PARTNERING WITH BARRICK TO DEVELOP CANADA S ONLY CARLIN-TYPE GOLD DISTRICT TSX-V: ATC

Size: px
Start display at page:

Download "PARTNERING WITH BARRICK TO DEVELOP CANADA S ONLY CARLIN-TYPE GOLD DISTRICT TSX-V: ATC"

Transcription

1 PARTNERING WITH BARRICK TO DEVELOP CANADA S ONLY CARLIN-TYPE GOLD DISTRICT TSX-V: ATC June 2017

2 FORWARD LOOKING STATEMENTS FORWARD-LOOKING STATEMENTS This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the estimation of inferred and indicated mineral resources; (ii) the success of exploration activities; (iii) the results of the PEA including statements about future production, future operating and capital costs, the projected IRR, NPV, payback period, and production timelines for the Tiger Deposit. These statements are based on information currently available to ATAC Resources Ltd. ( ATAC ) and ATAC provides no assurance that actual results will meet management's expectations. In certain cases, forward-looking information may be identified by such terms as "anticipates", "believes", "could", "estimates", "expects", "may", "shall", "will", or "would". Forward-looking information contained in this presentation is based on certain factors and assumptions regarding, among other things, the estimation of mineral resources, the realization of resource estimate, gold metal prices, the timing and amount of future exploration and development expenditures, the estimation of initial and sustaining capital requirements, the estimation of labour and operating costs, the availability of necessary financing and materials to continue to explore and develop the Tiger Deposit in the short and long-term, the progress of exploration and development activities, the receipt of necessary regulatory approvals, the completion of the environmental assessment process, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While ATAC considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect. Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of ATAC to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined including the possibility that mining operations may not commence at the Tiger Deposit, risks relating to variations in mineral resources, grade or recovery rates resulting from current exploration and development activities, risks relating to changes in gold prices and the worldwide demand for and supply of gold, risks related to increased competition in the mining industry generally, risks related to current global financial conditions, uncertainties inherent in the estimation of mineral resources, access and supply risks, reliance on key personnel, operational risks inherent in the conduct of mining activities, including the risk of accidents, labour disputes, increases in capital and operating costs and the risk of delays or increased costs that might be encountered during the development process, regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks, including the risk that the financing necessary to fund the exploration and development activities at the Tiger Deposit may not be available on satisfactory terms, or at all, risks related to disputes concerning property titles and interest, and environmental risks. This list is not exhaustive of the factors that may affect any of ATAC's forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance on ATAC's forward-looking information. ATAC does not undertake to update any forward-looking information that may be made from time to time by ATAC or on its behalf, except in accordance with applicable securities laws. PEA DISCLOSURE It should be noted that the Tiger Deposit PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA forecast will be realized or that any of the resources will ever be upgraded to reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Additional information about the Tiger Deposit PEA is summarized in ATAC s May 31, 2016 technical report titled Technical Report and Preliminary Economic Assessment for the Tiger Deposit, Rackla Gold Project, Yukon, Canada which can be viewed at under the ATAC profile or on the ATAC website at QUALIFIED PERSON Julia Lane, B.Sc., P.Geo., the Vice President of Exploration of ATAC, is a qualified person for the purposes of National Instrument All technical information contained in this presentation has been approved by Julia Lane. TRUE WIDTHS True widths for all Conrad, Osiris, Sunrise, Ibis, Anubis, Tiger and Ocelot highlight diamond drill holes are estimated to be 30% - 100% of intersected widths. RAB drill hole intersections are drilled thicknesses and true widths are unknown. Orion diamond drilling true thicknesses are also unknown at this time. 1

3 MANAGEMENT & DIRECTORS MANAGEMENT Graham Downs Julia Lane, B.Sc., P.Geo. Ian Talbot, B.Sc., LLB. Larry Donaldson, C.A. Vanessa Pickering DIRECTORS AND TECHNICAL COMMITTEE Douglas Goss, B.Comm., LLB. Rob Carne, M.Sc., P.Geo. Bruce Youngman, B.Sc. President & CEO - 23 Years of Yukon mineral exploration experience VP, Exploration - Partner of Archer, Cathro & Associates COO - Formerly internal counsel with BHP Billiton World Exploration Inc. CFO - 30 years of accounting, auditing and tax experience Manager, Corporate Communications - 13 years Yukon experience Chairman & Director - Queen Elizabeth II Golden and Diamond Jubilee Medals, Alberta Order of Excellence Director, Executive Chairman of Technical Committee - Former President of ATAC - Carlin-type gold discovery team for Rackla Gold Property Director & Technical Committee - Former COO of Canplats Resources Corp. - former VP and director of Northern Dynasty Minerals Glenn Yeadon, B.Comm., LLB. Don Poirier, B.Sc. Bruce Kenway, C.A. Ed Cope, M.Sc. Bill Wengzynowski, P.Eng. Secretary & Director - Over 30 years practicing securities law Director - Former VP, Corporate Development of Hecla Mining Director - Founding member of chartered accounting firm Kenway Mack Slusarchuk Stewart LLP Technical Committee - Former VP of Exploration, North America for Barrick Gold Corporation Technical Committee - Former partner in Archer, Cathro - Carlin-type gold discovery team for Rackla Gold Property 2

4 CAPITAL STRUCTURE SHARE STRUCTURE SHARES OUTSTANDING 139,556,877 FULLY DILUTED 151,031,877 OPTIONS ($ $1.80) 11,475,000 WARRANTS 0 WORKING CAPITAL ~$22M Share Structure as at June 1, 2017 Past 12 month trading pattern FINANCINGS SIGNIFICANT HOLDERS FLOW- THROUGH HARD DOLLARS PROCEEDS BARRICK ~27,771, % May 2017 Barrick Apr Mar $0.50/share $0.65/share $1.80/share ~$8.3 M ~$3.3 M ~$6.8 M TOCQUEVILLE 11,717,291* 8.4% STRATEGIC METALS 10,144, % *As at January 31, 2017 Mar Agnico Eagle $1.35/share ~$13.0 M 3

5 THE RACKLA GOLD PROPERTY, YUKON 4

6 THE RACKLA GOLD PROPERTY The Rackla Gold Property is ~1,700 km² and is comprised of three separate projects: the Osiris (100% ATAC), the Orion (ATAC-Barrick partnership) and the Rau (100% ATAC) The Osiris Project is host to Canada s first Carlin-type gold discoveries within the 12 km² Osiris Cluster at the Conrad, Osiris, Sunrise and Ibis zones The Orion Project is subject to an earn-in agreement with Barrick Gold Corporation whereby Barrick can earn up to 70% interest in Orion by spending $55 million in exploration The Rau Project hosts the economic Tiger Gold Deposit and 15 other underexplored targets 5

7 RACKLA GOLD PROPERTY HIGHLIGHTS Canada s only Carlin-type gold district discovered by ATAC in 2010 at the Osiris Project Drilled ~79,000 m and outlined 6 zones of significant, high-grade, Carlin-type gold mineralization at Conrad, Osiris, Sunrise, Ibis, Anubis and Orion between April 10, 2017: Barrick and ATAC enter partnership to explore the Orion Project transaction valued at ~$63 million May 3, 2017: initial regulatory approval to proceed with constructing a 65 km tote road to the Tiger Gold Deposit Well-funded with ~$22 million in cash and drilling has commenced on the $10 million exploration program for the Osiris and Rau Projects 6

8 THE BARRICK TRANSACTIONS The transactions consist of a potential total investment by Barrick of approximately $63.3 million, which includes a private placement of $8.3 million (completed), and a two-staged, $55 million exploration earn-in option to acquire 70% of the Orion Project: Stage 1 earn-in: $35 million expenditures for 60% of Orion Guaranteed $10 million expenditures in the first 3 years One or more senior Barrick exploration team members seconded to Orion Stage 2 earn-in: further $20 million expenditures for an additional 10% of Orion (70% total) Post earn-in: joint venture formed If either party s interest in the JV is reduced to 10% or less, their interest in Orion converts to a sliding scale NSR on gold between 1% - 3% with no buyout Barrick participated in a flow-through financing in ATAC for approximately $8.3 million Barrick s shareholding in ATAC post financing increased from 9.2% to 19.99% 7

9 OSIRIS AND ORION PROJECTS OSIRIS PROJECT First discoveries of Carlin-type mineralization found at the Osiris Project in discovery hole OS intersected m of 4.65 g/t gold ATAC will spend ~$8 million in exploration at the Osiris Project in 2017 ORION PROJECT The Orion Project is subject to an earn-in agreement with Barrick Gold Corporation whereby Barrick can earn up to 70% interest in Orion by expending $55 million in exploration Barrick will spend ~$5 million in exploration at the Orion Project in km tote road initial regulatory approval granted 8

10 CARLIN-TYPE GOLD DISCOVERIES ~5,000 m diamond drilling ~74,000 m diamond drilling

11 OSIRIS & ORION PROJECTS HIGHLIGHT DIAMOND DRILL RESULTS ZONE HOLE FROM (m) TO (m) INTERVAL (m) Au (g/t) CONRAD OS OS OS OS OS OSIRIS OS OS OS SUNRISE OS OS OS IBIS OS OS OS ANUBIS AN AN ORION AN True widths for all highlight drill holes on this slide are estimated to be 30% - 100% of intersected widths 10

12 THE OSIRIS PROJECT 2017 Exploration Plans - ATAC ~8,000 m of diamond drilling has commenced on the Osiris Project and is focusing on expanding high-grade gold mineralization at the Conrad and Osiris Zones Conrad Zone diamond drilling near the 350 Fault where OS intersected m of 8.03 g/t gold and the 650 Fault where OS intersected m of 4.05 g/t gold Shallow diamond and RAB drilling along the Sunrise Zone mineralized corridor where OS intersected m of 2.64 g/t gold Diamond drilling the Osiris Zone along strike of OS and OS which intersected m of 5.07 g/t gold and of 4.41 g/t gold, respectively 10

13 OSIRIS CLUSTER PLAN MAP 2017 diamond drilling has commenced on the Conrad Zone 12

14 THE ORION PROJECT Hosts the 18 km² Anubis Cluster with the drillconfirmed Carlin-type Orion and Anubis gold zones Subject to an earn-in agreement with Barrick, whereby Barrick can earn up to 70% of Orion by spending $55 million in exploration 2017 Exploration Plans - Barrick ~$5 million exploration program to commence mid-june Grassroots target delineation through detailed mapping, prospecting and trenching along with rock, soil and stream sediment sampling RAB drilling with possible follow-up diamond drilling Regional scale HeliFALCON airborne gravity gradiometry and magnetic geophysical surveys Anubis Cluster 13

15 ORION PROJECT - ANUBIS CLUSTER GEOLOGY 14

16 Hosts the Tiger Gold Deposit, Airstrip Gold Anomaly, and numerous other early-stage carbonate-replacement style gold and base metal targets 2017 Exploration Plans - ATAC THE RAU PROJECT Updated 2016 Tiger Deposit PEA doubled the pre-tax NPV to over $100 million* and improved on every metric from the 2014 PEA Diamond drilling of the Tiger East anomaly where 10 of 21 composite float grab samples returned between g/t gold in 2016 Diamond drilling to expand upon Tiger Gold Deposit sulphide mineralization such as RAU which intersected m of 5.11 g/t gold ATAC received initial regulatory approval from YESAB to proceed with constructing a 65 km tote road to the Tiger Deposit Prospecting, mapping and potential RAB drilling of four oxide gold targets along strike of the Tiger Gold Deposit * Please see page 1 of this presentation for Tiger PEA disclosure 20

17 RAU PROJECT GOLD GEOCHEMISTRY 16

18 TIGER DEPOSIT & TIGER EAST ANOMALY 20

19 2014 vs 2016 TIGER PEA 2014 PEA 2016 PEA Gold Price (US$/oz) $1250 $1250 Exchange Rate (US$:CA$) Pre-tax NPV (5%) (millions) $52.15 $106.6 Pre-tax IRR 30.0% 34.8% Post-tax NPV (5%) (millions) $33.67 $75.71 Post-tax IRR 21.5% 28.2% Recovered Gold 221,558 oz 302,307 oz Average Gold Grade 3.72 g/t 3.81 g/t Average Oxide Recovery 89.8% 90.3% Average Sulphide Recovery 0% 57.7% Pre-production Capital (millions) $92.3 $109.4 Sustaining Capital (millions) $26.5 $8.3 Payback (pre-tax) 2.2 years 1.85 years Payback (post-tax) 2.6 years 1.92 years Pre-production Period 1 year 1 year Mine life 4 years 6.2 years Closure Period 2 years 2 years Project life 7 years 9.2 years Process Hybrid CIL/Heap Leach CIP Production Rate 3,300 tpd 1,500 tpd Operational Period Seasonal (158 days) Year-round (365 days) Strip Ratio 5.6:1 4.9:1 Access Method Winter Road Tote Road Please see page 1 of this presentation for Tiger PEA disclosure 18

20 SUMMARY Commenced $10 million exploration program at the Osiris and Rau Projects diamond drilling at Conrad Zone underway ATAC maintains 100% ownership of its highest grade cluster of Carlin-type gold zones at the Osiris Project ATAC and Barrick to work collaboratively to advance the understanding of Carlin-type mineralization at the Orion Project Potential to add additional ounces to the Tiger Gold Deposit by drilling known sulphide zones and adjacent oxide targets 150 m away from the 2016 proposed PEA pit Aggressive 2017 exploration program and increased news-flow 19

21 APPENDIX 21. The Barrick Transactions 22. Osiris and Orion Projects highlight diamond drill results 23. Osiris Cluster plan map 24. Conrad Zone figure 25. Conrad Zone 2017 exploration plans 26. Osiris Zone figure 27. Osiris Zone 2017 exploration plans 28. Sunrise Zone figure 29. Ibis Zone figure 30. Sunrise and Ibis 2017 exploration plans 31. Tiger 2016 PEA Resources and Price Sensitivity 32. Tiger 2016 PEA Pre-Production and Operating Capital 33. Arcus Development Group Inc. deal 20

22 THE BARRICK TRANSACTIONS The transactions consist of a potential total investment by Barrick of approximately $63.3 million, which includes a private placement of $8.3 million (completed), and a two-staged, $55 million exploration earn-in option to acquire 70% of the Orion Project: Stage one earn-in requires Barrick to spend $35 million in exploration to acquire 60% of the Orion Project Stage one expenditures include a $10 million guaranteed exploration commitment over 3 years Stage two earn-in requires Barrick to spend an additional $20 million in exploration to acquire an additional 10% of the Orion Project (aggregate of 70%) One or more of Barrick s senior exploration team members will be appointed to the Orion Project Post earn-in, if either parties joint venture interest is reduced to 10% or less, their interest in the Orion Project converts to a sliding-scale Net Smelter Return Royalty (NSR) on gold which ranges between 1% to 3% with no buyout provision: Each stand-alone gold deposit within the Orion Project will be subject to the same sliding-scale NSR Silver will be subject to a 2% fixed NSR and all other commodities will be subject to a 1% fixed NSR neither NSR will have a buyout Barrick participated in a flow-through financing in ATAC for approximately $8.3 million and Barrick s shareholding in ATAC increases from 9.2% to 19.99% 21

23 OSIRIS & ORION PROJECTS HIGHLIGHT DIAMOND DRILL RESULTS ZONE HOLE FROM (m) TO (m) INTERVAL (m) Au (g/t) CONRAD OS OS OS OS OS OSIRIS OS OS OS SUNRISE OS OS OS IBIS OS OS OS ANUBIS AN AN ORION AN True widths for all highlight drill holes on this slide are estimated to be 30% - 100% of intersected widths 22

24 OSIRIS CLUSTER PLAN MAP 23

25 CONRAD ZONE

26 CONRAD ZONE Previous Exploration Conrad is the most advanced zone in the Nadaleen Trend and received 43,433 m of diamond drilling in 108 holes between Previous shallow drilling focused on developing the Conrad Upper Zone along the crest of an anticlinal fold where a strike length of 800 m has been defined Limited drilling beneath the Upper Zone has defined an area of mineralization proximal to a laterally extensive, near vertical siltstonelimestone contact at the Conrad Middle Zone only 300 m of the 800 m long favourable contact has been tested 2017 Exploration Plans Diamond drilling will focus on crosscutting faults thought to be associated with highgrade gold mineralization intersected in proximity to the 350 and 650 faults Only limited drilling has tested the 350 and 650 faults due to their near parallel orientation to previous drilling Diamond drilling will also test the Conrad Lower Zone along strike of OS which intersected m of 3.03 g/t gold and m of 3.15 g/t gold OS : m of g/t gold Limited drilling has tested for mineralization at the Conrad Lower Zone, opening up an entirely new area for exploration The average grade of all reported intersections at Conrad is 4.75 g/t gold* Out of 148 released Conrad intersections, the minimum intersection grade was 1.01 g/t gold and the maximum was g/t gold. The minimum interval width of intersections was 2.20 m and the maximum was m 25

27 OSIRIS ZONE 26

28 OSIRIS ZONE Previous Exploration The Osiris Zone was ATAC s first discovery of Carlin-type gold mineralization and hole OS intersected m of 4.65 g/t gold Osiris received 14,220 m of diamond drilling in 59 holes between Previous diamond drilling focused on the hinge of an anticline fold and along strike where shallow drilling traced mineralization over a 900 m strike length 2017 Exploration Plans Diamond drilling will focus on the northern extension of Osiris along strike of OS and OS which intersected m of 5.07 g/t gold and m of 4.41 g/t gold, respectively RAB drilling will test additional high-grade mineralized structures similar to the North Osiris Trench which returned values up to g/t gold over 1.8 m** The average grade of all reported Osiris intersections is 3.62 g/t gold* Out of 55 released Osiris intersections, the minimum intersection grade was 1.36 g/t gold and the maximum was 8.37 g/t gold. The minimum interval width of intersections was 3.05 m and the maximum was m ** See ATAC news release dated August 30, 2011 for further details 27

29 SUNRISE ZONE 14

30 IBIS ZONE

31 SUNRISE & IBIS ZONES Previous Exploration Sunrise is located 300 m east of the Osiris anticline and received 4,328 m in 19 holes between Mineralization at Sunrise occurs as subparallel tabular bodies that dip steeply south and drilling to date outlined a 215 m strike length that is open along strike and past a depth of 350 m The average grade of all reported Sunrise intersections is 6.25 g/t gold* Ibis is located 550 m southwest of the Sunrise Zone and received 6,574 m in 26 holes between Exploration Plans Shallow RAB and diamond drilling at Sunrise will focus on following the mineralized corridor along strike to the west where OS intersected m of 2.64 g/t gold There are 3 untested gold-in-soil anomalies to the north and east of where previous drilling intersected the main Ibis zone select rock samples within these anomalous areas grade: 1.30 g/t gold, 1.81 g/t gold, 2.46 g/t gold, and 3.15 g/t gold these anomalies will be tested by RAB drilling in 2017 Sunrise OS : m of 6.76 g/t gold Much like at Osiris and the Conrad Upper Zone, mineralization at Ibis is best developed in the crest of an anticline where mineralization has been traced through drilling for an unfolded strike length of 230 m The average grade of all reported Ibis intersections is 3.10 g/t gold** Out of 17 released Sunrise intersections, the minimum intersection grade was 2.03 g/t gold and the maximum was g/t gold. The minimum interval width of intersections was 1.05 m and the maximum was m ** Out of 18 released Ibis intersections, the minimum intersection grade was 1.02 g/t gold and the maximum was 6.28 g/t gold The minimum intersection width of intersections was 3.32 m and the maximum was m 30

32 Type Oxides TIGER RESOURCES AND GOLD PRICE SENSITIVITY Gold Price $US/oz $1,200 $1,250 $1,300 Pre-Tax Cumulative Net Cash Flow $M $130.1 $149.4 $168.7 Pre-Tax NPV (5% discount rate) $M $90.8 $106.6 $122.3 Pre-Tax IRR 30.8% 34.8% 38.8% 0.78 $US/CA$ Classification Au Cut-off (g/t) Tonnes > Cut-off Grade>Cut-off Contained Metal Au (g/t) Ag (g/t) Au (oz) Ag (oz) Measured ,600, , ,700 Indicated ,720, , ,700 Sulphides Indicated ,360, ,300 24,500 Total M+I 5,680, , ,900 Oxides Inferred , ,700 51,000 Sulphides Inferred ,950, ,800 44,600 Total Inferred 3,230, ,500 95,600 The Mineral Resource estimate used in the updated PEA was completed by Gary Giroux, P.Eng., M.A.Sc. (Giroux Consultants Ltd.) using 6,222 assays taken from 150 diamond drill holes, totalling 26,844 m. The effective date of this Mineral Resource estimate is October 28, A three dimensional solid model was constructed to constrain oxide and sulphide mineralization. Please see page 1 of this presentation for Tiger PEA disclosure 31

33 TIGER PRE-PRODUCTION AND OPERATING CAPITAL CAPITAL COSTS PRE PRODUCTION (millions)* SUSTAINING CAPITAL LOM Site Infrastructure $ $8.1 Tote Road $ $11.0 Open Pit Mining** $13.2 $0.03 $13.2 Materials Crushing and Handling $ $2.0 Process Plant $ $29.7 Tailings and Water Management $7.9 $6.1 $14.0 Project Indirects $ $19.8 OPERATING COSTS LOM Avg. Mining Costs ($/t mined)* $4.31 Processing ($/t processed) $26.98 G & A ($/t processed) $12.38 Surface Services ($/t processed) $3.80 Equipment Leasing ($/t processed) $1.68 * Not including capitalized pre-production mining costs Owner s Cost $ $1.2 Contingencies*** $16.5 $2.2 $18.7 TOTAL $109.4 $8.3 $117.7 * Totals may not add exactly due to rounding ** Includes capitalized pre-production mining costs. Major mining equipment is leased *** Contingencies were factored on an area-by-area basic depending on the detail level of each estimate Please see page 1 of this presentation for Tiger PEA disclosure 32

34 ARCUS DEAL ATAC sold its 50% interest in the Dawson Gold Joint Venture properties to Arcus Development Group Inc. in exchange for: 10,869,910 Arcus shares for a total of 11,399,910 or 15.66% of Arcus 5,000,000 warrants at $0.20 expiring on August 19, 2021 ATAC gains exposure to one of Yukon s premier exploration districts without incurring exploration expenditures or dilution On October 24, 2016 Arcus entered into a series of financings with Goldcorp Inc. whereby Goldcorp now owns 19.9% of Arcus outstanding shares Supremo Zone 33

DEVELOPING CANADA S ONLY CARLIN-TYPE GOLD DISTRICT TSX-V: ATC

DEVELOPING CANADA S ONLY CARLIN-TYPE GOLD DISTRICT TSX-V: ATC DEVELOPING CANADA S ONLY CARLIN-TYPE GOLD DISTRICT TSX-V: ATC November 2017 FORWARD LOOKING STATEMENTS FORWARD-LOOKING STATEMENTS This presentation contains forward-looking information. Forward looking

More information

DEVELOPING CANADA S ONLY CARLIN-TYPE GOLD DISTRICT TSX-V: ATC

DEVELOPING CANADA S ONLY CARLIN-TYPE GOLD DISTRICT TSX-V: ATC DEVELOPING CANADA S ONLY CARLIN-TYPE GOLD DISTRICT TSX-V: ATC March 2018 FORWARD LOOKING STATEMENTS FORWARD-LOOKING STATEMENTS This presentation contains forward-looking information. Forward looking information

More information

Corporate Presentation September 2017 TSX-V: RK

Corporate Presentation September 2017 TSX-V: RK Corporate Presentation September 2017 TSX-V: RK FORWARD LOOKING STATEMENTS Certain information regarding the Company contained herein may constitute forward-looking statements within the meaning of applicable

More information

CAUTIONARY STATEMENT

CAUTIONARY STATEMENT AUGUST 2018 RLG CAUTIONARY STATEMENT Some of the statements contained in this presentation are forward-looking statements. Such forward-looking statements involve known and unknown risks, uncertainties

More information

Bringing Nevada Expertise to the Yukon

Bringing Nevada Expertise to the Yukon Bringing Nevada Expertise to the Yukon February 2012 FORWARD LOOKING STATEMENTS Forward looking statements: This presentation contains certain forward-looking information within the meaning of Canadian

More information

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES TORONTO, ON September 18, 2017 INV Metals ( INV Metals or Company ) (TSX: INV) is very pleased

More information

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT

More information

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS NEWS RELEASE OA GOLD REPORTS CONTINUED SUCCESS AT GSS May 26, 2014 Orca Gold Inc. (TSX.V:ORG) ( Orca or the Company ) is pleased to provide an update on exploration at its Galat Sufar South ( GSS ) prospect

More information

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

Junior Uranium explorer in the Athabasca Basin. Patterson Claims Junior Uranium explorer in the Athabasca Basin Patterson Claims Cautionary Note Regarding Forward-Looking Statements This Presentation and the exhibits attached herein contain forward-looking statements

More information

Corporate Presentation December 2018 TSX-V: RK TSX-V:RK

Corporate Presentation December 2018 TSX-V: RK TSX-V:RK Corporate Presentation December 2018 TSX-V: RK FORWARD LOOKING STATEMENTS Certain information contained herein may constitute forward-looking statements within the meaning of applicable securities laws.

More information

Corporate Presentation March 2018 TSX-V: RK

Corporate Presentation March 2018 TSX-V: RK Corporate Presentation March 2018 TSX-V: RK FORWARD LOOKING STATEMENTS Certain information regarding the Company contained herein may constitute forward-looking statements within the meaning of applicable

More information

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT. 202-930 West First Street, North Vancouver, B.C. 604.998.4175 July 31, 2014 SBB NR-14-10 SBB TSX SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT. 2014 Drilling confirms

More information

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24%

More information

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3. August 2, 2011 AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND 26.39 G/T Au OVER 3.0 METRES Toronto, Ontario -- Avion Gold Corporation

More information

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE 257.2 metres with 0.53% Cu, 1.20 g/t Au, and 1.59 g/t Ag (1.19% Cu Eq or 2.39 g/t Au Eq) including 54.5 metres with 1.34% Cu,

More information

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO. 1305 1090 West Georgia Street, Vancouver, BC, V6E 3V7 Phone: +1 604 685 9316 / Fax: +1 604 683 1585 NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET

More information

News Release. Infill Drilling Program

News Release. Infill Drilling Program TSX:RMX NYSE.MKT:RBY News Release January 7, 2015 Rubicon s Infill Drilling Program Confirms Continuity and Grade of the F2 Deposit and Continues to Encounter High-Grade Mineralization in Sparsely Drilled

More information

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT For Immediate Release NR 13-10 FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT (Vancouver, BC, September 16, 2013) Falco Pacific Resource Group Inc. ( Falco Pacific

More information

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) 998-4175 Tel: (888) 648-4218 www.sabinagoldsilver.com March 6, 2018 SBB NR 18-05 SBB TSX Sabina Gold & Silver Reports 2018

More information

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT SALAZAR ANNOUNCES AN UPDATED 43-101 RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT VANCOUVER, BRITISH COLUMBIA, January 12, 2012 - Salazar Resources Ltd.

More information

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina TSX-V: MSR August 17, 2016 Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina Program features preliminary test of Epithermal Au-Ag Vein

More information

V Sample from C.O.D vein 15 metres southwest of V

V Sample from C.O.D vein 15 metres southwest of V TSX-V: GGX Gold Drop Property Multiple Gold Bearing Rock Samples including 19.6 g/t Gold at Historic C.O.D Shaft And 14.1 g/t Gold at New Vein Showing Greenwood BC Vancouver, British Columbia June 8, 2017

More information

Skeena Intersects g/t AuEq over metres at Eskay Creek

Skeena Intersects g/t AuEq over metres at Eskay Creek NR: 19-01 January 15, 2019 Skeena Intersects 30.99 g/t AuEq over 14.72 metres at Eskay Creek Vancouver, BC (January 15, 2019) Skeena Resources Limited (TSX.V: SKE, OTCQX: SKREF) ( Skeena or the Company

More information

April Exploring for Canadian Gold in the Rainy River District of Ontario

April Exploring for Canadian Gold in the Rainy River District of Ontario April 2013 Exploring for Canadian Gold in the Rainy River District of Ontario 1 Forward Looking Statements This presentation may contain forward-looking statements including but not limited to comments

More information

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V MINERAL MOUNTAIN RESOURCES LTD. 201-1416 West 8 th Avenue Vancouver, B.C. V6H 1E1 T: 604-714-0111 F: 604-714-1119 MMV.TSX-V NEWS RELEASE March 3, 2011 No. 2011-04 MINERAL MOUNTAIN DRILLS 3.17 g/t OVER

More information

July Exploring for Canadian Gold in the Rainy River District of Ontario

July Exploring for Canadian Gold in the Rainy River District of Ontario July 2013 Exploring for Canadian Gold in the Rainy River District of Ontario 1 Forward Looking Statements Some of the statements in this document may be deemed to be "forward-looking statements". All statements

More information

August 20, 2018 SBB NR SBB TSX

August 20, 2018 SBB NR SBB TSX Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) 998-4175 Tel: (888) 648-4218 www.sabinagoldsilver.com August 20, 2018 SBB NR 18-18 SBB TSX Sabina Gold & Silver Drills

More information

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program NEWS RELEASE May 23, 2018 TSX and NASDAQ: MPVD Mountain Province Diamonds Completes the Kennady North Winter Exploration Program Toronto and New York, May 23, 2018 Mountain Province Diamonds Inc. ( Mountain

More information

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION May

More information

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 27.96 GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS RESULTS FROM

More information

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY February 5, 2018, Toronto, Ontario Troilus Gold Corp. (TSX- V: TLG) ( Troilus or the Company ) is pleased to announce the commencement

More information

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO Toronto, Ontario and Vancouver, British Columbia Minera Alamos

More information

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling: TSX: RMX OTCQX: RBYCF Rubicon Minerals Provides Additional Drill Results and Observations from its 2017 Exploration Program and Commences Exploratory Underground Development TORONTO, Ontario, November

More information

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013 A New Direction Copper-Gold Deposit at Thor August 11, 2016 May 2013 TSX.V:COL FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements for

More information

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER 122.7 METRES March 1, 2012, Toronto, Ontario, Canada: Lexam VG Gold Inc. (TSX: LEX), (FRANKFURT: VN3A), (OTCQX:

More information

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT 65 Queen Street West CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT July 6, 2011 Crocodile Gold Corp. (TSX:CRK) (OTCQX:CROCF) (Frankfurt:XGC) (

More information

Green Springs Project

Green Springs Project Green Springs Project AUGUST 2016 Ely Gold & Minerals Inc. elygoldandminerals.com @ElyGoldNevada TSX.V:ELY FORWARD LOOKING STATEMENTS Certain statements herein may contain forward looking information within

More information

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program NEWS RELEASE September 17, 2018 TSX and NASDAQ: MPVD Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program Toronto and New York, September 17, 2018 Mountain

More information

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX 555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M7 604.998.4175 June 13, 2017 SBB NR-17-12 SBB TSX SABINA GOLD & SILVER INTERCEPTS LLAMA MINERALIZATION 300 METERS DOWN PLUNGE OF CURRENT RESOURCE Deposit

More information

Ausgold awarded EIS grant for Jinkas deep drilling

Ausgold awarded EIS grant for Jinkas deep drilling ASX Release 21 June 2018 Ausgold awarded EIS grant for Jinkas deep drilling Highlights: EIS grant will support drilling at the Katanning Gold Project to a value of $150,000 Grant will partly fund four

More information

Exploring for Precious and Base Metals in Sweden. Barsele Minerals Corp. (TSX.V: BME) June 2017

Exploring for Precious and Base Metals in Sweden. Barsele Minerals Corp. (TSX.V: BME) June 2017 Exploring for Precious and Base Metals in Sweden Barsele Minerals Corp. (TSX.V: BME) June 2017 1 Forward Looking Statements CAUTIONARY NOTE TO US INVESTORS The United States Securities and Exchange Commission

More information

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project. Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project. Vancouver, British Columbia, July 6, 2018 Blox, Inc. (OTCQB: BLXX), ( Blox or the Company ) is pleased to announce that a new

More information

Disclaimer. Forward-Looking Statements. Competent Person s Statement

Disclaimer. Forward-Looking Statements. Competent Person s Statement Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director Resources Rising Stars, May 29-30 2018 Disclaimer Forward-Looking Statements Some statements

More information

Cove Gold Project 2201 Discovery Update, May 2014

Cove Gold Project 2201 Discovery Update, May 2014 Proven Management Proven Gold Districts Safe Jurisdictions Cove Gold Project 2201 Discovery Update, May 2014 Symbol: Exchange: PG TSX 1-888-346-1390 DISCLAIMER: This presentation may contain "forward looking

More information

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) 998-4175 Tel: (888) 648-4218 www.sabinagoldsilver.com April 8, 2018 SBB NR 18-10 SBB TSX Sabina Gold & Silver continues

More information

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15. NEWS RELEASE 10/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over

More information

Solstice Gold Outlines Results from Winter 2018 Exploration Program on Its 100% Owned Kahuna Gold Project in Nunavut

Solstice Gold Outlines Results from Winter 2018 Exploration Program on Its 100% Owned Kahuna Gold Project in Nunavut Solstice Gold Outlines Results from Winter 2018 Exploration Program on Its 100% Owned Kahuna Gold Project in Nunavut Program Confirms, Extends and Further Defines Target Areas Vancouver (June 19, 2018)

More information

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE August 7, 2012 - Calgary, Alberta Graphite One Resources Inc. (GPH: TSX- V, GPHOF: OTCQX)

More information

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO VANCOUVER, CANADA. Sarama Resources Limited ( Sarama or the Company

More information

Goldcrest Resources Ltd.

Goldcrest Resources Ltd. Goldcrest Resources Ltd. PRESS RELEASE Goldcrest Announces Results from its 1,385 Metre RC Drilling Program at the Kampti Gold Project in Burkina Faso Toronto, ON - January 25, 2007 -- Goldcrest Resources

More information

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Continues to Expand Gold Zones At Val-d Or East NEWS RELEASE 02/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742 Highlights: Probe Metals Continues to Expand Gold Zones At Val-d Or East New Beliveau Deposit resource expansion drilling to the West returned

More information

Saville Resources Inc. Completes Review of Work on the Niobium Claim Group, Quebec

Saville Resources Inc. Completes Review of Work on the Niobium Claim Group, Quebec Saville Resources Inc. Completes Review of Work on the Niobium Claim Group, Quebec April 5, 2018 Saville Resources Inc. (TSXv: SRE, FSE: S0J) (the Company or Saville ) is pleased to provide an overview

More information

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts October 2017 Investor Presentation Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts 2 Disclaimer Forward-Looking Statements Some statements in this report regarding

More information

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL New Resource at Seel Contains 2.81 Billion lbs of Cu Eq Inferred Plus 0.58 Billion lbs of Cu Eq Indicated

More information

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine North American Palladium Announces Positive Exploration Results from Lac des Iles Mine Toronto, Ontario, October 24, 2017 North American Palladium Ltd. ( NAP or the Company ) (TSX: PDL) (OTC PINK: PALDF)

More information

Yukon Presentation. January 2015

Yukon Presentation. January 2015 Yukon Presentation January 2015 Disclaimer This presentation contains forward looking statements. All statements, other than statements of historical fact, included herein, including without limitation,

More information

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization NEWS RELEASE Foran Mining Intersects High Grade Zinc at McIlvenna Bay Results expand area of known mineralization Vancouver, BC (February 20, 2018) - Foran Mining Corporation (TSX.V: FOM) ( Foran or the

More information

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico 910-850 WEST HASTINGS ST. VANCOUVER, BC, CANADA V6C 1E1 TEL: 604.248.8648 FAX: 604.248.8663 WWW.EVRIMRESOURCES.COM TSX-V: EVM CONTACT: PADDY NICOL OR CHARLES FUNK NEWS RELEASE Evrim announces initial drilling

More information

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West TORONTO, ONTARIO -- (GlobeNewswire September 20, 2018) Plateau Energy Metals Inc.

More information

Fathom Minerals Ltd. Corporate Presentation October 2016

Fathom Minerals Ltd. Corporate Presentation October 2016 Fathom Minerals Ltd. Corporate Presentation October 2016 1 1 Forward Looking Statements This presentation may contain forward looking statements concerning the Company s plans for its properties, operations

More information

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia Suite 3114, 1055 Dunsmuir Street Four Bentall Centre Vancouver, BC V7X 1G4 tel 604 488 0822 toll free 866 488 0822 fax 604 899 1240 web www.tigray.ca email investors@tigray.ca NEWS RELEASE Tigray Intersects

More information

Northern Dynasty Minerals Ltd.

Northern Dynasty Minerals Ltd. Northern Dynasty Minerals Ltd. 1020 800 W Pender St. Vancouver BC Canada V6C 2V6 Tel 604 684-6365 Fax 604 684-8092 Toll Free 1 800 667-2114 http://www.northerndynasty.com RESOURCE ESTIMATE FOR PEBBLE EAST

More information

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico 910-850 WEST HASTINGS ST. VANCOUVER, BC, CANADA V6C 1E1 TEL: 604.248.8648 FAX: 604.248.8663 WWW.EVRIMRESOURCES.COM TSX-V: EVM CONTACT: PADDY NICOL OR CHARLES FUNK NEWS RELEASE Evrim announces additional

More information

Interval (meters) To (meters)

Interval (meters) To (meters) 200 Burrard Street, Suite 650 Tel: 604.801.5432 Vancouver, BC V6C 3L6 Fax: 604.662.8829 TSX-V: VG NEWS RELEASE Shallow RC drilling at the WAMA property returns intervals of 4m @ 30.57 g/t Au, 3m @ 19.39

More information

Corporate Presentation September 2017

Corporate Presentation September 2017 Corporate Presentation September 2017 1 Disclaimer Statements contained in this presentation that are not historical facts may be forward-looking statements within the meaning of the US Private Securities

More information

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO NEWS RELEASE June 13, 2018 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF www.azucarminerals.com AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO VANCOUVER, B.C. Azucar Minerals Limited ("Azucar"

More information

555 Burrard Street, Suite 1800, Vancouver, B.C. V7X 1M Nov 20, 2017 SBB NR SBB TSX

555 Burrard Street, Suite 1800, Vancouver, B.C. V7X 1M Nov 20, 2017 SBB NR SBB TSX 555 Burrard Street, Suite 1800, Vancouver, B.C. V7X 1M7 604.998.4175 Nov 20, 2017 SBB NR-17-24 SBB TSX SABINA GOLD & SILVER REPORTS FINAL RESULTS FROM SUMMER DRILL PROGRAM MINERALIZED DEEP IRON FORMATION

More information

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres NEWS RELEASE 07/2017 Symbol: TSX-V: PRB Shares Issued: 93,328,938 Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

More information

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East NEWS RELEASE 11/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Highlights: Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East Near-surface intercept grading 3.2 g/t Au over 45.5

More information

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING January 31, 2018 NEWS RELEASE - #18-03 TSX- V: GRR Suite 501-595 Howe Street Vancouver, BC V6C 2T5 Tel: (604) 685-4655 Fax: (604) 685-4675 Toll Free: 1-888-685-4655 TRENCHING AT LAS DOLORES EXTENDS STRIKE

More information

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT NEWS RELEASE NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT June 25, 2018: NGEx Resources Inc. (TSX: NGQ) (Nasdaq Stockholm: NGQ) ( NGEx or the Company ) is pleased to report encouraging copper-gold

More information

FYRE LAKE VMS PROJECT

FYRE LAKE VMS PROJECT PACIFIC RIDGE EXPLORATION LTD FYRE LAKE VMS PROJECT YUKON, CANADA March 1, 2013 TSX-V: PEX Forward-Looking Statements This presentation includes certain statements that may be deemed forward-looking statements.

More information

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST NEWS RELEASE 15/2018 Symbol: TSX: ME FOR IMMEDIATE RELEASE MONETA INTERCEPTS 5.30 m @ 7.63 g/t GOLD INCLUDING 0.80 m @ 22.40 g/t GOLD AND 7.13 m @ 5.06 g/t GOLD INCLUDING 1.98 m @ 12.47 g/t GOLD AT SOUTH

More information

Dalradian Provides Update on Norwegian Exploration Programs

Dalradian Provides Update on Norwegian Exploration Programs 2012 No. 14 TSX: DNA Dalradian Provides Update on Norwegian Exploration Programs TORONTO, ONTARIO - (Marketwire - August 29, 2012) - ("Dalradian") (TSX:DNA) is pleased to provide an update on its ongoing

More information

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7) FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7) Vendetta Increases Pegmont Lead-Zinc Mineral Resource to 5.8 Million Tonnes and 8.3 Million Tonnes of. Open Pit Constrained Mineral Resource now

More information

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER 22.84 METRES AND 12.15% ZINC+LEAD OVER 17.00 METRES AT PINE POINT (Montreal November 19, 2018) Osisko Metals Incorporated (the Company or Osisko Metals )

More information

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project IDM Mining s Underground Drilling Intersects 18.70 g/t Au and 66.85 g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project November 22 nd, 2016, Vancouver, BC IDM Mining Ltd. (TSX.V:IDM) (

More information

Fathom Minerals Ltd. Corporate Presentation (May 2016)

Fathom Minerals Ltd. Corporate Presentation (May 2016) Fathom Minerals Ltd. Corporate Presentation (May 2016) Forward Looking Statements This presentation may contain forward looking statements concerning the Company s plans for its properties, operations

More information

TSX.V: TR. Drilling in the Shadow of World-Class Deposits. TR: TSX.V January 2019

TSX.V: TR. Drilling in the Shadow of World-Class Deposits. TR: TSX.V January 2019 TSX.V: TR Drilling in the Shadow of World-Class Deposits TR: TSX.V January 2019 1 Looking Forward Statement Investors are cautioned that, except for statements of historical fact certain information contained

More information

News Release IMPACT Silver Corp. IMPACT Silver 2011 Exploration Review and 2012 Outlook

News Release IMPACT Silver Corp. IMPACT Silver 2011 Exploration Review and 2012 Outlook News Release IMPACT Silver Corp. For release: January 23, 2012 Trading Symbol: IPT: TSX.V IMPACT Silver 2011 Exploration Review and 2012 Outlook IMPACT Silver Corp. ( IMPACT ) is pleased to provide a summary

More information

Exploring for Precious and Base Metals in Sweden. Barsele Minerals Corp. (TSX.V: BME) December, 2016

Exploring for Precious and Base Metals in Sweden. Barsele Minerals Corp. (TSX.V: BME) December, 2016 Exploring for Precious and Base Metals in Sweden Barsele Minerals Corp. (TSX.V: BME) December, 2016 1 Forward Looking Statements CAUTIONARY NOTE TO US INVESTORS The United States Securities and Exchange

More information

An ASX listed Perth-based gold explorer focused on Ghana in West Africa

An ASX listed Perth-based gold explorer focused on Ghana in West Africa An ASX listed Perth-based gold explorer focused on Ghana in West Africa Africa Down Under Conference August 2012 www.vikingashanti.com Disclaimer and Competent Person s Statement This presentation has

More information

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties NEWS RELEASE Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties Toronto, Ontario, March 1, 2018 Orford Mining Corporation ( Orford ) (TSX-V:

More information

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST NEWS RELEASE 13/2018 Symbol: TSX: ME FOR IMMEDIATE RELEASE MONETA INTERCEPTS 25.00 m @ 2.48 g/t GOLD INCLUDING 4.50 m @ 5.00 g/t GOLD AT SOUTH WEST Toronto, Ontario September 13, 2018 - Moneta Porcupine

More information

Advancing High Grade Gold Assets in Red Lake, Ontario

Advancing High Grade Gold Assets in Red Lake, Ontario Advancing High Grade Gold Assets in Red Lake, Ontario Forward Looking Statement Except for historical information contained herein, this presentation may contain forward-looking statements including but

More information

Yellowknife Gold Project

Yellowknife Gold Project Yellowknife Gold Project This presentation contains forward-looking statements within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, that address

More information

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF www.almadexminerals.com ALMADEX REPORTS FIRST HOLES FROM RAYA TEMBRILLO (VILLA RICA) INTERSECTS ENRICHED COPPER ZONE AND HYPOGENE

More information

Kelly Creek Basin. EXPLORATION UPDATE June 23, Reno Office 10 Greg Street, Suite 170 Sparks, Nevada

Kelly Creek Basin. EXPLORATION UPDATE June 23, Reno Office 10 Greg Street, Suite 170 Sparks, Nevada Kelly Creek Basin EXPLORATION UPDATE June 23, 2016 Reno Office 10 Greg Street, Suite 170 Sparks, Nevada 89431 775-359-7740 Vancouver Office 1500 885 West Georgia Street Vancouver, B.C. V6C 3E8 604-601-2006

More information

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN Vancouver, B.C., March 4, 2019. Boreal Metals Corp. ( Boreal or the Company ) (TSXV:BMX) is

More information

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia 1,000-Metre Diamond Drill Program to Test Alacran Porphyry and Northern Extension Targets

More information

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES PRESS RELEASE DUBUISSON NORTH DRILLING CUTS 45.05 g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES Toronto, Ontario November 19, 2014 Wesdome Gold Mines Ltd (TSX: WDO) today

More information

NEWS RELEASE. Evrim commences drilling at Cerro Cascaron gold and silver project with partner Harvest Gold

NEWS RELEASE. Evrim commences drilling at Cerro Cascaron gold and silver project with partner Harvest Gold 910 850 WEST HASTINGS ST. VANCOUVER, BC, CANADA V6C 1E1 TEL: 604.248.8648 FAX: 604.248.8663 WWW.EVRIMRESOURCES.COM TSX V: EVM CONTACT: PADDY NICOL OR CHARLES FUNK NEWS RELEASE Evrim commences drilling

More information

Highlights from the four holes announced in this news release include:

Highlights from the four holes announced in this news release include: November 20, 2017 OTCQB: SVBL, TSX: SVB SILVER BULL INTERSECTS 9 METERS OF SULPHIDE MINERALIZATION GRADING 20.7% ZINC, 1% LEAD AND 98G/T SILVER, INCLUDING 3.65 METERS OF MASSIVE SULPHIDE MINERALIZATION

More information

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011 PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011 Toronto, Ontario March 30, 2011 Wesdome Gold Mines Ltd (WDO: TSX) has initiated an aggressive exploration, development and

More information

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT NEWS RELEASE November 29, 2016 AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT Toronto, Ontario November 29, 2016 - The Manager, Red Pine Exploration

More information

HANNAN SEISMIC SURVEY IDENTIFIES MULTIPLE NEW DRILL TARGETS IN IRELAND

HANNAN SEISMIC SURVEY IDENTIFIES MULTIPLE NEW DRILL TARGETS IN IRELAND 1305 1090 West Georgia Street, Vancouver, BC, V6E 3V7 Phone: +1 604 685 9316 / Fax: +1 604 683 1585 NEWS RELEASE April 24, 2018 HANNAN SEISMIC SURVEY IDENTIFIES MULTIPLE NEW DRILL TARGETS IN IRELAND Vancouver,

More information

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP Toachi Mining Inc. Intersects 13.91 m grading 3.51 g/t Au, 64.24 g/t Ag, 0.59% Cu, 4.11% Zn and 0.85% Pb at the Gold-Rich La Plata VMS Project in Ecuador Toronto, Ontario October 11, 2017 Toachi Mining

More information

NEWS RELEASE November 5, 2018

NEWS RELEASE November 5, 2018 NEWS RELEASE 18-22 November 5, 2018 Liberty Gold Extends Goldstrike Deposit Trend 300 Metres to the Southwest 0.72 g/t over 76.2 m including 1.26 g/t over 6.1 m 0.98 g/t over 15.2 m and 0.81 g/t over 27.4

More information

IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL

IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL TORONTO, May 21, 2013 IAMGOLD Corporation ( IAMGOLD or the Company ) today announced additional drilling results

More information

April 26, 2012 SBB NR SBB-T

April 26, 2012 SBB NR SBB-T 930 1 st Street, Suite 202, North Vancouver, BC V7P 3N4 Tel: (604) 998-4175 Toll Free: (888) 648-4218 www.sabinagoldsilver.com April 26, 2012 SBB NR 12-06 SBB-T Sabina Announces High Grade Drill Results

More information