South Deep: A World Class Ore Body In Perspective. Group Competent Person 7 April 2014

Size: px
Start display at page:

Download "South Deep: A World Class Ore Body In Perspective. Group Competent Person 7 April 2014"

Transcription

1 South Deep: A World Class Ore Body In Perspective TIM ROWLAND Group Competent Person 7 April 2014

2 Forward looking statements Certain statements in this document constitute forward looking statements within the meaning of Section 27A of the US Securities Act of 1933 and Section 21E of the US Securities Exchange Act of In particular, the forward looking statements in this document include among others those relating to the Damang Exploration Target Statement; the Far Southeast Exploration Target Statement; commodity prices; demand for gold and other metals and minerals; interest rate expectations; exploration and production costs; levels of expected production; Gold Fields growth pipeline; levels and expected benefits of current and planned capital expenditures; future reserve, resource and other mineralisation levels; and the extent of cost efficiencies and savings to be achieved. Such forward looking statements involve known and unknown risks, uncertainties and other important factors that could cause the actual results, performance or achievements of the company to be materially different from the future results, performance or achievements expressed or implied by such forward looking statements. Such risks, uncertainties and other important factors include among others: economic, business and political conditions in South Africa, Ghana, Australia, Peru and elsewhere; the ability to achieve anticipated efficiencies and other cost savings in connection with past and future acquisitions, exploration and development activities; decreases in the market price of gold and/or copper; hazards associated with underground and surface gold mining; labour disruptions; availability terms and deployment of capital or credit; changes in government regulations, particularly taxation and environmental regulations; and new legislation affecting mining and mineral rights; changes in exchange rates; currency devaluations; the availability and cost of raw and finished materials; the cost of energy and water; inflation and other macro-economic factors, industrial action, temporary stoppages of mines for safety and unplanned maintenance reasons; and the impact of the AIDS and other occupational health risks experienced by Gold Fields employees. These forward looking statements speak only as of the date of this document. Gold Fields undertakes no obligation to update publicly or release any revisions to these forward looking statements to reflect events or circumstances after the date of this document or to reflect the occurrence of unanticipated events. 2

3 Agenda Agenda Regional and Local Geology Geological Modelling Inputs o o o 3D Seismic Survey Surface Drilling Programme Grade Control and Mine Exploration Drilling Geological Modelling Procedures Mineral Resource Estimation Mine Design and Planning Mineral Resource and Mineral Reserve Resource to Reserve Reconciliation Summary 3

4 Regional and Local Geology

5 Regional and Local Geology Depositional Environment Far West Rand Goldfield Blyvooruitzicht Elandsrand West Wits Line Goldfield West Rand Cons. Doornkop Cooke Section Ezulwini SOUTH DEEP Kloof Driefontein Mponeng Central Rand Goldfield South Deep A Unique Ore Body In An Area With A 60+ Year Production History 5

6 Local Geology Cross Section Of Ore Body (Linked To Mining Method) Subcrop 240m 240m 240m 240m WEST Base of Ventersdorp lava 4-West (4W) C4 3-West (3W) 2-West (2W) 1-West (1W) C3 C2 C1 EAST VCR 2m VCR MBT Targeted reef units 120m Vertical Target package: 2m m 40 70m 20 60m 20 30m MBB MIQ MIT MIB MAD MAC ED ECT ECMQ ECMC ECBQ ECB ECBAQ ECBA 16 Reef Units Reserve Tonnes 1,325Kt 68,895Kt 80,379Kt 48,988Kt 24,823Kt Reserve Grade 9.45g/t 5.5g/t 5.3g/t 5.1g/t 4.9g/t LoM Tonnage Make up: 18% of LoM tonnes 49% of LoM tonnes 22% of LoM tonnes 11% of LoM tonnes Mining Method: Horizontal destress; long hole stoping / drifts and benches 6

7 Ore Body Dictates Mining Method Reserve Designs In Section: Corridor 4 Bench Drift Section view without resource model C4 C3 C2 C1 7

8 Ore Body Dictates Mining Method Reserve Designs In Section: Corridor 3 Section view without resource model C4 C3 C2 C1 8

9 Ore Body Dictates Mining Method Reserve Designs In Section: Corridor 2 Section view without resource model C4 C3 C2 C1 9

10 Ore Body Dictates Mining Method Reserve Designs In Section: Corridor 1 Section view without resource model C4 C3 C2 C1 10

11 Geological Modelling Inputs

12 Geological Modelling Inputs De-risking The Ore Body 3D Seismic Survey (2003) ~20m resolution Covers the whole lease area south of the wrench fault. Used to confirm the base of lava position as well as major structures. Surface drilling ( ) (49,536m) 600m x 600m grid Used for facies boundaries, structural definition, stratigraphic modelling, assaying and resource estimation. LIB Drilling (Long Inclined Boreholes) (13,023m) 300m x 300m grid Used for structural definition, stratigraphic modelling, assaying and grade indication. Grade Control Drilling 50m x 50m grid Used for facies determination, structural definition, stratigraphic modelling, assaying and resource estimation. Cumulatively covers 78% of the next 4 years of planning Years Ahead of Current Workings Years Ahead of Current Workings Years Ahead of Current Workings. 0 2 Years Ahead of Current Workings. Good Reconciliation Between Resource Model And Mining 12

13 Geological Modelling Inputs 3D Seismic Survey Raw 3D Seismic data from all available data sets has been combined and reprocessed to produce a single consolidated seismic image of the subsurface strata The consolidated seismic volume extends 40km East West, 16km North South and reaches depths up to 7km below surface The accuracy of the seismic data has been confirmed by drilling results with the majority of reef intersections being within 20m of the modelled depth Base of Ventersdorp lava as per 3D seismic survey Base of Lava 3081m below surface Macro Geological Structure Confirmed 13

14 Geological Modelling Inputs Surface Exploration Drilling Drilling completed by GFI in 2013 (6 Year Project) The focus was on improving the confidence in the resource estimate south of the Wrench fault Destress & Massive Mine plan to C2020 Achieved agrid of approximately 600m x 600m A total of 49,536m were drilled during the project The project comprising 9 boreholes added 72 of 84 planned intersections resulting in 11,635 additional samples south of wrench (SoW) 50m x 50m grid drilling 300m x 300m grid drilling 600m x 600m grid drilling 14

15 Geological Modelling Inputs Surface Drilling Borehole depths varied between 2,400m and Surface Pretoria Group Base of Rooihoogte formation at 500mbc Chuniespoort Group Base of Black Reef Fm. at 1800mbc 3,400m below surface Up to 12 intersections per borehole, dependant on ground conditions and drill string integrity 3 clusters of 4 intersections each Short deflections intersected reef within a 5m radius Long deflections are 20m to 30m from the original intersection Long deflection Klipriviersberg Group Short deflections VCR at 3000mbc SD5 SD4 LD1 SD6 Upper Elsburg s SD3 SD1 SD2 Original Intersection SD8 SD7 LD2 SD9 Base of EC s at 3200mbc 15

16 Geological Modelling Inputs Surface Borehole o e Intersections s and Sampling Corridor 4 (E.g. Hole DP 25) Reef # of Samples Channel Width (cm) Grade (g/t) VCR m MBT MBB Sample sizes vary between 2cm and 60cm depending on the reef contacts. MIQ Number of units vary MIT depending on proximity to the sub crop and onlapping MAD relationships MAC within the wedge shaped ore body ED ECT ECMQ ECMC ECBQ ECB ECBAQ ECBA High sampling data volume and granularity per borehole 16

17 Geological Modelling Inputs Surface Borehole o e Intersections s and Sampling Corridor 3 (E.g. Hole DP 7) 10m Reef # of Samples Channel Width (cm) Grade (g/t) VCR MBT MBB MIT MIB MAD MAC ED DYKE Sample sizes vary between 2cm and 60cm depending on the reef contacts. Number of units vary depending on proximity to the sub crop and onlapping relationships within the wedge shaped ore body. ECMC ECBQ ECB ECBAQ ECBA High sampling data volume and granularity per borehole 17

18 Geological Modelling Inputs Surface Borehole o e Intersections s and Sampling Corridor 2 (E.g. Hole DP24 SD3) 10m Reef # of Samples Channel Width (cm) Grade (g/t) MBT MBB MIQ MIT MIB MAC ED ECT ECMQ Sample sizes vary between 2cm and 60cm depending on the reef contacts. Number of units vary depending on proximity to the sub crop and onlapping relationships within the wedge shaped ore body. ECMC ECBQ ECB ECBAQ ECBA High sampling data volume and granularity per borehole 18

19 Geological Modelling Inputs Surface Intersections s and Sampling Corridor 1 (E.g. Hole K1) 10m Reef # of Samples Channel Width (cm) Grade (g/t) VCR MBT MBB MIQ MIT MIB MAD MAC ED ECT ECMQ ECMC ECBQ ECB ECBAQ ECBA Sample sizes vary between 2cm and 60cm depending on the reef contacts. Number of units vary depending on proximity to the sub crop and onlapping relationships within the wedge shaped ore body. High sampling data volume and granularity per borehole 19

20 Geological Modelling Inputs Indicative Results Slides that follow show summarised results for 4 of the 16 Upper Elsburg units at South Deep (MBB, MIT, ECT and ECMC); (Approximately 70% of total Reserve). The grade and channel width data are provided as simple mathematical averages of the individual deflection values. In this form, the raw data cannot be used directly for estimation purposes and the application of relevant geostatistical techniques and kriging constrained within rigorously defined geological and resource models is essential. Bore Hole Data Raw Until Processed Within Array of 16 Discrete Resource Models 20

21 Geological Modelling Inputs Surface Drilling MBB Reef Borehole Channel Width (cm) Grade (g/t) MD MD DP DP DP DP DP KDP KMF DP DP KMF KMF K MD KMF KMF KMF KMF Current Holes Historic Holes 21

22 Geological Modelling Inputs Surface Drilling MIT Reef Borehole Channel Width (cm) Grade (g/t) DP DP MD MD DP DP KMF KMF K KDP KMF KMF KMF KMF KMF MD Page 22

23 Geological Modelling Inputs Surface Drilling ECT Reef Borehole Channel Width (cm) Grade (g/t) DP DP DP MD MD DP DP DP K KMF DP KMF KMF KMF DP KMF KMF KDP KMF MD

24 Geological Modelling Inputs Surface Drilling ECMC C Reef Borehole Channel Width (cm) Grade (g/t) DP MD DP DP MD DP DP DP KMF KDP KMF KMF KMF KMF K MD DP KMF KMF

25 Geological Modelling Inputs LIB Drilling The mine has supported an aggressive underground drilling program since mid-2009 to address the historically i low borehole data density which supported the earlier geological and resource models. Long Inclined Boreholes (LIB s) are drilled ahead of the current workings on an approximate 300m grid. All LIB drilling has been done post Gold Fields acquisition. 10 LIB s, totalling 7,213m have been drilled testing the Upper Elsburgs to the south of current workings. The VCR target t immediately adjacent (west) to current Elsburg mining i has been explored with an additional 9 LIB holes, totalling 5,810m. 25

26 Geological Modelling Inputs North ot of Wrench LIB Drilling gcampaign pag 9VCRLIB s drilled in 2012/ Upper Elsburgs LIB s completed; 8 more to be drilled in next 2 years. Grade control drilling is on plan in Corridors 1, 2, 3 & W & 87-2W ongoing. 200m OPS Plan Advance Drilling Designed To Pin Structure And Stratigraphy- 10 years ahead of mining 26

27 Geological Modelling Inputs Cross Section of a LIB Hole Looking East North North 95L 95L Wrench Fault 137m Wrench fault 137m 1,300m LIB hole drilled from 95L South Southintersecting the 137m upthrow Wrench Fault and confirming i position and throw of the Upper Elsburg reefs. Lava 350m right ihtlt lateral l movement 100m 100m 27

28 Geological Modelling Inputs Grade GadeControl to Drilling A planned drilling grid is targeted comprising in-stope and destress drilling and drilling from footwall infrastructure t up to 70m ahead of the current destress leading edge In-stope and footwall drilling is ongoing and the average drill density has been reduced from an 80m grid to a 50m grid Drilling from the destress stopes will be into both the hangingwall and footwall Grade Control Drilling Designed To Confirm Short To Medium Term Resource Model 28

29 Geological Modelling Inputs Grade Control o Drilling 7 year plan (provides high confidence) ce) 200m Outline of Area already destressed Drill hole density has been reduced from 80m to 50m in the last 5 years Virgin ground drilling done ahead of mining, covers a range of metres 62% of 7 yr plan is within the current destress area. 105L 100L 7yr OPS Plan Outline Planned GC drill grid Drilled Holes Drilled from destress Drilled from footwall Page 29

30 Geological Modelling Inputs Typical Grade Control o Drill Fan from Main Access Drive in the Destress ess Cut Side view Grade control drilling fan drilled from the two Main Access Development limits per destress cut Average length of hole = 85m Rotated view Page 30

31 Geological Modelling Procedures South Deep Gold Mine

32 Geological Modelling Procedures Improvement e in Accuracy and Confidence in Modelling 4 Units Shore Line Composite Units Singular Subcrop Point Gold Fields acquires South Deep Gold Mine Units 2008 Re aligned Subcrop Positions LIB Drilling 16 Units Campaign Started Singular Subcrop Infill Drilling (GC) Point Campaign Started Surface Drilling Campaign Started Units Palinspastically ll Reconstructed Depositional Model 16 Units Kriging of Channel Widths & Dynamic Modelling 2013 Detailed reserve designs for Current Mine only. Future mine estimated using the Bayesian methodology Future mine north of the wrench fault designed in detail for the first time Studies in mechanising the destress commence The entire Mineral Reserve is designed for the first time in the LoM Reserve updated with new models Reserve updated with new models Highly detailed designs for 7 years included as part of the new LOM Evolution of a fit for purpose Geological Modelling process Page 32

33 Geological Modelling Procedures Facies and Domains Geological facies are areas of the ore body that have been deposited under similar conditions and correlate with gold grade distribution Domains are areas within a facies zone in which a consistent grade distribution occurs Discrete facies and domains are constructed for each of the 16 units Facies and domains therefore provide a geological framework for geostatistical modelling Channel width models of the different units are constructed to enable the modelling of individual reef volumes and tonnages Page 33

34 Mineral Resource Estimation South Deep Gold Mine

35 Mineral Resource Estimation Current Process Flow for Model Updates Sampling Process all samples through the QA/QC programme. Geological Models Convert all geological data to a dynamic modelling environment and update the geological, facies and domain models. Resource Estimation Update the geostatistical models and estimate the mining areas. LoM Planning Update the LoM plan with respect to the updated Mineral Resource Models. Review Internal and external review on data, geological and resource models, plans and design. Page 35

36 Mineral Resource Estimation Resource Evaluation and SAMREC Classification Geostatistical models are generated for each of the 16 units Estimation is constrained by geostatistical domains Ordinary and Simple Kriging techniques are utilised in the estimation of grade Facies modelling informs geological continuity from Current mine to Future mine 96% of fthe current mine Measured dresource is destressed, d equating to 27M 2.7 Moz gold Subcrop South Shaft Twin Shaft 7 Year Plan (Destress and Massive Mining) Measured Resource is 96% Destressed Page 36

37 Planning vs Measured Boundaries Dec 2013 Measured ed Boundary & Dec 2014 Confidence Boundary Planning Dec 2013 Measured Boundary Inside Outside Total C2014 C2015 C2016 C2017 Tonnage (kt) % 93% 7% 100% Tonnage (kt) % 85% 15% 100% Tonnage (kt) % 76% 24% 100% Tonnage (kt) % 65% 35% 100% Table illustrates annual specific coverage, if calculated cumulatively, year-on -year the overall coverage is at 78% of planned mining (destress and massive) up to and including C2017 falls within the current Measured Resource boundary On a rolling basis, year 1 of the plan will be >90% classified as Proved Reserve (i.e. destressed Measured Resource) Page 37

38 Mineral Resource Estimation Grade Reconciliation Resource Model vs Grade Control Model (MBB unit - Corridor 4) Reef Resource Model Grade (2011) Grade Control Drilling Grade (2012) Grade Control Model Grade (2013) Percentage Change MBBReef (g/t) * % * Arithmetic mean calculated from actual raw assay results. 50m m 50m m Page 38

39 Mine Design and Planning South Deep Gold Mine

40 Mine Design and Planning Overview e Mining method in use was developed at South Deep, specific to the ore body. Scheduling assumptions are based on actual achieved efficiencies Destress mining is required to enable the mining of large excavations in a destressed environment and will be applied in all future mine stoping areas If the targeted reserve is 12m or less in height a drift, 6.0m (w) x 5.5m 5m (h) with a bench of 6.5m (h) or less will be applied. Targets larger than this will be extracted with long-hole stoping The initial 7-year design is completed in high detail (long-hole stopes are segmented into 7.5m portions (5 rings), all individual id stopes, accesses, drifts and benches are individually id designed). d) For mining beyond 7 years the designs are less detailed but retain the requisite definition to model production profiles with confidence. Individual stopes are replaced with stope designs that include 5 to 10 individual stopes. The designs are depleted at the same rate as the individual stopes LoM infrastructure designs include all stoping access ramps, conveyer haulages, intake and return haulages, bulk air cooler excavations, workshops, ore passes, silo s, vent-holes, intake and rock-handling cross-cuts. Mine design and mining method is customised to fit South Deep s requirements Page 40

41 LOM Sequence Mining sequence LoM ends in 2087 Depth 2400m below surface Old Mine NoW depleted d in Level 105 Level Current Mine 93 Level LOM 2014 to 2087 (38,224 koz) 110 Level NoW 95 Level Wrench Fault SoW E SoW W 110 Level Depth 3300m below surface Mineral Reserve is based on a full LoM design Page 41

42 Mineral Resource and Mineral Reserve South Deep Gold Mine

43 Mineral Resource As at December 2013 Measured Indicated Inferred Total Mineral Resource Mineral Resource classification Tonnes Grade Gold Tonnes Grade Gold Tonnes Grade Gold Tonnes Grade Gold per mining area (Mt) (g/t) (koz) (Mt) (g/t) (koz) (Mt) (g/t) (koz) (Mt) (g/t) (koz) Underground Current Mine , , ,489 NOW , , ,804 SOW , , ,649 VCR , , ,881 Total underground , , , ,824 Page 43

44 Mineral Resource As at December Top 10 Gold Deposits Resource Size Res source (KOz) South Deep: A World Class Ore Body World s In Perspective Second Tim Largest Rowland, Group Gold Competent Mineral Person Resource 7 April 2014 Page 44

45 Mineral Reserve As at December Year mine life ( ) Mineral Reserve classification per mining area Underground Tonnes (Mt) Proved Probable Total Mineral Reserve Grade (g/t) Gold (koz) Tonnes (Mt) Grade (g/t) Gold (koz) Tonnes (Mt) Grade (g/t) Gold (koz) Current Mine , ,245 NOW , ,286 SOW , ,693 Total underground , , ,224 In stope waste ramping included in the 224.4Kt / 5.3g/t Page 45

46 Resource to Reserve Reconciliation Mineral Reserve e Time Line Reserve Ounces and Grades Millions Jun 2006 Jun 2009 Dec 2010 Dec 2012 Dec Elsburgs VCR OldMine Head Grade VCR 3,793,615 3,426, , , ,876 OldMine 1,044,466 1,044, Elsburgs 25,859,092 25,014,732 34,087,489 38,696,930 37,820,670 Total 30,697,173 29,485,961 34,532,525 39,112,090 38,223,546 Grade Moz of VCR and 1.0Moz of Old Mine included Acquisition Reserves 1.6Moz of VCR designed and 1.0Moz of Old Mine included. Current Mine fully designed with 106 % MCF, remainder still acquisition reserves (includes 1.8Moz VCR) Excludes VCR South of the Wrench fault Excludes Old Mine Includes lower grade Uncle Harry s 108% MCF Includes more marginal material from the SoW projects 100% MCF *PRF reduced from 97.3% to 96.5% In section waste dilution applied Updated for Dec 13 98% MCF In section waste dilution applied *PRF means Plant Recovery Factor, MCF means Mine Call Factor Page 46

47 Resource to Reserve Reconciliation South Deep Gold Mine

48 Resource to Reserve Reconciliation Ounces South Deep Mineral Resource Reconciliation Gol ld (Moz) Cut off Grade Resource Reserve CM 3.2 g/t 3.8 g/t FM 3.6 g/t 4.2 g/t MCF of 98% Mining beyond BW 87 O Line 95 O Line Ph1 SoW O Line VCR Resource Inferred Pay Limit MCF Tail Management Exclusions Extraction/Mining Reserve Resources Method Page 48

49 Resource to Reserve Reconciliation Grade Gade South Deep Mining Grade for the 7 Year grade 6.0 Low grade and waste Cut off Grade Low grade VCR not 4.0 Resource Reserve material within reported as 7.3 CM 3.2 g/t 3.8 g/t stope designs reserve FM 3.6 g/t 4.2 g/t (limited selectivity 3.0 within longhole Average MCF of 98% stopes) dilution of 7.3% (mainly backfill within close in secondaries) proximity of accesses Localised areas not reserved. Not Resource (Incl. Inferred) Reserve Paylimits Ramping Internal design dilution Excluding VCR Dilution MCF Residual Declared Reserve CM is Current Mine FM is Future Mine (south of the Wrench fault) MCF is Mine Call Factor Page 49

50 Summary Key Points Continuous data supplied by sequential, rolling drilling programs Robust geological modelling with appropriate resolution. Resource estimation embodies a high level of ore body granularity Ore body dictates relevant mine design and mining method Good reconciliation between resource model and mining achieved Technically assured Resource and Reserve Page 50

51 Thank you South Deep Gold Mine

RESOURCES AND RESERVES BY OPERATION SOUTH AFRICA FREE STATE CONTINUED

RESOURCES AND RESERVES BY OPERATION SOUTH AFRICA FREE STATE CONTINUED The ore body is composed of some 67 or more individual conglomerates located in the Uitkyk (Elsburg EA) and Van der Heeversrust (Dreyerskuil DK), members of the upper Eldorado (Elsburg) Formation. These

More information

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written

More information

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT

More information

Press Release Thunder Bay: August 2, 2018

Press Release Thunder Bay: August 2, 2018 Press Release Thunder Bay: August 2, 2018 PREMIER GOLD CONFIRMS NEW HIGH-GRADE EXTENSIONS AT MERCEDES Drill results include 21.95 m at 36.65 g/t Au and 171.30 g/t Ag PREMIER GOLD MINES LIMITED ( Premier

More information

FLEXIBILITY IN ADVERSITY KEY TO SUCCESSFULLY

FLEXIBILITY IN ADVERSITY KEY TO SUCCESSFULLY FLEXIBILITY IN ADVERSITY KEY TO SUCCESSFULLY NAVIGATING THE CURRENT ENVIRONMENT STEVE PHIRI Disclaimer The information presented in this presentation is of a general nature and the forward-looking information,

More information

Evaluation of Mineral Resource risk at a high grade underground gold mine

Evaluation of Mineral Resource risk at a high grade underground gold mine Evaluation of Mineral Resource risk at a high grade underground gold mine Presented by: Aaron Meakin Manager Corporate Services CSA Global 21 August 2015 Project Background Beaconsfield Gold Mine, Tasmania

More information

SIBANYE GOLD MINERAL RESOURCES and MINERAL RESERVES UPDATE: FURTHER INCREASES IN GOLD AND URANIUM MINERAL RESERVES

SIBANYE GOLD MINERAL RESOURCES and MINERAL RESERVES UPDATE: FURTHER INCREASES IN GOLD AND URANIUM MINERAL RESERVES SIBANYE GOLD MINERAL RESOURCES and MINERAL RESERVES UPDATE: FURTHER INCREASES IN GOLD AND URANIUM MINERAL RESERVES Westonaria, 24 February 2016: Sibanye Gold Limited (JSE: SGL & NYSE: SBGL) is pleased

More information

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

King of the Hills Gold Project, Leonora, to commence production in Q2 2011 King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher

More information

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION May

More information

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. 30 April 2008 60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. Perilya Limited (ASX: PEM) is pleased to announce a 60% increase in the mineral resource estimate for the

More information

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April OZ Minerals Limited Carrapateena Mineral Resources Statement April 14 2011 CARRAPATEENA MINERAL RESOURCE STATEMENT April 14, 2011 The Carrapateena Resource Statement relates to an upgrading to an Inferred

More information

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT 65 Queen Street West CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT July 6, 2011 Crocodile Gold Corp. (TSX:CRK) (OTCQX:CROCF) (Frankfurt:XGC) (

More information

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE TORONTO, ON, December 15, 2016 -- Mandalay Resources Corporation ("Mandalay" or the "Company") (TSX: MND)

More information

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 27.96 GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS RESULTS FROM

More information

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth PRESS RELEASE TSX NYSE MKT: RIC Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth Deep Drilling Intersects 18.63 g/t over 6.60

More information

Practical long-term planning in narrow vein mines a case study

Practical long-term planning in narrow vein mines a case study Underground Design Methods 2015 Y Potvin (ed.) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-3-2 https://papers.acg.uwa.edu.au/p/1511_31_khani/ Practical long-term planning in narrow

More information

Option agreement with Randgold set to commercialise Massigui Gold Project

Option agreement with Randgold set to commercialise Massigui Gold Project ASX Announcement 4 November 2016 Option agreement with Randgold set to commercialise Massigui Gold Project Option agreement with the Morila mine-operator provides potential low risk and low cost processing

More information

New Drilling Program Commences at Mutiny s Deflector Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern

More information

STATEMENT OF MINERAL RESOURCES AND MINERAL RESERVES

STATEMENT OF MINERAL RESOURCES AND MINERAL RESERVES Sibanye s approach to reporting Mineral Resources and Mineral Reserves is to ensure integrity and consistency in compliance with public and internal regulatory codes, and to inform all stakeholders of

More information

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3. August 2, 2011 AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND 26.39 G/T Au OVER 3.0 METRES Toronto, Ontario -- Avion Gold Corporation

More information

MARCH 2010 QUARTERLY REPORT

MARCH 2010 QUARTERLY REPORT MARCH 2010 QUARTERLY REPORT ASX Release HIGHLIGHTS Friday 30 April 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill

More information

FIRST RESULTS FROM RC DRILLING AT KONONGO

FIRST RESULTS FROM RC DRILLING AT KONONGO ASX Release Monday 29 March 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 FIRST RESULTS FROM RC DRILLING AT KONONGO Signature

More information

Parkin Offset Properties. Sudbury, Ontario

Parkin Offset Properties. Sudbury, Ontario Parkin Offset Properties Sudbury, Ontario May 11, 2015 CAUTIONARY STATEMENT No regulatory authority has approved or disapproved the information contained in this presentation. This presentation includes

More information

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program NEWS RELEASE September 17, 2018 TSX and NASDAQ: MPVD Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program Toronto and New York, September 17, 2018 Mountain

More information

2.3 South Africa region

2.3 South Africa region 2.3 South Africa region World-class mechanised mine in the Witwatersrand Basin. As project construction shifts to production build-up, South Deep is a kingpin asset to support the Gold Fields vision: To

More information

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project September 24, 2018 News Release Release #15 2018 Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project Vancouver, B.C. Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) ("Monument"

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

2018 South Australian Exploration & Mining Conference

2018 South Australian Exploration & Mining Conference 2018 South Australian Exploration & Mining Conference Richard Holmes Head of Exploration & Growth 7 DECEMBER 2018 Forward Looking Statements This presentation has been prepared by OZ Minerals Limited (OZ

More information

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT For Immediate Release NR 13-10 FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT (Vancouver, BC, September 16, 2013) Falco Pacific Resource Group Inc. ( Falco Pacific

More information

LATEST RESULTS FROM RC DRILLING

LATEST RESULTS FROM RC DRILLING ASX Release Tuesday 6 July 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 LATEST RESULTS FROM RC DRILLING Signature Metals Limited

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE 16 th August, 2013 ASX:ABU Trial Mining Continues and Commissioning of the Old Pirate Processing Plant is Underway ABM Resources NL ( ABM or The Company ) presents an update

More information

News Release. Infill Drilling Program

News Release. Infill Drilling Program TSX:RMX NYSE.MKT:RBY News Release January 7, 2015 Rubicon s Infill Drilling Program Confirms Continuity and Grade of the F2 Deposit and Continues to Encounter High-Grade Mineralization in Sparsely Drilled

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 21 st September 2015 Operational Update from the Old Pirate Gold Mine and the Coyote Processing Plant ABM Resources NL ( ABM or the Company ) is pleased to announce

More information

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program NEWS RELEASE May 23, 2018 TSX and NASDAQ: MPVD Mountain Province Diamonds Completes the Kennady North Winter Exploration Program Toronto and New York, May 23, 2018 Mountain Province Diamonds Inc. ( Mountain

More information

SIBANYE GOLD DECLARES UPDATED MINERAL RESOURCES and MINERAL RESERVES

SIBANYE GOLD DECLARES UPDATED MINERAL RESOURCES and MINERAL RESERVES Sibanye Gold Limited Incorporated in the Republic of South Africa Registration number 2002/031431/06 Share code: SGL ISIN ZAE000173951 Issuer code: SGL ( Sibanye Gold, Sibanye or the Company ) SIBANYE

More information

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE 257.2 metres with 0.53% Cu, 1.20 g/t Au, and 1.59 g/t Ag (1.19% Cu Eq or 2.39 g/t Au Eq) including 54.5 metres with 1.34% Cu,

More information

For personal use only

For personal use only 18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand

More information

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation MAD345 - Mining II INTRODUCTION 10 October 2018 Course content MAD345 THEORY Date October, 10 October, 17 October, 24 October, 31 November, 7 November, 14 November, 21 Topic Introduction Prospecting, exploration

More information

Kalman Mineral Resource Update

Kalman Mineral Resource Update 10 September 2008 The Manager Company Announcements Office stralian Stock Exchange Via Online Electronic Lodgement Kalman Mineral source Update The Directors are pleased to announce an updated mineral

More information

PRESENTATION BUILDING VALUE IN ARGENTINA Las Aguilas Overview

PRESENTATION BUILDING VALUE IN ARGENTINA Las Aguilas Overview PRESENTATION 2018 BUILDING VALUE IN ARGENTINA Las Aguilas Overview 02 LAS AGUILAS - ARGENTINA S ONLY NICKEL/COBALT DEPOSIT Las Aguilas is located in the heart of Argentina and is a Ni/Co/Co/PGM sulfide

More information

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com MANN SILVER-COBALT MINE PORE: TSXV PowerOre.com FORWARD LOOKING STATEMENTS We are in the mineral exploration and development business. It is inherently risky, and all potential investors should be keenly

More information

Oposura Scoping Study Nearing Completion

Oposura Scoping Study Nearing Completion 20 AUGUST 2018 KEY POINTS: Oposura Scoping Study Nearing Completion Mining study with open pit optimisations and underground mine designs completed High grade massive sulphide mineralisation occurs near

More information

ASX/Media Announcement

ASX/Media Announcement ASX/Media Announcement 25 March 2013 MAIDEN HIGH-GRADE JUDY LODE RESOURCE INDICATES POTENTIAL TO INCREASE ANDY WELL MINE LIFE 106,000 ounce high-grade resource (Indicated & Inferred) Judy South (137,000t

More information

Coeur Mining Provides Silvertip Exploration Update

Coeur Mining Provides Silvertip Exploration Update Coeur Mining Provides Silvertip Exploration Update Positive results include 6.0 meters (19.7 feet) at 925.7 g/t (27.0 oz/t) silver, 16.0% zinc and 15.2% lead, or (2,076.9 g/t (60.6 oz/t) AgEq 1 ) in Discovery

More information

For personal use only

For personal use only UPDATE ON COCK-EYED BOB UNDERGROUND MINING INCREASING CONFIDENCE IN THE POTENTIAL FOR THREE LONG-LIFE UNDERGROUND MINES Integra Mining Limited (ASX:IGR, Integra) is pleased to report that the trial mining

More information

Bass Metals records further positive drill results & progress at 3 prospects.

Bass Metals records further positive drill results & progress at 3 prospects. 16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret

More information

Detour Gold Reports Drilling Results from Lower Detour

Detour Gold Reports Drilling Results from Lower Detour December 17, 2015 NEWS RELEASE Detour Gold Reports Drilling Results from Lower Detour Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports final results from its 2015 summer drilling

More information

Geological factors influencing the design of a narrow-reef autonomous gold miner

Geological factors influencing the design of a narrow-reef autonomous gold miner Geological factors influencing the design of a narrow-reef autonomous gold miner Dr George Henry and Dr. Jan Kuijpers Centre for Mining Innovation (CMI) 31 August 2011 Introduction CMI focus areas Real

More information

STATEMENT OF MINERAL RESOURCES AND MINERAL RESERVES A SUMMARY

STATEMENT OF MINERAL RESOURCES AND MINERAL RESERVES A SUMMARY STATEMENT OF MINERAL RESOURCES AND MINERAL RESERVES A SUMMARY Sibanye s Mineral Resources and Mineral Reserves are reported in accordance with the SAMREC Code, and are considered to be fully compliant

More information

NEWS RELEASE. FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286

NEWS RELEASE. FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286 NEWS RELEASE FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286 February 15, 2012 CNSX: VGO Toronto, Ontario VICTORY GOLD DRILLS 71.5 METRES OF 2.02 GRAMS PER TONNE GOLD ON THE GOLD PIKE MINE PROPERTY

More information

High Grade Gold Drill Results Extend Buccaneer

High Grade Gold Drill Results Extend Buccaneer ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 14 June, 2012 High Grade Gold Drill Results Extend 31 metres averaging 3.68g/t gold including 14 metres averaging 7.56g/t gold ABM Resources NL ( ABM or The Company

More information

Ulysses Gold Project, WA

Ulysses Gold Project, WA Ulysses Gold Project, WA Growing and developing a new high-grade Australian gold project in a Tier-1 location December 2018 Investor Luncheon Series Melbourne, Monday 10 th Sydney, Wednesday 12 th Disclaimer

More information

ASX announcement 16 May 2016

ASX announcement 16 May 2016 ASX announcement 16 May 2016 Adelaide Resources Limited ABN: 75 061 503 375 Corporate details: ASX Code: ADN Cash: $0.701million (at 31 Mar 2016) Issued Capital: 357,922,352 ordinary shares 37,222,104

More information

ASX ANNOUNCEMENT 21 MARCH 2011

ASX ANNOUNCEMENT 21 MARCH 2011 ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights

More information

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East NEWS RELEASE 11/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Highlights: Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East Near-surface intercept grading 3.2 g/t Au over 45.5

More information

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET PRESS RELEASE ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET Highlights: Highly encouraging results from new near-mine exploration target, Akwasiso 10,000 metres of

More information

MANGANESE DISCOVERY AT KONONGO PROJECT

MANGANESE DISCOVERY AT KONONGO PROJECT ASX Release Wednesday 8 September 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill Oliver (Managing Director) E-mail:

More information

For personal use only

For personal use only ACN 097 088 689 ASX Announcement 1 EXPLORATION SUCCESS CONTINUES AT RAVENSWOOD RC drilling targeting shallow portions of Welcome breccia returns a number of significant new results including: 7m @ 7.84g/t

More information

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce

More information

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project IDM Mining s Underground Drilling Intersects 18.70 g/t Au and 66.85 g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project November 22 nd, 2016, Vancouver, BC IDM Mining Ltd. (TSX.V:IDM) (

More information

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017. MANDALAY RESOURCES CORPORATION ANNOUNCES 2018 MINERAL RESOURCES AND RESERVES UPDATE FOR ITS COSTERFIELD OPERATION, INCLUDING MAIDEN RESOURCES AND RESERVES ESTIMATE FOR THE YOULE LODE TORONTO, ON, January

More information

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE MEDIA RELEASE 21 July 2010 OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE (MELBOURNE) OceanaGold Corporation (ASX: OGC, TSX: OGC, NZX: OGC) ( the

More information

Petra Diamonds Limited Resource Statement

Petra Diamonds Limited Resource Statement Petra Limited 2016 Resource Statement Petra Limited ( Petra or the Company or the Group ) manages one of the world s largest diamond resources of over 300 million carats ( Mcts ). This major resource implies

More information

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April. 16 March 2018 Company Announcement Officer ASX Limited 20 Bridge Street SYDNEY NSW 2000 Highlights CORPORATE UPDATE Inaugural Bowdens Reserve Statement due early April. Feasibility Study being finalised

More information

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY February 5, 2018, Toronto, Ontario Troilus Gold Corp. (TSX- V: TLG) ( Troilus or the Company ) is pleased to announce the commencement

More information

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project 5 th July 2017 Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project Intensive site based exploration has commenced at Dobsina Co-Ni Project. Activities include:

More information

South Deep: Finding It s Feet. SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

South Deep: Finding It s Feet. SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team South Deep: Finding It s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team Introduction NICK HOLLAND Chief Executive Officer South Deep Gold Mine A Gold Fields Franchise

More information

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE High-grade, visible-gold mineralization intersected 120 metres ( m ) down-plunge of Swan Zone Inferred Mineral Resource and 210

More information

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT 2 September 2013 ASX Release ASX Code: CXX P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT Highlights Project is on schedule, with completion of the preliminary economic assessment study on target for Quarter

More information

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT No. 01/07 IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT Toronto, Ontario, January 17, 2007 IAMGOLD Corporation ( IAMGOLD or the Company ) is pleased to announce results of 10

More information

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

More information

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver 2012-19 Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver September 26, 2012 Toronto, Ontario - QUEENSTON

More information

For personal use only

For personal use only 1 ASX: BRW Drilling for Exploration Success Building an Australian Base Metal Company Resources Rising Stars 27 September 2011 David Hutton, Managing Director Disclaimer 2 Certain oral and written statements

More information

For personal use only

For personal use only ASX/MEDIA ANNOUNCEMENT 16 NOVEMBER 2012 ASX Code: HOR Management Mr Jeremy Shervington Non Executive Chairman Mr Neil Marston Managing Director Mr Michael Fotios Non Executive Director Mr Stuart Hall Non

More information

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending June 17, 2015 NYSE-MKT: SVBL, TSX: SVB SILVER BULL IDENTIFIES NEW MASSIVE SULPHIDE MINERALIZATION GRADING 690G/T SILVER, 1% COPPER, 4.8% LEAD AND 15.25% ZINC AT THE SIERRA MOJADA PROJECT, COAHUILA, MEXICO.

More information

The McPhillamys Gold Deposit, Discovery History & Geology. Presenter: Tara French

The McPhillamys Gold Deposit, Discovery History & Geology. Presenter: Tara French The McPhillamys Gold Deposit, Discovery History & Geology. Presenter: Tara French Forward-Looking Statements This presentation contains forward-looking statements. without limitation: Estimates of future

More information

QUITO PROJECT. December Northwest Mining Association Annual Conference. Austin, Nevada BVA:TSX.V BRT: FSE

QUITO PROJECT. December Northwest Mining Association Annual Conference. Austin, Nevada BVA:TSX.V BRT: FSE QUITO PROJECT Austin, Nevada December 2011 Northwest Mining Association Annual Conference Forward-looking Statement Some of the statements contained in this presentation may be deemed forward-looking statements.

More information

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura July 11, 2016 News Release Release 15-2016 Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura Vancouver, B.C., July 11, 2016, Monument Mining Limited (TSX-V: MMY and FSE: D7Q1)

More information

For personal use only

For personal use only 23 September 2013 Exploration Target for Sambas Project set at 58,500 to 87,750 Tonnes of Tin 1 Following a review of available geological and government data, Stratos Resources Ltd (ASX: SAT) is pleased

More information

For personal use only

For personal use only MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine North American Palladium Announces Positive Exploration Results from Lac des Iles Mine Toronto, Ontario, October 24, 2017 North American Palladium Ltd. ( NAP or the Company ) (TSX: PDL) (OTC PINK: PALDF)

More information

BOTSWANA. Marula. Bushveld Complex. Rustenburg Johannesburg SOUTH AFRICA

BOTSWANA. Marula. Bushveld Complex. Rustenburg Johannesburg SOUTH AFRICA FACT SHEET MARULA N BOTSWANA Bushveld Complex Marula Rustenburg Johannesburg SOUTH AFRICA Marula is 73% owned by Implats and is one of the first operations to have been developed on the relatively under-exploited

More information

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011 PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011 Toronto, Ontario March 30, 2011 Wesdome Gold Mines Ltd (WDO: TSX) has initiated an aggressive exploration, development and

More information

Chalice, Higginsville Drilling

Chalice, Higginsville Drilling Chalice, Higginsville Drilling 31 May 2006 Eastern Goldfields Higginsville Chalice First results from Chalice Gold Mines Limited s (Chalice Gold Mines or Company) drilling program have been received. Chalice

More information

NEW DISCOVERIES AT THE RED OCTOBER MINE

NEW DISCOVERIES AT THE RED OCTOBER MINE 23 July 2013 ASX & MEDIA RELEASE NEW DISCOVERIES AT THE RED OCTOBER MINE The Directors of Saracen Mineral Holdings Limited (the Company ) are pleased to provide an update on the Red October underground

More information

Annual General Meeting

Annual General Meeting Slide 1 Annual General Meeting 8 November 2010 Slide 2 INVESTMENT HIGHLIGHTS Boddington South Gold Project Located within the Southwest Yilgarn region of Western Australia Gold mineralisation similar to

More information

Goldcrest Resources Ltd.

Goldcrest Resources Ltd. Goldcrest Resources Ltd. PRESS RELEASE Goldcrest Announces Results from its 1,385 Metre RC Drilling Program at the Kampti Gold Project in Burkina Faso Toronto, ON - January 25, 2007 -- Goldcrest Resources

More information

MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND

MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND Level 1, 350 Hay Street, Subiaco, WA 6008 ABN 84 061 219 985 P: +61 8 6365 4519 F: +61 8 9388 6040 E:enquiries@balamara.com.au 15 October 2014 MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT

More information

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz) SILVER BEAR RESOURCES ANNOUNCES UPDATED MINERAL RESOURCE ESTIMATE FOR THE MANGAZEISKY SILVER PROJECT, YAKUTIA, RUSSIA: INDICATED MINERAL RESOURCE INCREASE BY OVER 30% February 26, 2015 Toronto, Ontario

More information

Silver City Minerals

Silver City Minerals ABN 68 130 933 309 ASX Code: SCI Silver City Minerals Annual General Meeting 15 November 2016 1 Important Disclaimer This presentation is provided to you for the sole purpose of providing background technical,

More information

YANFOLILA EXPLORATION 2018

YANFOLILA EXPLORATION 2018 YANFOLILA EXPLORATION 2018 EXPLORATION MINERAL RESOURCES & RESERVES STRATEGY & BUDGET DEPOSITS ADDITIONAL RESOURCES THE UPSIDE EXPENDITURE 2 EXPLORATION STRATEGY YANFOLILA PRODUCTION FORECAST: HIGH GRADE,

More information

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project NEWS RELEASE June 11, 2015 Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project Toronto, Ontario June 11, 2015 Red Pine Exploration Inc. (TSX-V: RPX) (the Company

More information

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia Bellhaven Announces Updated NI 43-101 Mineral Resource for La Mina Project, Colombia Vancouver, B.C. October 24, 2016. Bellhaven Copper & Gold Inc. (TSX-Venture: BHV) ( Bellhaven or the Company ) is pleased

More information

Mountain Maid Gold System Displays Major Size Potential

Mountain Maid Gold System Displays Major Size Potential 29 July 2008 The Manager, Companies Australian Securities Exchange Ltd Electronic Announcement System Dear Sir, AXIOM MINING LIMITED (ASX CODE: AVQ) ASX Announcement Mountain Maid Gold System Displays

More information

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA Vancouver, BC, June 26, 2012 Red Eagle Mining Corporation (TSX-V: RD, OTCQX: RDEMF), is pleased to announce additional

More information

Altynalmas Gold s new upgraded and confirmed Bakyrchik East Mineral Resource Gold deposit boosts total gold resources at Kyzyl Project in Kazakhstan

Altynalmas Gold s new upgraded and confirmed Bakyrchik East Mineral Resource Gold deposit boosts total gold resources at Kyzyl Project in Kazakhstan August 3, 2011 Altynalmas Gold s new upgraded and confirmed Bakyrchik East Mineral Resource Gold deposit boosts total gold resources at Kyzyl Project in Kazakhstan VANCOUVER, CANADA Robert Friedland, founder

More information

TriAusMin Limited LEWIS PONDS PROJECT

TriAusMin Limited LEWIS PONDS PROJECT TriAusMin Limited LEWIS PONDS PROJECT TSX: TOR November 2010 ASX: TRO Disclaimer The Information contained in this presentation has been prepared using the information available to TriAusMin at the time

More information

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Excellent Results Received for the Six BZ Holes Highest grade intercepted was 1 metre at 58 g/t gold

More information

Rubicon Updates Mineral Resource Statement for the Phoenix Gold Project And Evaluates Strategic Alternatives

Rubicon Updates Mineral Resource Statement for the Phoenix Gold Project And Evaluates Strategic Alternatives News Release Rubicon Updates Mineral Resource Statement for the Phoenix Gold Project And Evaluates Strategic Alternatives January 11, 2016 TORONTO, Ontario Rubicon Minerals Corporation (TSX: RMX NYSE-MKT:

More information

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling: TSX: RMX OTCQX: RBYCF Rubicon Minerals Provides Additional Drill Results and Observations from its 2017 Exploration Program and Commences Exploratory Underground Development TORONTO, Ontario, November

More information