1 How many drillholes do I need to upgrade my Inferred Mineral Resource? Andrew Fowler, Kathy Zunica AMC Consultants Pty Ltd Summary The aim of an in-fill drilling programme is to gain more detailed information so as to convert lower-confidence Inferred Mineral Resources to the higher-confidence categories of Indicated and Measured (grouped together in this paper as higher resource categories ). This upgrade in resource category is necessary to convert a resource to an Ore/Mineral Reserve. Generally, an in-fill drilling programme increases the proportion of higher resource categories relative to Inferred. Ideally, this is done using the fewest drillholes possible. Can we, however, quantify this relationship between drillhole number and conversion to higher resource categories? This could help to develop a benchmark that companies could use to determine how many drillholes would be required to upgrade a desired proportion of their Inferred Mineral Resource. Through an analysis of 50 case studies, this paper aims to see if this relationship can be quantified. In doing so, it is hoped that we can also assist companies to answer other pertinent questions, including: Does the drilling programme meet our Resource upgrade expectations? Are factors such as the commodity type or a change in the Competent Person /Qualified Person (CP/QP) influencing whether in-fill drilling programmes are achieving the desired outcome? What are our expectations of the change in grade when we change the proportion of higher resource categories relative to Inferred? The 50 case studies analysed were selected from the AMC Consultants Pty Ltd (AMC) project database and publically available information. They include precious metal, base metal and bulk commodity projects from the last ten years, reported in accordance with the Australasian JORC Code 1 and the Canadian NI requirements. For each case study, two consecutive Mineral s are compared.. The percentage increase in the number of drillholes between the two reports is then plotted against the proportional increase in units of contained metal and/or tonnage in the higher resource categories relative to the Inferred Mineral Resource category. The resulting statistics act as proxies for drillhole spacing and resource category upgrade, and allow comparison across different projects and commodity groups. The outcomes of the comparisons vary, but there is a pattern. Some in-fill drilling programmes, for example, result in substantial conversion to higher resource categories. Others result in little change. Despite this variance, the data displays a consistent pattern when grouped into different populations. This suggests a general relationship between increased drillhole density and conversion from Inferred to higher resource categories. The authors hope that the results and discussion presented here will elicit further questions and discussion that will ultimately improve and optimize in-fill drilling programmes. Introduction Comparing mining operations by cost and productivity metrics is common in the mining industry and is referred to as benchmarking. Benchmarking can be defined as measuring an organization s policies, products, programmes, and strategies, and comparing these with 1 Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 Edition, prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia. 2 The CIM Definition Standards on Mineral Resources and Reserves (CIM Definition Standards) establish definitions and guidance on the definitions for mineral resources, mineral reserves, and mining studies used in Canada. The Mineral Resource, Mineral Reserve, and Mining Study definitions are incorporated, by reference, into National Instrument Standards of Disclosure for Mineral Projects (NI ).

2 standard measurements or the measurements of the company s peers. (BusinessDictionary.com, 2014). AMC has undertaken benchmarking studies of mining operations for more than 20 years. As a result, it has built a substantial database of open-pit and underground data, with the aim of identifying and quantifying improvement opportunities for its clients. (Berry, 2014; Scholz, 2014). In benchmarking studies, geological functions have not generally received the same scrutiny as mining functions. This is mainly due to the difficulty of establishing appropriate metrics for geological functions that allow comparison across mine sites (Berry, 2014). Nevertheless, there are examples where a number of projects or operations have been compared and where implications for geological data capture have been assessed (Berry & McCarthy, 2006). This study applies AMC s benchmarking methodology to compare 50 mineral projects and establish a relationship between in-fill drilling programmes and conversion of Mineral Resources from Inferred to higher Resource categories. Method Table 1 below is an example of the method used in this study, applied to publicallyavailable information on the Juanicipio Silver Project in Mexico. It compares two consecutive Mineral s (from 2012 and 2014). The proportions are calculated on the basis of contained metal. Table 1 Example of applied method 2012 estimate 2014 estimate Tonnag e (Mt) Ag (g/t) Tonnag e (Mt) Ag (g/t) Inferred Indicated Indicated proportion proportion change Drillhole number Increase in drilling 18% Indicated proportion = Indicated proportion of total in units of contained metal. Mt = million tonnes, Ag = Silver, g/t = grams per tonne The method and calculations used in the study are detailed below: 1. Projects were found in the AMC project database or online that met the following criteria: a. Two consecutive Mineral Resource reports were available that documented: i. Mineral Resource tonnage and grade by Mineral Resource category at the same cut-off grade. ii. Number of drillholes that informed each Mineral Resource estimation. b. The two reports showed a change in the Mineral Resource by category. 2. Project information, tonnage, grade, number of drillholes, and reasons for the change in the Mineral Resource were recorded by the authors in a database. 3. Percentage change in drillholes was calculated as: Where: DH curr = Number of drillholes in the most recent Mineral DH prev = Number of drillholes in the previous Mineral 4. Measured + Indicated Mineral Resource proportion change was calculated as: Where: MI curr = Measured + Indicated contained metal as a percentage of total contained metal in the most recent Mineral MI prev = Measured + Indicated contained metal as a percentage of total contained metal in the previous Mineral Resource report MI curr calculated as:

3 Where: MT curr = Measured Mineral Resource tonnage in the most recent Mineral MG curr = Measured Mineral Resource grade in the most recent Mineral IT curr = Indicated Mineral Resource tonnage in the most recent Mineral IG curr = Indicated Mineral Resource grade in the most recent Mineral TT curr = Measure + Indicated Mineral Resource tonnage in the most recent Mineral TG curr = Measured + Indicated Mineral Resource grade in the most recent Mineral Similarly, MI prev was calculated as: The case studies were selected from AMC s in-house project database and from publically available NI Technical Reports. The earliest case study is from 2002, although the majority of studies are from the last three years ( ). The projects represented in the case studies are located in twenty-one countries across six continents (see Figure 1 below). Figure 1 Case Studies by Country In Figure 2, the case studies are grouped into commodity types. Figure 2 Case Studies by Commodity Group Commodity Group Where: MT prev = Measured Mineral Resource tonnage in the previous Mineral MG rev = Measured Mineral Resource grade in the previous Mineral Resource report IT prev = Indicated Mineral Resource tonnage in the previous Mineral IG prev = Indicated Mineral Resource grade in the previous Mineral Resource report TT prev = Measure + Indicated Mineral Resource tonnage in the previous Mineral TG prev = Measured + Indicated Mineral Resource grade in the previous Mineral 5. Various charts were plotted from the resulting output. Case studies 28% 20% 12% 40% Bulk Commodity Base Metal Precious Metal - Epithermal/Porphyry Precious Metal - Shear/Breccia Table 2 lists the number of case studies by deposit type. Table 2 Case Studies by Deposit Type Deposit Type Commodity Group Number Base Metal/PM Shear/Breccia hosted (Shear/Breccia) 1/12 Porphyry Base Metal/PM 7/3 Epithermal PM (Epithermal) 7 Skarn Base Metal 3 Iron Formation BC 4 Carlin-type gold PM (Shear/Breccia) 2

4 Stratiform Copper Base Metal 2 Ultramafic Ni-Cu sulphide Base Metal 2 Iron Oxide Copper Gold Base Metal 1 Mineral sand: Zircon Titanium BC 1 Nickel Laterite Base Metal 1 Pegmatite Lithium Base Metal 1 Phosphate: upwelling type BC 1 Sedimentary Lead-Zinc- Silver Base Metal 1 VMS Base Metal 1 Note: VMS = Volcanogenic Massive Sulphide, BC = Bulk Commodity, PM = Precious Metal The relationship between in-fill drilling and resource upgrade To investigate the relationship between infill drilling and resource upgrade, proportional change in higher resource categories is plotted against percentage increase in drilling in Figure 3. Each point represents one of the 50 case studies or projects evaluated. The dashed line in the figure divides the positive proportion change projects from the negative proportion change projects. Positive proportion change means the higher resource categories have increased at the expense of the Inferred Mineral Resource. Conversely, negative proportion change means the Inferred Mineral Resource has increased at the expense of the higher resource categories. It is important to note that most drilling programmes actually include a combination of in-fill and extensional drilling. However, in a normal situation, only the in-fill drilling will lead to conversion to higher Resource categories. Conversely, purely extensional drilling often adds to the Inferred Mineral Resource and not the Measured or Indicated Mineral Resource. Therefore, the authors interpret that the positive proportional change projects are dominated by in-fill drilling, while the negative proportional change projects are dominated by extensional drilling. This is a simplification of reality, but it aids interpretation of the plots. 1. An optimal population where upgrade to higher Mineral Resource categories is positively correlated with increased drilling. The optimal group is defined as those projects where greater proportion increase is achieved with the least amount of drilling. 2. A sub-optimal population, where there is generally a positive correlation between upgrade to higher Mineral Resource categories with increased drilling. The suboptimal group is offset from the optimal group because it shows that significantly more drilling was required to achieve similar proportion changes. 3. Extensional drilling population showing negative proportional change. This population will not be considered further in this study, because the projects in this population do not contain a significant in-fill drilling component. 4. No significant in-fill drilling population, where significant upgrade to higher Mineral Resource categories has occurred with little or no change in drilling. This population will not be included in the analysis, because the projects in this population do not contain a significant in-fill drilling component. However, the proposed reasons for the upgrade are presented below. Figure 3 Proportion change (metal) versus percentage change in drillholes The 50 projects fall into four populations, as annotated in Figure 3: Note:

5 A = Dominant effect is in-fill drilling B = Dominant effect is extensional drilling Optimal and sub-optimal populations The optimal population exhibits a similar linear trend to the sub-optimal population. However, significantly more drilling was required to achieve the same proportion changes in the sub-optimal population. The authors analyzed the resource reports and propose the following reasons to account for the sub-optimal population: 1. The in-fill drilling programme did not intersect sufficient mineralization above cut-off and/or did not target areas that would increase the confidence in the Mineral Resource. 2. The initial estimation method and/or interpretation was inappropriate. The additional information changed the understanding of the deposit. The change in understanding meant that more drillholes were required to increase the confidence in the deposit. No significant in-fill drilling population This population represents projects where there was very little additional drilling between estimates, but there was significant upgrading to the higher resource categories for other reasons. The authors have analyzed the resource reports and propose the following reasons for the significant upgrading: 1. The initial estimate was based only on historical data, but then a limited drilling programme verified historical data, resulting in large portions of the resource being upgraded from Inferred to Indicated. 2. The initial estimate was based only on historical data, but then an additional validation work improved confidence in the historical data, resulting in large portions of the resource being upgraded from Inferred to Indicated. No additional drilling occurred between estimates. 3. A change in Competent Person (CP)/Qualified Person (QP) led to considerable changes in the geological interpretation, estimation method, and confidence in the Mineral Resource estimate. Very few additional drillholes were completed between estimates. The correlation between in-fill drilling and resource upgrade for the optimal and sub-optimal populations The aim of the paper is to investigate how in-fill drilling programmes affect the upgrade of Mineral Resources, with the ultimate aim of establishing a benchmark for how many drillholes are required to upgrade a desired proportion of the Mineral Resource from Inferred to higher resource categories. The optimal and sub-optimal populations both exhibit a positive correlation between increased drilling and resource upgrade (Figure 4). Trend lines fitted to each population give correlation coefficients of 0.54 for the optimal population and 0.77 for the sub-optimal population, respectively. The steeper slope of the optimal population suggests that fewer drillholes are resulting in a higher proportion change relative to the sub-optimal population. The authors consider that these are meaningful correlations that further studies will help to refine and improve. The results are elaborated upon further in the discussion section of this paper. Figure 4 Proportion change (metal) versus percentage change in drillholes: infill drilling projects only

6 Commodity type, Resource size and change of CP/QP The relationship between in-fill drilling and resource upgrade is investigated further by plotting the case studies by commodity groups (Figure 5), resource size groups (Figure 6), and if the CP/QP changed between estimates (Figure 7). The results are interpreted in the discussion section of this paper. Figure 5 Proportion change (metal) versus percentage change in drillholes grouped by commodity type Figure 6 Proportion change (metal) versus percentage change in drillholes grouped by total Resource size Relationship between resource upgrade and grade The effect on grade when the resource is upgraded from Inferred to higher resource categories is investigated by plotting positive and negative grade change against resource proportional change. The grade changes are calculated as percentages. The resource proportional changes are calculated as changes in tonnes rather than metal, as in the examples above. The results are grouped by comodity type (Figure 8) and are interpreted in the discussion section. Figure 8 Proportion change (tonnes) versus grade change: grouped by commodity type Figure 7 Proportion change (metal) versus percentage change in drillholes grouped by total change in CP/QP Discussion Drilling programmes with a significant in-fill component, display a positive linear correlation between percentage increase in drilling and proportional increase in higher resource categories. This positive linear correlation was observed in two populations the optimal and sub-optimal. The authors propose that projects in the sub-optimal population relate to instances where:

7 1. The CP/QP was not adequately consulted during the planning phase to avoid redundancy in the drilling programme. 2. The initial geological interpretation of the project was simplistic and subsequent drilling revealed complexity that reduced, rather than increased, geological confidence. 3. There were managerial, contractual, regulatory or other requirements to complete drillholes that were not specifically related to resource upgrading. An optimal in-fill drilling programme will upgrade the resource using the fewest drillholes, targeting locations that will define mineralization and increase confidence in the grade and geological continuity. CPs and QPs should design drilling programmes that lie within the optimal population. For example, if a company wishes to have a proportion change of 0.2, the company should increase drilling by 25%. In contrast, achieving a proportion change of 0.2 would require a 110% increase in drilling in the sub-optimal population. Figures 5 7 in this paper attempt to quantify whether commodity type, resource size, or CP/QP influences can explain the optimal and sub-optimal populations. Firstly, there appears to be no obvious relationship between commodity type and whether the project sits in the optimal population or sub-optimal population. However, there is one trend that warrants further investigation the fact that the majority of base metal projects lie in the optimal population. Regarding resource size, the majority of projects with less than 20 Mt in total Mineral Resource lie within the optimal population. A possible reason for this could be that when there is a smaller area that requires in-fill drilling, design of the programme is relatively straightforward. Again, further investigation is required. Regarding change of the CP/QP, there seem to be no obvious trends. Figure 8 explores how the grade changes with the in-fill drilling programme and whether this is impacted by commodity type. The mean percentage grade change is negative across all commodity types,. This suggests that earlier interpretations based on fewer drillholes assumed continuity that subsequent drilling disproved. This is possibly a reflection of human nature, as we tend to be optimistic in our geological interpretation at the early stage of a project. Another trend observed in Figure 8is the large variation in grade changes for the precious metal projects relative to the bulk commodities. This is expected considering that precious metal deposits are naturally more variable than bulk commodities. What was unexpected by the authors, however, was the trend towards more negative-mean grade changes as the variability of the deposit increases. An interesting question that is raised by this is: if the grade is expected to decrease with in-fill drilling, should this not affect how we classify the Mineral Resources in the first place? Further investigation is required to better understand how the grade is impacted with in-fill drilling and the increasing confidence in the Mineral Resource. The authors consider that there is further opportunity to expand on the results presented in this paper. In particular, through acquiring and analyzing more case studies, there is opportunity to confirm the optimal population and whether the optimal population versus the sub-optimal population is a real phenomenon. This might allow the establishment of a benchmark for CP/QPs to aspire to. Conclusion The study results and discussion are presented to assist CP/QPs that are planning drill programmes and managers that approve drilling budgets. It is hoped that the results will prompt CP/QPs and managers to ask if the proposed drill programme will meet the resource upgrade objectives. Where the proposed drill programme is not expected to produce the resource upgrade predicted by the optimal population, it might be pertinent to consider if there is redundancy in the drilling programme.

8 Further research will build upon what is considered in this paper and will help exploration geologists, CP/QPs and budget managers to achieve their drilling programme objectives while minimizing expenditure. Practical tools that optimize the drilling programme so that it does not fall into the sub-optimal population should be the focus of future work. REFERENCES Berry, M and McCarthy, P, Practical consequences of geological uncertainty, in Proceedings Sixth International Mining Geology Conference, pp (The Australasian Institute of Mining and Metallurgy: Melbourne). Berry, M., (2014). Benchmarking Does it have a role in Improving the performance of mining geology?, in Proceedings Ninth International Mining Geology Conference, pp (The Australasian Institute of Mining and Metallurgy: Melbourne). BusinessDictionary.com, (2015). [Online]. Available from: ion/benchmarking.html. Ross, D., Cox, J., Krutzelmann, H., (2014). Technical Report on the Mineral Resource update for the Juanicipio joint venture, Zacatecas State, Mexico. Prepared for MAG Silver Corp by Roscoe Postle Associates Incorporated. Scholz, M., (2014) Real Benchmarking [Online]. Available from: deeper articles/real-benchmarking Thomas, M., Thalenhorst, H., Riles, A., (2012). Minera Juanicipio Property, Zacatecas State, Mexico. Technical Report. Prepared for Minera Juanicipio S.A. de C.V. by AMC Mining Consultants (Canada) Limited. Con formato: Español (Perú)

How many drillholes do I need to upgrade my Inferred Resource? Andrew Fowler Kathy Zunica

How many drillholes do I need to upgrade my Inferred Resource? Andrew Fowler Kathy Zunica How many drillholes do I need to upgrade my Inferred Resource? Andrew Fowler Kathy Zunica The Idea Overheard in a boardroom in Canada You typically upgrade 30 % of your resource from an in-fill drilling

More information

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April OZ Minerals Limited Carrapateena Mineral Resources Statement April 14 2011 CARRAPATEENA MINERAL RESOURCE STATEMENT April 14, 2011 The Carrapateena Resource Statement relates to an upgrading to an Inferred

More information

GoviEx completes acquisition of African Energy s Zambian uranium assets

GoviEx completes acquisition of African Energy s Zambian uranium assets October 30, 2017 GoviEx completes acquisition of African Energy s Zambian uranium assets VANCOUVER, CANADA GoviEx Uranium Inc. (TSX-V: GXU; OTCQB: GVXXF) ( GoviEx ) announced today the completion of its

More information

Bass Metals records further positive drill results & progress at 3 prospects.

Bass Metals records further positive drill results & progress at 3 prospects. 16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret

More information

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7) FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7) Vendetta Increases Pegmont Lead-Zinc Mineral Resource to 5.8 Million Tonnes and 8.3 Million Tonnes of. Open Pit Constrained Mineral Resource now

More information

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT SALAZAR ANNOUNCES AN UPDATED 43-101 RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT VANCOUVER, BRITISH COLUMBIA, January 12, 2012 - Salazar Resources Ltd.

More information

High-grade Gold in First Drilling Undertaken at Productora South

High-grade Gold in First Drilling Undertaken at Productora South ASX ANNOUNCEMENT Wednesday 10th October 2012 High-grade Gold in First Drilling Undertaken at Productora South Shallow, high-grade, narrow-vein gold area adds further up-side to Productora Sierra Zapallo

More information

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY February 5, 2018, Toronto, Ontario Troilus Gold Corp. (TSX- V: TLG) ( Troilus or the Company ) is pleased to announce the commencement

More information

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK Orko Announces a Significant Upgraded Resource at the La Preciosa Project in Durango, Mexico; A Superpit is now being considered as the preferred

More information

New Drilling Program Commences at Mutiny s Deflector Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern

More information

High-grade Copper and Gold Discovered at Productora

High-grade Copper and Gold Discovered at Productora ASX ANNOUNCEMENT Tuesday 25th September 2012 High-grade Copper and Gold Discovered at Productora Potential for High-grade Copper-Gold Shoots to Add New Dimension to Productora High-grade copper-gold discovered

More information

A B C PAD A HIGHLIGHTS

A B C PAD A HIGHLIGHTS Murchison Minerals Intercepts 12.30% Zinc, 0.70% Copper, 0.18% Lead and 42.03 g/t Silver 14.97% ZnEq over 6.37 Metres and Extends Known Limits of Brabant McKenzie VMS Deposit June 25, 2018 (Toronto, Ontario):

More information

USGS Reserves/Resource Definitions

USGS Reserves/Resource Definitions Copper Reserves and Resources Dan Edelstein U.S. Department of the Interior U.S. Geological Survey USGS Reserves/Resource Definitions Resource: a concentration of naturally occurring solid, liquid or gaseous

More information

ASX announcement 16 May 2016

ASX announcement 16 May 2016 ASX announcement 16 May 2016 Adelaide Resources Limited ABN: 75 061 503 375 Corporate details: ASX Code: ADN Cash: $0.701million (at 31 Mar 2016) Issued Capital: 357,922,352 ordinary shares 37,222,104

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

Mt Cannindah IP Data Reprocessing & 3D Geological Modelling Identifies Potential Resource Extensions

Mt Cannindah IP Data Reprocessing & 3D Geological Modelling Identifies Potential Resource Extensions Mt Cannindah IP Data Reprocessing & 3D Geological Modelling Identifies Potential Resource Extensions New 3D Geological Model of Mt Cannindah resource completed Reprocessed historical IP Data identifies

More information

Acquisition of Kilfoyle Project, Northern Territory

Acquisition of Kilfoyle Project, Northern Territory ASX Announcement 31 May 2018 Level 1, 135 Fullarton Road Rose Park, SA 5067 Australia Telephone +61 (0) 8 8364 3188 Facsimile +61 (0) 8 8364 4288 info@pnxmetals.com.au www.pnxmetals.com.au Acquisition

More information

Brookfield Place Tel: (416) Bay Street, Suite 3630 Fax: (416) FOR IMMEDIATE RELEASE February 7, 2012

Brookfield Place Tel: (416) Bay Street, Suite 3630 Fax: (416) FOR IMMEDIATE RELEASE February 7, 2012 FOR IMMEDIATE RELEASE Brookfield Place Tel: (416) 367-5500 181 Bay Street, Suite 3630 Fax: (416) 367-5505 Toronto, Ontario M5J 2T3 E: info@romarco.com NEWS RELEASE FOR IMMEDIATE RELEASE February 7, 2012

More information

The Manager Companies ASX Limited 20 Bridge Street

The Manager Companies ASX Limited 20 Bridge Street ABN 79 106 879 690 10 July 2012 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (5 pages by email) Dear Madam, 1.54 Moz Gold Equivalent Maiden Gold/Copper Resource at Wonogiri The Directors

More information

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador Maiden 43-101 Resource Estimate Study Under Way Toronto, Ontario July 10, 2017

More information

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending June 17, 2015 NYSE-MKT: SVBL, TSX: SVB SILVER BULL IDENTIFIES NEW MASSIVE SULPHIDE MINERALIZATION GRADING 690G/T SILVER, 1% COPPER, 4.8% LEAD AND 15.25% ZINC AT THE SIERRA MOJADA PROJECT, COAHUILA, MEXICO.

More information

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width

More information

Annual Report Amended Additional Information

Annual Report Amended Additional Information ASX Announcement 13 October 2017 Annual Report Amended Additional Information ASX Code: VKA Viking Mines Ltd (Viking or the Company) hereby releases amended commentary to relevant sections of its annual

More information

ASX Code: ORN Compelling Nickel-Copper Targets Defined at Fraser Range Project

ASX Code: ORN   Compelling Nickel-Copper Targets Defined at Fraser Range Project ASX Code: ORN www.oriongold.com.au Compelling Nickel-Copper Targets Defined at Fraser Range Project 1 Disclaimer and Forward-Looking Statements Certain statements contained in this presentation, including

More information

Drilling Extending Mineralization in La Mina North Zone

Drilling Extending Mineralization in La Mina North Zone Toachi Mining Inc. Intersects 5.42 m grading 4.35 g/t Au, 77.34 g/t Ag, 7.48% Cu, 4.24% Zn and 0.22% Pb at the Gold-Rich La Plata VMS Project in Ecuador Drilling Extending Mineralization in La Mina North

More information

AMUR MINERALS CORPORATION (AIM: AMC) Kubuk Drilling To Upgrade and Expand Resource

AMUR MINERALS CORPORATION (AIM: AMC) Kubuk Drilling To Upgrade and Expand Resource 14 September 2017 AMUR MINERALS CORPORATION (AIM: AMC) Kubuk Drilling To Upgrade and Expand Resource New Mineralisation Expands Kubuk Deposit by 50% to 1,500 Metres Amur Minerals Corporation ( Amur or

More information

Drilling Extending Mineralization in La Mina North Zone

Drilling Extending Mineralization in La Mina North Zone Toachi Mining Inc. Intersects 10.78 m grading 6.35 g/t Au, 54.32 g/t Ag, 9.64% Cu, 8.70% Zn and 0.43% Pb at the Gold-Rich La Plata VMS Project in Ecuador Drilling Extending Mineralization in La Mina North

More information

2017 as at 30 June 2017 Project Tonnes HM HM SL OS HM Assemblage Tonnes HM HM SL OS HM Assemblage

2017 as at 30 June 2017 Project Tonnes HM HM SL OS HM Assemblage Tonnes HM HM SL OS HM Assemblage ASX, AIM and Media Release 8 October Mineral Resources and Ore Reserves Statement SUMMARY The recently acquired Toliara Project has an estimated Mineral Resource of 857 million tonnes at 6.2% Heavy Mineral

More information

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS Magmatic Resources Ltd Level 1, 11 Lucknow Place West Perth WA 6005 Phone: +61 8 6102 2709 www.magmaticresources.com ASX / MEDIA ANNOUNCEMENT 21 August 2017 RC DRILLING TO RESUME THIS WEEK AT CARLISLE

More information

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project NEWS RELEASE June 11, 2015 Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project Toronto, Ontario June 11, 2015 Red Pine Exploration Inc. (TSX-V: RPX) (the Company

More information

MINERAL RESOURCE CLASSIFICATION IT S TIME TO SHOOT THE SPOTTED DOG!

MINERAL RESOURCE CLASSIFICATION IT S TIME TO SHOOT THE SPOTTED DOG! MINERAL RESOURCE CLASSIFICATION IT S TIME TO SHOOT THE SPOTTED DOG! P R Stephenson, A Allman, D P Carville, P T Stoker, P Mokos, J Tyrrell, T Burrows ABSTRACT Classification of mineral resource estimates

More information

Magmatic completes acquisition of the Mt Venn Copper-Nickel-Cobalt Project in Western Australia

Magmatic completes acquisition of the Mt Venn Copper-Nickel-Cobalt Project in Western Australia ASX / Media Release 8 May 2018 Magmatic completes acquisition of the Mt Venn Copper-Nickel-Cobalt Project in Western Australia Highlights Previously announced binding agreement with Montezuma Mining Company

More information

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL ASX ANNOUNCEMENT 16 SEPTEMBER 2011 Phillips River Mining NL ABN 61 004 287 790 Unit 46/328 Albany Highway VICTORIA PARK WA 6100 T: 08 6250 4600 F: 08 6250 4699 info@phillipsriver.com.au CONTACT Jason Stirbinskis

More information

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 20 September 2010 EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT Boddington South Gold

More information

ASX ANNOUNCEMENT 21 MARCH 2011

ASX ANNOUNCEMENT 21 MARCH 2011 ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights

More information

Form F3 MATERIAL CHANGE REPORT

Form F3 MATERIAL CHANGE REPORT Form 51-102F3 MATERIAL CHANGE REPORT Item 1. Item 2. Item 3. Item 4. Item 5. Name and Address of Reporting Issuer Northern Superior Resources Inc. 1351C Kelly Lake Road, Unit 7 Sudbury, Ontario, Canada

More information

MAJOR RESOURCE BOOST FOR QUEENSLAND NICKEL PROJECT

MAJOR RESOURCE BOOST FOR QUEENSLAND NICKEL PROJECT ASX RELEASE January, MAJOR RESOURCE BOOST FOR QUEENSLAND NICKEL PROJECT First resource estimate for rd NORNICO deposit Total combined total resource % higher A maiden resource of. million tonnes has been

More information

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP Toachi Mining Inc. Intersects 13.91 m grading 3.51 g/t Au, 64.24 g/t Ag, 0.59% Cu, 4.11% Zn and 0.85% Pb at the Gold-Rich La Plata VMS Project in Ecuador Toronto, Ontario October 11, 2017 Toachi Mining

More information

Highlights. 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY

Highlights. 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY Managing Director Simon Noon Directors Richard Monti (Chairman) Peter Harold (Non-exec.) Andrew Parker (Non-exec.) Company

More information

Resource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent*

Resource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent* Resource upgrade at Greater Whitewash Project to 242mt @ 604 Moly Equivalent* 240% increase in tonnage Date: Monday 30 May, 2011 ASX: AQR Share Price: $0.40 Shares on issue: 145,022,440 Market Capitalisation:

More information

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April. 16 March 2018 Company Announcement Officer ASX Limited 20 Bridge Street SYDNEY NSW 2000 Highlights CORPORATE UPDATE Inaugural Bowdens Reserve Statement due early April. Feasibility Study being finalised

More information

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

704,000 OUNCE MIYABI GOLD PROJECT UPDATE 704,000 OUNCE MIYABI GOLD PROJECT UPDATE ASX/ RELEASE 21 April 2016 ASX code RVY Board of Directors: Geoff Gilmour Managing Director Greg Cunnold Technical Director Graeme Clatworthy Non-Executive Director

More information

CIM DEFINITION STANDARDS. On Mineral Resources and Mineral Reserves. Prepared by the CIM Standing Committee on Reserve Definitions

CIM DEFINITION STANDARDS. On Mineral Resources and Mineral Reserves. Prepared by the CIM Standing Committee on Reserve Definitions CIM DEFINITION STANDARDS On Mineral Resources and Mineral Reserves Prepared by the CIM Standing Committee on Reserve Definitions CIM DEFINITION STANDARDS - On Mineral Resources and Mineral Reserves Prepared

More information

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. 30 April 2008 60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. Perilya Limited (ASX: PEM) is pleased to announce a 60% increase in the mineral resource estimate for the

More information

Continental Gold Announces an Updated Mineral Resource Estimate for the Buriticá Project, Colombia

Continental Gold Announces an Updated Mineral Resource Estimate for the Buriticá Project, Colombia Continental Gold Announces an Updated Mineral Resource Estimate for the Buriticá Project, Colombia Toronto, Ontario, October 1, 2012 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or

More information

For personal use only

For personal use only ACN 092 471 513 28 November 2016 ASX Release PENNY S FIND GOLD MINE UPGRADED POTENTIAL FOR MINE LIFE EXTENSION Empire Resources Limited ( Empire, ASX code: ERL) is pleased to give an update on the progress

More information

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development ABN 44 009 157 439 Company Announcement 22 November 2018 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com

More information

Highlights from the four holes announced in this news release include:

Highlights from the four holes announced in this news release include: November 20, 2017 OTCQB: SVBL, TSX: SVB SILVER BULL INTERSECTS 9 METERS OF SULPHIDE MINERALIZATION GRADING 20.7% ZINC, 1% LEAD AND 98G/T SILVER, INCLUDING 3.65 METERS OF MASSIVE SULPHIDE MINERALIZATION

More information

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia Bellhaven Announces Updated NI 43-101 Mineral Resource for La Mina Project, Colombia Vancouver, B.C. October 24, 2016. Bellhaven Copper & Gold Inc. (TSX-Venture: BHV) ( Bellhaven or the Company ) is pleased

More information

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project 5 th July 2017 Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project Intensive site based exploration has commenced at Dobsina Co-Ni Project. Activities include:

More information

PRESS RELEASE 16th SEPTEMBER 2008 BEOWULF ANNOUNCES INFERRED RESOURCE FOR THE LULEPOTTEN COPPER-GOLD DEPOSIT, BALLEK JOINT VENTURE, SWEDEN

PRESS RELEASE 16th SEPTEMBER 2008 BEOWULF ANNOUNCES INFERRED RESOURCE FOR THE LULEPOTTEN COPPER-GOLD DEPOSIT, BALLEK JOINT VENTURE, SWEDEN PRESS RELEASE 16th SEPTEMBER 2008 BEOWULF ANNOUNCES INFERRED RESOURCE FOR THE LULEPOTTEN COPPER-GOLD DEPOSIT, BALLEK JOINT VENTURE, SWEDEN 16 September 2008: Beowulf Mining PLC ('Beowulf' AIM:BEM, Aktietorget:BEO),

More information

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT For Immediate Release NR 13-10 FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT (Vancouver, BC, September 16, 2013) Falco Pacific Resource Group Inc. ( Falco Pacific

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

High Grade Gold Drill Results Extend Buccaneer

High Grade Gold Drill Results Extend Buccaneer ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 14 June, 2012 High Grade Gold Drill Results Extend 31 metres averaging 3.68g/t gold including 14 metres averaging 7.56g/t gold ABM Resources NL ( ABM or The Company

More information

This year s conference theme: Mining Geology through the value chain

This year s conference theme: Mining Geology through the value chain Benchmarking: Does it have a role in improving the performance of mining geology? AMC Consultants Pty Ltd Mark Berry, Principal Geologist This year s conference theme: Mining Geology through the value

More information

ASX RELEASE. Drilling Commenced at Monax s Punt Hill Copper-Gold Project

ASX RELEASE. Drilling Commenced at Monax s Punt Hill Copper-Gold Project Exploration Office Warehouse I, 5 Butler Blvd BurbridgeBusinessPark Adelaide Airport SA 5950 Postal Address PO Box 247 Export Park SA 5950 ABN: 96 110 336 733 Tel: +61 8 8375 3900 Fax: +61 8 8375 3999

More information

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA HIGHLIGHTS New claims staked covering ~9km 2 to secure a 100% interest in the McCleery Copper-Cobalt Project in the Yukon Territory, Canada ABN

More information

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS National Stock Exchange of Australia Company Announcements Level 2, 117 Scott Street Newcastle NSW 2300 25 th January 2013 STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS 100m

More information

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

King of the Hills Gold Project, Leonora, to commence production in Q2 2011 King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher

More information

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION May

More information

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL New Resource at Seel Contains 2.81 Billion lbs of Cu Eq Inferred Plus 0.58 Billion lbs of Cu Eq Indicated

More information

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

More information

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT PROVEN AND PROBABLE MINERAL RESERVES

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT PROVEN AND PROBABLE MINERAL RESERVES Gold Corporation 2014 Annual Mineral Reserve and Resource Statement Proven and Probable Mineral Reserves PROVEN AND PROBABLE MINERAL RESERVES (1,3,4,5,6,8, 10) Fort Knox Area USA 100.0% 67,855 0.40 872

More information

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project. Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project. Vancouver, British Columbia, July 6, 2018 Blox, Inc. (OTCQB: BLXX), ( Blox or the Company ) is pleased to announce that a new

More information

DRILLING NEWS. NYSE Amex: GORO 22, February. Tuesday DENVER. Company. 50 meters ahead of. La Arista. 11 meters of within, La Arista

DRILLING NEWS. NYSE Amex: GORO 22, February. Tuesday DENVER. Company. 50 meters ahead of. La Arista. 11 meters of within, La Arista FOR IMMEDIATE RELEASE February 22, 2011 NEWS NYSE Amex: GORO GOLD RESOURCE CORPORATION DRILLING RETURNS HIGHEST GRADE INTERCEPTS TO DATE DENVER Tuesday February 22, 2011 Gold Resource Corporation s (GORO)

More information

Ovoot Coking Coal Project (100%)

Ovoot Coking Coal Project (100%) NEW MAJOR MONGOLIAN COAL RESOURCE Ovoot Coking Coal Project (100%) ASX Announcement 13/10/2010 14/10/2010 ASPIRE MINING LIMITED ABN 46 122 417 243 Unit 2, 454 Roberts Road Subiaco, WA, 6008 P.O. Box 1918

More information

2016 Annual Mineral Reserve and Resource Statement

2016 Annual Mineral Reserve and Resource Statement Gold Corporation 25 York Street, 17th Floor Toronto, ON Canada M5J 2V5 2016 Annual Mineral Reserve and Resource Statement Proven and Probable Mineral Reserves Bald Mountain USA 100.0% 10,332 0.8 271 100,154

More information

DRILLING COMMENCES AT ESK TROUGH

DRILLING COMMENCES AT ESK TROUGH ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement

More information

GEOPHYSICAL SURVEYING COMMENCES AT ESK TROUGH

GEOPHYSICAL SURVEYING COMMENCES AT ESK TROUGH ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement

More information

DECEMBER QUARTERLY REPORT

DECEMBER QUARTERLY REPORT DECEMBER QUARTERLY REPORT Resource Mining Corporation Limited ( RMC ) For the period ended 31 st December 2011 HIGHLIGHTS: Resource Mining Corporation Limited ABN: 97 008 045 083 Updated Mineral Resource

More information

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated November 30, 2012 TECHNICAL REPORT TO BE RELEASED THAT PRESENTS FIRST MINERAL RESOURCE ESTIMATE TO NI 43-101 STANDARDS FOR CAHUILLA PROJECT IN IMPERIAL COUNTY, CALIFORNIA BY TERAS RESOURCES. POSITIVE GOLD-SILVER

More information

Australia s Mineral Resources: A New Era of Exploration and Development

Australia s Mineral Resources: A New Era of Exploration and Development Australia s Mineral Resources: A New Era of Exploration and Development Dr James Johnson Chief Onshore Energy and Minerals Division Geoscience Australia Australia s Mineral Production and Endowment Commodity

More information

For personal use only

For personal use only ASX RELEASE 2 August 2011 Significant Gold intersections at Chameleon Prospect Maiden 15 hole RC drilling programme (3,170 metres) completed by Scotia Gold Rights JV partner, Aphrodite Gold at the Chameleon

More information

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA ASX Release 4 th November 2009 SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce commencement of site works at the A1 Gold Mine in eastern

More information

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project Bulletin Resources is the 100% owner of the Lamboo and Golden Crown Gold Projects located near Halls Creek in the East Kimberley region of Western Australia. The projects have a combined open pit and underground

More information

For personal use only

For personal use only Company Announcements Office, ASX Securities Limited, 20, Bridge Street, Sydney, N.S.W. 2000 COMMENCEMENT OF DRILLING, PILOT MOUNTAIN - NEVADA The Board of Thor Mining Plc ( Thor or the Company ) (AIM,

More information

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce

More information

For personal use only

For personal use only ACN 092 471 513 6 February 2012 ASX Release New drill assays up to 4% Cu confirm high grade copper continues at depth at Empire s Yuinmery project in WA 3m @ 4.0% Cu within 6m @ 3.0% Cu in drill hole YRC11-41D

More information

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519) Spruce Ridge Resources Ltd. 7735 Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) 822-5904, Fax: (519) 823-5090 PRESS RELEASE 2018-07 July 24, 2018 Spruce Ridge Resources Provides Update on the

More information

Continental Gold Announces an Updated Mineral Resource Estimate for the Buriticá Project, Colombia

Continental Gold Announces an Updated Mineral Resource Estimate for the Buriticá Project, Colombia Continental Gold Announces an Updated Mineral Resource Estimate for the Buriticá Project, Colombia Toronto, Ontario, May 13, 2014 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or the

More information

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT September 18 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT Two tier one Australian banks mandated to arrange

More information

Co-O MINE MINERAL RESOURCE UPDATE

Co-O MINE MINERAL RESOURCE UPDATE MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

Replacement: Material Increase to Tuzon Resource

Replacement: Material Increase to Tuzon Resource Replacement: Material Increase to Tuzon Resource RNS Number : 1067C Hummingbird Resources PLC 12 March 2014 Hummingbird Resources plc ("Hummingbird Resources" or the "Company") (AIM: HUM) THE FOLLOWING

More information

Additional significant gold and copper intercepts obtained in Sweden

Additional significant gold and copper intercepts obtained in Sweden 18 November 2009 Additional significant gold and copper intercepts obtained in Sweden Drake Resources (ASX: DRK, Drake ) is pleased to announce that additional significant assays for the drilling programme

More information

Compliant Exploration for JORC and CIM Definition Standards / NI Certification

Compliant Exploration for JORC and CIM Definition Standards / NI Certification Compliant Exploration for JORC and CIM Definition Standards / NI 43-101 Certification Dr Norman Lock Private Consultant norman.lock@yahoo.co.uk +1 647 242 9471 Presentation to CBMINA Belo Horizonte, August,

More information

MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND

MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND Level 1, 350 Hay Street, Subiaco, WA 6008 ABN 84 061 219 985 P: +61 8 6365 4519 F: +61 8 9388 6040 E:enquiries@balamara.com.au 15 October 2014 MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT

More information

Helix Resources Limited A.C.N Incorporated in Western Australia

Helix Resources Limited A.C.N Incorporated in Western Australia Helix Resources Limited A.C.N. 009 138 738 Incorporated in Western Australia 3 rd June 2008 Australian Stock Exchange Limited Via Electronic Lodgement Dear Sirs INITIAL INFERRED RESOURCE ESTIMATE OF 112

More information

76,000 Ounce Gold Resource at Akoko North

76,000 Ounce Gold Resource at Akoko North 31 st March 2009 76,000 Ounce Gold Resource at Akoko North 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Scoping study (assuming toll milling) estimates $A24M

More information

Skeena Intersects g/t AuEq over metres at Eskay Creek

Skeena Intersects g/t AuEq over metres at Eskay Creek NR: 19-01 January 15, 2019 Skeena Intersects 30.99 g/t AuEq over 14.72 metres at Eskay Creek Vancouver, BC (January 15, 2019) Skeena Resources Limited (TSX.V: SKE, OTCQX: SKREF) ( Skeena or the Company

More information

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE High-grade, visible-gold mineralization intersected 120 metres ( m ) down-plunge of Swan Zone Inferred Mineral Resource and 210

More information

Mandalay Resources Corporation Increases Gold Reserves by 33%, Silver Reserves by 14% and Antimony Reserves by 38% in 2012

Mandalay Resources Corporation Increases Gold Reserves by 33%, Silver Reserves by 14% and Antimony Reserves by 38% in 2012 Mandalay Resources Corporation Increases Gold Reserves by 33%, Silver Reserves by 14% and Antimony Reserves by 38% in 2012 TORONTO, ON, March 6, 2013 -- Mandalay Resources Corporation ("Mandalay" or the

More information

Tel: (+61-8) Mob: (+61) (0)

Tel: (+61-8) Mob: (+61) (0) 30 November 2010 HIGH GRADE INTERCEPT EXTENDS FOSSEY EAST DISCOVERY 15 metres at 7.4 % zinc, 4 % lead, 0.5% copper, 76 g/t silver and 2.8 g/t gold Fossey East now defined over 100 metres strike extent

More information

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased PRESS RELEASE CZN-TSX CZICF-OTCQB FOR IMMEDIATE RELEASE March 26, 2015 NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE Measured + Indicated and Inferred Resource Tonnages Increased Underground Exploration

More information

MEDIA RELEASE OCEANAGOLD REPORTS ADDITIONAL HIGH-GRADE DRILL RESULTS AT WAIHI IN NEW ZEALAND

MEDIA RELEASE OCEANAGOLD REPORTS ADDITIONAL HIGH-GRADE DRILL RESULTS AT WAIHI IN NEW ZEALAND MEDIA RELEASE 30 October 2018 OCEANAGOLD REPORTS ADDITIONAL HIGH-GRADE DRILL RESULTS AT WAIHI IN NEW ZEALAND (MELBOURNE) OceanaGold Corporation (TSX: OGC) (ASX: OGC) (the Company ) is pleased to announce

More information

Condor Blanco Mines Limited (Code: CDB) Company Presentation Devil s Creek Tenement E70/4529

Condor Blanco Mines Limited (Code: CDB) Company Presentation Devil s Creek Tenement E70/4529 Condor Blanco Mines Limited (Code: CDB) Company Presentation Devil s Creek Tenement E70/4529 Disclaimer This document is not a disclosure document nor does it constitute the provision of financial product

More information

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project September 24, 2018 News Release Release #15 2018 Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project Vancouver, B.C. Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) ("Monument"

More information

Tahoe Resources Mineral Reserves as of January 1, 2018

Tahoe Resources Mineral Reserves as of January 1, 2018 Tahoe Resources Mineral Reserves as of January 1, 2018 Gold Location Ownership Bell Creek Canada 100% 0.5 3.90 68 1.9 4.12 246 2.4 4.07 315 Escobal Guatemala 100% 2.5 0.42 34 22.1 0.34 244 24.7 0.35 278

More information

Goldplay President and CEO Marcio Fonseca commented

Goldplay President and CEO Marcio Fonseca commented February 7, 2019 GOLDPLAY ANNOUNCES ITS MAIDEN MINERAL RESOURCE, CONTAINING 36 MILLION Oz AgEq (INDICATED) AND 11 MILLION Oz AgEq (INFERRED), AT THE SAN MARCIAL PROJECT Vancouver, BC - Goldplay Exploration

More information

Fortuna Updates Reserves and Resources

Fortuna Updates Reserves and Resources Fortuna Updates Reserves and Resources Vancouver, February 22, 2018-- Fortuna Silver Mines, Inc. (NYSE: FSM) (TSX: FVI) is pleased to report updated Mineral Reserve and Mineral Resource estimates as of

More information

For personal use only

For personal use only INTEGRATED RESOURCES GROUP LIMITED REPORT ON ACTIVITIES, MARCH 2012 QUARTER HIGHLIGHTS Announcement of company transforming Maryborough Basin project acquisition, expected to be completed in June 2012.

More information