Dumont Project Site & Pilot Plant Visit. 19 January 2011

Size: px
Start display at page:

Download "Dumont Project Site & Pilot Plant Visit. 19 January 2011"

Transcription

1 Dumont Project Site & Pilot Plant Visit 19 January 2011

2 Disclaimer Cautionary Statements Concerning Forward-Looking Statements This presentation contains forward-looking information which may include, but is not limited to, statements with respect to the future financial or operating performance of the Company and its projects, the future price of metals, the estimation of mineral reserves and mineral resources, the conversion of mineral resource estimates to mineral reserve estimates, the realization of mineral reserve and mineral resources estimates, the timing and amount of estimated future production, costs of production, capital, operating and exploration expenditures, costs and timing of the development of new deposits, costs and timing of future exploration, requirements for additional capital, government regulation of mining operations, environmental risks, reclamation expenses, title disputes or claims, limitations of insurance coverage and the timing and possible outcomes of pending litigation and/or regulatory matters. Often, but not always, forward-looking statements can be identified by the use of words such as plans, expects, is expected, budget, scheduled, estimates, forecasts, intends, anticipates, or does not anticipate or believes or variations (including negative variations) of such words and phrases, or state that certain actions, events or results may, could, would, might or will be taken, occur or be achieved. Accordingly, readers should not place undue reliance on forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company and/or its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: the actual results of current exploration and development activities; project delays; funding needs; general business, economic, competitive, political and social uncertainties; future prices of metals; availability of alternative nickel sources or substitutions; actual results of reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; the future cost of capital to the Company; possible variations of ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; political instability, terrorism, insurrection or war; delays in obtaining governmental approvals, necessary permitting or in the completion of development or construction activities, as well as those factors discussed in the section entitled Risk Factors in the prospectus of the Company dated December 9, 2010 (the "Prospectus") and available at Such forward-looking statements are based on a number of material factors and assumptions identified in the Prospectus. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forwardlooking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking statements contained herein are made as of the date of this prospectus and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable securities laws. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Statement of Qualified Person Preparation of this presentation has been supervised by Alger St. Jean, P.Geo., Vice-President, Exploration of Royal Nickel and a Qualified Person as defined in NI For more information on the Dumont Nickel Project, please refer to Royal Nickel s NI compliant technical report Preliminary Assessment of the Dumont Property Launay and Trecesson Township, Quebec, Canada dated as of September 30,2010 and available on Royal Nickel s website and on SEDAR at 1

3 Presentation Overview Location & Infrastructure Property Deposit Overview Development of Geometallurgical Modeling Pre-Feasibility Study Work to be Completed Community 2

4 Location One of World s Best Mining Jurisdictions (1) Dumont Nickel Project Location Malartic Québec a miningfriendly province Established mining district and proximity to local communities minimizes infrastructure costs Rail / road links facilitate access Grid power available at Quebec rate of C$0.05/kWh Well-defined permitting process Source: Technical Report (1) According to the Fraser Institute s Survey of Mining Companies mid-year report 3

5 Regional Rail Network

6 Regional Natural Gas Network 5

7 Local Situation Royal Nickel Dumont Project HWY 109 Dumont Project located 25 km west of Amos. Launay HWY 111 Villemontel Amos Road, rail on site. Municipal Airport HWY109 RNC Office Power and Natural gas in Amos. Strong Local Support

8 Dumont Mineral Rights Residual Interests Marbaw 3% NSR reducible to 1.5% for $10M Sheridan-Ferderber & Frigon 2% NSR reducible to 1% for $1M Griffis & RNC No residual interest

9 Large Resource Large Option Value Resource open at depth over entire strike length. Current drilling (4 holes) confirms extension of mineralization below current resource extent. 1.2 km Dumont Resource Estimate Resources (k tonnes) Grade (%) Contained Metals (mm lbs) Contained Metals (k tonnes) Measured 155, % Indicated 1,003, % 5,967 2,707 Measured + Indicated 1,159, % 6,952 3,154 Inferred 581, % 3,198 1,451 Source: Technical Report 3.75km 8

10 Dumont Geology Zoned / Layered Mafic- Ultramafic Intrusion Ni Mineralization Hosted in Dunite Orebody drilled at 100 X100 m centers with 50 X 50 m drilling locally proving continuity Claim area provides space for mining & processing infrastructure.

11 Mineralogy Drives Low Strip & Bulk Mining Mineralization extending hundreds of metres in width Low strip ratio 1.24 High tenor nickel minerals yield high grade concentrates Sulphide: Pentlandite (33% Ni), Heazlewoodite (73% Ni) Alloy: Awaruite (72% Ni)+Fe Detailed mineralogical testing to fully define ore characteristics Waste rock and tailings non-acid generating due to absence of pyrrhotite and pyrite Additional exploration potential at depth >0.2% outline resource Dumont Cross Section 8100E: Surface 310m el Source: Technical Report Scoping Study Pit Shell Deposit Remains Open at Depth 10

12 Dumont Ore Mineralogy Core Photo Serpentinized Dunite 195 Qemscan (Explomin) Samples Mineral Mean Max Min Std dev Serpentine* 89 % Magnetite 4 % Brucite 3 % Olivine 2 % Pentlandite 0.3 % Heazlewoodite 0.1% Awaruite 0.1% * Includes chrysotile Olivine Histogram Qemscan Image

13 Work Supporting Scoping Study Geology and Deposit Modeling Drilling : Resource Defintion (>90,000m), Geotechnical Surface Mapping, geophysics Structural Modeling Resource Estimation Geometallurgical modeling Metallurgical Process Development Identification of critical metallurgical parameters Development of standard process flowsheet Domain Composite drilling & variability testing Sampling for Pilot Plant Mine Engineering Preliminary Geotechnical Studies» Rock Mechanics Slope determination» Overburden Characterization» Hydrogeology

14 Exploration and Development Work Environmental Baseline study. Water, fauna, flora, archeology. No major issues Laying groundwork for environmental impact study. Preliminary Environmental geochemistry study Acid Rock Drainage potential Leaching potential Tailings and Waste rock will be non acid-generating Simplifies tailings and waste management. Surface Rights acquisition Purchase and options to purchase critical private surface rights

15 Exploration Data Collection Drilling Logging Secure DATABASE Sample Analysis Sample Preparation

16 Geometallurgical Modeling Key to predicting recovery in any given portion of the deposit is knowing the nickel mineralogy (Nickel in Sulphide vs Awaruite vs Silicates). Use correlation between Mineralogy Data (restricted) and Assay Data(distributed) to develop a predictive model for nickel mineralogy over the entire deposit. Function (ASSAY DATA) = MINERALOGY Recovery equations derived from metallurgical variability testing (Domain Composites) used to calculate recovery for each block. Recovery is a function of mineralogy. Recovery,TCs applied to each block to yield an NSR model.

17 Assay Data (in all drill holes) Distributed Dataset 51,974 samples in 213 holes Factor Analysis Au Pt PdAg Al As B Ba Be Bi Ca Cd Co Cr Cu Fe Ga Hg K La Mg Mn Mo Na Ni P Pb S Sb Sc Sr Th Ti Tl U V W Zn SG MS

18 Mineralogical Data (Explomin) Restricted Dataset 195 samples (now 588) Abundance of Awaruite, Pentlandite, Heazlewoodite, Magnetite, Olivine, etc. Establish correlation between factors from assay data and mineral abundances. Develop Regression.

19 Geometallurgical Model (Mineralization Type by mineral abundance) Sulphide Alloy Mixed Sulphide: (Pn+Hz)/AW>5.5 Mixed: (Pn+Hz)/AW in between 5.5 and 0.85 Alloy: (Pn+Hz)/AW<0.85 Fields in Model: SG, NI, CU, CO, PT, PD, AU, AWA, PEN, HZL, MAG, SUL_AW

20 Metallurgical Data (Domain Variability Composites) 32 tests from 5 holes (70 from 9 holes planned) 2008 Used to develop recovery functions based on mineral abundances predicted in geomet model Developed independently for Domain 4+5 Domain 3

21 Domain Variability Composites

22 Recovery Model D5 D4 D3

23 NSR Model

24 Scoping Study Layout at end of mine life (yr20)

25 Proposed PFS Work Program Resource Definition Increase confidence of resource in pit-shell Add tonnage within pit-shell (convert waste to mill-feed) 46 holes; 17,500 metres; Collect comminution data Augment, Refine and Audit Geomet Model Geotechnical Rock Mechanics / Slope Stability 10 holes; 5200metres; Overburden Characterization -Pit & Infrastructure 64 sonic holes (27 monitored); 30 CPT Hydrogeology / Hydrology Environmental Geochemistry Tailings and Waste Characterization 90 samples across all rock types and entire deposit Begin in-situ characterization cells for waste & tailings Community Relations Define Communications Strategy Begin formal consultation 24

26 Proposed PFS Work Program Current Data Points Existing Holes Outcrop Planned Data Points Resource Rock Mech. Overburden 25

27 Proposed PFS Work Program Current Data Points Existing Holes Outcrop Planned Data Points Resource Rock Mech. Overburden 26

28 Addressing Community Issues Community relations Stakeholders matrix and risk analysis social acceptance strategy. Working with Transfert Environnement. Discussing the basis of an eventual IBA (employment opportunities, job training, business opportunities) with Abitibiwinni First Nation (ongoing). Environmental Geochemistry: Initiating Phase 2 of tailings and waste rock characterization program ABA, ARD, Leaching; Designing on-site experimental cells using Pilot Plant tailings to study: Neutral contaminated drainage potential Long term carbon sequestration (offsetting GHG footprint) Chrysotile management Hydrogeology / Hydrology Geochemical characterization of groundwater (with UQAT); Modelling of the open pit impact on local water table (planning stage); Characterization of the Launay water-bearing esker and modelling of the potential impact of the Dumont infrastructure on the water quality/quantity (propose joint-venture with UQAT, planning stage). 27

29 Carbon Sequestration Mineral Carbonation A Spontaneous reaction between carbon dioxide (CO 2 ) and silicate rocks containing magnesium (serpentine) leading to the formation of carbonate minerals that are geologically stable and harmless to the environment (magnesite), thereby permitting the storage of CO 2 in a stable, inert and solid form. Serpentine + Atmospheric CO 2 Magnesite Spontaneous mineral carbonation of Dumont tailings may offset the carbon footprint of the Dumont mining and processing operations. This rapid reaction also converts chrysotile to magnesite thereby reducing the risk of airborne chrysotile.

30 Proposed Social Integration Strategy - PFS 29

31 Timeline Scoping/ Pilot Plant Testing Pre-Feasibility Feasibility Permitting Long Lead Items Construction Commissioning & Ramp Up The following milestones provide material additional information which further de-risks and increases the value of the project: Completion of 1 st run pilot plant testing Q Completing of Pre-feasibility Study Q Feasibility study Mid

32 Metallurgical Overview January 19 th, 2011

33 Presentation Overview Rougher Recovery Testing Miniplant Operation Optimization Opportunities Reagents Grind size Primary Grinding Circuit 2011 Prefeasibility Study Plan

34 Actual Rougher Recovery Rougher Recovery Equations Rougher recovery basis for scoping study was 32 lab scale tests from 5 drill holes An additional 38 tests have been completed (total 70) Predicted Recovery Vs. Actual for Additional Domain Samples y = x R² = Results show that the scoping study equations continue to adequately predict performance Equations are being updated for the PFS to include Ni in silicates and other factors that effect recovery Predicted Rougher Recovery

35 Miniplant Operation Miniplant circuit defibering, wet ball milling, desliming, rougher flotation (40 min residence time), magnetic separation Goals Confirm STP laboratory rougher results achieved in scoping study Done, analysis in progress Optimize flowsheet (in progress) Reagents, grind size Cleaning circuits Define concentrate grade/recovery curve Provide engineering design criteria for PFS

36 Grind Size Optimization Scoping Standard Test Procedure Initial grind 100 Mesh (150 microns) Secondary Grind 200 Mesh (74 microns) Current laboratory work is investigating the optimum grind size Testing 48 Mesh (297 microns) and 65 Mesh (210 microns) If results are positive, potential for: operating savings from energy reduction reduction in sliming and viscosity issues

37 Reagent Optimization In the scoping study, reagent cost was 70% of the consumables operating budget and 50% of the total mill budget The largest single cost to the mill opex is CMC which acts as a dispersant and MgO depressant at a cost of $US1.78/tonne Preliminary results show that a significant reduction in this use may be possible with a slightly coarser grind In addition, other reagents are being tested that may provide metallurgical benefit

38 Grinding Circuit Optimization The scoping study used a 2 step wet & dry crushing process using Vertical Shaft impact crushers for fine crushing to allow dry size reduction and fiber removal PFS is looking at utilizing either a dry or wet SAG options in a single crushing stage Potential for significant capex, opex, and sustaining capex reductions Ausenco Minerals and Metals has been awarded an engineering contract to assess the various primary comminution alternatives This study will provide capital and operating costs for each option along with an analysis of technical risk The results from this study will be used to choose the best comminution circuit for the PFS concentrator design.

39 2011 Work Plan Identify flowsheet and reagent regime Primary grind circuit Primary grind size, desliming/defibering, fines recovery, cleaning circuits and regrind Reagent optimization Establish recovery figures and concentrate quality with higher degree of confidence Pilot plant Study variability of metallurgical performance across orebody Additional STP testing, grindability tests Establish preliminary concentrator design factors Lab Pilot plant Complete PFS concentrator design

Photo: Jean Laforest, Qiqavik Property, Nunavik

Photo: Jean Laforest, Qiqavik Property, Nunavik Photo: Jean Laforest, Qiqavik Property, Nunavik Kuujjuaq Mining Workshop April 2016 Cautionary Statements Concerning Forward-Looking Statements This presentation contains "forward-looking information"

More information

Corporate Presentation ORFORD MINING. March 2017

Corporate Presentation ORFORD MINING. March 2017 Orford True North Mining Nickel Corporate Presentation ORFORD MINING March 2017 Cautionary Statements Concerning Forward-Looking Statements This presentation contains "forward-looking information" including

More information

Exploration Potential

Exploration Potential Exploration Potential Curraghinalt Project October 2011 Damien Stephens Exploration Manager Forward-Looking Information and Qualified Person This presentation contains forward looking information which

More information

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine North American Palladium Announces Positive Exploration Results from Lac des Iles Mine Toronto, Ontario, October 24, 2017 North American Palladium Ltd. ( NAP or the Company ) (TSX: PDL) (OTC PINK: PALDF)

More information

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3. August 2, 2011 AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND 26.39 G/T Au OVER 3.0 METRES Toronto, Ontario -- Avion Gold Corporation

More information

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND PRESS RELEASE CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND Confirmed Continuity of High-Grade Zinc Zone and Addition of Gold to the Expanded Copper Zone Montreal, March

More information

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling: TSX: RMX OTCQX: RBYCF Rubicon Minerals Provides Additional Drill Results and Observations from its 2017 Exploration Program and Commences Exploratory Underground Development TORONTO, Ontario, November

More information

GROWTH OPTIMIZATION INNOVATION PEOPLE

GROWTH OPTIMIZATION INNOVATION PEOPLE Bulgaria Brownfields Exploration: Krumovgrad DPM Exploration April 3, 2015 Kupel North GROWTH OPTIMIZATION INNOVATION PEOPLE Forward Looking Statements This presentation contains forward looking information

More information

News Release. Infill Drilling Program

News Release. Infill Drilling Program TSX:RMX NYSE.MKT:RBY News Release January 7, 2015 Rubicon s Infill Drilling Program Confirms Continuity and Grade of the F2 Deposit and Continues to Encounter High-Grade Mineralization in Sparsely Drilled

More information

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES TORONTO, ON September 18, 2017 INV Metals ( INV Metals or Company ) (TSX: INV) is very pleased

More information

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY February 5, 2018, Toronto, Ontario Troilus Gold Corp. (TSX- V: TLG) ( Troilus or the Company ) is pleased to announce the commencement

More information

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release CANARC RESOURCE CORP. 810-625 Howe Street Vancouver, BC V6C 2T6 T: 604.685.9700 F: 604.6685-9744 www.canarc.net CCM: TSX CRCUF: OTCQX News Release Canarc Intersects Significant Gold Mineralization in First

More information

Dalradian Provides Update on Norwegian Exploration Programs

Dalradian Provides Update on Norwegian Exploration Programs 2012 No. 14 TSX: DNA Dalradian Provides Update on Norwegian Exploration Programs TORONTO, ONTARIO - (Marketwire - August 29, 2012) - ("Dalradian") (TSX:DNA) is pleased to provide an update on its ongoing

More information

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina NEWS RELEASE Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina Toronto, Ontario, August 2, 2018 Orford Mining Corporation ( Orford ) (TSX-V: ORM) is pleased to announce

More information

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties NEWS RELEASE Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties Toronto, Ontario, March 1, 2018 Orford Mining Corporation ( Orford ) (TSX-V:

More information

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24%

More information

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project. Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project. Vancouver, British Columbia, July 6, 2018 Blox, Inc. (OTCQB: BLXX), ( Blox or the Company ) is pleased to announce that a new

More information

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com MANN SILVER-COBALT MINE PORE: TSXV PowerOre.com FORWARD LOOKING STATEMENTS We are in the mineral exploration and development business. It is inherently risky, and all potential investors should be keenly

More information

PEAK GOLD JOINT VENTURE PROJECT TOK MINING DISTRICT, ALASKA

PEAK GOLD JOINT VENTURE PROJECT TOK MINING DISTRICT, ALASKA PEAK GOLD JOINT VENTURE PROJECT TOK MINING DISTRICT, ALASKA Contango ORE, Inc. September 20, 2017 1 CONTANGO ORE, INC. DISCLAIMER This presentation may contain forward-looking statements including, but

More information

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au SAN GOLD CORPORATION TSX: SGR OTCQX: SGRCF FOR IMMEDIATE RELEASE October 15, 2014 San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au WINNIPEG, MANITOBA

More information

Goldcrest Resources Ltd.

Goldcrest Resources Ltd. Goldcrest Resources Ltd. PRESS RELEASE Goldcrest Announces Results from its 1,385 Metre RC Drilling Program at the Kampti Gold Project in Burkina Faso Toronto, ON - January 25, 2007 -- Goldcrest Resources

More information

Victoria Advance Exploration Project Past, Present and What s Next

Victoria Advance Exploration Project Past, Present and What s Next Victoria Advance Exploration Project Past, Present and What s Next Forward Looking Statement KGHM International press releases and information on Victoria Project together with supplemental data about

More information

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated November 30, 2012 TECHNICAL REPORT TO BE RELEASED THAT PRESENTS FIRST MINERAL RESOURCE ESTIMATE TO NI 43-101 STANDARDS FOR CAHUILLA PROJECT IN IMPERIAL COUNTY, CALIFORNIA BY TERAS RESOURCES. POSITIVE GOLD-SILVER

More information

PRESENTATION BUILDING VALUE IN ARGENTINA Las Aguilas Overview

PRESENTATION BUILDING VALUE IN ARGENTINA Las Aguilas Overview PRESENTATION 2018 BUILDING VALUE IN ARGENTINA Las Aguilas Overview 02 LAS AGUILAS - ARGENTINA S ONLY NICKEL/COBALT DEPOSIT Las Aguilas is located in the heart of Argentina and is a Ni/Co/Co/PGM sulfide

More information

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL TORONTO, June 19 th, 2012 Belo Sun Mining Corp. (BSX:TSX) (the "Company" or "Belo Sun") is pleased to announce the complete

More information

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE High-grade, visible-gold mineralization intersected 120 metres ( m ) down-plunge of Swan Zone Inferred Mineral Resource and 210

More information

V Sample from C.O.D vein 15 metres southwest of V

V Sample from C.O.D vein 15 metres southwest of V TSX-V: GGX Gold Drop Property Multiple Gold Bearing Rock Samples including 19.6 g/t Gold at Historic C.O.D Shaft And 14.1 g/t Gold at New Vein Showing Greenwood BC Vancouver, British Columbia June 8, 2017

More information

MINERAL MOUNTAIN CONFIRMS PROOF OF CONCEPT IN THE HOMESTAKE GOLD BELT

MINERAL MOUNTAIN CONFIRMS PROOF OF CONCEPT IN THE HOMESTAKE GOLD BELT MMV-TSX.V MNRLF-OTCQX News Release NR 2018 06 May 3, 2018 MINERAL MOUNTAIN CONFIRMS PROOF OF CONCEPT IN THE HOMESTAKE GOLD BELT STANDBY DRILLING RESULTS HAS IDENTIFIED A CLASSIC HOMESTAKE-STYLE, ALTERED

More information

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT For Immediate Release NR 13-10 FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT (Vancouver, BC, September 16, 2013) Falco Pacific Resource Group Inc. ( Falco Pacific

More information

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519) Spruce Ridge Resources Ltd. 7735 Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) 822-5904, Fax: (519) 823-5090 PRESS RELEASE 2018-07 July 24, 2018 Spruce Ridge Resources Provides Update on the

More information

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT. 202-930 West First Street, North Vancouver, B.C. 604.998.4175 July 31, 2014 SBB NR-14-10 SBB TSX SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT. 2014 Drilling confirms

More information

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE 257.2 metres with 0.53% Cu, 1.20 g/t Au, and 1.59 g/t Ag (1.19% Cu Eq or 2.39 g/t Au Eq) including 54.5 metres with 1.34% Cu,

More information

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT TORONTO, January 28 th, 2013 Belo Sun Mining Corp. (TSX:BSX) reports assays for 86 additional drill holes (corresponding

More information

Comparison Between July 2012 Technical Report and December 2012 Mineral Resource Statement July 2012 December 2012 Percentage Difference.

Comparison Between July 2012 Technical Report and December 2012 Mineral Resource Statement July 2012 December 2012 Percentage Difference. BELO SUN INCREASES MEASURED AND INDICATED RESOURCES TO 4.1 MILLION OUNCES OF GOLD PLUS INFERRED RESOURCES OF 2.8 MILLION OUNCES OF GOLD AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL TORONTO, December 18, 2012

More information

CAUTIONARY STATEMENT

CAUTIONARY STATEMENT AUGUST 2018 RLG CAUTIONARY STATEMENT Some of the statements contained in this presentation are forward-looking statements. Such forward-looking statements involve known and unknown risks, uncertainties

More information

Atacama Pacific Drills 208 Metres Grading 0.60 g/t Gold at Cerro Maricunga. Reports Further Positive Metallurgical Test Results

Atacama Pacific Drills 208 Metres Grading 0.60 g/t Gold at Cerro Maricunga. Reports Further Positive Metallurgical Test Results Atacama Pacific Drills 208 Metres Grading 0.60 g/t Gold at Cerro Maricunga Reports Further Positive Metallurgical Test Results TORONTO, February 17, 2011 Atacama Pacific Gold Corporation (TSXV:ATM) ( Atacama

More information

NEWS RELEASE RNC MINERALS

NEWS RELEASE RNC MINERALS RNC MINERALS NEWS RELEASE RNC Minerals Announces Intention to Spin-out Qiqavik and West Raglan Projects, and Option Agreement with Carolina Gold Resources for Two Properties in Carolina Gold Belt Toronto,

More information

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project IDM Mining s Underground Drilling Intersects 18.70 g/t Au and 66.85 g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project November 22 nd, 2016, Vancouver, BC IDM Mining Ltd. (TSX.V:IDM) (

More information

NEWS RELEASE November 5, 2018

NEWS RELEASE November 5, 2018 NEWS RELEASE 18-22 November 5, 2018 Liberty Gold Extends Goldstrike Deposit Trend 300 Metres to the Southwest 0.72 g/t over 76.2 m including 1.26 g/t over 6.1 m 0.98 g/t over 15.2 m and 0.81 g/t over 27.4

More information

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013 A New Direction Copper-Gold Deposit at Thor August 11, 2016 May 2013 TSX.V:COL FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements for

More information

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT

More information

Dalradian Intersects 2.48 metres Grading g/t Gold and 4.87 metres Grading 8.35 g/t Gold With Infill Drilling at Curraghinalt

Dalradian Intersects 2.48 metres Grading g/t Gold and 4.87 metres Grading 8.35 g/t Gold With Infill Drilling at Curraghinalt 2013 No. 13 TSX: DNA Dalradian Intersects 2.48 metres Grading 21.33 g/t Gold and 4.87 metres Grading 8.35 g/t Gold With Infill Drilling at Curraghinalt TORONTO, ONTARIO - (Marketwire August 15, 2013) -

More information

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia NEWS RELEASE TSX: ELD NYSE: EGO September 6, 2016 Eldorado Announces Drilling Results from KMC Project, Serbia VANCOUVER, BC, September 6, 2016 Eldorado Gold Corporation, ( Eldorado or the Company ) is

More information

Gowest Gold Ltd. Selective Arsenopyrite-Pyrite Flotation

Gowest Gold Ltd. Selective Arsenopyrite-Pyrite Flotation Gowest Gold Ltd. Selective Arsenopyrite-Pyrite Flotation CMP Ottawa January 2012 G. Wilcox / D. Koningen / R. Jackman (SGS Canada Ltd.) TSX-V:GWA www.gowestgold.com 1.877.363.1218 18/01/12 Frankfield East

More information

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East NEWS RELEASE 11/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Highlights: Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East Near-surface intercept grading 3.2 g/t Au over 45.5

More information

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER 22.84 METRES AND 12.15% ZINC+LEAD OVER 17.00 METRES AT PINE POINT (Montreal November 19, 2018) Osisko Metals Incorporated (the Company or Osisko Metals )

More information

Details of the NI compliant mineral resource estimate are as follows. Total Inferred 7,603,

Details of the NI compliant mineral resource estimate are as follows. Total Inferred 7,603, ADEX ANNOUNCES NI 43-101 COMPLIANT INDICATED MINERAL RESOURCE ESTIMATE OF 10.88 MILLION TONNES FOR THE NORTH ZONE S TIN-INDIUM-ZINC DEPOSIT AT MOUNT PLEASANT Toronto April 6, 2009 Adex Mining Inc. ( Adex

More information

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

Junior Uranium explorer in the Athabasca Basin. Patterson Claims Junior Uranium explorer in the Athabasca Basin Patterson Claims Cautionary Note Regarding Forward-Looking Statements This Presentation and the exhibits attached herein contain forward-looking statements

More information

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina TSX-V: MSR August 17, 2016 Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina Program features preliminary test of Epithermal Au-Ag Vein

More information

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP TORONTO, March 20 th, 2012 Belo Sun Mining Corp. (TSX:BSX) (the "Company" or "Belo

More information

Discovering Canadian Gold and Diamonds. Oxford Lake Project, Manitoba

Discovering Canadian Gold and Diamonds. Oxford Lake Project, Manitoba Discovering Canadian Gold and Diamonds Oxford Lake Project, Manitoba March 2016 Forward Looking Statement Certain statements contained in this presentation may contain forward-looking information within

More information

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program NEWS RELEASE May 23, 2018 TSX and NASDAQ: MPVD Mountain Province Diamonds Completes the Kennady North Winter Exploration Program Toronto and New York, May 23, 2018 Mountain Province Diamonds Inc. ( Mountain

More information

Investor Presentation October 2012

Investor Presentation October 2012 Investor Presentation October 2012 2 Forward Looking Statements This presentation contains "forward-looking information" (also referred to as "forward looking statements") which may include, but are not

More information

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project September 24, 2018 News Release Release #15 2018 Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project Vancouver, B.C. Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) ("Monument"

More information

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver 2012-19 Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver September 26, 2012 Toronto, Ontario - QUEENSTON

More information

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura July 11, 2016 News Release Release 15-2016 Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura Vancouver, B.C., July 11, 2016, Monument Mining Limited (TSX-V: MMY and FSE: D7Q1)

More information

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011 PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011 Toronto, Ontario March 30, 2011 Wesdome Gold Mines Ltd (WDO: TSX) has initiated an aggressive exploration, development and

More information

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT NEWS RELEASE November 29, 2016 AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT Toronto, Ontario November 29, 2016 - The Manager, Red Pine Exploration

More information

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia Bellhaven Announces Updated NI 43-101 Mineral Resource for La Mina Project, Colombia Vancouver, B.C. October 24, 2016. Bellhaven Copper & Gold Inc. (TSX-Venture: BHV) ( Bellhaven or the Company ) is pleased

More information

Asmara Mining Conference

Asmara Mining Conference 2014 BISHA MINING EXPLORATION An OVERVIEW Asmara Mining Conference October 1 st, 2014 Rob Foy BMSC Exploration Manager FORWARD LOOKING STATEMENTS This Presentation contains forward-looking statements within

More information

ASX Code: ORN Compelling Nickel-Copper Targets Defined at Fraser Range Project

ASX Code: ORN   Compelling Nickel-Copper Targets Defined at Fraser Range Project ASX Code: ORN www.oriongold.com.au Compelling Nickel-Copper Targets Defined at Fraser Range Project 1 Disclaimer and Forward-Looking Statements Certain statements contained in this presentation, including

More information

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE August 7, 2012 - Calgary, Alberta Graphite One Resources Inc. (GPH: TSX- V, GPHOF: OTCQX)

More information

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 27.96 GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS RESULTS FROM

More information

Prophecy: Pacamayo, Paca North and El Abra Return Anomalous Silver, Zinc, Lead and Antimony Assay Results

Prophecy: Pacamayo, Paca North and El Abra Return Anomalous Silver, Zinc, Lead and Antimony Assay Results Prophecy: Pacamayo, Paca North and El Abra Return Anomalous Silver, Zinc, Lead and Antimony Assay Results Vancouver, British Columbia, August 27, 2015 Prophecy Development Corp. ( Prophecy or the Company

More information

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project 5 th July 2017 Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project Intensive site based exploration has commenced at Dobsina Co-Ni Project. Activities include:

More information

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS NEWS RELEASE OA GOLD REPORTS CONTINUED SUCCESS AT GSS May 26, 2014 Orca Gold Inc. (TSX.V:ORG) ( Orca or the Company ) is pleased to provide an update on exploration at its Galat Sufar South ( GSS ) prospect

More information

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) 998-4175 Tel: (888) 648-4218 www.sabinagoldsilver.com April 8, 2018 SBB NR 18-10 SBB TSX Sabina Gold & Silver continues

More information

Royal Nickel Corporation A PRELIMINARY ASSESSMENT OF THE DUMONT PROPERTY LAUNAY AND TRÉCESSON TOWNSHIPS, QUEBEC, CANADA. 30 September, 2010

Royal Nickel Corporation A PRELIMINARY ASSESSMENT OF THE DUMONT PROPERTY LAUNAY AND TRÉCESSON TOWNSHIPS, QUEBEC, CANADA. 30 September, 2010 Royal Nickel Corporation A PRELIMINARY ASSESSMENT OF THE DUMONT PROPERTY LAUNAY AND TRÉCESSON TOWNSHIPS, QUEBEC, CANADA 30 September, 2010 William J. Lewis, B.Sc., P.Geo. Ing. Alan J. San Martin, MAusIMM

More information

North American Palladium Signs Option Agreement for the Sunday Lake Project and Commences New Exploration Strategy

North American Palladium Signs Option Agreement for the Sunday Lake Project and Commences New Exploration Strategy North American Palladium Signs Option Agreement for the Sunday Lake Project and Commences New Exploration Strategy Toronto, Ontario, June 20, 2017 North American Palladium Ltd. ( NAP or the Company ) (TSX:

More information

Xstrata Process Support (XPS) Falconbridge, Ontario COM 2009 Geometallurgy Short Course August 22 23, Peter J. Whittaker, Ph.D., P.Geo.

Xstrata Process Support (XPS) Falconbridge, Ontario COM 2009 Geometallurgy Short Course August 22 23, Peter J. Whittaker, Ph.D., P.Geo. Xstrata Process Support (XPS) Falconbridge, Ontario COM 2009 Geometallurgy Short Course August 22 23, 2009 Peter J. Whittaker, Ph.D., P.Geo. 1 Process Mineralogy at Xstrata Process Support: Outline Introduction

More information

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel: 930 1 st Street, Suite 202, North Vancouver, BC V7P 3N4 Tel: (604) 998-4175 Tel: 1888 668-4216 www.sabinagoldsilver.com July 24, 2013 SBB NR 13-12 SBB.T SABINA GOLD & SILVER ANNOUNCES POSITIVE RESULTS

More information

Rare Earth project update

Rare Earth project update 22 June 2011 ASX Release By e-lodgement Rare Earth project update HIGHLIGHTS Work advanced on Rare Earth Elements ( REE ) project in Arizona, USA 5,120 metre, 195 hole drilling programme completed Early

More information

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO TORONTO, ONTARIO - (April 21, 2015) - McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to announce drill results that we expect will

More information

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND 65 Queen Street West Suite 815 Toronto, Ontario Canada M5H 2M5 QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND Toronto, Ontario January 8th, 2019 - QMX Gold

More information

Compliant Exploration for JORC and CIM Definition Standards / NI Certification

Compliant Exploration for JORC and CIM Definition Standards / NI Certification Compliant Exploration for JORC and CIM Definition Standards / NI 43-101 Certification Dr Norman Lock Private Consultant norman.lock@yahoo.co.uk +1 647 242 9471 Presentation to CBMINA Belo Horizonte, August,

More information

North American Palladium Provides Update on Lac des Iles Exploration Program

North American Palladium Provides Update on Lac des Iles Exploration Program North American Palladium Provides Update on Lac des Iles Exploration Program 4/5/2018 TORONTO, April 05, 2018 (GLOBE NEWSWIRE) -- North American Palladium Ltd. ("NAP" or the "Company") (TSX:PDL) (OTC PINK:PALDF)

More information

News Release B2Gold Announces Updated Higher Grade Gold Resource at Wolfshag Zone, Otjikoto Mine, Namibia

News Release B2Gold Announces Updated Higher Grade Gold Resource at Wolfshag Zone, Otjikoto Mine, Namibia News Release B2Gold Announces Updated Higher Grade Gold Resource at Wolfshag Zone, Otjikoto Mine, Namibia Vancouver, January 20, 2015 - B2Gold Corp. (TSX: BTO, NYSE MKT: BTG, NSX: B2G) ( B2Gold or the

More information

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West TORONTO, ONTARIO -- (GlobeNewswire September 20, 2018) Plateau Energy Metals Inc.

More information

Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda

Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda April 11, 2016 News Release Release 10-2016 Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda Vancouver, B.C., April 11, 2016, Monument Mining Limited (TSX-V: MMY and FSE: D7Q1)

More information

BELO SUN ANNOUNCES INFERRED RESOURCE ESTIMATE OF 356,600 OUNCES GRADING 2

BELO SUN ANNOUNCES INFERRED RESOURCE ESTIMATE OF 356,600 OUNCES GRADING 2 BELO SUN ANNOUNCES INFERRED RESOURCE ESTIMATE OF 356,600 OUNCES GRADING 2.75 G/T GOLD FOR THE SOUTH BLOCK TARGET AREA, VOLTA GRANDE GOLD PROJECT, BRAZIL TORONTO, June 11 th, 2012 Belo Sun Mining Corp.

More information

Fura Gems Inc. FURA ANNOUNCES MAIDEN MINERAL RESOURCE ESTIMATE FOR THE COSCUEZ EMERALD MINE, A FIRST FOR THE COLOMBIAN EMERALD SECTOR

Fura Gems Inc. FURA ANNOUNCES MAIDEN MINERAL RESOURCE ESTIMATE FOR THE COSCUEZ EMERALD MINE, A FIRST FOR THE COLOMBIAN EMERALD SECTOR Fura Gems Inc. FURA ANNOUNCES MAIDEN MINERAL RESOURCE ESTIMATE FOR THE COSCUEZ EMERALD MINE, A FIRST FOR THE COLOMBIAN EMERALD SECTOR For Immediate Release: December 12, 2018 TORONTO, ONTARIO - Fura Gems

More information

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER 122.7 METRES March 1, 2012, Toronto, Ontario, Canada: Lexam VG Gold Inc. (TSX: LEX), (FRANKFURT: VN3A), (OTCQX:

More information

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Continues to Expand Gold Zones At Val-d Or East NEWS RELEASE 02/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742 Highlights: Probe Metals Continues to Expand Gold Zones At Val-d Or East New Beliveau Deposit resource expansion drilling to the West returned

More information

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes Suite 200 65 Front St. East Toronto, ON M5E 1B5 www.renforthresources.com 23 January, 2018 CSE: RFR For Immediate Release Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes Renforth

More information

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred Suite 700 1620 Dickson Ave. Kelowna, BC V1Y 9Y2 rich@fissionuranium.com www.fissionuranium.com TSX SYMBOL: FCU OTCQX SYMBOL: FCUUF January 9, 2015 FRANKFURT SYMBOL: 2FU Fission s Initial Resource Totals

More information

Fission Increases Indicated Resource; Doubles Inferred Resource

Fission Increases Indicated Resource; Doubles Inferred Resource Suite 700 1620 Dickson Ave. Kelowna, BC V1Y 9Y2 rich@fissionuranium.com www.fissionuranium.com TSX SYMBOL: FCU OTCQX SYMBOL: FCUUF February 20, 2018 FRANKFURT SYMBOL: 2FU Fission Increases Indicated Resource;

More information

Detour Gold Reports Drilling Results from Lower Detour

Detour Gold Reports Drilling Results from Lower Detour December 17, 2015 NEWS RELEASE Detour Gold Reports Drilling Results from Lower Detour Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports final results from its 2015 summer drilling

More information

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres NEWS RELEASE 07/2017 Symbol: TSX-V: PRB Shares Issued: 93,328,938 Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

More information

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION May

More information

Northern Dynasty Minerals Ltd.

Northern Dynasty Minerals Ltd. Northern Dynasty Minerals Ltd. 1020 800 W Pender St. Vancouver BC Canada V6C 2V6 Tel 604 684-6365 Fax 604 684-8092 Toll Free 1 800 667-2114 http://www.northerndynasty.com RESOURCE ESTIMATE FOR PEBBLE EAST

More information

Interval (meters) To (meters)

Interval (meters) To (meters) 200 Burrard Street, Suite 650 Tel: 604.801.5432 Vancouver, BC V6C 3L6 Fax: 604.662.8829 TSX-V: VG NEWS RELEASE Shallow RC drilling at the WAMA property returns intervals of 4m @ 30.57 g/t Au, 3m @ 19.39

More information

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project Sudbury, July 27, 2017 Canadian Gold Miner Corp ( CGM, the Company) and Transition Metals Corp. (XTM TSX.V,

More information

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold Wallbridge Options 100% of the Beschefer Project near Fenelon Gold Toronto, Ontario October 17, 2018 Wallbridge Mining Company Limited (TSX:WM, FWB: WC7) ( Wallbridge or the Company ) is pleased to announce

More information

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15. NEWS RELEASE 10/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over

More information

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7) FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7) Vendetta Increases Pegmont Lead-Zinc Mineral Resource to 5.8 Million Tonnes and 8.3 Million Tonnes of. Open Pit Constrained Mineral Resource now

More information

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL TORONTO, July 20, 2015 IAMGOLD Corporation ( IAMGOLD or the Company

More information

FOCUSED ON ACQUIRING, EXPLORING AND ADVANCING QUALITY MINING PROJECTS IN THE AMERICAS CORPORATE PRESENTATION 1

FOCUSED ON ACQUIRING, EXPLORING AND ADVANCING QUALITY MINING PROJECTS IN THE AMERICAS CORPORATE PRESENTATION 1 FOCUSED ON ACQUIRING, EXPLORING AND ADVANCING QUALITY MINING PROJECTS IN THE AMERICAS JUNE 2018 CORPORATE PRESENTATION 1 Disclaimer Except for the statements of historical fact contained herein, certain

More information

FILO MINING DRILLS 50 METRES OF G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL

FILO MINING DRILLS 50 METRES OF G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL NEWS RELEASE FILO MINING DRILLS 50 METRES OF 236.4 G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL April 27, 2018: Mining Corp (TSXV, Nasdaq First North: FIL) (" Mining",,

More information

Renard Diamond Project Mineral Resource Update. Companion Materials to the Stornoway October 14, 2015 Renard Technical Report

Renard Diamond Project Mineral Resource Update. Companion Materials to the Stornoway October 14, 2015 Renard Technical Report Renard Diamond Project Mineral Resource Update Companion Materials to the Stornoway October 4, 05 Renard Technical Report Forward-Looking Information This presentation contains "forward-looking information"

More information

MEXICAN GOLD INTERSECTS 7.18 G/T GOLD EQUIVALENT (2.00 G/T AU, G/T AG, 3.05 % CU) OVER 14.0 METERS AT LAS MINAS DIKE CONTACT ZONES

MEXICAN GOLD INTERSECTS 7.18 G/T GOLD EQUIVALENT (2.00 G/T AU, G/T AG, 3.05 % CU) OVER 14.0 METERS AT LAS MINAS DIKE CONTACT ZONES Thunder Bay, Ont. TSX-V: MEX For Immediate Release December 12, 2017 MEXICAN GOLD INTERSECTS 7.18 G/T GOLD EQUIVALENT (2.00 G/T AU, 13.13 G/T AG, 3.05 % CU) OVER 14.0 METERS AT LAS MINAS DIKE CONTACT ZONES

More information