1 Exploration Technical Report Los Azules Cu-Mo-Au Project, III Region, Chile For Polar Star Mining Corp. Report Prepared by SRK Consulting (Chile) S.A November 2013

2 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page i Los Azules Cu-Mo-Au Project III Region, Chile Polar Star Mining Corp. 10 King Street East, Suite 500 Toronto, Ontario, MSC 1C3 Canada SRK Consulting (Chile) S.A. Av. Vitacura 2939, Piso 5º Las Condes - Santiago Chile santiago@srk.cl website: Tel: +(56-2) Fax: +(56-2) SRK Project Number November, 2013 Compiled by: George Even Principal Geologist QP MAIG, MAusIMM Peer Reviewed by: Ernesto Jaramillo Principal Consultant, SRK geven@srk.cl Author: George Even, Principal Geologist QP, SRK Consulting (Chile) S.A.

3 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page ii Table of Contents 1 Summary Introduction Scope of Work Work Program Basis of the Technical Report Qualification of SRK Acknowledgements Reliance on Other Experts and Disclaimer Property Description and Location Introduction Land Tenure Underlying Ownership Mineral Rights in Chile Accessibility, Climate, Local Resources, Infrastructure and Physiography History Geological Setting,Mineralization and Modeling Regional Geology Property Geology Mineralization Mineralization and Alteration Deposit Type Polar Star Exploration Geological Mapping and Prospecting Geophysical Surveys Surveying Polar Star Drilling 2008 and Sample Preparation, Analyses and Security Sampling and Analysis Sample Security Data Verification Mineral Processing and Metallurgical Testing Mineral Resource Estimation Adjacent Properties Other Relevant Data and Information... 30

4 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page iii 17 Interpretation and Conclusions Recommendations References List of Tables Table 4-1: Los Azules Tenements Table 10-1: Significant intercepts 2008 Drilling Table 10-2: Significant intercepts 2010 Drilling Table 10-3: Collar Coordinates 2008 and 2010 Drilling Table 18-1: Polar Star Los Azules proposed 2014 Exploration Programme List of Figures Figure 2-1: Location of the Los Azules Project... 5 Figure 4-1: Los Azules Tenement Map Figure 7-1: Regional Geology of the Los Azules area Figure 7-2: Los Azules Prospect Geology Figure 9-1: Los Azules IP Chargeability Anomaly Map Figure 10-1: Los Azules 2008 DDH Drilling Figure 10-2: Los Azules 2010 RC Drilling... 25

5 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 1 1 Summary Introduction In October 2011, Polar Star Mining Corporation (Polar Star), a TSX listed company, entered into an agreement with SRK Consulting (Chile) S.A. (SRK) to prepare the following CIM NI Technical Report (Technical Report) of its Los Azules Cu-Mo-Au exploration property located in Chile s Region III (Los Azules Property). The 3,818 hectare Los Azules Property is comprised of 21 concessions. History There are no records of recent systematic exploration in the property area, however, small scale mining has been carried out in the larger breccias pipes since at least the 1930 s whenever copper prices permitted. Currently, two of the larger breccia pipes on an adjacent property are being mined by pirquineros (small-scale independent miners) on a small scale, about tonnes per month, for copper oxide. The two main pits on the Polar Star property were mined in this manner from and approximately 7,500 tonnes of material were mined. This historical information was provided to SRK by Polar Star, but has not been independently verified by SRK and is not necessarily indicative of the mineralization to be found in other areas of the Los Azules property. Geology and Mineralization The property lies along the western edge of the Cabaca de Vaca intrusive which occurs within the Late Cretaceous Paleocene Cu-Au Metallogenic Belt of the Chilean pre-cordillera. This Late Cretaceous batholithic body of essentially tonalite to diorite composition invades lower Cretaceous andesitic to dacitic volcanics and sediments and is host to numerous post-magmatic collapse breccias. These breccias are structurally controlled within a generally north south regional fault zone which also forms the western margin of the Cabaca de Vaca intrusive. The breccias tend to occur in swarms of up to 100 bodies. These swarms are the loci of a number of copper-gold mining districts, one of the larger being the Los Azules District. The property is generally underlain by tonalite to diorite phases of the Cabaca de Vaca batholith, however, on its eastern and southern boundaries a generally sub-horizontal sequence of sub-areal epiclastic sediments and inter-bedded basaltic to andesitic flows overlies the intrusive. Numerous post-magmatic hydrothermal collapse breccia pipes cut the intrusive and to a lesser extent the sediments and are distributed in clusters throughout the property (Figure 7-2). The individual pipes, which are circular to elliptical in plan, range from 5 m to 350 m in diameter. On the property, at least four are over several hundred metres in diameter. The largest of these, the Araya Breccia, is approximately 1,100 metres long and averages 150 metres in width. The breccia pipe locations and shape are strongly controlled by intersecting and generally NNE NE and NW-NNW trending faults. The breccia pipes are also generally enveloped by zones of strong argillic alteration in the host intrusive. This feature can be a useful guide in locating blind pipes. The hydrothermal copper, gold and molybdenum mineralization occurs exclusively in the breccia pipes and may be divided into an early fragment replacement stage, followed by open-space filling. The filling stage consists of tourmaline, accompanied by specularite and followed principally by quartz, chalcopyrite, pyrite (+/- gold), molybdenite and galena. The breccia fragments are generally

6 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 2 intensely argillically altered. All the Los Azules breccia pipes appear to contain uranium, however, no uranium minerals have been identified to date. A zone of surface oxidation up to 150 metres deep has produced a blanket of readily leachable copper minerals including atacamite, chrysocolla, brocanthite, copper wad and copper pitch. Locally, an irregular zone of secondary sulphide enrichment consisting essentially of chalcocite and minor pyrite is developed at the base of the oxide zone. Exploration and Drilling During June-July 2007 Polar Star personnel conducted prospecting and reconnaissance mapping programs over the larger pipes which were also checked for uranium using an Exploranium GS135 gamma ray spectrometer. All the breccia pipes tested consistently recorded values of over 100 ppm up to highs of 550 ppm equivalent uranium. Three bulk samples of kilograms were also taken from the main pit on the Araya breccia pipe. These samples were analysed by the Chilean Institute of Mining and Metallurgy in La Serena, Chile and assayed from % total copper, % molybdenum and 106 to 1130 ppm uranium. During July 2009, geological mapping and prospecting surveys employing hand held gamma ray spectrometers were completed by Polar Star personnel over most of the company s claims east and north of the Araya breccia pipe. These surveys outlined several zones of multiple breccia pipes and alteration with associated copper oxides assaying up to 4.4 % copper, 0.08% molybdenum, 0.29 g/t gold and 250 ppm uranium. During December 2009 and May 2010, Quantec Geoscience of Santiago Chile, completed a 41 line kilometer pole-dipole IP/Resistivity survey over the Los Azules area. The survey results show a moderate to strong chargeability anomaly at least 2.9 km long and up to 1.7 km wide that underlies the breccias pipe swarms at depths of from 50 metres to over 250 metres. Within this anomaly there are four centres of strong chargeability which generally coincide with surface areas of mineralised breccias and or strong argillic alteration. During the first half of 2008 Major Drilling Chile S.A., on behalf of Polar Star, completed a 2,100 metre diamond drill (DDH) program, consisting of five fences of holes spaced at 200m intervals along the axis of the main Araya pipe. This program mainly tested the oxidised upper 150 metres of the breccia pipe and returned intercepts ranging from 42 m grading 0.67% total copper to 24 m grading 1.1% total copper as indicated in Table The principle zone of oxide mineralisation was encountered along the southeast flank of the breccia pipe over a strike length of about 800 metres and to a vertical depth of about 100 metres and is mainly confined to the matrix of the breccia. Primary sulphide mineralisation consisting of disseminated and veinlet chalcopyrite, molybdenite and minor pyrite in both breccia and altered host intrusive was intersected in hole LA which yielded 0.41% copper over 120 metres. This was the deepest hole drilled and may suggest a porphyry source below the mineralised breccia pipe. Between late October and early December 2010, Polar Star, completed a 3,693 metre, 15 hole reverse circulation (RC) drill program. This program was designed to test a variety of coincident geological, geochemical and Induced Polarization (IP) targets within a 1.5 km wide by 2 km long zone of argillic and phyllic altered porphyritic intrusives containing numerous copper-molybdenumgold and uranium bearing quartz-tourmaline breccia pipes. This area is generally underlain by a moderate to strong IP chargeability anomaly extending from 50 to over 250 metres in depth and had never been drilled before.

7 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 3 Based on geological interpretation and the results of the reconnaissance RC program, this IP anomaly appears to reflect a large body of primary, pyrite-chalcopyrite-molybdenite disseminated and veinlet mineralisation with significant gold, rhenium and uranium enrichment. Both the alterationmineralisation and IP chargeability zones are open to the northeast and at depth. Interpretation and Conclusions Polar Star s surface geological and geochemical exploration programs today have outlined a northeast elongate, approximately 8 square kilometer area containing a swarm of at least 90 quartztourmaline breccia pipes many of which contain variable amounts of copper, molybdenum, gold and uranium mineralisation. This swarm of pipes is generally enveloped by an extensive zone of argillic alteration which also is variable anomalous in copper, molybdenum, gold and uranium. Induced Polarisation geophysical surveys over this zone detected a moderate to strong chargeability anomaly at least 2.9 km long and up to 1.7 km wide that underlies the breccia swarm at depths of from 50 metres to over 250 metres. The two subsequent reconnaissance drilling programs; a) targeting the Araya Breccia pipe in 2008 and b) the stronger IP chargeability centres in the northeast half of the zone in 2010 cut significant intercepts of oxide copper, molybdenum and gold mineralisation in the Araya Breccia pipe plus disseminated and veinlet primary pyrite-chalcopyritemolybdenite mineralisation with significant gold, rhenium and uranium enrichment in strong IP centers. The latter is generally hosted by an argillic to phyllic altered feldspar porphyritic felsic intusive and associated quartz-tourmaline breccias. The style of mineralisation and alteration appears similar to low flourine copper-molydenum porphyry systems. This evidence is the primary basis for the planned future exploration by Polar Star at Los Azules, which SRK believes is a valid basis and approach for the next drill programme. Recommendations Polar Star believes that a large porphyry system is the source of the mineralization at Los Azules which lies at shallow depth below the 3 kilometre square area of alteration and mineralised breccia pipes and plans to follow up with a another drill program in the near future. SRK is of the opinion that this exploration concept has merit as evidenced by SRK s experience with other prospects in Chile where porphyry copper deposits and associated hydrothermal alteration are in close proximity to mineralised breccias pipes. SRK also recommends that a QA/QC sample and laboratory analysis programme be implemented for the next drilling campaign, inserting duplicate, blank and certified reference materials samples into the sample stream. Regular check assays at another laboratory should also be carried out. Evaluation of the results of this QA/QC programme must be done on a regular basis during the drill campaign. When QA/QC analyses are completed after the drill campaign, it can be too late for making necessary adaptations and corrections. Polar Star considers that both the Araya Breccia pipe oxide mineralisation and the primary sulphide mineralisation need to be followed up with more detailed drilling programs. A two-phase reverse circulation drilling program is proposed by Polar Star to follow up on the results of the 2008 and 2010 reconnaissance drilling programs. 1. Infill drilling on 100m sections along the southeast flank of the Araya Breccia with a view to establishing at least an inferred oxide resource and; 2. Infill and step-out drilling in the northeast sector of the IP highs.

8 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 4 SRK is in general agreement with the potential to find additional mineralization to the northeast and at depth and that additional and deeper drilling is warranted. SRK also concurs with the plan for infill and step-out drilling as mentioned above. The drilling programme outlined for 2014 should allow Polar Star to test their mineralization interpretation at Los Azules and test the continuity of the mineralization leading to a mineral resource calculation.

9 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 5 2 Introduction In November, 2007, SRK Consulting (Chile) S.A. ( SRK or SRK Chile ) was asked by Polar Star Mining (Polar Star or Client), a TSX listed company, to visit their Los Azules Cu-Mo-Au Exploration Project, located in Chile s III Region to review the drilling and sampling procedures for their first drill campaign, visit surface outcrops of the mineralised area, assess the exploration potential and prepare an NI technical report commensurate with this project in an early exploration stage. Figure 2-1: Location of the Los Azules Project

10 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 6 SRK issued the NI technical report on the Los Azules Project on February 16, No work has been conducted on the property since that date, however, in September 2013, Polar Star requested that SRK update that report to reflect that the project belongs 100% to Polar Star and that there are currently no agreements or pending agreements with other parties. This report also shows the current claim situation and the revised exploration budget for Scope of Work The scope of the work is consistent with the NI items to be developed in the technical report considering the task of producing a technical report on the exploration of the Los Azules property. The areas of development and the activities under SRK responsibility, as agreed upon in the proposal, are described as follows: 1. Make a site visit to review the drilling and sampling protocols of Polar Star, as well as view surface outcrops 2. Review the geologic information provided by Polar Star as well as the drill hole database. 3. Prepare a technical report following the guidelines of the Canadian Securities Administrators National Instrument and Form F1, and in conformity with generally accepted CIM Exploration Best Practices guidelines. 2.2 Work Program The work program involved a field visit to the Los Azules property on January 29-30, 2008 to review the diamond drilling, sampling and logging procedures employed by Polar Star during that first drill programme, as well as view surface rock outcrops. The visit was made by SRK Chile geologist, Mr. George Even, a Qualified Person (according to NI criteria). He was accompanied to the site by Polar Star personnel. Several meetings were held in the SRK Chile office with Polar staff during the course of this study. Mr. Even again visited the Los Azules property on December 29, 2011, where he verified the collar coordinates of the 15 reverse circulation holes drilled during the 2010 campaign. 2.3 Basis of the Technical Report This report is based on information collected by SRK during the site visit and on additional information provided by Polar Star. The information contained herein is based on information believed to be reliable. This technical report is based on the following sources of information: Discussions with Polar Star personnel and reports prepared by Polar Star on the Los Azules property; Personal inspection of the Los Azules project area; Inspection and review of drill core from the Los Azules Project; Review of historical exploration work conducted on the property; Additional information obtained from public domain sources.

11 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page Qualification of SRK The SRK Group comprises over 1,500 professionals, offering expertise in a wide range of resource engineering disciplines. The SRK Group s independence is ensured by the fact that it holds no equity in any project and that its ownership rests solely with its staff. This permits SRK to provide its clients with conflict-free and objective recommendations on crucial judgment issues. SRK has a demonstrated track record in undertaking independent assessments of Mineral Resources and Mineral Reserves, project evaluations and audits, technical reports and independent feasibility evaluations to bankable standards on behalf of exploration and mining companies and financial institutions worldwide. The SRK Group has also worked with a large number of major international mining companies and their projects, providing mining industry consultancy service inputs. This technical report was compiled by Mr. George Even, MAIG (#3616), MAusIMM (Geology, #228861). A site visit was made to the Los Azules property from 29 to 30 January, 2008 by SRK geologist, Mr. George Even, who was accompanied to the site by Polar personnel. This visit had as its purpose to review the data available, particularly verifying the information used in the drill hole database, as well as procedures used during the drilling campaigns. Mr. Even again visited the Los Azules property on December , where he verified the collar coordinates of the 15 reverse circulation holes drilled during the 2010 campaign. 2.5 Acknowledgements SRK would like to acknowledge the support and collaboration provided by Polar Star personnel for the preparation of this report.

12 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 8 3 Reliance on Other Experts and Disclaimer SRK s opinion contained herein and effective February 16, 2012, is based on information provided to SRK by Polar Star throughout the course of SRK s investigations, which in turn reflect various technical and economic conditions at the time of writing. Given the nature of the mining business, these conditions can change significantly over relatively short periods of time. Consequently actual results may be significantly more or less favorable. SRK is not an insider, associate or an affiliate of Polar Star Mining and neither SRK nor any affiliate has acted as advisor to Polar Star or its affiliates in connection with this project. The results of the technical review by SRK are not dependent on any prior agreements concerning the conclusions to be reached, nor are there any undisclosed understandings concerning any future business dealings. SRK has not independently researched ownership information of the Los Azules property claim title documents as these are mostly legal in nature. However, based on a detailed review by Polar Star s Chilean lawyers Carey y CIA of Santiago, all the claims appear to have been processed correctly and are currently up to date with their annual fees. The latest documents from Carey y CIA, dated January 16, 2012, were reviewed and SRK statements regarding the state of the properties are wholly based on the opinions expressed by Carey y CIA. The documents are entitled: Polar Star Mining / Azules Project Mining Properties, January 16, 2012 and Annexes I and II. SRK s reliance on the information provided by Carey y CIA applies to all of Section 4 of this report. The Los Azules project is an early stage project with exploration potential. Polar Star is continuing with exploration activities at the site. The opinions expressed in this Report have been based on the information supplied to SRK Consulting (Chile) S.A., (SRK) by Polar Star Mining Corporation (Polar Star). The opinions in this Report are provided in response to a specific request from Polar Star to do so. SRK has exercised all due care in reviewing the supplied information. Opinions presented in this report apply to the site conditions and features as they existed at the time of SRK s investigations, and those reasonably foreseeable. These opinions do not necessarily apply to conditions and features that may arise after the date of this Report, about which SRK had no prior knowledge nor had the opportunity to evaluate. SRK s reliance on information provided by Polar Star applies to all Sections of this report.

13 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 9 4 Property Description and Location 4.1 Introduction The Los Azules property consists of a group of 21 concessions, totaling 3,818 hectares (Table 4-1). It is located 65 kilometres east of Copiapó and about 600 kilometres north of Santiago. The centre of the property is located at 417,500E 6,971,000N (Figure 4-1). Access from Copiapó is by wellmaintained public roads except for the last few kilometers which is along tertiary dirt roads which is privately maintained. According to Chilean law, owners of mining claims are to be given access to perform work on those claims even though they are not the owners of the surface property. The owner of the claims would need to come to an agreement with the surface owner regarding the nature of the access, particularly if new roads are to be built, or other surface disturbance is contemplated during the exploration programme. Drilling to date has not required permits, however, if more closely spaced grid drilling is planned in future explorations, a permit would be required from the government entity, Sernageomin. A plan of operations would need to be submitted to them indicating what intervention is planned in the area showing the drill hole locations and roads to be built. The project does not lie within environmentally protected areas or indigenous reservations. The property covers part of the historic Los Azules copper-gold mining district which is periodically active during times of high metal prices. There are, however, no known current environmental liabilities. No other risks involving the property are know at this time Land Tenure Polar Star (through its wholly-owned subsidiary Minera Celeste Chile Ltda.) holds 100% title to 16 exploitation concessions totaling 2,818 hectares and 5 exploration concessions totaling 1,000 hectares, for an overall total of 3,818 hectares. The author did not complete an independent review of the Azules property claim title documents as these are mostly legal in nature. However, based on the review by Polar Star s Chilean lawyers Carey y CIA of Santiago, dated January 16, 2012 and updated information supplied in October, 2013, all the claims appear to have been processed correctly and are currently up to date with their annual fees. The following are the exploitation and exploration concessions at Los Azules.

14 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 10 Table 4-1: Los Azules Tenements ClaimName Area (hectares) Year Status Registry CBM Celeste 3, 1 to Constituted Exploitation Copiapó Celeste 4, 1 to Constituted Exploitation Copiapó Celeste 5, 1 to Constituted Exploitation Copiapó Celeste 6, 1 to Constituted Exploitation Copiapó Celeste 10, 1 to Constituted Exploitation Copiapó Celeste 11, 1 to Constituted Exploitation Copiapó Celeste 12, 1 to Constituted Exploitation Copiapó Celeste 13, 1 to Constituted Exploitation Copiapó Celeste 14, 1 to Constituted Exploitation Copiapó Celeste 15, 1 to Constituted Exploitation Copiapó Celeste 17, 1 to Constituted Exploitation Copiapó Celeste 18, 1 to Constituted Exploitation Copiapó Olvidada, 1 to Constituted Exploitation Copiapó Azulita II, 1 to In Review Exploitation Copiapó Azul IV, 1 to Constituted Exploitation Copiapó Azul 1/ Constituted Exploitation Copiapó Azulino Constituted Exploration Copiapó Azulino Constituted Exploration Copiapó Azulino Constituted Exploration Copiapó Azulino Constituted Exploration Copiapó Azulino Constituted Exploration Copiapó

15 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 11 Figure 4-1: Los Azules Tenement Map

16 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page Underlying Ownership As mentioned above in sub-section 4.1.1, Polar Star (through its wholly-owned subsidiary Minera Celeste Chile Ltda.) holds 100% title to all 21 concessions totaling 3,818 hectares. 4.3 Mineral Rights in Chile In accordance with Chilean mining legislation, there are two types of mining concessions in Chile; exploration concessions and exploitation concessions. The principal characteristics of each are the following: Exploration Concessions the titleholder of an exploration concession has the right to carry out all types of mining exploration activities within the area of the concession. Exploration concessions can overlap or be granted over the same area of land however, the rights granted by an exploration concession can only be exercised by the titleholder with the earliest dated exploration concession over a particular area. For each exploration concession the titleholder must pay an annual fee of approximately US$1 per hectare to the Chilean Treasury and exploration concessions have durations of two years. At the end of this period, they may (i) be renewed as an exploration concession for two further years in which case at least 50% of the surface area must be renounced, or (ii) be converted, totally or partially, into exploitation concessions. A titleholder with the earliest dated exploration concession has a preferential right to an exploitation concession in the area covered by the exploration concession, over any third parties with a later dated exploration concession for that area or without an exploration concession at all and must oppose any applications made by third parties for exploitation concessions within the area for the exploration concession to remain valid. Exploitation Concessions The titleholder of an exploitation concession is granted the right to explore and exploit the minerals located within the area of the concession and to take ownership of the minerals that are extracted. Exploitation concessions cannot overlap or be granted over the same area of land. Exploitation Concessions are of indefinite duration and an annual fee is payable to the Chilean Treasury in relation to each exploitation concession of approximately US$5 per hectare. Where a titleholder of an exploration concession has applied to convert the exploration concession into an exploitation concession, the application for the exploitation concession and the exploitation concession itself is back dated to the date of the exploration concession. A titleholder to an exploitation concession must apply to annul or cancel any exploitation concessions which overlap with the area covered by its exploitation concession within a certain time period in order for the exploitation concession to remain current, otherwise, the overlapping claim holder can challenge the ownership of the mining property.

17 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 13 5 Accessibility, Climate, Local Resources, Infrastructure and Physiography The Los Azules property is readily accessible year round by paved and good gravel road from the city of Copiapó 65 kilometers to the west. The property is located within the Atacama Desert region of Chile with average annual precipitation of under 10 mm. The project may be worked on year-round. The city of Copiapó, with a population of about 120,000 is an active mining centre with full services, a skilled mining workforce and several local processing plants and metallurgical plant. High tension electrical power and water are available within 15 kilometers of the property. The property covers a low dissected plateau on the edge of the Chilean pre-cordillera with a mean elevation of about 2,000 metres. Vegetation consists of sparse desert scrub and occasionally, cactus.

18 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 14 6 History There are no records of recent systematic exploration in the property area, however, small scale mining has been carried out in the larger breccias pipes since at least the 1930 s whenever copper prices permitted. Currently, two of the larger breccia pipes on an adjacent property are being mined by pirquineros (small-scale independent miners) on a small scale, about tonnes per month, for copper oxide in the 3-5% range (verbal communication from the miners). The two main pits on the Polar Star property were mined in this manner from and approximately 7,500 tonnes of material at similar grades are estimated to have been produced during this period. This information was provided to SRK by Polar Star, but has not been independently verified by SRK and is not necessarily indicative of the mineralization in other areas of the Los Azules property.

19 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 15 7 Geological Setting,Mineralization and Modeling 7.1 Regional Geology The property lies along the western edge of the Cabaca de Vaca intrusive which occurs within the Late Cretaceous Paleocene Cu-Au Metallogenic Belt of the Chilean pre-cordillera (Figure 7-1). This Late Cretaceous batholithic body of essentially tonalite to diorite composition invades lower Cretaceous andesitic to dacitic volcanics and sediments and is host to numerous post-magmatic collapse breccias. These breccias are structurally controlled within a generally north south regional fault zone which also forms the western margin of the Cabaca de Vaca intrusive. The breccias tend to occur in swarms of up to 100 bodies. These swarms are the loci of a number of copper-gold mining districts, one of the larger being the Los Azules District. The following figure shows the regional geology of the Los Azules area. The Los Azules property boundary is indicated by the orange polygon just below the name Los Azules in the figure.

20 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 16 Figure 7-1: Regional Geology of the Los Azules area

21 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page Property Geology The property is generally underlain by tonalite to diorite phases of the Cabaca de Vaca batholith, however, on its eastern and southern boundaries a generally sub-horizontal sequence of sub-areal epiclastic sediments and inter-bedded basaltic to andesitic flows overlies the intrusive. Numerous post-magmatic hydrothermal collapse breccia pipes cut the intrusive and to a lesser extent the sediments and are distributed in clusters throughout the property (Figure 7-2). The individual pipes, which are circular to elliptical in plan, range from 5 m to 350 m in diameter. On the property, at least four are over a few hundred metres in diameter. The largest of these, the Araya Breccia, is approximately 1,100 metres long and averages 150 metres in width. The breccia pipe locations and shape are strongly controlled by intersecting and generally NNE NE and NW-NNW trending faults. The breccia pipes are also generally enveloped by zones of strong argillic alteration in the host intrusive. This feature can be a useful guide in locating blind pipes. This information regarding nearby properties was provided to SRK by Polar Star, but has not been independently verified by SRK and is not necessarily indicative of the mineralization on the Los Azules property. Figure 7-2: Los Azules Prospect Geology

22 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page Mineralization Mineralization and Alteration The hydrothermal copper, gold and molybdenum mineralization occurs exclusively in the breccia pipes and may be divided into an early fragment replacement stage, followed by open-space filling. The filling stage consists of tourmaline, accompanied by specularite and followed principally by quartz, chalcopyrite, pyrite (+/- gold), molybdenite and galena. The breccia fragments are generally intensely argillically altered. All the Los Azules breccia pipes appear to contain uranium. Carnotite is the only uranium mineral that has been identified to date. A zone of surface oxidation up to 150 metres deep has produced a blanket of readily leachable copper minerals including atacamite, chrysocolla, brocanthite, copper wad and copper pitch. Locally, an irregular zone of secondary sulphide enrichment consisting essentially of chalcocite and minor pyrite is developed at the base of the oxide zone.

23 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 19 8 Deposit Type The principle deposit types identified to date on the Los Azules property are post-magmatic hydrothermal collapse breccia pipes of Late Cretaceous Paleocene age. These breccias are thought to be related to the latest phases of crystallisation of the Cabaca de Vaca pluton. The hydrothermal mineralization of the pipes may be divided into an early fragment replacement stage, followed by open-space filling. The filling stage consists of tourmaline, accompanied by specularite and followed principally by quartz, chalcopyrite, pyrite (+/- gold), molybdenite and galena. About 100 of these pipes have previously been recognized in the Los Azules District. The individual pipes, which are circular to elliptical in plan, range from 5 m to 350 m in diameter.. This information regarding nearby properties was provided to SRK by Polar Star, but has not been independently verified by SRK and is not necessarily indicative of the mineralization on the Los Azules property. Polar Star is also of the opinion that the 2010 RC drilling indicates the possibility that a coppermolybdenum (rhenium) porphyries beneath the northeast part of the IP geophysical grid survey. The style of mineralisation and alteration appears to be similar to low flourine copper-molydenum porphyry systems.

24 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 20 9 Polar Star Exploration 9.1 Geological Mapping and Prospecting During June-July 2007 Polar personnel conducted prospecting and reconnaissance mapping programs over the larger pipes (shown in Figure 9-1 by the purple areas)which were also checked for uranium using an Exploranium GS135 gamma ray spectrometer. The geochemical samples were representative composite chip samples each with an average weight of about 3 kg taken directly from visible mineralised bedrock over an area of approximately 5 square metres. The objective of these samples was to identify areas of relative enrichment in Cu, Mo and U. Sample density is relative to the exposure of bedrock outcrops and the samples were not on a regular grid. All the breccia pipes tested consistently recorded values of over 100 ppm up to highs of 550 ppm equivalent uranium. Three bulk samples of kilograms each were also taken from the northwest face of the main pit on the Araya breccia pipe. Each sample is comprised of 10 contiguous individual 3 metres long continuous chip samples. There are no known reasons to expect that these samples would be biased. The samples were analysed by the Chilean Institute of Mining and Metallurgy laboratory (CIMM) in La Serena, Chile and assayed from % totalcopper, % molybdenum and 106 to 1130 ppm uranium. The CIMM laboratory is independent of both Polar Star and RedQuest and is registered to ISO 9001:2008. During July 2009, geological mapping and prospecting surveys employing hand held gamma ray spectrometers were completed by Polar personnel over most of the company s claims east and north of the Araya breccia pipe. These surveys outlined several zones of multiple breccia pipes and alteration with associated copper oxides assaying up to 4.4 % copper, 0.08% molybdenum, 0.29 g/t gold and 250 ppm uranium. 9.2 Geophysical Surveys During December 2009 and May 2010, Quantec Geoscience of Santiago Chile, completed a 41 line kilometer pole-dipole IP/Resistivity survey over this area. The survey used 200 metre spaced NW-SE trending lines and 100m a spacings. The survey results show a moderate to strong chargeability anomaly at least 2.9 km long and up to 1.7 km wide that underlies the breccias pipe swarms at depths of from 50 metres to over 250 metres. Within this anomaly there are four centres of strong chargeability which generally coincide with surface areas of mineralised breccias and or strong argillic alteration (Figure 9-1).

25 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 21 Figure 9-1: Los Azules IP Chargeability Anomaly Map 9.3 Surveying Holes drilled at Los Azules were relatively short (only 6 of the 30 holes reached to 300m) and little deviation would be expected from those holes. SRK considers, however, that for the next drill campaign it would be recommended to survey the deviation of some of the holes to confirm that there is no significant deviation.

26 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page Polar Star Drilling 2008 and 2010 During the first half of 2008 Major Drilling Chile S.A., on behalf of Polar Star, completed a 2,100 metre diamond drill (DDH) program, consisting of five fences of holes spaced at 200m intervals along the axis of the main Araya pipe (Figure 10-1). This program mainly tested the oxidised upper 150 metres of the breccia pipe and returned intercepts ranging from 42 m grading 0.67% total copper to 24 m grading 1.1% total copper as indicated in Table The breccia bodies are interpreted to be steeply dipping and the inclination of the holes varied between -20 to -90 from the horizontal, however, the majority of the holes were designed to cut the mineralized zones obliquely to perpendicularly. The true widths of the mineralised zones cannot be interpreted confidently at this time because of a lack of more closely spaced drilling. This will be done after the next drill hole campaign when a geological model will be constructed and a resource estimation performed. The principle zone of oxide mineralization was encountered along the southeast flank of the Araya breccia pipe over a strike length of about 800 metres and to a vertical depth of about 100 metres and is mainly confined to the matrix of the breccia. Primary sulphide mineralisation consisting of disseminated and veinlet chalcopyrite, molybdenite and minor pyrite in both breccia and altered host intrusive was intersected in hole LA which yielded 0.41% copper over 120 metres. This was the deepest hole drilled and may suggest a porphyry source below the mineralised breccia pipe. Between late October and early December 2010, Geo-Operaciones Chile Ltda., on behalf of Polar Star, completed a 3,693 metre, 15 hole reverse circulation (RC) drill program. This program was designed to test a variety of coincident geological, geochemical and Induced Polarization (IP) targets within a 1.5 km wide by 2 km long zone of argillic and phyllic altered porphyritic intrusives containing numerous copper-molybdenum-gold and uranium bearing quartz-tourmaline breccia pipes (Figure 10-1). This area is generally underlain by a moderate to strong IP chargeability anomaly extending from 50 to over 250 metres in depth and has never been drilled before. Significant intercepts from this program are indicated in Table Based on geological interpretation and the results of the reconnaissance RC program, this IP anomaly appears to reflect a large body of primary, pyrite-chalcopyrite-molybdenite disseminated and veinlet mineralisation with significant gold, rhenium and uranium enrichment. Both the alterationmineralisation and IP chargeability zones are open to the northeast and at depth. The mineralisation is generally hosted by an argillic to phyllic altered feldspar porphyritic felsic intusive and associated quartz-tourmaline breccias. The style of mineralisation and alteration appears to be similar to low flourine copper-molydenum porphyry systems. Polar Star believes that a large porphyry system is the source of the mineralization and lies at shallow depth below the 3 kilometre square area of alteration and mineralised breccia pipes and plans to follow up with a another drill program in the near future (Figure 10-2).

27 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Figure 10-1: GE/dt Page 23 Los Azules 2008 DDH Drilling R_ _SRK_Polar_Star_ _Rev0 7-Nov-13

28 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 24 Table 10-1: Significant intercepts 2008 Drilling Hole # From To Intercept Cu Mo Au U (m) (m) (m) % % ppm ppm LA including including LA including including LA including LA including LA including LA LA No significant values LA LA LA LA LA LA LA No significant values LA

29 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 25 Figure 10-2: Los Azules 2010 RC Drilling

30 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 26 Table 10-2: Significant intercepts 2010 Drilling Hole Number From To Width Cu Mo Au Re U (m) (m) (m) % % ppm ppm ppm AZRC including AZRC including AZRC10-03 no significant values AZRC Anomalous in Cu, Mo, U, Re AZRC including AZRC AZRC AZRC including AZRC including AZRC AZRC Anomalous in Cu Anomalous in Mo, Re Anomalous in Cu, Mo, U, Re AZRC Anomalous in Cu, Mo, Re Anomalous in Cu, Mo, Re AZRC including AZRC including AZRC

31 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 27 Table 10-3: Collar Coordinates 2008 and 2010 Drilling DRILL HOLE UTM EAST UTM NORTH ELEV. (masl) LENGTH (m) AZIMUTH DIP AZRC AZRC AZRC AZRC AZRC AZRC AZRC AZRC AZRC AZRC AZRC AZRC AZRC AZRC AZRC LA LA LA LA LA LA LA LA LA LA LA LA LA LA LA SRK is of the opinion that there are no known factors relative to the drilling, sampling or recoveries that could materially impact the accuracy and reliability of the results.

32 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page Sample Preparation, Analyses and Security 11.1 Sampling and Analysis Outcrop samples where composite chip samples cut manually by Polar Star staff using moils and hammers. These samples were tagged, bagged and sealed at site. Individual diamond drill core samples where halved using a hydraulic core splitter, one half bagged and sealed on site for assay the other half retained on site in sealed wooden core boxes for future reference. Sampling intervals were dictated mineralogical and lithological changes within the holes. Reverse circulation drill hole cuttings samples were reduce to two splits of approximately 4 kilograms each at site using a Jones splitter. As with diamond drill core samples, one half bagged and sealed on site for assay the other half retained on site in sealed wooden core boxes for future reference. All sample preparation and analysis were carried out at ALS Patagonia Laboratories, in Coquimbo, Chile for all programs. In 2010, ALS routinely shipped pulps prepared at their Coquimbo Laboratory in Chile to their laboratory in Lima, Peru for silver and base metal analysis. Routine gold analysis was carried out in Chile on 30g sub-samples using a fire assay pre-concentration and atomic absorption spectro-photogrametric (AAS) finish. Samples with values greater than 10g/t were re-analysed by fire assay and gravimetric finish. Silver, copper, zinc and lead were also routinely analysed by ICP following hot four-acid digestion. Samples with values over 1% were re-analysed using a hydrofluoric-nitric-hypochloric acid digestion, hydrochloric acid leach and AAS finish. The ALS laboratories are internationally certified laboratories, independent of both Polar Star and RedQuest. The ALS laboratory is registered to ISO 9001:2008. SRK visited the ALS-Chemex laboratory in Coquimbo, Chile during the time of the 2008 drilling campaign and the analytical procedures used for geochemical testing were also inspected. Observed comparisons of tests done at various other ALS-Chemex laboratories in the world were noted as well as comparisons of the ALS Coquimbo laboratory with other non-als-chemex labs. According to the results shown SRK during this visit, the ALS-Chemex Coquimbo lab appears to meet industry standards for both internal and external duplicates and check assays Sample Security While still on site, all drill core samples bagged and sealed. The bagged samples are kept at the campsite, where there is always at least one person on hand, while awaiting transport to the laboratory. The core boxes and duplicate cuttings samples are kept secured and sealed at the project site. All samples ready to be transported to the ALS-Chemex Coquimbo laboratory, are sealed in sacks, marked, registered and the shipped by Pullman Cargo trucks to the laboratory to be prepared and analysed.

33 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page Data Verification SRK reviewed the drilling data supplied by Polar Star, including sample certificates (and Excel format reports) from the ALS laboratory and the compiled Polar Star Excel databases for each drill hole from both the 2008 and the 2010 campaigns. Spot checks were performed to confirm that data from the lab certificates, lab Excel reports and the Polar Star database correspond. SRK did not detect errors in this spot check which involved approximately 5% of the samples. Thus far in Polar Star s exploration programme at Los Azules, no QA/QC samples have been submitted. While the protocols and procedures for drilling sampling and logging are in accordance with industry best practices, thus far in this early stage of exploration they have not inserted duplicates, blanks or certified reference materials into the laboratory sample stream. The ALS- Chemex laboratory in Coquimbo is an internationally certified lab (registered to ISO 9001:2008 standards), and was visited personally by Mr. Even on January 30, During the visit, the ASL lab appears to be using industry standard sample preparation and analytical procedures in all their processes. SRK believes that the geochemical analysis data from the drilling campaigns are adequate for the purposes of this report, SRK strongly recommends that for the next drilling programme at Los Azules, Polar Star implement a complete and thorough QA/QC programme for the samples, as well as down the hole surveying for drill hole deviation.

34 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page Mineral Processing and Metallurgical Testing This section does not apply as the project is at an early exploration stage and no mineral and metallurgical testing has been yet performed. 14 Mineral Resource Estimation This section does not apply as the project is at an early exploration stage and no mineral resources have yet been calculated. 15 Adjacent Properties SRK does not have specific information related to properties adjacent to the Los Azules Project. 16 Other Relevant Data and Information SRK has no additional relevant data or information pertinent to the Los Azules Project.

35 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page Interpretation and Conclusions Polar Star s surface geological and geochemical exploration programs today have outlined a northeast elongate, approximately 8 square kilometer area containing a swarm of at least 90 quartztourmaline breccia pipes many of which contain variable amounts of copper, molybdenum, gold and uranium mineralisation. This swarm of pipes is generally enveloped by an extensive zone of argillic alteration which also is variable anomalous in copper, molybdenum, gold and uranium. Induced Polarisation geophysical surveys over this zone detected a moderate to strong chargeability anomaly at least 2.9 km long and up to 1.7 km wide that underlies the breccia swarm at depths of from 50 metres to over 250 metres. The two subsequent reconnaissance drilling programs; a) targeting the Araya Breccia pipe in 2008 and b) the stronger IP chargeability centres in the northeast half of the zone in 2010 cut significant intercepts of oxide copper, molybdenum and gold mineralisation in the Araya Breccia pipe plus disseminated and veinlet primary pyrite-chalcopyritemolybdenite mineralisation with significant gold, rhenium and uranium enrichment in strong IP centers. The latter is generally hosted by an argillic to phyllic altered feldspar porphyritic felsic intusive and associated quartz-tourmaline breccias. The style of mineralisation and alteration appears similar to low flourine copper-molydenum porphyry systems. This evidence is the primary basis for the planned future exploration by Polar Star at Los Azules, which SRK believes is a valid basis and approach for the next drill programme. Thus far, the early stages of exploration carried out by Polar Star at Los Azules has focused on following up on areas of anomalous surface geochemical results and favorable geological indications, namely in areas of known breccias with associated hydrothermal alteration. As such, there is insufficient data density to adequately outline and delimit the mineralized zones and assign average grades. The sizes, shapes, depths and grades of these bodies are yet undetermined. That said, the results so far indicate that the Los Azules prospect warrants a follow up drill programme to delimit the mineralization in the more prospective areas and also with an eye to confirming or not the idea of a possible copper-molybdenum porphyry system at depth associated with the shallower drilling results at the Araya Breccia in 2008 and in the northeast area with the 2010 drilling.

36 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page Recommendations Polar Star believes that a large porphyry system is the source of the mineralization at Los Azules which lies at shallow depth below the 3 kilometre square area of alteration and mineralised breccia pipes and plans to follow up with a another drill program in the near future. SRK is of the opinion that this exploration concept has merit as evidenced by SRK s experience with other prospects in Chile where porphyry copper deposits and associated hydrothermal alteration are in close proximity to mineralized breccia pipes. SRK also recommends that a QA/QC sample and laboratory analysis programme be implemented for the next drilling campaign, inserting duplicate, blank and certified reference materials samples into the sample stream. Regular check assays at another laboratory should also be carried out. Evaluation of the results of this QA/QC programme must be done on a regular basis during the drill campaign. When QA/QC analyses are completed after the drill campaign, it can be too late for making necessary adaptations and corrections. Down the hole surveys to test for drill hole deviation should also be conducted in future drill holes. Polar Star considers that both the Araya Breccia pipe oxide mineralisation and the primary sulphide mineralisation need to be followed up with more detailed drilling programs. A two-phase reverse circulation drilling program is proposed by Polar Star to follow up on the results of the 2008 and 2010 reconnaissance drilling programs. 1. Infill drilling on 100m sections along the southeast flank of the Araya Breccia with a view to establishing at least an inferred oxide resource and; 2. Infill and step-out drilling in the northeast sector of the IP highs. SRK is in general agreement with the potential to find additional mineralization to the northeast and at depth and that additional and deeper drilling is warranted. SRK also concurs with the plan for infill and step-out drilling as mentioned above. The drilling programme outlined for 2014 should allow Polar Star to test their mineralization interpretation at Los Azules and test the continuity of the mineralization leading to a mineral resource calculation. Table 18-1, below, details Polar Star s planned 2014 exploration programme at Los Azules.

37 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 33 Table 18-1: Polar Star Los Azules proposed 2014 Exploration Programme Budget Item US$ Cost Contract Drilling, 2,500 $ 200/m 500,000 Access and site preparation 20,000 Wages geologists + helpers 100,000 Assays 15,000 Field Supplies 5,000 Accommodation/Office 12,000 Total Program Costs 652,000

38 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page References The only reference used in this report is an internal report from Polar Star regarding the geology of the Los Azules project and surrounding area.

39 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 35 CERTIFICATE AND CONSENT To accompany the report entitled: Exploration Technical Report Los Azules Cu, Mo, Au Project, III Region, Chile. This qualified person certificate, dated October 30, 2013, applies to the abovementioned technical report, also dated October 30, I, George Even, residing at Vital Apoquindo 941, Las Condes, Santiago, Chile, do hereby certify that: 1) I am a Principal Geologist with the firm of SRK Consulting (Chile) S.A. (SRK) with an office at Av. Vitacura 2939 Piso 5, Las Condes, Santiago, Chile; 2) I am a graduate of San Diego State University in San Diego, California U.S.A. with a BSc. in Geology in I have practiced my profession continuously since 1972; 3) I am a Professional Geologist registered with the AusIMM of Australia (#228861) and also with the AIG (#3616) of Australia; 4) I have not received, nor do I expect to receive, any interest, directly or indirectly, in the Los Azules project or securities of Polar Star Mining. 5) That, as of the date of this certificate, to the best of my knowledge, information and belief, this technical report contains all scientific and technical information that is required to be disclosed to make the technical report not misleading; 6) I have read National Instrument and Form F1 and by reason of my education and past relevant work experience, I fulfill the requirements to be a Qualified Person for the purposes of NI This technical report has been prepared in compliance with National Instrument and Form F1; 7) As a qualified person, I am independent of the issuer and also of the property and vendor, as defined in Section 1.5 of National Instrument ; 8) I am the sole author and responsible for all sections of this report; 9) I have had no prior involvement with the Los Azules property; 10) I visited the Los Azules project and surrounding area during the drilling campaign on January 29 and 30, 2008 and also a one-day visit on December 29, 2011; 11) SRK Consulting (Chile) S.A. was retained by Polar Star Mining to prepare an independent technical report for the Los Azules project. This assignment was completed using CIM Best practice and Canadian Securities Administrators National Instrument guidelines. The preceding report is based on our review of project files and discussions with Polar Star Mining personnel; 12) I consent to the filing of the Technical Report with the securities regulatory authorities. Santiago, Chile October 30, 2013 George Even Principal Geologist

40 SRK Consulting: : Exploration Technical Report Los Azules Cu-Mo_Au Project Page 36 Prepared by George Even Reviewed by Ernesto Jaramillo All data used as source material plus the text, tables, figures, and attachments of this document have been reviewed and prepared in accordance with generally accepted professional engineering and environmental practices.

LOS AZULES April 2018

LOS AZULES April 2018 April 2018 lies along the southern extensions of the highly productive Paleocene Mineral Belt in northern Chile that contains numerous important copper, gold and silver mines and projects, and to the south

More information

CREATING VALUE THROUGH DISCOVERY IN SOUTH AMERICA. Lara Copper Project. Lara 45%-Owned Property in Southern Peru

CREATING VALUE THROUGH DISCOVERY IN SOUTH AMERICA. Lara Copper Project. Lara 45%-Owned Property in Southern Peru CREATING VALUE THROUGH DISCOVERY IN SOUTH AMERICA Lara Copper Project Lara 45%-Owned Property in Southern Peru 1 Forward Looking Statements Except for statements of historical fact relating to the Company,

More information

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement

More information

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

Mineral Resource Estimate Comparison at 3 g/t Au cut-off HARTE GOLD CORP. 8 King Street East, Suite 1700 Toronto, Ontario, M5C 1B5 Tel: 416-368-0999 Fax: 416-368-5146 Harte Gold Announces 2018 Drilling Increases Indicated Mineral Resources by 55% Overall Resource

More information

Pacific Empire Minerals Provides Copper King RC Drilling Results

Pacific Empire Minerals Provides Copper King RC Drilling Results Pacific Empire Minerals Provides Copper King RC Drilling Results November 1, 2018 - Vancouver, BC, Canada - Pacific Empire Minerals Corp. (TSXV: PEMC) ( Pacific Empire, PEMC or the Company ), a hybrid

More information

For personal use only

For personal use only ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 28 NOVEMBER 2012 DRILLING UPDATE MABILO PROJECT The Directors of Sierra Mining Limited ( Sierra ) are pleased to announce further results from reconnaissance

More information

Northern Chile, 85 Km NE of La Serena 125 km S of Relincho (Nueva Union Teck-Goldcorp)

Northern Chile, 85 Km NE of La Serena 125 km S of Relincho (Nueva Union Teck-Goldcorp) July 2017 Mirador lies along the southern extensions of the highly productive Paleocene Mineral Belt in northern Chile that contains numerous important copper, gold and silver mines and projects. Mirador

More information

Revelo Defines Porphyry Copper Targets at its Calvario Project

Revelo Defines Porphyry Copper Targets at its Calvario Project www.reveloresources.com NEWS RELEASE #01/2015 Revelo Defines Porphyry Copper Targets at its Calvario Project Vancouver - February 03, 2015 - Revelo Resources Corp. ( Revelo or the Company ) (TSX-V: RVL)

More information

Revelo Reports on Initial Drill Test of its Cerro Buenos Aires Project

Revelo Reports on Initial Drill Test of its Cerro Buenos Aires Project www.reveloresources.com NEWS RELEASE # 7 / 2018 Revelo Reports on Initial Drill Test of its Cerro Buenos Aires Project Vancouver September 18, 2018 Revelo Resources Corp. ( Revelo or the Company ) (TSX-V:

More information

FIRST 2 DRILL HOLES AT NAKRU-2 PROSPECT BOTH INTERSECT SIGNIFICANT HIGHER GRADE COPPER MINERALISATION

FIRST 2 DRILL HOLES AT NAKRU-2 PROSPECT BOTH INTERSECT SIGNIFICANT HIGHER GRADE COPPER MINERALISATION ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement

More information

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF www.almadexminerals.com ALMADEX REPORTS FIRST HOLES FROM RAYA TEMBRILLO (VILLA RICA) INTERSECTS ENRICHED COPPER ZONE AND HYPOGENE

More information

Revelo Completes Geological Review of its Montezuma Copper-Gold Project & Defines Priority Targets

Revelo Completes Geological Review of its Montezuma Copper-Gold Project & Defines Priority Targets www.reveloresources.com NEWS RELEASE # 17 / 2017 Revelo Completes Geological Review of its Montezuma Copper-Gold Project & Defines Priority Targets Vancouver December 12, 2017 Revelo Resources Corp. (

More information

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West TORONTO, ONTARIO -- (GlobeNewswire September 20, 2018) Plateau Energy Metals Inc.

More information

Drilling Program Commences on Iron Oxide Copper Gold Targets

Drilling Program Commences on Iron Oxide Copper Gold Targets 3 June 2008 Manager Company Announcements Company Announcements Office Australian Stock Exchange Limited Level 10, 20 Bond Street SYDNEY NSW 2000 ABN 42 082 593 235 Electronic delivery No of pages: 6 Drilling

More information

Focus Acquires Porphyry Copper-Molybdenum Project, Peru; Historical Drilling includes 0.57% Cu and 0.7% Cu

Focus Acquires Porphyry Copper-Molybdenum Project, Peru; Historical Drilling includes 0.57% Cu and 0.7% Cu Focus Acquires Porphyry Copper-Molybdenum Project, Peru; Historical Drilling includes 190m @ 0.57% Cu and 71.7m @ 0.7% Cu July 11, 2012; Vancouver, Canada: Focus Ventures Ltd. (TSX-V: FCV) is pleased to

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein May 17, 2011 PROSPERO INTERSECTS 781 g/t Ag, 1.2% Cu, 4.1% Zn OVER 2.62 METERS; DISCOVERS NEW ZINC RICH CANAL ZONE AT SAN LUIS DEL CORDERO PROJECT, MEXICO Vancouver, B.C. - Prospero Silver Corp. (TSX VENTURE:

More information

High Grade Gold Intercepts at Bangaba

High Grade Gold Intercepts at Bangaba 20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com

More information

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres NEWS RELEASE 07/2017 Symbol: TSX-V: PRB Shares Issued: 93,328,938 Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

More information

Seafield Announces the Discovery of a New Porphyry-Style Drill Target at its Quinchía Gold Project in Risaralda, Colombia

Seafield Announces the Discovery of a New Porphyry-Style Drill Target at its Quinchía Gold Project in Risaralda, Colombia For Immediate Release Seafield Announces the Discovery of a New Porphyry-Style Drill Target at its Quinchía Gold Project in Risaralda, Colombia Toronto, Ontario, September 27, 2012 - Seafield Resources

More information

For personal use only

For personal use only 22 April 2013 Drilling to commence at Majada, Copper-Gold Prospect, Chile. Red Gum Resources Limited (ASX: RGX, Red Gum or the Company ) is pleased to announce that drilling of its Majada Copper-Gold Prospect,

More information

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST NEWS RELEASE 15/2018 Symbol: TSX: ME FOR IMMEDIATE RELEASE MONETA INTERCEPTS 5.30 m @ 7.63 g/t GOLD INCLUDING 0.80 m @ 22.40 g/t GOLD AND 7.13 m @ 5.06 g/t GOLD INCLUDING 1.98 m @ 12.47 g/t GOLD AT SOUTH

More information

LOS CALATOS DRILLING RESULTS TD2 TARGET

LOS CALATOS DRILLING RESULTS TD2 TARGET ASX ANNOUNCEMENT 18 April 2016 LOS CALATOS DRILLING RESULTS TD2 TARGET Metminco Limited ( Metminco or the Company ) (ASX: MNC; AIM: MNC) advises that the drilling of a single drill hole at the TD2 Target

More information

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS Toronto, Canada July 19, 2016 Savary Gold Corp. (TSX-V: SCA) ( Savary or the Company ) is pleased

More information

Northern Chile, 170 km SE of Antofagasta Centred km S-SW of the giant La Escondida Mining District (BHP Billiton & Rio Tinto)

Northern Chile, 170 km SE of Antofagasta Centred km S-SW of the giant La Escondida Mining District (BHP Billiton & Rio Tinto) October 2017 Block 3-Culebra is a large property block situated along the Domeyko Cordillera porphyry copper belt in northern Chile, which is host to some of the world s largest copper deposits and mines.

More information

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold October 8, 2015 News Release 15-24 Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold Vancouver, British Columbia October 8, 2015; Pretium Resources Inc. (TSX/NYSE:PVG) ( Pretivm or

More information

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres GT Gold Continues to Drill Multiple High-Grade Intercepts at Saddle South, Intersecting 12.05 g/t Au Over 3.79 Metres and 9.77 g/t Au Over 5.53 Metres in Hole TTD045 Vancouver, British Columbia December

More information

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico 910-850 WEST HASTINGS ST. VANCOUVER, BC, CANADA V6C 1E1 TEL: 604.248.8648 FAX: 604.248.8663 WWW.EVRIMRESOURCES.COM TSX-V: EVM CONTACT: PADDY NICOL OR CHARLES FUNK NEWS RELEASE Evrim announces initial drilling

More information

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam ASX Announcement 28 January 2010 Drill results indicate large Porphyry Copper Gold System at Peenam Highlights: 270 metres of visible copper (gold) mineralisation in first diamond core hole at Peenam Prospect

More information

Drilling Extending Mineralization in La Mina North Zone

Drilling Extending Mineralization in La Mina North Zone Toachi Mining Inc. Intersects 5.42 m grading 4.35 g/t Au, 77.34 g/t Ag, 7.48% Cu, 4.24% Zn and 0.22% Pb at the Gold-Rich La Plata VMS Project in Ecuador Drilling Extending Mineralization in La Mina North

More information

Bellhaven Expands the Middle Zone Prospect with New Drilling: Advances toward New Resource in First Half of 2012

Bellhaven Expands the Middle Zone Prospect with New Drilling: Advances toward New Resource in First Half of 2012 Bellhaven Expands the Middle Zone Prospect with New Drilling: Advances toward New Resource in First Half of 2012 Vancouver, British Columbia January 19, 2012. Bellhaven Copper & Gold Inc. (TSX- Venture:

More information

ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA

ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA ASX / MEDIA RELEASE 5 JULY 2010 ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA Peel Exploration is pleased to announce that recent drilling at the Company s Attunga and May Day projects

More information

Quarterly Activities Report For the Period Ended March HIGHLIGHTS

Quarterly Activities Report For the Period Ended March HIGHLIGHTS Quarterly Activities Report For the Period Ended March 31 2008 HIGHLIGHTS Merceditas Project, Chile Genesis Minerals Limited secured an Option to acquire a 100% interest in the significant Merceditas copper

More information

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0. Bellhaven Tops Previous Best Hole at the Middle Zone Deposit, La Mina Project, Colombia: LME-1072 134.39m at 0.65 g/t Au and 0.32%Cu, or 1.19 g/t Au Equivalent Medellin, Colombia May 14, 2012. Bellhaven

More information

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip GT Gold Drills 281 Metres of 0.65 g/t Au, 0.38% Cu, 1.38 g/t Ag (1.24 g/t AuEq 1 ) Within 685 Metres 2 of 0.40 g/t Au, 0.26% Cu, 1.03 g/t Ag (0.81 g/t AuEq) in Step-out Hole TTD098 Rich Saddle North Au-Cu-Ag

More information

ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG

ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG FOR IMMEDIATE RELEASE: ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG Vancouver, April XX, 2017: Aton Resources Inc. (AAN: TSX-V) (

More information

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15. NEWS RELEASE 10/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over

More information

2. The latter two intersections occur outside the presently defined mineral resource.

2. The latter two intersections occur outside the presently defined mineral resource. Avidian Drills 67 m of 4.93 g/t Au, includes 39.8 m of 7.54 g/t Au, at Golden Zone Property, Alaska & Discovers New Zone Northeast of the Breccia Pipe Deposit (Toronto, Ontario January 18, 2018) Avidian

More information

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE 1020 800 West Pender Street Vancouver, BC V6C 2V6 Tel: 604-646-8354 Fax: 604-646-4526 TSX-V: GBR NEWS RELEASE Great Bear Drills Hinge Zone Extensions - Results Include New 42 m Wide Zone with Multiple

More information

News Release February 27, 2014 TSX SYMBOL: COP

News Release February 27, 2014 TSX SYMBOL: COP Suite 1280 625 Howe St Vancouver, B.C. V6C 2T6 February 27, 2014 TSX SYMBOL: COP www.coromining.com CORO ANNOUNCES DRILLING RESULTS FROM ITS EL DESESPERADO PROJECT, CHILE February 27 2014, Coro Mining

More information

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO NEWS RELEASE June 13, 2018 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF www.azucarminerals.com AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO VANCOUVER, B.C. Azucar Minerals Limited ("Azucar"

More information

Atacama Pacific Drills 208 Metres Grading 0.60 g/t Gold at Cerro Maricunga. Reports Further Positive Metallurgical Test Results

Atacama Pacific Drills 208 Metres Grading 0.60 g/t Gold at Cerro Maricunga. Reports Further Positive Metallurgical Test Results Atacama Pacific Drills 208 Metres Grading 0.60 g/t Gold at Cerro Maricunga Reports Further Positive Metallurgical Test Results TORONTO, February 17, 2011 Atacama Pacific Gold Corporation (TSXV:ATM) ( Atacama

More information

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST NEWS RELEASE 13/2018 Symbol: TSX: ME FOR IMMEDIATE RELEASE MONETA INTERCEPTS 25.00 m @ 2.48 g/t GOLD INCLUDING 4.50 m @ 5.00 g/t GOLD AT SOUTH WEST Toronto, Ontario September 13, 2018 - Moneta Porcupine

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ASX: IVG Date: 30 April 2012 Number: 030_300412 MARCH 2012 QUARTERLY REPORT SUMMARY Market Cap A$2.23m ($0.062 p/s) Issued Capital 36,006,006 Assay data and mineral alteration studies

More information

Bellhaven Adds Gold at the El Limon Target at the La Mina Project, Colombia

Bellhaven Adds Gold at the El Limon Target at the La Mina Project, Colombia Bellhaven Adds Gold at the El Limon Target at the La Mina Project, Colombia Denver, Colorado December 27, 2012. Bellhaven Copper & Gold Inc. (TSX-Venture: BHV) ( Bellhaven or the Company ) is pleased to

More information

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina TSX-V: MSR August 17, 2016 Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina Program features preliminary test of Epithermal Au-Ag Vein

More information

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP Toachi Mining Inc. Intersects 13.91 m grading 3.51 g/t Au, 64.24 g/t Ag, 0.59% Cu, 4.11% Zn and 0.85% Pb at the Gold-Rich La Plata VMS Project in Ecuador Toronto, Ontario October 11, 2017 Toachi Mining

More information

EXPLORATION UPDATE CHILEAN COPPER-GOLD PROJECTS

EXPLORATION UPDATE CHILEAN COPPER-GOLD PROJECTS ASX: SUH TSX-V: SH Australian Office: PO Box 598 T: +61 8 9481 2122 West Perth F: +61 8 9481 2322 WA 6872 www.shmining.com.au Chilean Office: Minera Hemisferio Sur SCM Unit 1103, Roger de Flor 2907 Los

More information

ET and and and

ET and and and NEWS RELEASE Oceanus Intersects 110 Meters of 0.79 g/t Gold Equivalent Consisting of 0.6 g/t Gold and 14.5 g/t Silver at its El Tigre Property in Sonora, Mexico HALIFAX, NOVA SCOTIA December 14, 2016 Oceanus

More information

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland 1 July 2008 The Manager, Companies Australian Securities Exchange Ltd Electronic Announcement System Dear Sir, AXIOM MINING LIMITED (ASX CODE: AVQ) ASX Announcement Axiom Nightflower Drilling Progress

More information

Drilling Extending Mineralization in La Mina North Zone

Drilling Extending Mineralization in La Mina North Zone Toachi Mining Inc. Intersects 10.78 m grading 6.35 g/t Au, 54.32 g/t Ag, 9.64% Cu, 8.70% Zn and 0.43% Pb at the Gold-Rich La Plata VMS Project in Ecuador Drilling Extending Mineralization in La Mina North

More information

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East NEWS RELEASE 11/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Highlights: Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East Near-surface intercept grading 3.2 g/t Au over 45.5

More information

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER ASX / MEDIA RELEASE 6 MAY 2011 4-MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER Highlights: Silver-lead-zinc discovery at 4-Mile; mineralisation intersected in all

More information

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone Page 1 of 6 a Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone Jan 11, 2017 Toronto, Ontario, Canada Listed: RUP-TSX-V January 10, 2017 Rupert

More information

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO TORONTO, ONTARIO - (April 21, 2015) - McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to announce drill results that we expect will

More information

Aurelian Intersects Metres Grading 7.71 g/t of Gold in Infill Drilling and Metres Grading 8.13 g/t of Gold at the Eastern Edge of FDN

Aurelian Intersects Metres Grading 7.71 g/t of Gold in Infill Drilling and Metres Grading 8.13 g/t of Gold at the Eastern Edge of FDN AURELIAN RESOURCES INC. NEWS RELEASE Trading Symbol TSX:ARU July 18th, 2007 For immediate release Aurelian Intersects 172.70 Metres Grading 7.71 g/t of Gold in Infill Drilling and 158.64 Metres Grading

More information

For personal use only

For personal use only Quarterly Activities Report September 2013 Equus Mining Limited (ASX: EQE) is pleased to report on its exploration activities in Chile, South America, and corporate developments for the quarter ended 30

More information

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

NEW COBAR-STYLE COPPER DISCOVERY IN NSW ASX / MEDIA RELEASE 2 AUGUST 2011 NEW COBAR-STYLE COPPER DISCOVERY IN NSW Broad zone of copper-polymetallic mineralisation intersected at 4-Mile prospect Highlights: Wide zone of copper-silver-gold-lead-zinc

More information

COMPASS GOLD: DRILLING SUCCESS AT FIRST OUASSADA BEDROCK GOLD TARGETS

COMPASS GOLD: DRILLING SUCCESS AT FIRST OUASSADA BEDROCK GOLD TARGETS COMPASS GOLD: DRILLING SUCCESS AT FIRST OUASSADA BEDROCK GOLD TARGETS Toronto, Ontario, January 10, 2019 Compass Gold Corp. (TSX-V: CVB) (Compass or the Company) is pleased to provide an update on the

More information

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling: TSX: RMX OTCQX: RBYCF Rubicon Minerals Provides Additional Drill Results and Observations from its 2017 Exploration Program and Commences Exploratory Underground Development TORONTO, Ontario, November

More information

Timberline Completes Technical Reports on the Elder Creek and Paiute Porphyry Copper-Gold Projects, Nevada

Timberline Completes Technical Reports on the Elder Creek and Paiute Porphyry Copper-Gold Projects, Nevada FOR IMMEDIATE RELEASE Timberline Completes Technical Reports on the Elder Creek and Paiute Porphyry Copper-Gold Projects, Nevada Coeur d Alene, Idaho November 29, 2018 Timberline Resources Corporation

More information

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling Resource Diamond Drilling Commences at Productora Strong results continue from Productora central area drilling Resource diamond drilling commences at Productora 5 drill rigs to be operating shortly Productora

More information

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY TSX: BAR / OTCQX: BALMF December 18, 2014 For Immediate Release NR14-32 BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY Extends Horizon 3 Discovery to 400 metres vertical depth and confirms 400

More information

DRILLING EXPANDS SIGNIFICANT COPPER-GOLD PORPHYRY SYSTEM AT IVANHOE S KHARMAGTAI PROJECT IN MONGOLIA

DRILLING EXPANDS SIGNIFICANT COPPER-GOLD PORPHYRY SYSTEM AT IVANHOE S KHARMAGTAI PROJECT IN MONGOLIA For immediate release November 26, 2002 DRILLING EXPANDS SIGNIFICANT COPPER-GOLD PORPHYRY SYSTEM AT IVANHOE S KHARMAGTAI PROJECT IN MONGOLIA ULAANBAATAR, MONGOLIA Ivanhoe Mines Chairman Robert Friedland

More information

For Immediate Release May 21, 2002

For Immediate Release May 21, 2002 For Immediate Release May 21, 2002 IMPORTANT NEW COPPER AND GOLD DISCOVERY EXPANDS CENTRAL ZONE AT TURQUOISE HILL GOLD AND COPPER PROJECT IN MONGOLIA; CONTRACT SIGNED TO EXPAND DRILLING PROGRAM MONGOLIA

More information

Kalman Mineral Resource Update

Kalman Mineral Resource Update 10 September 2008 The Manager Company Announcements Office stralian Stock Exchange Via Online Electronic Lodgement Kalman Mineral source Update The Directors are pleased to announce an updated mineral

More information

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013 A New Direction Copper-Gold Deposit at Thor August 11, 2016 May 2013 TSX.V:COL FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements for

More information

Eloro Outlines Major New Mineralized Trend on La Victoria Project, Peru; Sample Results Return Values To 33 Grams Gold Per Tonne

Eloro Outlines Major New Mineralized Trend on La Victoria Project, Peru; Sample Results Return Values To 33 Grams Gold Per Tonne 20 Adelaide Street East, Suite 200, Toronto, Ontario CANADA M5C 2T6 Tel.: (416) 868-9168 Fax: (416) 361-1333 TSX.V Symbol: ELO www.elororesources.com Eloro Outlines Major New Mineralized Trend on La Victoria

More information

Detour Gold Reports Drilling Results from Lower Detour

Detour Gold Reports Drilling Results from Lower Detour December 17, 2015 NEWS RELEASE Detour Gold Reports Drilling Results from Lower Detour Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports final results from its 2015 summer drilling

More information

Classification Tonnage (t) Grade Au (g/t) Grade Ag (g/t)

Classification Tonnage (t) Grade Au (g/t) Grade Ag (g/t) Table 1: 2016 Kizilcukur JORC 2012 compliant Mineral Resource estimate, based on 17 diamond and 26 RC drill holes. Gold equivalent is the sum of the gold ounces and the gold equivalent ounces of silver

More information

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER 22.84 METRES AND 12.15% ZINC+LEAD OVER 17.00 METRES AT PINE POINT (Montreal November 19, 2018) Osisko Metals Incorporated (the Company or Osisko Metals )

More information

High Grade Gold Intersections at Harry Smith Prospect

High Grade Gold Intersections at Harry Smith Prospect ABN: 82 138 358 728 ASX: TMZ Level 1, 80 Chandos Street, St Leonards, NSW 2065 PO Box 956, Crows Nest, NSW 1585 Tel: +61 2 9906 6225 Fax: +61 2 9906 5233 Web: www.thomsonresources.com.au ASX Release 16

More information

NEWS RELEASE. Empire Mining Corporation 1090 Hamilton Street Vancouver, B.C. V6B 2R9

NEWS RELEASE. Empire Mining Corporation 1090 Hamilton Street Vancouver, B.C. V6B 2R9 Empire Mining Corporation 1090 Hamilton Street Vancouver, B.C. V6B 2R9 Phone: (604) 634-0970 Fax: (604) 634-0971 Toll Free: 1 888 818-1364 info@empireminingcorp.com www.empireminingcorp.com NEWS RELEASE

More information

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East June 18, 2018 News Release 18-07 Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East Vancouver, British Columbia, June 18, 2018; Pretium Resources Inc. (TSX/NYSE:PVG)

More information

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink) NEWS RELEASE September 30 th, 2015 Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink) Colt Resources intersects 2.29% Cu over a 7.30 metres true width at its Miguel Vacas copper project in its

More information

NEWS RELEASE Ocean Park Ventures Identifies Large Multi-Structure Sulfide Mineralized System Trapper Gold Project, British Columbia

NEWS RELEASE Ocean Park Ventures Identifies Large Multi-Structure Sulfide Mineralized System Trapper Gold Project, British Columbia Suite 302 750 West Pender St Vancouver, BC V6C 2T7 Tel: 604-681-0084 Fax: 604-681-0094 www.oceanparkventures.com TSX-V SYMBOL: OCP NEWS RELEASE Ocean Park Ventures Identifies Large Multi-Structure Sulfide

More information

Andina Announces Final Results from Volcan Phase IV Drill Campaign

Andina Announces Final Results from Volcan Phase IV Drill Campaign Andina Announces Final Results from Volcan Phase IV Drill Campaign Drilling Returns 206 Metres Grading 0.86 g/t Gold Including 116 Metres Grading 1.10 g/t Gold TORONTO, June 19, 2008 - ANDINA Minerals

More information

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia 1,000-Metre Diamond Drill Program to Test Alacran Porphyry and Northern Extension Targets

More information

Toronto, Canada March 4, 2013

Toronto, Canada March 4, 2013 NEWS RELEASE SAS REPORTS ADDITIONAL DRILLING RESULTS FOR THE HISLOP NORTH AND SMOKE DEEP ZONES AND SIGNIFICANT INITIAL RESULTS FROM THE HISLOP PIT COMPLEX AND NEW SEDIMENT ZONE AT THE HOLLOWAY MINE Hislop

More information

DISCOVERY OF MINERALISED PORPHYRY & MAGNETITE-COPPER-GOLD AT KAMARANGAN

DISCOVERY OF MINERALISED PORPHYRY & MAGNETITE-COPPER-GOLD AT KAMARANGAN MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

Mountain Maid Gold System Displays Major Size Potential

Mountain Maid Gold System Displays Major Size Potential 29 July 2008 The Manager, Companies Australian Securities Exchange Ltd Electronic Announcement System Dear Sir, AXIOM MINING LIMITED (ASX CODE: AVQ) ASX Announcement Mountain Maid Gold System Displays

More information

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia NEWS RELEASE TSX: ELD NYSE: EGO September 6, 2016 Eldorado Announces Drilling Results from KMC Project, Serbia VANCOUVER, BC, September 6, 2016 Eldorado Gold Corporation, ( Eldorado or the Company ) is

More information

AUC.V PRESS RELEASE NO. 01/06

AUC.V PRESS RELEASE NO. 01/06 AUC.V PRESS RELEASE NO. 01/06 Golden China Update on the Resource Drill-Out at Nibao And Drilling at Beyinhar and Wangmo Toronto, Ontario, January 11, 2006. Golden China Resources Corporation (TSX.V: AUC)

More information

November 9, Highlights:

November 9, Highlights: FOR IMMEDIATE RELEASE TSX-V: OSU November 9, 2017 Results from Phase 2 trenching and drilling program by Orsu Metals at the Klyuchi West and Kozie Prospects, Sergeevskoe Gold Project in Russia confirm

More information

Melkior retains Geologica to complete a NI report on its Launay property, Québec

Melkior retains Geologica to complete a NI report on its Launay property, Québec TSX.V: MKR / OTCPK: MKRIF / FSE: MEK September 4 th, 2014 Melkior retains Geologica to complete a NI 43-101 report on its Launay property, Québec Ottawa, Ontario. Melkior Resources Inc. ( Melkior or the

More information

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC TSX: BAR / OTCQX: BALMF October 8, 2014 For Immediate Release NR14-24 BALMORAL INTERSECTS 12.50 g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC Continues to Expand High Grade

More information

EXPLORATION NEWS RELEASE EL GALLO EXPANDED AT DEPTH & TO THE WEST SEVERAL ZONES MERGING TOGETHER RESOURCE ESTIMATE 2 WEEKS

EXPLORATION NEWS RELEASE EL GALLO EXPANDED AT DEPTH & TO THE WEST SEVERAL ZONES MERGING TOGETHER RESOURCE ESTIMATE 2 WEEKS June 23, 2010 EXPLORATION NEWS RELEASE EL GALLO EXPANDED AT DEPTH & TO THE WEST SEVERAL ZONES MERGING TOGETHER RESOURCE ESTIMATE 2 WEEKS TORONTO, ONTARIO (JUNE 23, 2010) US GOLD CORPORATION (NYSE Amex:

More information

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING January 31, 2018 NEWS RELEASE - #18-03 TSX- V: GRR Suite 501-595 Howe Street Vancouver, BC V6C 2T5 Tel: (604) 685-4655 Fax: (604) 685-4675 Toll Free: 1-888-685-4655 TRENCHING AT LAS DOLORES EXTENDS STRIKE

More information

LINGIG PORPHYRY COPPER DISCOVERY

LINGIG PORPHYRY COPPER DISCOVERY MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: 618-9367 0601 Facsimile: 618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

Trading Symbol: ADA TSX-V; C2Z-Frankfurt Press Release No Shares Outstanding: 104,808,584 November 1, 2006

Trading Symbol: ADA TSX-V; C2Z-Frankfurt Press Release No Shares Outstanding: 104,808,584 November 1, 2006 Trading Symbol: ADA TSX-V; C2Z-Frankfurt Press Release No. 22-06 Shares Outstanding: 104,808,584 November 1, 2006 ACADIAN GOLD ANNOUNCES DRILL RESULTS TANGIER GOLD PROPERTY CONFIRMS GOLD MINERALIZATION

More information

ASX Announcement 29 July 2015

ASX Announcement 29 July 2015 ASX Announcement 29 July 2015 Further assays received from historic drill core at the Porte-aux-Moines VMS deposit within the Merléac exploration licence. A number of high grade intersections recorded

More information

News Release No GOLD AND COPPER MINERALIZATION DISCOVERED DURING PHASE 2 EXPLORATION AT THE MCBRIDE PROPERTY

News Release No GOLD AND COPPER MINERALIZATION DISCOVERED DURING PHASE 2 EXPLORATION AT THE MCBRIDE PROPERTY November 19, 2018 TSX Venture Exchange Listed Frankfurt Exchange Listed News Release No. 303-2018 GOLD AND COPPER MINERALIZATION DISCOVERED DURING PHASE 2 EXPLORATION AT THE MCBRIDE PROPERTY Vancouver,

More information

For personal use only

For personal use only ASX Announcement 2 June 2015 STRONG GOLD ANOMALIES DEFINED AT ST PIERRE Soil sampling defines two strong gold-in-soil anomalies within the St Pierre exploration licence. Soil sampling conducted to follow

More information

High-grade Gold in First Drilling Undertaken at Productora South

High-grade Gold in First Drilling Undertaken at Productora South ASX ANNOUNCEMENT Wednesday 10th October 2012 High-grade Gold in First Drilling Undertaken at Productora South Shallow, high-grade, narrow-vein gold area adds further up-side to Productora Sierra Zapallo

More information

For personal use only

For personal use only ACN 097 088 689 ASX Announcement 1 EXPLORATION SUCCESS CONTINUES AT RAVENSWOOD RC drilling targeting shallow portions of Welcome breccia returns a number of significant new results including: 7m @ 7.84g/t

More information

UP TO 17.20% COPPER IN DETAILED SAMPLING CONFIRMS CONTINUOUS HIGH GRADE COPPER ZONE AT EL ROBLE

UP TO 17.20% COPPER IN DETAILED SAMPLING CONFIRMS CONTINUOUS HIGH GRADE COPPER ZONE AT EL ROBLE UP TO 17.20% COPPER IN DETAILED SAMPLING CONFIRMS CONTINUOUS HIGH GRADE COPPER ZONE AT EL ROBLE ASX ANNOUNCEMENT 14 March 2014 Perth-based copper developer Mining Group Limited (ASX: MNE) is pleased to

More information

ANTLER GOLD DRILLS GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

ANTLER GOLD DRILLS GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND ANTLER GOLD DRILLS 10.01 GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND HALIFAX, NOVA SCOTIA (CNW December 13 th, 2017) Antler Gold Inc. ( Antler ) (TSX- V:ANTL) is

More information

RECENT RESULTS FROM THE COMPANY S EXPLORATION PROGRAMME AT PROSPERO (PAMPAMALI NORTH) PROSPERO HIGHLIGHTS

RECENT RESULTS FROM THE COMPANY S EXPLORATION PROGRAMME AT PROSPERO (PAMPAMALI NORTH) PROSPERO HIGHLIGHTS 7 October 2015 Hunter Resources plc ( Hunter or the Company ) (AIM: HUN) RECENT RESULTS FROM THE COMPANY S EXPLORATION PROGRAMME AT PROSPERO (PAMPAMALI NORTH) The Company is pleased to announce the results

More information

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24%

More information

July Exploring for Canadian Gold in the Rainy River District of Ontario

July Exploring for Canadian Gold in the Rainy River District of Ontario July 2013 Exploring for Canadian Gold in the Rainy River District of Ontario 1 Forward Looking Statements Some of the statements in this document may be deemed to be "forward-looking statements". All statements

More information