Quarterly Activities Report Period Ending 31 December 2010

Size: px
Start display at page:

Download "Quarterly Activities Report Period Ending 31 December 2010"

Transcription

1 Excelsior Gold Limited is a gold and uranium exploration company with a portfolio of exploration projects in Western Australia and the Northern Territory of Australia. The Company holds 100% interest in the gold mineral rights to an extensive package of tenements covering 98km 2 over the highly prospective Bardoc Tectonic Zone 45kms north of Kalgoorlie in Western Australia and interests in 3 uranium exploration projects in the Northern Territory. The Company s Kalgoorlie North Project contains JORC compliant Indicated and Inferred Resource of 11.65Mt at 1.48g/t Au for 553,700 ounces of contained gold (at 0.6g/t cut-off) and is the focus of the Company s exploration activity. The Allamber Uranium Project located in the Pine Creek Geosyncline, 175km southeast of Darwin hosts Inferred JORC compliant resources of 304ppm U3O8 containing 430 tonnes (960,000 lbs) of U3O8. in the Twin and Dam areas The Project is operated in joint venture with Thundelarra Exploration Ltd (ASX: THX) and the Company retains a 30% contributing interest. Uranium exploration projects in the Alice Springs and Tennant Creek areas of the Northern Territory cover extensive areas with potential for palaeochannel and sediment hosted uranium mineralisation. The Company is reviewing options for the future divestment of these non-core assets. admin@excelsiorgold.com.au Quarterly Activities Report Period Ending 31 December 2010 Overview ASX Code: EXG Excelsior Gold Limited conducted further drilling and resource development on the Kalgoorlie North Gold Project during the Quarter. Mineral Resources now total 553,700 ounces of contained gold from 1.48g/t Au at a 0.6g/t cut-off. Drilling on the Allamber Uranium Project in the Northern Territory by joint venture operator, Thundelarra Exploration Limited intersected significant uranium and copper mineralisation on new structural targets. Highlights North Kalgoorlie Project drilling at the Lochinvar and Western Lode targets on the Excelsior Shear Zone encountered strong mineralisation to support resource expansion and upgrade: -. Lochinvar g/t Au from 95 metres g/t Au from 110 metres g/t Au from 80 metres Western Shear g/t Au from 63 metres g/t Au from 73 metres Lochinvar Indicated and Inferred Resources upgraded (at 1.0g/t cut-off): g/t Au for 26,500ozs New Inferred Resources established on deposits south of the Excelsior Shear Castlereagh 2.3g/t Au for 8,400ozs Nerrin Nerrin 3.0g/t Au for 8,500ozs Drilling initiated at Castlereagh to upgrade resources. Allamber Uranium Project drilling intersected significant uranium and copper mineralisation, including: -. Lucas Prospect % Cu from 7 metres ppm U 3 O 8 from 37 metres Cliff South Prospect 9 440ppm U 3 O 8 from 43 metres and % Cu from 44 metres ppm U 3 O 8 from 76 metres

2 The Kalgoorlie North Gold Project (EXG 100% gold rights) The Kalgoorlie North Gold Project is located 45km north of Kalgoorlie in Western Australia and covers 98 km 2 of granted mining and prospecting leases over 25 kilometres of strike of the Bardoc Tectonic Zone. The tenements extend north from Norton Goldfields Limited s Paddington Gold Operations to the south of Aphrodite Gold Limited s Aphrodite Deposit. Historic gold production from the Bardoc Mining Centre in the central part of the tenements occurred from the underground Zoroastrian Mine in the late 1890s to early 1900s and from the Zoroastrian and Excelsior open pits mined by Aberfoyle Gold Pty between 1987 and Open pit production was 200,000 tonnes grading 2.47 g/t from the Zoroastrian Pit and 2,020,000 tonnes grading 1.5 g/t from the Excelsior Pit for a total of 2,220,000 tonnes at 1.6 g/t for 113,000ozs of gold. Previous exploration on the Project area has identified structurally and lithologically controlled gold mineralisation in numerous deposits and prospects associated with generally N to NNW trending shears and high grade cross cutting structures. Five main NNW trending shears are recognised within the tenements but during 2009 and 2010 the Company has primarily focused drilling programs on the Excelsior Shear. This is a major structure up to 80m wide and extending for over 6km within the tenements. The mineralised zone at the Excelsior deposit is 10 to 30m wide with high grade shoots plunging moderately to the south. During the December Quarter exploration on the Kalgoorlie North Gold Project returned significant drill intersections on the Excelsior Shear Zone and delineated additional resources on other major structures within the tenement. Results received from the recent drilling program at the Lochinvar and Western Lode targets on the Excelsior Shear Zone include: -. Lochinvar 3.59g/t Au from 95 metres 2.29g/t Au from 113 metres 4.78g/t Au from 110 metres 4.05g/t Au from 80 metres Western Shear 7.58g/t Au from 63 metres g/t Au from 73 metres Excelsior Gold has an ongoing program of prospect review. Resource modelling utilising the extensive historical drilling database is focussed on delineation of shallow resources amenable to open pit extraction and toll treatment. Review of more than 50 known prospects within the Kalgoorlie North tenements is progressing in order to prioritise drilling targets for campaigns in To date the Company has established resources in 14 locations within the tenements and has identified an additional 12 immediate resource targets for modelling and drill testing.

3 Resource modelling of historical drill data from areas to the south west of the Excelsior Shear deposit and has defined shallow oxide resources at Castlereagh and Nerrin Nerrin prospects which the Company will target with future drill programs. Total Project Resources have increased to: g/t containing 553,700ozs at a 0.6g/t lower cut-off, or 1.77g/t containing 463,100ozs at a 1.0g/t cut-off Indicated Resources Inferred Resources Total Resources Lower Cut-off 0.6g/t Cut-off g/t Cut-off Kalgoorlie North Gold Project Resource Summaries (December 2010) Indicated Resources 1.0g/t Cut-off Inferred Resources 1.0g/t Cut-off Total Resources 1.0g/t Cut-off Deposit Excelsior Lochinvar Three Star Ellen Pearce Zoroastrian Navan Jackorite Bulletin South North Talbot Castlereagh Nerrin Nerrin North Duke Eldorado Windanya TOTAL Kalgoorlie North Gold Project Resource Inventory (December 2010)

4 Kalgoorlie North Gold Project Tenements and Structural Targets Note: Mineral Resources derived from resource modelling conducted by Ravensgate Resource Consultants and Excelsior Gold Ltd in accordance with the JORC Code stated at a 0.6g/t lower cut-off grade

5 Excelsior Shear Drilling Campaigns The Excelsior Shear is a major NNW trending structure up to 80m wide and extending for over six kilometres within the tenements. The structure has recently been one of the Company s main resource definition targets. Drilling by Excelsior has delineated significant resource in the vicinity of the Excelsior deposit and the Company is now commencing to test other less well defined mineralisation along the Excelsior Shear Zone to the north of the main Excelsior resource. Drilling programs are aimed at definition of shallow oxide resources which offer potential for early mine development and possible toll treatment at near-by processing facilities. Resources delineated on the Excelsior Shear total 1.70g/t Au containing 251,500ozs of gold at a 1.0g/t cut-off, and the northern shear deposits at Lochinvar, Three Star and Ellen Pearce are currently being reviewed as potential sources of near term mineable shallow oxide resources. Excelsior Shear Indicated Resources 1.0g/t Cut-off Inferred Resources 1.0g/t Cut-off Total Resources 1.0g/t Cut-off Deposit Excelsior Lochinvar Three Star Ellen Pearce TOTAL Lochinvar Excelsior Shear Resource Inventory (December 2010) An initial program of reverse circulation drilling involving about 1,801 metres of drilling in 16 holes was completed in November to test extensions to the 440m long mineralised shear at Lochinvar and to verify intersections in historic drilling to support upgrading of the inferred resources. Significant mineralisation, including 3.59g/t Au from 95m in KNC10026, was intersected in the southern part of the resource area (holes KNC10025 to KNC10029). Positive results from the reverse circulation drilling program led to a significant increase (270%) and upgrade of the resource. Infill drilling was commenced in December to test further near surface mineralisation. The resource expansion at Lochinvar highlights the potential to increase resources in other areas such as Three Star and Ellen Pearce on the Excelsior Shear and in the newly defined resource areas at Castlereagh and Nerrin Nerrin on parallel shear structures 3.5km to the south.

6 Excelsior Shear Zone Resources and Exploration Targets Note: Mineral Resources outlined on the Excelsior Shear in this plan are derived from resource modeling conducted by Ravensgate Resource Consultants and Excelsior Gold utilising recent and historic drilling information. The Resources are combined Indicated and Inferred Resources in accordance with the JORC Code stated at a 1.0g/t lower cut-off grade.

7 Excelsior Western Shear Three drill holes were completed in November to test the Western Shear at shallow depths over a strike length of 100 metres immediately north of the Excelsior open pit. This zone was untested by historic drilling and high grade intersections returned from drilling in June 2010, including 16.96g/t from 47m depth in KNC10002 (335580mE, mN) and 3.85g/t from 25m in KNC10005 (335570mE, mN), indicated potential for shallow oxide resources. The preliminary drilling on this zone encountered narrow high grade mineralisation 7.58g/t Au from 63m) and a broad zone of mineralisation, 1.29g/t Au from 73m (incl. 3.9g/t from 81m) in hole KNC Narrow zones of low grade mineralisation in KNC g/t from 61m and 1.20g/t from 70m) were also intersected and further work is proposed to delineate the extent and orientation of the Western Shear in this area. HOLE NUMBER LOCHINVAR MGA94 Z51 EAST MGA94 Z51 NORTH AHD RL DIP AZIM LENGTH (m) RESULTS KNC g/t from 72m KNC g/t from 136m KNC g/t from 95m and 2.29g/t from 113m KNC g/t from 110m and 2.37g/t from 122m KNC g/t from 80m and 1.39g/t from 97m KNC g/t from 120m (incl. 1.51g/t from 121m) KNC g/t from 113m KNC g/t from 64m (incl. 2.97g/t from 67m) KNC No Significant Results KNC No Significant Results KNC g/t from 127m KNC No Significant Results KNC No Significant Results KNC No Significant Results KNC No Significant Results KNC No Significant Results WESTERN SHEAR KNC g/t from 63m and 1.29g/t from 73m KNC g/t from 61m and 1.20g/t from 70m KNC No Significant Results Excelsior North Drill Hole Summary November 2010 Drilling Program

8 Resource Definition Program The Kalgoorlie North Project covers 25 kilometres of strike of the prospective Bardoc Tectonic Zone which hosts widespread gold mineralisation on five major NNW trending shear structures within the Company s tenements. Resource modelling on the Castlereagh and Nerrin Nerrin areas to the south west of the Excelsior deposit has defined shallow oxide resources which the Company will target with future drill programs. Newly delineated Inferred Resources in the Castlereagh area at a 1.0g/t lower cut-off are: - Castlereagh Nerrin Nerrin 114, g/t Au for 8,400zs 88, g/t Au for 8,500ozs Castlereagh Mineralisation at Castlereagh is concentrated on a northerly trending sheared basaltultramafic contact over a strike length of 1.1 kilometres. North easterly cross cutting faults influence the distribution of mineralisation along the shear and the current resource was defined over the northern portion of the zone ( mN to mN) where two continuous lodes averaging 5m wide were modelled over 450m of strike to a depth of 50-60m. The southern portion of the mineralized zone which is not included in the resource, contains high grade (up to 28.8g/t Au) historical drill intercepts (refer Castlereagh Drill Section mN) which appear related to mineralisation on cross faults. Further drilling is warranted to determine the orientation and continuity of this mineralization. Kalgoorlie North Gold Project Castlereagh Drill Section mN

9 An initial program of 18 holes for 980 metres of reverse circulation drilling was completed on 20 December at the Castlereagh resource area to delineate extensions to the mineralisation and to upgrade the inferred resources. Results from this drilling program are expected in late January and will be incorporated into new resource models to facilitate mining studies. Northern Territory Projects CLEO S URANIUM PROJECT- ALLAMBER JOINT VENTURE (EXG 30%) The Allamber Project (ELs 24259, 25477, and 25479) is located within the eastern portion of the Pine Creek Orogen approximately 175km southeast of Darwin. The Project tenements cover 260km 2 over a granite and metasediment package that is prospective for structurally controlled uranium and base metal mineralisation. The Cleo s deposit (Twin and Dam resources) within EL hosts a near surface JORC compliant Inferred Resource totalling 304ppm U 3 O 8 containing 960,000lbs U 3 O 8 (at 100ppm cut-off). The Cleo s Project is subject to the Allamber Project Farmin and Joint Venture Heads of Agreement with Element 92 Pty Ltd, a wholly owned subsidiary of ASX listed Thundelarra Exploration Limited (ASX Code: THX). Thundelarra initiated reverse circulation drilling in November 2010 to test structural targets outside the known resource areas within EL A total of 18 RC holes for 1,667 metres were completed and significant uranium and copper mineralisation was intersected, including: -. Lucas Prospect 9.69% Cu from 7 to 23m depth (TAL024RC) 328ppm U 3 O 8 from 27 to 39m (TAL025RC) 405ppm U 3 O 8 (incl. 1,945ppm) from 37 to 48m and 353ppm U 3 O 8 (incl. 1,710ppm) from 87 to 99m (TAL035RC) Cliff South Prospect 440ppm U 3 O 8 (incl. 1,368ppm) from 43 to 52m depth and 2.45% Cu from 44 to 46m (TAL032RC) 610ppm U 3 O 8 (incl. 3,926ppm) from 76 to 91m; 436ppm U 3 O 8 (incl. 1,627ppm) from 108 to 116m, and 422ppm U 3 O 8 (incl. 1,076ppm) from 123 to 129m (TAL033RC) The Lucas Prospect occurs to the west of Twin Resource 316ppm U3O8 containing 585,000lbs U3O8 at a 100ppm cut-off) and uranium mineralisation and associated elevated copper levels appear to be controlled by north-easterly trending

10 structures and microgranitic dykes intruding the structures. Seven metres of malachite mineralisation were intersected in the oxidised zone of TAL024RC where a dyke intrudes the faulted contact between the Allamber Springs Granite to the west and metasediments to the east. Thundelarra completed one RC drill hole (TAL029RC) approximately 20m behind TAL024RC in order to test for primary sulphide mineralisation. Copper assay results for this hole and a number of other holes in the program are pending. At the Cliff South Prospect approximately 250m north of the Twin resource area, drilling was designed to test a north-south trending structure and north-easterly cross-cutting structures. A series of microgranite dykes and sulphidic sediments displaying chlorite alteration was intersected and two out of only three RC holes returned encouraging uranium and/or copper results. Drill hole locations and significant uranium and copper intercepts are illustrated on the following plan and all drilling results are tabulated below. Thundelarra Exploration November 2010 Drilling Campaign Result Summary Plan

11 Thundelarra considers the results from this limited drilling program to be particularly important because: - The broad uranium intercepts at the Cliff South prospect occur in an area largely untested by historical drilling and well away from the known uranium resources of Twin and Dam. Importantly, the uranium mineralisation intersected in the drilling does not have a surface radiometric response. The high grade uranium mineralisation appears to be associated with a north-east trending fractural system which was not targeted by historical drilling. These numerous north-east structures possibly also control the highest grade mineralisation within the known resources at Twin and Dam. The strong uranium-copper mineralisation discovered at both the Cliff South and Lucas prospects appears to be related to late stage granitic intrusions. This style of mineralisation has the potential to host a large tonnage uranium-copper resource and will be a target for exploration in (Refer to Thundelarra ASX announcement dated 6 December 2010) Excelsior believes that the exploration and development potential of the Allamber Project has been significantly enhanced by the discovery of these new uranium mineralised zones and the associated high grade copper mineralisation. HOLE NUMBER MGA94 Z53 EAST LUCAS PROSPECT MGA94 Z53 NORTH DIP AZIM RESULTS From To (m) Interval (m) U3O8 (ppm) Cu (%) Au (ppm) TAL018RC BLD BLD BLD BLD 12 TAL024RC TAL025RC incl , TAL026RC TAL035RC BLD BLD incl , incl , BLD = below detection limit Allamber Uranium Project Drill Hole Summary Lucas Prospect

12 HOLE NUMBER MGA94 Z53 EAST CLIFF SOUTH PROSPECT MGA94 Z53 NORTH DIP AZIM RESULTS From To (m) Interval (m) U3O8 (ppm) Cu (%) Au (ppm) TAL032RC incl incl , TAL033RC BLD incl , incl , incl , , TAL034RC BLD = below detection limit Allamber Uranium Project Drill Hole Summary Cliff South Prospect NATIVE GAP PROJECT (EXG 100%) The Native Gap Project (EL24287) is located 120 kilometres north of Alice Springs and covers a portion of the eastern end of the Ngalia Basin. NuPower Resources Limited expended in excess of $288,000 on exploration on the Project under the terms of the Native Gap Farm In and Joint Venture Agreement signed in November In July 2010 NuPower electing not to proceed with the Joint Venture due to exploration commitments elsewhere in the Northern Territory and Excelsior retained 100% interest in the Project. The Company is reviewing data from NuPower s extensive regional airborne electromagnetic survey which was flown in 2008 to delineate priority areas for further detailed exploration. The survey located a shallow trough with palaeochannel outflows to the east and west and a thickening sequence of Cainozoic sediments in the west of the Native Gap licence and two south flowing palaeochannels in the eastern part. Radiometrically anomalous granites in the west and water bore sampling in the northern and central tenement areas which returned high levels of uranium and fluorine indicate good source waters for the formation of secondary uranium in deeper parts of the Cainozoic sediments. Excelsior lodged an application for extension of term of the licence to enable the Company to test the existing targets on the tenement.

13 OTHER NORTHERN TERRITOTY PROJECTS (EXG 100%) In addition to the Allamber Joint Venture and wholly owned Native Gap tenements, Excelsior Gold holds one granted exploration licence, Allambi (EL25347) and one licence application covering a total of 719km 2 in the Alice Springs and Tennant Creek district of the Northern Territory. The Company s recent focus on gold exploration has resulted in a reduction in exposure to early stage uranium exploration projects and retention of projects with defined targets in active exploration environments. Exploration licences at Gaylad Creek (EL24249) and Palmer River (EL25594) have been surrendered. Excelsior is continuing to evaluate the potential of the uranium properties in the Northern Territory and avenues for the future divestment of these non-core assets. Corporate Activity 56,502,103 options exercisable at 37.5 cents each expired on 25 October Competent Persons Statement: Information in this document that relates to Mineral Resources, Exploration Targets and exploration results is based on information compiled by Mr David Hamlyn of Excelsior Gold Limited. Mr Hamlyn is a Member of The Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Hamlyn consents to the inclusion in the document of the information in the form and context in which it appears.

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

For personal use only

For personal use only ASX RELEASE 2 August 2011 Significant Gold intersections at Chameleon Prospect Maiden 15 hole RC drilling programme (3,170 metres) completed by Scotia Gold Rights JV partner, Aphrodite Gold at the Chameleon

More information

New Drilling Program Commences at Mutiny s Deflector Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern

More information

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width

More information

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development ABN 44 009 157 439 Company Announcement 22 November 2018 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com

More information

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT ASX ANNOUNCEMENT 8 March 2011 LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT New true-width intercepts along strike from Katanning Deposit include: o BSRC0050-10m

More information

Drilling program commences on Cloncurry and Mount Isa projects

Drilling program commences on Cloncurry and Mount Isa projects 1P P May UASX/Media Announcement st 2009 Drilling program commences on Cloncurry and Mount Isa projects Key Points 1,700 metres reverse circulation drilling program over two prospects on untested geochemical,

More information

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 20 September 2010 EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT Boddington South Gold

More information

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA 28 NOVEMBER 2018 ASX/MEDIA RELEASE NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA Drilling underway targeting high-grade underground extensions of Zoroastrian

More information

For personal use only

For personal use only 18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand

More information

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT ASX ANNOUNCEMENT 17 OCTOBER 2017 DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT Reconnaissance Air Core drilling to commence at Macorna Bore and Sebastian Projects Diamond drilling planned

More information

NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR

NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR Activities Report Background NT Resources Limited ( NT Resources or the Company ) holds six granted Exploration

More information

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

More information

For personal use only

For personal use only ASX/MEDIA ANNOUNCEMENT 16 NOVEMBER 2012 ASX Code: HOR Management Mr Jeremy Shervington Non Executive Chairman Mr Neil Marston Managing Director Mr Michael Fotios Non Executive Director Mr Stuart Hall Non

More information

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes ASX ANNOUNCEMENT/MEDIA RELEASE 7 January 2019 Drill testing of gold zones at Albury Heath intersect impressive quartz lodes Focused drill testing of bonanza grade gold at Albury Heath completed Seven holes

More information

For personal use only

For personal use only 29 July 2011 ASX RELEASE ACN 008 901 380 ABN 35 008 901 380 Level 1 460 Roberts Road Subiaco, Western Australia 6008 P.O. Box 66 Floreat Forum WA 6014 Email:wally@stratmin.com.au Website: www.stratmin.com.au

More information

High Grade Gold Drill Results Extend Buccaneer

High Grade Gold Drill Results Extend Buccaneer ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 14 June, 2012 High Grade Gold Drill Results Extend 31 metres averaging 3.68g/t gold including 14 metres averaging 7.56g/t gold ABM Resources NL ( ABM or The Company

More information

High Grade Gold Intercepts at Bangaba

High Grade Gold Intercepts at Bangaba 20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com

More information

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE ASX ANNOUNCEMENT 2 MARCH 2018 FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE Mineralisation Report for Four Eagles Gold Project accepted by DEDJTR RC and Diamond drilling to recommence

More information

ASX ANNOUNCEMENT. Spectacular radiometric results at Mad Gap Project and East Kimberley Joint Venture

ASX ANNOUNCEMENT. Spectacular radiometric results at Mad Gap Project and East Kimberley Joint Venture 5 th October 007 ASX Code: UTO ASX ANNOUNCEMENT Spectacular radiometric results at Mad Gap Project and East Kimberley Joint Venture HIGHLIGHTS Significant uranium anomalies identified in the south-western

More information

High-grade Copper and Gold Discovered at Productora

High-grade Copper and Gold Discovered at Productora ASX ANNOUNCEMENT Tuesday 25th September 2012 High-grade Copper and Gold Discovered at Productora Potential for High-grade Copper-Gold Shoots to Add New Dimension to Productora High-grade copper-gold discovered

More information

For personal use only

For personal use only ASX Announcement 23 May 2014 DORAY FARMS IN TO EXCITING NEW GOLD PROJECT Doray to explore highly prospective Horse Well Gold Project in north-eastern Goldfields through Joint Venture with Alloy Resources

More information

For personal use only

For personal use only (ASX:HLX) is a minerals exploration company focused on identification, acquisition and Canbelego Drilling Extends Mineralisation at Depth Assay results from the recent RC/Diamond drilling at the Canbelego

More information

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS Magmatic Resources Ltd Level 1, 11 Lucknow Place West Perth WA 6005 Phone: +61 8 6102 2709 www.magmaticresources.com ASX / MEDIA ANNOUNCEMENT 21 August 2017 RC DRILLING TO RESUME THIS WEEK AT CARLISLE

More information

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate 29 th July 2010 June December 2010 Quarterly Report Report 2008 Highlights Wa Project Kandia Prospect» RC drilling defines open ended zones of sediment hosted gold mineralisation at the site of the Kandia

More information

AGM Presentation 6 November 2012

AGM Presentation 6 November 2012 AGM Presentation 6 November 2012 November 2012 Disclaimer Exploration Results and Mineral Resources The information in this report that relates to Exploration Results, Exploration Targets, Mineral Resources

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 29 July 2011 KATANNING UPDATE GOLD DISCOVERED AT JACKSON First-pass drilling at Jackson confirms presence of primary gold mineralisation Potential for third ore body at the Katanning Gold

More information

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS National Stock Exchange of Australia Company Announcements Level 2, 117 Scott Street Newcastle NSW 2300 25 th January 2013 STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS 100m

More information

Mountain Maid Gold System Displays Major Size Potential

Mountain Maid Gold System Displays Major Size Potential 29 July 2008 The Manager, Companies Australian Securities Exchange Ltd Electronic Announcement System Dear Sir, AXIOM MINING LIMITED (ASX CODE: AVQ) ASX Announcement Mountain Maid Gold System Displays

More information

High-grade Gold in First Drilling Undertaken at Productora South

High-grade Gold in First Drilling Undertaken at Productora South ASX ANNOUNCEMENT Wednesday 10th October 2012 High-grade Gold in First Drilling Undertaken at Productora South Shallow, high-grade, narrow-vein gold area adds further up-side to Productora Sierra Zapallo

More information

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

NEW COBAR-STYLE COPPER DISCOVERY IN NSW ASX / MEDIA RELEASE 2 AUGUST 2011 NEW COBAR-STYLE COPPER DISCOVERY IN NSW Broad zone of copper-polymetallic mineralisation intersected at 4-Mile prospect Highlights: Wide zone of copper-silver-gold-lead-zinc

More information

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM ASX RELEASE 4 April 2007 REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM The Directors of Hemisphere Resources Limited ( Hemisphere or the Company ) are pleased to announce that a review has been conducted

More information

Significant Copper-Gold JORC Exploration Target

Significant Copper-Gold JORC Exploration Target 12 March 2013 Highlights: ASX & MEDIA ANNOUNCEMENT Significant Copper-Gold JORC Exploration Target ü JORC i Exploration Target 1 of 4.8-6.2Mt @ 2.00-2.78% Cu and 1.23-2.23g/t Au confirmed. ü Opportunity

More information

New Zone of High Grade Gold Discovered at Balogo

New Zone of High Grade Gold Discovered at Balogo ASX/Media Announcement 12 November 2013 New Zone of High Grade Gold Discovered at Balogo A broad zone of high grade gold mineralisation (Panga Lodes) has been discovered 600m north of the Netiana Lodes.

More information

EXPLORATION SUCCESS AT COYOTE GOLD MINE

EXPLORATION SUCCESS AT COYOTE GOLD MINE 19 November 2012 Jon Latto COMPANY SECRETARY Jane Bown EXECUTIVE ASSISTANT EXPLORATION SUCCESS AT COYOTE GOLD MINE COYOTE GOLD MINE HIGHLIGHTS Ongoing exploration drilling continues to return high grade

More information

High Grade Gold Intersections at Harry Smith Prospect

High Grade Gold Intersections at Harry Smith Prospect ABN: 82 138 358 728 ASX: TMZ Level 1, 80 Chandos Street, St Leonards, NSW 2065 PO Box 956, Crows Nest, NSW 1585 Tel: +61 2 9906 6225 Fax: +61 2 9906 5233 Web: www.thomsonresources.com.au ASX Release 16

More information

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce

More information

ASX Release. 16 December 2010 LIMITED. EXPLORATION UPDATE Highlights

ASX Release. 16 December 2010 LIMITED. EXPLORATION UPDATE Highlights ASX Release EXPLORATION UPDATE Highlights Bonsiega Joint Venture tenements minimum expenditure commitment met by 30 November 2010 Commencement of power auger bedrock drilling program at Fouli Prospect

More information

For personal use only

For personal use only ASX/MEDIA RELEASE NICKEL SULPHIDE DISCOVERY AT FISHER EAST Highlights RC drilling at Fisher East discovers nickel sulphides Sulphide mineralisation coincident with EM conductors Mineralisation encountered

More information

For personal use only

For personal use only CLASSIC CONTINUES HUNT FOR HIGH GRADE GOLD WITH COMMENCEMENT OF RC DRILLING PROGRAM Highlights: ~3000m of RC drilling underway at Kat Gap, Lady Lila, Lady Magdalene and Van Uden West Assay results expected

More information

Encouraging drill results from Paroo Range

Encouraging drill results from Paroo Range 17 July 2012 The Manager ASX Company Announcements Office PO Box H224, Australia Square SYDNEY NSW 2001 Encouraging drill results from Paroo Range Highlights Significant uranium mineralisation at the 100%

More information

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts MARCH 2012 QUARTERLY REPORT Highlights Magnetic and radiometric survey acquired for Wyloo Anomalous gold zones identified at Wyloo from desktop study Ongoing exploration program completed at Wyloo Application

More information

SPOT MARKET URANIUM OXIDE FIRMS TO US$49.25 POUND

SPOT MARKET URANIUM OXIDE FIRMS TO US$49.25 POUND QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2010 SEPTEMBER 2010 QUARTER HIGHLIGHTS Over 18 kilometres of uranium mineralised palaeochannel drilled at Stallion, Highway and Highway North 32,000 metres of

More information

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION Ramelius Resources Limited ACN 001 717 540 140 Greenhill Road, Unley SA 5061 GPO Box 1373, Adelaide SA 5001 DX 52003, Unley Telephone (08) 8373 6473 / (08) 8373 5588 Facsimile (08) 8373 5917 ASX RELEASE

More information

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS Heron Resources Limited ABN: 30 068 263 098 Level1, 37 Ord Street, West Perth WA 6005 Phone: +61 (0) 8 9215 4444 Website: www.heronresources.com.au Email: info@heronresouces.com.au ASX: HRR ASX Release

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE ASX ANNOUNCEMENT 21 APRIL 2017 TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE RC Blade drilling commences at Tandarra Gold Project Up to 3,800 metres planned in 67

More information

For personal use only

For personal use only About Artemis Resources Artemis Resources is an ASX-listed mineral exploration company with a focus on gold: Key Projects Gold Mt Clement (WA) Yandal (WA) Rare Metals Yangibana (WA) Buchanan's Creek (QLD)

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 26 April 2016 QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDING 31 March 2016 ASX: NXM Capital Structure Shares on Issue 70.4 million First Earn-in milestone completed in the Pinnacles JV

More information

MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT HIGHLIGHTS

MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT HIGHLIGHTS MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT ASX RELEASE 21 MARCH 2011 HIGHLIGHTS Recently completed auger soil geochemistry program has defined a 130m

More information

Additional significant gold and copper intercepts obtained in Sweden

Additional significant gold and copper intercepts obtained in Sweden 18 November 2009 Additional significant gold and copper intercepts obtained in Sweden Drake Resources (ASX: DRK, Drake ) is pleased to announce that additional significant assays for the drilling programme

More information

Malachite Resources Limited ABN

Malachite Resources Limited ABN Malachite Resources Limited ABN 86 075 63 268 ASX Announcement ASX Code: MAR 27 October 20 NEW DRILLING RESULTS AT LORENA SUPPORT COMMENCEMENT OF MINING FEASIBILITY STUDY Malachite Resources Limited (

More information

For personal use only

For personal use only ASX Release 2 February 2012 ENCOURAGING DIAMOND DRILLING RESULTS CONTINUE AT THE FEKOLA PROJECT Papillon Resources Limited ( Papillon or the Company ) is pleased to release the assay results from two additional

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 8 October 2012 FRESH REVIEW OF HIGH GRADE GOLD LODES ON BATANGAS PROJECT SOUTH OF MANILA A new review of available data on high grade epithermal gold lodes including beneath an historic

More information

Quarterly Activities Report

Quarterly Activities Report ASX: CYL Quarterly Activities Report Quarter ended 31 March 2018 HIGHLIGHTS The grant of Retention Licence RL4622 over the Four Eagles Gold Project provides secure 10-year title over Catalyst's most advanced

More information

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April OZ Minerals Limited Carrapateena Mineral Resources Statement April 14 2011 CARRAPATEENA MINERAL RESOURCE STATEMENT April 14, 2011 The Carrapateena Resource Statement relates to an upgrading to an Inferred

More information

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland 1 July 2008 The Manager, Companies Australian Securities Exchange Ltd Electronic Announcement System Dear Sir, AXIOM MINING LIMITED (ASX CODE: AVQ) ASX Announcement Axiom Nightflower Drilling Progress

More information

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2018

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2018 ASX Announcement ASX & NSX: DYL / OTCQX: DYLLF 23 October 2018 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2018 HIGHLIGHTS REPTILE PROJECT New zone of significant uranium mineralisation

More information

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL ASX ANNOUNCEMENT 16 SEPTEMBER 2011 Phillips River Mining NL ABN 61 004 287 790 Unit 46/328 Albany Highway VICTORIA PARK WA 6100 T: 08 6250 4600 F: 08 6250 4699 info@phillipsriver.com.au CONTACT Jason Stirbinskis

More information

BUNDARRA RESOURCE UPDATE

BUNDARRA RESOURCE UPDATE t Friday 15 April 2011 Company Announcement ASX ANNOUNCEMENT ASX CODE: TMX, TMXOA CAPITAL STRUCTURE TMX - Shares on Issue 217.98m TMXOA - Options on Issue 18.24m - Unlisted Options 56.81m DIRECTORS & KEY

More information

THUNDELARRA EXPLORATION

THUNDELARRA EXPLORATION THUNDELARRA EXPLORATION Thundelarra Thundelarra is one of the most active and successful uranium exploration companies in Australia The Company s primary focus is on the Pine Creek Orogen and Ngalia Basin

More information

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling Resource Diamond Drilling Commences at Productora Strong results continue from Productora central area drilling Resource diamond drilling commences at Productora 5 drill rigs to be operating shortly Productora

More information

ASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects

ASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects ASX Release 14 th September 2010 Corporate Update Divestment of Gold, Copper and Nickel Projects The Directors of ADX Energy Ltd (ASX Code: ADX) are pleased to provide an update in relation to the proposed

More information

SUMBA EXPLORATION UPDATE

SUMBA EXPLORATION UPDATE ASX RELEASE Tuesday, 23 November 2010 SUMBA EXPLORATION UPDATE Hillgrove Resources Limited (ASX:HGO) today announces a planned airborne geophysical survey, Pelitalira prospect progress and final results

More information

For personal use only

For personal use only MEDIA RELEASE 10 October 2016 CITADEL PROJECT 2016 RC DRILLING PROGRAMME Highlights Reverse-Circulation (RC) drilling programme up to approximately 6,000m testing 20km corridor of Induced Polarisation

More information

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

High Grade Gold Results from RAB Drilling at the Central Bore Prospect 16 th July 2009 Company Announcements Office Australian Securities Exchange Level 4 20 Bridge Street SYDNEY NSW 2000 Dear Sir / Madam High Grade Gold Results from RAB Drilling at the Central Bore Prospect

More information

For personal use only

For personal use only Alloy Regains Control of the Horse Well Gold Project ASX Release 29 January 2018 Capital Structure ABN 20 109 361 195 ASX Code AYR Issued Shares 1,266,993,360 Unlisted Options 29,000,000 Corporate Directory

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 24 April 2012 COMPANY SNAPSHOT LODESTAR MINERALS LIMITED ABN: 32 127 026 528 CONTACT DETAILS Bill Clayton, Managing Director +61 8 9423 3200 41 Stirling Highway, Nedlands, WA, 6009 PO

More information

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS 1 November 2007 MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS Highlights Very high gold-in-soil sample results up to 17.3 g/t gold have been received from the Banana Creek Prospect.

More information

For personal use only

For personal use only ACN 097 088 689 ASX Announcement 1 EXPLORATION SUCCESS CONTINUES AT RAVENSWOOD RC drilling targeting shallow portions of Welcome breccia returns a number of significant new results including: 7m @ 7.84g/t

More information

102 metres strike length averaging 32.62g/t Gold extends overall surface vein sampling to date to 726 metres strike length averaging 24.

102 metres strike length averaging 32.62g/t Gold extends overall surface vein sampling to date to 726 metres strike length averaging 24. ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 8 th February 2012 Old Pirate Phase 4 Longitudinal Trenching Results for veins on the Western Limb Lodes 102 metres strike length averaging 32.62g/t Gold extends

More information

For personal use only

For personal use only Quarterly Report for quarter ended 30 September 2016 Meteoric Resources NL ABN 64 107 985 651 ASX Code: MEI Ground Floor 10 Outram Street West Perth WA 6005 T +61 8 9485 2836 F +61 8 9321 6571 E info@meteoric.com.au

More information

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005 ABN 63 110 396 168 FOR THE PERIOD ENDED 31 About Atlas Gold Limited The Company has four projects at varying stages of exploration located at Farrel Well, Pardoo, Mt Minnie and Pearana in the Pilbara region,

More information

For personal use only

For personal use only 2 May 2013 No. of Pages: 7 ASX CODE: ORS Market Cap.: $12.2 m ($0.115 p/s) Shares on issue: 106,048,002 Cash: $2.4 m (31 March 2013) BOARD & MANAGEMENT Ian Gandel, Chairman Anthony Gray, Managing Director

More information

Ni-Cu-Au-U TYPE AIRBORNE ANOMALIES OUTLINED

Ni-Cu-Au-U TYPE AIRBORNE ANOMALIES OUTLINED ABN 28 122 180 205 www.juttholdings.com ASX ANNOUNCEMENT (ASX Code: JUT) 29 February 2008 Ni-Cu-Au-U TYPE AIRBORNE ANOMALIES OUTLINED Tay - Munglinup Project: near Ravensthorpe in the SW of Western Australia

More information

Sipa Resources Limited

Sipa Resources Limited 30 October 2012 Sipa Resources Limited ABN 26 009 448 980 September Quarter 2012 Quarterly ASX Report HIGHLIGHTS The September Quarter, and through October, has seen a very high level of drilling and geophysical

More information

ASX ANNOUNCEMENT 21 MARCH 2011

ASX ANNOUNCEMENT 21 MARCH 2011 ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights

More information

For personal use only

For personal use only Wednesday, 13 June 2012 STRONG DRILLING RESULTS FROM INDONESIA Hillgrove Resources Limited (ASX:HGO) is pleased to announce results from its ongoing drilling operations at the Karipi Prospect, Sumba and

More information

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

King of the Hills Gold Project, Leonora, to commence production in Q2 2011 King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher

More information

Queensland Mining Corporation Limited

Queensland Mining Corporation Limited Queensland Mining Corporation Limited ABN 61 109 962 469 ASX Release 29 th July 2011 Drilling Commenced at Duck Creek Copper-Gold Project, Cloncurry, North-west Queensland Highlights RC drilling has commenced

More information

Magnus Copper Project exploration update

Magnus Copper Project exploration update ASX ANNOUNCEMENT 30 SEPTEMBER 2011 CODE: ALY BOARD OF DIRECTORS Mr Warwick Davies Non-Executive Chairman Mr Robert Brierley Managing Director Mr John Arbuckle Non-Executive Director Mr Jeffrey Moore Non-Executive

More information

For personal use only

For personal use only INTEGRATED RESOURCES GROUP LIMITED REPORT ON ACTIVITIES, MARCH 2012 QUARTER HIGHLIGHTS Announcement of company transforming Maryborough Basin project acquisition, expected to be completed in June 2012.

More information

ASX ANNOUNCEMENT FURTHER EXPLORATION SUCCESS AT NULLAGINE

ASX ANNOUNCEMENT FURTHER EXPLORATION SUCCESS AT NULLAGINE WEDGETAIL MINING LTD ABN 85 3 257 556 Ground Floor, 24 Outram St West Perth WA 65 ASX ANNOUNCEMENT Postal: PO Box 117, West Perth WA 6872 Phone: +61 8 9488 88 Fax: +61 8 9481 288 Website: www.wedgetail.net.au

More information

ASX/Media Announcement

ASX/Media Announcement ASX/Media Announcement 25 March 2013 MAIDEN HIGH-GRADE JUDY LODE RESOURCE INDICATES POTENTIAL TO INCREASE ANDY WELL MINE LIFE 106,000 ounce high-grade resource (Indicated & Inferred) Judy South (137,000t

More information

Significant New Mineralised Zone Paroo Range (RGU:100%)

Significant New Mineralised Zone Paroo Range (RGU:100%) 2 November 2011 The Manager ASX Company Announcements Office PO Box H224, Australia Square SYDNEY NSW 2001 Significant New Mineralised Zone Paroo Range (RGU:100%) Regalpoint Resources Ltd (ASX:RGU or the

More information

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

ROE HILLS COBALT AND GOLD DRILLING ADVANCES ASX ANNOUNCEMENT 22 June 2017 ROE HILLS COBALT AND GOLD DRILLING ADVANCES Aircore drilling completed to test ROE-1 cobalt prospect with assays awaited; RC drilling now underway targeting three high-priority

More information

AGM Presentation 12 November 2013

AGM Presentation 12 November 2013 AGM Presentation 12 November 2013 Disclaimer Exploration Results and Mineral Resources The information in this report that relates to Exploration Results, Exploration Targets, Mineral Resources or Ore

More information

24 September Best results achieved at U40 Prospect (West Arnhem JV with Cameco Australia): o 1.34% eu 3 O 8

24 September Best results achieved at U40 Prospect (West Arnhem JV with Cameco Australia): o 1.34% eu 3 O 8 24 September 2010 The Company Announcement Officer Australian Securities Exchange Ltd via electronic lodgement Uranium Equities Reports Outstanding High Uranium Grades from Drilling at Nabarlek Joint Venture

More information

Drilling Commences at Telfer West Gold Project

Drilling Commences at Telfer West Gold Project Level 7, 600 Murray Street West Perth WA 6005 PO Box 273 West Perth WA 6872 P 08 9486 9455 F 08 6210 1578 www.enrl.com.au 17 November 2016 ASX : ENR Company Announcements Office Australian Securities Exchange

More information

For personal use only

For personal use only BOARD OF DIRECTORS Mr Oscar Aamodt Non-Executive Chairman Ms Sofia Bianchi Non-Executive Director Mr Lindsay Dudfield Non-Executive Director Mr Anthony Ho Non-Executive Director ISSUED CAPITAL SHARES 156,852,955

More information

FIRST RESULTS FROM RC DRILLING AT KONONGO

FIRST RESULTS FROM RC DRILLING AT KONONGO ASX Release Monday 29 March 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 FIRST RESULTS FROM RC DRILLING AT KONONGO Signature

More information

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam ASX Announcement 28 January 2010 Drill results indicate large Porphyry Copper Gold System at Peenam Highlights: 270 metres of visible copper (gold) mineralisation in first diamond core hole at Peenam Prospect

More information

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

704,000 OUNCE MIYABI GOLD PROJECT UPDATE 704,000 OUNCE MIYABI GOLD PROJECT UPDATE ASX/ RELEASE 21 April 2016 ASX code RVY Board of Directors: Geoff Gilmour Managing Director Greg Cunnold Technical Director Graeme Clatworthy Non-Executive Director

More information

For personal use only

For personal use only ACN 092 471 513 6 February 2012 ASX Release New drill assays up to 4% Cu confirm high grade copper continues at depth at Empire s Yuinmery project in WA 3m @ 4.0% Cu within 6m @ 3.0% Cu in drill hole YRC11-41D

More information

Chalice, Higginsville Drilling

Chalice, Higginsville Drilling Chalice, Higginsville Drilling 31 May 2006 Eastern Goldfields Higginsville Chalice First results from Chalice Gold Mines Limited s (Chalice Gold Mines or Company) drilling program have been received. Chalice

More information

CHALICE GOLD MINES LIMITED HIGHLIGHTS. Quarterly Report 31 March Activity. IPO completed 24 March 2006, raising the maximum of $7.

CHALICE GOLD MINES LIMITED HIGHLIGHTS. Quarterly Report 31 March Activity. IPO completed 24 March 2006, raising the maximum of $7. CHALICE GOLD MINES LIMITED HIGHLIGHTS Quarterly Report 31 March 2006 Eastern Goldfields Higginsville Chalice Activity IPO completed 24 March 2006, raising the maximum of $7.5 million Drilling underway

More information

NEW DISCOVERIES AT THE RED OCTOBER MINE

NEW DISCOVERIES AT THE RED OCTOBER MINE 23 July 2013 ASX & MEDIA RELEASE NEW DISCOVERIES AT THE RED OCTOBER MINE The Directors of Saracen Mineral Holdings Limited (the Company ) are pleased to provide an update on the Red October underground

More information

ASX/Media Announcement 14 July 2010

ASX/Media Announcement 14 July 2010 ASX/Media Announcement 14 July 2010 HIGH-GRADE DRILL RESULTS FROM ANDY WELL EXTEND WILBER LODE Diamond drilling at Andy Well intersects visible gold in quartz lodes below MNRC006, extending the depth of

More information

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT ABN 17 124 444 122 9 November 2009 SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT HIGHLIGHTS Non-JORC code compliant gold resource of 553,000t @ 2.5g/t gold identified as being hosted

More information