman Andrew

More information

For personal use only

For personal use only 12 September 2012 ASX RELEASE ASX Code: WAC FIRST PASS FIELD WORK COMPLETED AT PERU IOCG TARGETS Site visits and reconnaissance sampling has been completed at the Yauca and Chaparra Iron Oxide Copper Gold

More information

For personal use only

For personal use only MEDIA RELEASE 12 April 2017 CITADEL PROJECT RIO TINTO FUNDED 2017 EXPLORATION PROGRAMME Highlights Proposed Rio Tinto Exploration Pty Limited ( Rio Tinto ) funded Exploration Programme for 2017 calendar

More information

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM ASX RELEASE 4 April 2007 REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM The Directors of Hemisphere Resources Limited ( Hemisphere or the Company ) are pleased to announce that a review has been conducted

More information

AGM Presentation 12 November 2013

AGM Presentation 12 November 2013 AGM Presentation 12 November 2013 Disclaimer Exploration Results and Mineral Resources The information in this report that relates to Exploration Results, Exploration Targets, Mineral Resources or Ore

More information

Drilling Program Commences on Iron Oxide Copper Gold Targets

Drilling Program Commences on Iron Oxide Copper Gold Targets 3 June 2008 Manager Company Announcements Company Announcements Office Australian Stock Exchange Limited Level 10, 20 Bond Street SYDNEY NSW 2000 ABN 42 082 593 235 Electronic delivery No of pages: 6 Drilling

More information

For personal use only

For personal use only 28 th November 2018 Market Announcements Platform ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 AMENDMENT ANNOUCEMENT AUROCH STAKES HIGHLY-PROSPECTIVE IOCG PROJECT AT LAKE TORRENS Auroch

More information

COARSE GRAINED MAGNETITE DISCOVERED NORTH OF YORK

COARSE GRAINED MAGNETITE DISCOVERED NORTH OF YORK ASX Release ASX code: MAU 27 April 2012 Level 2, 16 Ord St West Perth WA 6005 PO Box 1388 West Perth WA 6872 Telephone 08 9226 1777 Facsimile 08 9485 2840 info@magres.com.au www.magres.com.au ABN 34 121

More information

Drilling Commences at Telfer West Gold Project

Drilling Commences at Telfer West Gold Project Level 7, 600 Murray Street West Perth WA 6005 PO Box 273 West Perth WA 6872 P 08 9486 9455 F 08 6210 1578 www.enrl.com.au 17 November 2016 ASX : ENR Company Announcements Office Australian Securities Exchange

More information

For personal use only

For personal use only 22 April 2013 Drilling to commence at Majada, Copper-Gold Prospect, Chile. Red Gum Resources Limited (ASX: RGX, Red Gum or the Company ) is pleased to announce that drilling of its Majada Copper-Gold Prospect,

More information

Silver City Minerals

Silver City Minerals ABN 68 130 933 309 ASX Code: SCI Silver City Minerals Annual General Meeting 15 November 2016 1 Important Disclaimer This presentation is provided to you for the sole purpose of providing background technical,

More information

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce

More information

For personal use only

For personal use only ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 28 TH FEBRUARY 2014. EXPLORATION ACTIVITIES Following senior management changes late 2013, a new highly experienced exploration team

More information

High Grade Gold Intercepts at Bangaba

High Grade Gold Intercepts at Bangaba 20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com

More information

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

704,000 OUNCE MIYABI GOLD PROJECT UPDATE 704,000 OUNCE MIYABI GOLD PROJECT UPDATE ASX/ RELEASE 21 April 2016 ASX code RVY Board of Directors: Geoff Gilmour Managing Director Greg Cunnold Technical Director Graeme Clatworthy Non-Executive Director

More information

For personal use only

For personal use only ABN 77 141 335 364 ASX: AAJ For the quarter ending 30 September 2014 HIGHLIGHTS Bulloo Downs Copper Project exploration 2,000km 2 HyMap survey at Bulloo Project completed Increased lengths of mineralisation

More information

New Zone of High Grade Gold Discovered at Balogo

New Zone of High Grade Gold Discovered at Balogo ASX/Media Announcement 12 November 2013 New Zone of High Grade Gold Discovered at Balogo A broad zone of high grade gold mineralisation (Panga Lodes) has been discovered 600m north of the Netiana Lodes.

More information

The Company was admitted to the Official List on 12 November 2010 and its shares commenced trading

The Company was admitted to the Official List on 12 November 2010 and its shares commenced trading ASX ANNOUNCEMENT ST GEORGE MINING LIMITED ASX: SGQ ACN 139 308 973 Level 1, 115 Cambridge Street PO Box 1305, West Leederville WA 6007 www.stgeorgemining.com.au Phone +618 9322 6600 Facsimile +618 9322

More information

Quarterly Activities Report For the Period Ended March HIGHLIGHTS

Quarterly Activities Report For the Period Ended March HIGHLIGHTS Quarterly Activities Report For the Period Ended March 31 2008 HIGHLIGHTS Merceditas Project, Chile Genesis Minerals Limited secured an Option to acquire a 100% interest in the significant Merceditas copper

More information

UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT

UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT ASX ANNOUNCEMENT 1 April 2015 UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT Attached for shareholders information, is an announcement made to the market by Apollo Minerals Limited (ASX:

More information

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width

More information

Spectacular uranium assays from rock sampling. at FYI s Yarlarweelor project in Western Australia

Spectacular uranium assays from rock sampling. at FYI s Yarlarweelor project in Western Australia Tuesday 6 July, 2010 ASX Release (ASX code: FYI ) Spectacular uranium assays from rock sampling at FYI s Yarlarweelor project in Western Australia Uranium assays of 7,992 parts per million (ppm), 4,062

More information

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS Magmatic Resources Ltd Level 1, 11 Lucknow Place West Perth WA 6005 Phone: +61 8 6102 2709 www.magmaticresources.com ASX / MEDIA ANNOUNCEMENT 21 August 2017 RC DRILLING TO RESUME THIS WEEK AT CARLISLE

More information

Magnus Copper Project exploration update

Magnus Copper Project exploration update ASX ANNOUNCEMENT 30 SEPTEMBER 2011 CODE: ALY BOARD OF DIRECTORS Mr Warwick Davies Non-Executive Chairman Mr Robert Brierley Managing Director Mr John Arbuckle Non-Executive Director Mr Jeffrey Moore Non-Executive

More information

AGM Presentation 6 November 2012

AGM Presentation 6 November 2012 AGM Presentation 6 November 2012 November 2012 Disclaimer Exploration Results and Mineral Resources The information in this report that relates to Exploration Results, Exploration Targets, Mineral Resources

More information

Two New WA Projects Introduced into Newcrest Generation Alliance

Two New WA Projects Introduced into Newcrest Generation Alliance Level 7, 600 Murray Street West Perth WA 6005 PO Box 273 West Perth WA 6872 P 08 9486 9455 F 08 9486 8366 21 March 2018 Company Announcements Office Australian Securities Exchange 4th Floor, 20 Bridge

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 24 JUNE 2015 APOLLO MINERALS WINS FUNDING GRANT FOR DRILLING AT FRASER RANGE PROJECT HIGHLIGHTS Apollo Minerals awarded $150,000 funding grant for its Fraser Range project The grant was

More information

ASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects

ASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects ASX Release 14 th September 2010 Corporate Update Divestment of Gold, Copper and Nickel Projects The Directors of ADX Energy Ltd (ASX Code: ADX) are pleased to provide an update in relation to the proposed

More information

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT, 20 June 2008 Companies Announcement Office Via Electronic Lodgement GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT, Fiji. (Geopacific

More information

For personal use only

For personal use only 18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand

More information

The Manager Companies ASX Limited 20 Bridge Street

The Manager Companies ASX Limited 20 Bridge Street ABN 79 106 879 690 10 July 2012 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (5 pages by email) Dear Madam, 1.54 Moz Gold Equivalent Maiden Gold/Copper Resource at Wonogiri The Directors

More information

For personal use only. Copper, Zinc and Uranium Projects in NT and SA ASX CODE: CXO

For personal use only. Copper, Zinc and Uranium Projects in NT and SA ASX CODE: CXO For personal use only Copper, Zinc and Uranium Projects in NT and SA ASX CODE: CXO DISCLAIMER The information in this report that relates to Exploration Results and Mineral Resources is based on information

More information

For personal use only

For personal use only INTEGRATED RESOURCES GROUP LIMITED REPORT ON ACTIVITIES, MARCH 2012 QUARTER HIGHLIGHTS Announcement of company transforming Maryborough Basin project acquisition, expected to be completed in June 2012.

More information

For personal use only

For personal use only 17 December 2012 ASX ANNOUNCEMENT Mining at Zeta Pit ASX/BSE: DML MARKET CAPITALISATION Shares on Issue 487m Share Price A$1.62 Market Cap A$789m Cash (7 Dec) US$72.8m Debt (7 Dec) US$205m ABN 29 104 924

More information

For personal use only

For personal use only DIRECTORS Mr Martin Blakeman Executive Chairman Mr Winton Willesee Non-Executive Director Mr Eric de Mori Non-Executive Director COMPANY SECRETARY Mr Winton Willesee ASX Release 28 August 2012 Newera Commences

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

For personal use only

For personal use only ASX Announcement 15 March 2017 HIGHLIGHTS Drill contractors have been engaged with drilling to commence April 2017 pending access approvals Two mineralised lodes within the oxide volcanogenic massive sulphide

More information

For personal use only

For personal use only Alloy Regains Control of the Horse Well Gold Project ASX Release 29 January 2018 Capital Structure ABN 20 109 361 195 ASX Code AYR Issued Shares 1,266,993,360 Unlisted Options 29,000,000 Corporate Directory

More information

EXPLORING FOR COPPER AND GOLD IN CHILE

EXPLORING FOR COPPER AND GOLD IN CHILE EXPLORING FOR COPPER AND GOLD IN CHILE November 2013 Competent Person Statement The information contained in this report that relates to Exploration Results and Exploration Targets is based on information

More information

Magmatic completes acquisition of the Mt Venn Copper-Nickel-Cobalt Project in Western Australia

Magmatic completes acquisition of the Mt Venn Copper-Nickel-Cobalt Project in Western Australia ASX / Media Release 8 May 2018 Magmatic completes acquisition of the Mt Venn Copper-Nickel-Cobalt Project in Western Australia Highlights Previously announced binding agreement with Montezuma Mining Company

More information

For personal use only

For personal use only Limited ASX code: RNU The Eastern Eyre Copper Project Presented at the South Australian Resources and Energy Investment Conference Adelaide, 14 April 2015 David Christensen, Managing Director 1 Eastern

More information

June 2017 Quarterly Report

June 2017 Quarterly Report ASX ANNOUNCEMENT Date: 31 July 2017 June 2017 Quarterly Report Victory Mines Limited (ASX:VIC) ( Victory or the Company ) provides a review of its activities during the June 2017 quarter. Exploration Western

More information

Victory plans gravity survey for Bonaparte after encouraging rock-chip results

Victory plans gravity survey for Bonaparte after encouraging rock-chip results ASX ANNOUNCEMENT 18 September 2017 Victory plans gravity survey for Bonaparte after encouraging rock-chip results Highlights Rock-chip sampling program at Bonaparte Project returns highly encouraging results

More information

Encouraging drill results from Paroo Range

Encouraging drill results from Paroo Range 17 July 2012 The Manager ASX Company Announcements Office PO Box H224, Australia Square SYDNEY NSW 2001 Encouraging drill results from Paroo Range Highlights Significant uranium mineralisation at the 100%

More information

FIVE RIGS DRILLING AT KARLAWINDA

FIVE RIGS DRILLING AT KARLAWINDA FIVE RIGS DRILLING AT KARLAWINDA Major resource in-fill and extensional drill program well underway at Karlawinda Gold Project with 88 holes already completed ASX ANNOUNCMENT 2 September 2016 Australian

More information

NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR

NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR Activities Report Background NT Resources Limited ( NT Resources or the Company ) holds six granted Exploration

More information

Drilling commenced at Thomson targets

Drilling commenced at Thomson targets ABN: 82 138 358 728 ASX: TMZ Level 1, 80 Chandos Street, St Leonards, NSW 2065 PO Box 956, Crows Nest, NSW 1585 Tel: +61 2 9906 6225 Fax: +61 2 9906 5233 Web: www.thomsonresources.com.au ASX Release 25

More information

For personal use only

For personal use only ASX RELEASE 2 August 2011 Significant Gold intersections at Chameleon Prospect Maiden 15 hole RC drilling programme (3,170 metres) completed by Scotia Gold Rights JV partner, Aphrodite Gold at the Chameleon

More information

For personal use only

For personal use only BOARD OF DIRECTORS Mr Oscar Aamodt Non-Executive Chairman Ms Sofia Bianchi Non-Executive Director Mr Lindsay Dudfield Non-Executive Director Mr Anthony Ho Non-Executive Director ISSUED CAPITAL SHARES 156,852,955

More information

For personal use only

For personal use only ASX:LEG 10 July 2014 Fraser Range Aeromagnetic Survey Identifies Targets Seven priority targets considered prospective for nickel-copper Targets interpreted to relate to intrusive mafic/ultramafic bodies

More information

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project ASX ANNOUNCEMENT 4 December 2018 ASX: NWM Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project Norwest Minerals listed on the ASX 29 th November following its successful $6.6

More information

ASX:TLM. Closing in on world-class copper-gold deposits Annual General Meeting, November 2011

ASX:TLM. Closing in on world-class copper-gold deposits Annual General Meeting, November 2011 ASX:TLM Closing in on world-class copper-gold deposits Annual General Meeting, November 2011 Disclaimer and Competent Person s Statements 2 Disclaimer This presentation is not a prospectus nor an offer

More information

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS 1 November 2007 MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS Highlights Very high gold-in-soil sample results up to 17.3 g/t gold have been received from the Banana Creek Prospect.

More information

ASX:TLM. Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011

ASX:TLM. Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011 ASX:TLM Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011 Disclaimer and Competent Person s Statements 2 Disclaimer This presentation is not a prospectus nor an offer

More information

For personal use only

For personal use only ASX/Media Announcement 16 May 2011 Major Copper-Gold Discovery at Balogo in Burkina Faso Broad high grade copper and gold intercepts obtained from reverse circulation drilling program at the Balogo Project.

More information

For personal use only

For personal use only Renascor Resources Limited ASX code: RNU The Eastern Eyre Copper Project Presented at the Australian Copper Conference Brisbane, 16 June 2015 David Christensen, Managing Director Renascor Resources 1 Renascor

More information

Drilling program commences on Cloncurry and Mount Isa projects

Drilling program commences on Cloncurry and Mount Isa projects 1P P May UASX/Media Announcement st 2009 Drilling program commences on Cloncurry and Mount Isa projects Key Points 1,700 metres reverse circulation drilling program over two prospects on untested geochemical,

More information

For personal use only

For personal use only 25 th June 2018 ASX MARKET RELEASE ASX: AMG AUSMEX COMMENCES MT SURVEY OVER LARGE CONDUCTIVE STRUCTURE BELOW BURRA, SA Ø AUSMEX (AMG) AND UNIVERSITY OF ADELAIDE (UoA) IN COLLABORATION WITH OTHERS (SEE

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ACN 123 567 073 3 July 2014 NEW FRASER RANGE PROJECT AREA AT KITCHENER New 100%-owned exploration licence application covers 203km 2, situated on the Fraser Range Gravity High Enterprise

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 31 AUGUST 2015 HIGH POWERED EM SURVEY AND DRILLING PLANNED AT TWO IDENTIFIED NICKEL PROSPECTS, FRASER RANGE WA HIGHLIGHTS 60km of High powered EM (HPEM) survey due to commence at Plato

More information

EMU NL Annual General Meeting

EMU NL Annual General Meeting EMU NL Annual General Meeting Big Targets in the Maricunga Gold Belt Encouraging Results Getting the job done 9 November 2017 Investment proposition EMU is an ASX listed company seeking to deliver tangible

More information

For personal use only

For personal use only Citadel Project LandTEM Electromagnetic Survey Detailed Update No. 1 Magnum Unlocked Corker Unearthed Highlights The LandTEM electromagnetic survey showed the Magnum Deposit to have a significant electromagnetic

More information

For personal use only

For personal use only South America s Emerging Gold Explorer ASX Release 22 November 2012 OUTSTANDING GEOPHYSICS RESULTS FROM ALUMBRE AND QUINUAL CONCESSIONS HIGHLIGHTS Independent review of the Alumbre and Quinual concessions

More information

Northern Mining Limited 2012 Annual General Meeting Presentation

Northern Mining Limited 2012 Annual General Meeting Presentation NORTHERN MINING LIMITED Northern Mining Limited 2012 Annual General Meeting Presentation www.northernmining.com.au 23 November 2012 NORTHERN MINING LIMITED DISCLAIMER This presentation has been prepared

More information

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary ASX announcement 27 November 2017 Andromeda Metals Limited ABN: 75 061 503 375 Mylo-Frontier Pilbara Gold Project acquisition Corporate details: Summary ASX Code: ADN Cash: $0.546 million (at 30 June 2017)

More information

For personal use only

For personal use only MEDIA RELEASE 10 October 2016 CITADEL PROJECT 2016 RC DRILLING PROGRAMME Highlights Reverse-Circulation (RC) drilling programme up to approximately 6,000m testing 20km corridor of Induced Polarisation

More information

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate 29 th July 2010 June December 2010 Quarterly Report Report 2008 Highlights Wa Project Kandia Prospect» RC drilling defines open ended zones of sediment hosted gold mineralisation at the site of the Kandia

More information

******************* *******************

******************* ******************* This announcement lifts the trading halt requested by the Company on the 13 September 2012 Announcement to the Australian Securities Exchange Monday 17 September 2012 COMPANY UPDATE PARTIALLY UNDERWRITTEN

More information

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE ASX ANNOUNCEMENT 21 APRIL 2017 TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE RC Blade drilling commences at Tandarra Gold Project Up to 3,800 metres planned in 67

More information

For personal use only

For personal use only 31 Ord Street, West Perth WA 6005 PO Box 1941, West Perth WA 6872 +61 8 9322 1003 australianpotash.com.au ABN 58 149 390 394 5 September 2017 EXPLORATION UPDATE AHEAD OF GOLD DRILLING YAMARNA GOLD PROJECT

More information

Acquisition of Kilfoyle Project, Northern Territory

Acquisition of Kilfoyle Project, Northern Territory ASX Announcement 31 May 2018 Level 1, 135 Fullarton Road Rose Park, SA 5067 Australia Telephone +61 (0) 8 8364 3188 Facsimile +61 (0) 8 8364 4288 info@pnxmetals.com.au www.pnxmetals.com.au Acquisition

More information

For personal use only

For personal use only ASX and Media Release 22 June 2018 CÁRMENES COBALT-COPPER PROJECT SPAIN DRILLING APPROVALS GRANTED AND NEW HIGH- PRIORITY TARGETS GENERATED NEAR PROFUNDA COBALT-COPPER MINE ACN 143 042 022 Suite 1, 6 Richardson

More information

Mountain Maid Gold System Displays Major Size Potential

Mountain Maid Gold System Displays Major Size Potential 29 July 2008 The Manager, Companies Australian Securities Exchange Ltd Electronic Announcement System Dear Sir, AXIOM MINING LIMITED (ASX CODE: AVQ) ASX Announcement Mountain Maid Gold System Displays

More information

ASX RELEASE. Drilling Commenced at Monax s Punt Hill Copper-Gold Project

ASX RELEASE. Drilling Commenced at Monax s Punt Hill Copper-Gold Project Exploration Office Warehouse I, 5 Butler Blvd BurbridgeBusinessPark Adelaide Airport SA 5950 Postal Address PO Box 247 Export Park SA 5950 ABN: 96 110 336 733 Tel: +61 8 8375 3900 Fax: +61 8 8375 3999

More information

Market Release October

Market Release October Market Release October 21 2009 Extremely High-grade Molybdenite Zone Christened Little Wizard High-Value JORC Resource Defined Near Merlin Decline Drilling Extends New High-grade Molybdenum Discovery at

More information

High-grade Copper in the Cobar Superbasin. Rob Tyson, Managing Director - Broken Hill Conference

High-grade Copper in the Cobar Superbasin. Rob Tyson, Managing Director - Broken Hill Conference High-grade Copper in the Cobar Superbasin Rob Tyson, Managing Director - Broken Hill Conference Disclaimer The views expressed here other than historical fact constitute forward-looking statements. Forward-looking

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 8 June 2016 Aeromagnetic Interpretation Identifies Pinnacles Targets ASX: NXM Capital Structure Shares on Issue 70.4 million Unlisted Options 3.5 million Corporate Directory Mr Paul Boyatzis

More information

Sipa Resources Limited

Sipa Resources Limited 30 October 2012 Sipa Resources Limited ABN 26 009 448 980 September Quarter 2012 Quarterly ASX Report HIGHLIGHTS The September Quarter, and through October, has seen a very high level of drilling and geophysical

More information

GAWLER IRON PROJECT PROGRESS UPDATE

GAWLER IRON PROJECT PROGRESS UPDATE ASX Release and Media Announcement 18 February 2010 GAWLER IRON PROJECT PROGRESS UPDATE Iron Road Limited (Iron Road, ASX: IRD, IRDO) is pleased to announce that significant progress has been made at the

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 1 May 2015 GOLD AND IOCG DRILLING COMMENCES AT THE TITAN PROJECT, SOUTH AUSTRALIA HIGHLIGHTS Planned 2,150m RC drilling campaign has commenced at the Titan Project in South Australia to

More information

DRIVING NICKEL AND COPPER SULPHIDE DISCOVERY ON THE FRASER RANGE

DRIVING NICKEL AND COPPER SULPHIDE DISCOVERY ON THE FRASER RANGE INVESTOR UPDATE DRIVING NICKEL AND COPPER SULPHIDE DISCOVERY ON THE FRASER RANGE JUNE 2014 Disclaimer The information in this presentation is published to inform you about Classic Minerals Limited and

More information

CRATER MOUNTAIN MAJOR MULTIPLE MINERALISATION EVENTS POTENTIAL ASSOCIATED WITH PORPHYRY SYSTEM NOW IDENTIFIED

CRATER MOUNTAIN MAJOR MULTIPLE MINERALISATION EVENTS POTENTIAL ASSOCIATED WITH PORPHYRY SYSTEM NOW IDENTIFIED Registered Office and Postal Address Gold Anomaly Limited ABN 75 067 519 779 Level 4, 15-17 Young St Sydney, NSW, 2000 Australia Ph (02) 9241 4224 Fax (02) 9252 2335 30 th December 2011 Company Announcements

More information

For personal use only

For personal use only ASX RELEASE DATE 21 AUGUST 2018 TECHNICAL PRESENTATION Alice Queen Limited (the Company) advises that a recording of an investor webinar held today at 1pm (AEST) regarding the attached Technical Presentation

More information

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso ASX/Media Announcement 24 May 2013 New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso A new zone of high grade gold mineralisation has been discovered 1km NE along strike from

More information

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT ABN 17 124 444 122 9 November 2009 SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT HIGHLIGHTS Non-JORC code compliant gold resource of 553,000t @ 2.5g/t gold identified as being hosted

More information

For personal use only

For personal use only ASX Announcement 23 May 2014 DORAY FARMS IN TO EXCITING NEW GOLD PROJECT Doray to explore highly prospective Horse Well Gold Project in north-eastern Goldfields through Joint Venture with Alloy Resources

More information

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam ASX Announcement 28 January 2010 Drill results indicate large Porphyry Copper Gold System at Peenam Highlights: 270 metres of visible copper (gold) mineralisation in first diamond core hole at Peenam Prospect

More information

ASX ANNOUNCEMENT 30th September 2015 ASX: EPM ASX ANNOUNCEMENT Australian Securities Exchange Companies Announcements Office ASX Limited Level 40, Central Park 152-158 St Georges Terrace PERTH WA 6000

More information

For personal use only

For personal use only (ASX:HLX) is a minerals exploration company focused on identification, acquisition and Canbelego Drilling Extends Mineralisation at Depth Assay results from the recent RC/Diamond drilling at the Canbelego

More information

For personal use only

For personal use only ASX Release 23 rd January 2015 Quarterly Activities Report for the period ending 31 December 2014 Highlights Zanthus Ni & Cu Fraser Range MLTEM survey identified several new conductors that represent priority

More information

Annual General Meeting

Annual General Meeting Slide 1 Annual General Meeting 8 November 2010 Slide 2 INVESTMENT HIGHLIGHTS Boddington South Gold Project Located within the Southwest Yilgarn region of Western Australia Gold mineralisation similar to

More information

2010 RIU Sydney Resources Round-up

2010 RIU Sydney Resources Round-up ASX: PEX 2010 RIU Sydney Resources Round-up 11 May 2010 Managing Director Rob Tyson Disclaimer & Competent Persons Statement Disclaimer The views expressed here other than historical fact constitute forward-looking

More information

For personal use only

For personal use only 15 October 2010 ASX/Media Release 17 July 2012 Paste Fill Approval and New Drilling Program at Dargues Reef Initial focus on high priority near-mine gold targets Approval received for use of paste-fill

More information

Alligator commences drilling of TCC4 uranium prospect in Arnhem Land, NT 4 September 2018

Alligator commences drilling of TCC4 uranium prospect in Arnhem Land, NT 4 September 2018 Alligator commences drilling of TCC4 uranium prospect in Arnhem Land, NT 4 September 2018 Highlights The TCC4 prospect represents Alligators most advanced untested undercover uranium target with a large

More information