1 PO Box 364 Whakatane 3158 Attention: Jill Owen Dear Jill Response to Section 92 RMA Request for Further Information - Donald Rodee, Matahui Peninsula -RM Introduction Donald Rodee ( the applicant ) has forwarded us a copy of your dated 14 March 2016 requesting further information under s 92 of the Resource Management Act 1991 ( RMA ) in relation to the above Resource Consent application. The applicant has asked us to provide a response to the request on his behalf. Consequently, we provide a response to the numbered items contained within your below. 2 Item 1 Further drawings Please provide further description and detailed accompanying drawings of the proposed structure. Specifically requested is: A long section drawing of the structure; and A cross section profile representing the areas where there is a break in the crest. This request is based on Note 2 in the Typical Section of Proposed Reef Breakwater plan which mentioned 5m wide break in the crest at 30m. The body of the AEE does not address this aspect of the breakwater design. Please find attached updated Revision 1 drawings containing a long section encompassing two individual breakwaters and one connecting rock sill. We have not provided a long section of the entire 300 m longshore extent of the eight breakwaters, as the height of the proposed structures in relation to their overall aggregated length, would result in a drawing which contained little detail and associated value. Revision 1 drawings provide the following additional information and detail which should be treated as an update to the applicant s proposal. Sheet 01 shows that the proposal encompasses eight individual nearshore breakwaters with a low rock sill constructed in the gaps between the breakwaters. The rock sills act as control structures for The Hub on Cameron, Level 1, 525 Cameron Road, Tauranga 3110, New Zealand PO Box 317, Tauranga 3140 P F E tga@tonkintaylor.co.nz

2 2 sediments placed during construction, as well as sediments that naturally accumulate in the lee of the breakwater, due to coastal processes and weathering of the bank. The gaps between the breakwaters are required to ensure that tidal flows do not create a preferential scour channel along the back of a 300 m long continuous breakwater structure. That is, with multiple entry and exit points to foreshore area in the lee of the structures, the volumes and velocities of tidal water movements are reduced. More information on the rock sills is provided under Item 4 below. Sheet 01 shows that it is intended that the breakwaters will be constructed in three stages (Areas A, B and C). The first of the three breakwater areas will be constructed as soon as the Resource Consent is approved with two subsequent areas of breakwaters constructed in around 2018 and 2019 respectively. Sheet 02 shows that the relocated foreshore material placed in the lee of the breakwaters will be shaped into a profile such that most of the new profile will be located above MHWS. This will mean that intertidal vegetation will be established at the toe of the new profile and that coastal vegetation will be established near the toe of the existing bank with a transition between the two types of vegetation occurring along the profile. Further, due to the relocated foreshore material being comprised of mainly silts (see Item 4 below), a biodegradable matting (such as Biomac or Biocoir ) will be placed on top of the relocated foreshore material to assist with retaining the relocated foreshore material in situ and provide a medium for the vegetation to establish within. Lastly, the applicant now proposes to place rock at the toe of the existing bank as soon as the Resource Consent is approved. This placed rock would provide a degree of immediate short term mitigation against wave energy acting on the bank during storm events whilst the applicant commissions a detailed design and procures a contractor following the approval of the Resource Consent. The placed rock would be a temporary measure and would be sequentially removed as the permanent breakwaters are constructed along the area of foreshore occupied by the placed rock. 3 Item 2 Construction methodology Please provide a detailed construction methodology for review, including: Timing of the proposed works; Types and numbers of vehicles likely to be used and when; Map showing the access track of the vehicles down to the site in order to avoid disruption of ecological, historical and cultural sites of significance; and Proposed erosion and sediment controls to be undertaken (the necessity will be determined by what equipment is proposed to be used, whether or not the wall will be built to completion in any section, prior to moving to the next section, the length of breakwater structure proposed to be built at one time, and how much of the structure can be built over the hours either side of low tide). See response to Item 1 regarding staging and timing of construction works. We estimate it will take approximately 16 weeks to construct each stage of the breakwaters. We expect an excavator (approximately 12 tonne) would be used to build the structure with a tracked dump truck or tractor and trailer supplying the excavator with rock from a stockpile located on land; see Figure 1 overleaf. Access to the foreshore will be gained from the distal end of the peninsula; see Figure 1 overleaf. Access along the foreshore will be along the upper part of the foreshore when it is not inundated by seawater. The access will occur within the green shaded area notated as intertidal and coastal vegetation to be established within new beach profile behind breakwater on Sheet 01.

3 3 The following erosion and sediment controls are proposed: Avoiding working on the foreshore when the breakwater construction area and access to it is inundated by seawater; and Placing geotextile over or around the relocated foreshore material area in the lee of the breakwater until the relocated foreshore material has been shaped into the design profile, the biodegradable matting placed over it, and vegetation planted within the matting. Only one breakwater will be constructed at a time. This means that approximately m of alongshore extent of foreshore will be disturbed through excavating the foundation of the breakwater and placing the relocated foreshore material behind the breakwater at any time. Figure 1: Stockpile and access locations Source LINZ Item 3 Breakwater core material Section of the AEE suggests broken concrete will be supplied by the applicant as underlay rock. The quality of this material used could difficult to determine. It could be weak and degrade over time. This might result in damage to the geotextile and slumping of the breakwater. Please either confirm the specification of the proposed material (strength and grading) and its suitability for this application, or provide an alternative high quality form of concrete to be used to ensure the integrity of the structure is maintained from the time of construction. As part of the future detailed design process the specification of the breakwater core material will be confirmed. The detailed design process will ensure the material is suitable and does not cause the geotextile to become damaged and affect the structural integrity of the breakwater.

4 4 5 Item 4 Substrate composition Please provide comment in relation to the substrate that the breakwater structure is to be built of in relation to effects on ecology and water quality. Test pits have been dug on site to assess the type of sediments that will be excavated to form the breakwaters and placed behind the breakwaters to create the new profile. The sediments have been assessed to predominantly comprise silts with clay fractions mostly likely sourced from the adjacent eroding escarpment. Based on the sediment characteristics, it is considered that the relocated foreshore material will be more easily remobilised by coastal processes than if the sediment predominantly comprised sands. To assist with the retention of these smaller particle size sediments on the foreshore, the biodegradable matting is proposed and a low rock sill (as shown on Sheet 02) will act as a control structure for sediments to accumulate behind that would otherwise be lost to erosion, due to tidal water flows and wave actions/currents passing through the gaps between the breakwaters. The silts and clay fractions are part of the native material within the foreshore but at present they are covered by a layer of sand. Through excavating and replacing the silts and clay fractions on top of the foreshore in the lee of the breakwaters, the visual appearance of the foreshore along a narrow tract between the structures and the bank will be more like the sediments exposed within the bank face itself. To some extent, the proposed biodegradable matting and vegetation to be planted within it will mitigate any short term effects associated with the visual change of the upper component of the foreshore. Further, the proposal is likely to reduce the erosion of the escarpment and consequential deposition of silt and clay material into the Harbour. On the basis of the above and the discussion contained under Item 1 above, it is considered the potential effect on ecology (such as benthic organisms and zostera) due to increased suspended sediment loadings in the coastal water column attributable to the relocated foreshore material can be suitably mitigated to the extent that they will be minor. 6 Item 5 Sediment supply to Matahui spit The break wall will likely affect the delivery of sediment to sand spit, further exacerbating current erosion of the area. The sand spit has ecological value as a high tide bird roost. Sediment delivery to sand spit seems to be from eroding surfaces of Matahui Peninsula. Without hydraulic modelling it is difficult to correctly identify process occurring in area for sediment delivery. But from observations it is suggested this is case. Please provide comment regarding this. On our site visits we have not observed any issue with the distal end of the peninsula eroding. Having reviewed aerial imagery from (2003 to 2017) it is considered that the nett longshore sediment transport at the site is south to north with sediment being delivered to the distal end of the peninsula. A review of the aerial imagery does not suggest a sand spit is in place or that the spit has been prograding due to the longshore movement of sediments from south to north. It is considered that the breakwater structures and more elevated and vegetated foreshore behind them are likely to reduce the supply of eroded bank sediments to the distal end of the peninsula. However, the proposed structures are located relatively high up the beach profile and are shore

5 5 parallel and therefore are unlikely to significantly interrupt the existing longshore sediment transport at the site. It is considered that any reduction in sediment volume as a result of the construction of the breakwaters will be minor given the other sources of sediment within the wider embayment, estuary and stream systems. 7 Item 6 Relocated foreshore material There is very little sand and sediment present in area where seawall is to be constructed. The excavated clays from construction of the seawall will likely be unsuitable to back fill the breakwater as saltmarsh vegetation will likely not grow in this substrate. Further this fill material could create longer term impacts from increased turbidity due to erosion of this fill material. Please comment on the chosen fill material in relation to the suitability for use to support coastal vegetation and address potential erosion effects. Or, if an alternative fill material is to be used please provide comment regarding the suitability for use to support coastal vegetation and address potential erosion effects. See response provided under Item 4 above. Given the MHWS water level is near the toe of the proposed new foreshore profile, the bulk of the vegetation to be established will not comprise saltmarsh type species. It is envisaged the following species (or similar species) would be established: Oi Oi or similar other rush or sedge; Cabbage Tree; NZ Flax; Manuka and Kanuka; and Red Matipo. The BOPRC s Land Management Fact Sheets 7, 12, 14 and 15 provide useful guidance for coastal revegetation projects in terms of species selection and establishment. The applicant will select species and establish them on site in general accordance with the fact sheets. 8 Position of sub-tidal channel Please clarify the position of the channel and comment further on how you propose to manage this risk (potentially thickening the toe or monitoring and repairing at later date if required) with consideration to the theoretical depth of scour. The position of the sub-tidal channel has not been identified by a recent bathymetric survey. A review of the aerial imagery shows the sub-tidal channel being located approximately 20 m to the west of the Area A most southern breakwater and significantly more distant than 20 m for all other breakwaters. As part of the detailed design process the assessment of the wave climate and potential scour depth for the structures at the site will take into account the location and potential influence of the sub-tidal channel. If necessary, the location of the most southern breakwater will be adjusted further landward away from the sub-tidal channel.

6 6 9 Remediation of bank It is apparent that the existing bank has scoured significantly and now overhangs in excess of 2m in some places. Many of these overhangs support trees. Further information is required on what, if any, works are proposed to remediate or buttress these overhangs. We note drawing (Rev 0) does not show any overhang on the existing bank. The overhangs described are the main driver of the application. In most places there is no space between the toe of the bank and trees located right on the crest of the bank to trim the bank to a stable angle of repose without removing more shelter trees. Clearly, the applicant does not want to remove their shelter trees. Therefore, the placed rock and foreshore material won on site will be used to back fill these overhangs as far as practicable. It may even be necessary to import clean soil to fill these overhangs prior to the placed rock and relocated foreshore material won from the site being formed into the new profile. 10 Natural character assessment Due to the large scale of the proposed breakwater and the sensitivity of the site, I am not comfortable to assess the natural character of the proposal based on the limited information provided in the application. Therefore I will require a suitably qualified and experienced person to prepare a detailed Natural Character assessment of the proposal. Please find attached an assessment undertaken by Design Engine Landscape Architects.

7

FINAL REPORT NO.54. Erosion and Sediment Control Plan - Coastal Reclamation. Tauranga City Council. Private Bag Tauranga 16 August

FINAL REPORT NO.54. Erosion and Sediment Control Plan - Coastal Reclamation. Tauranga City Council. Private Bag Tauranga 16 August J:\Jobs\42066678\6000 Reports\Erosion Management\(Cover).doc FINAL REPORT NO.54 Erosion and Sediment Control Plan - Coastal Reclamation Prepared for Tauranga City Council Private Bag 12022 Tauranga 16

More information

Connecticut Coastal Management Program

Connecticut Coastal Management Program Connecticut Coastal Management Program Fact Sheet for SHORELINE FLOOD AND EROSION CONTROL STRUCTURES What are Shoreline Flood and Erosion Control Structures? The Connecticut General Statutes (CGS) define

More information

Seaton to Seaton Hole SUMMARY OF PREFERRED PLAN RECOMMENDATIONS AND JUSTIFICATION

Seaton to Seaton Hole SUMMARY OF PREFERRED PLAN RECOMMENDATIONS AND JUSTIFICATION Location reference: Policy Unit reference: Plan: Seaton to Seaton Hole 6a29 and 6a30 SUMMARY OF PREFERRED PLAN RECOMMENDATIONS AND JUSTIFICATION The large number of properties and assets at risk in the

More information

SHORELINE AND BEACH PROCESSES: PART 2. Implications for Coastal Engineering

SHORELINE AND BEACH PROCESSES: PART 2. Implications for Coastal Engineering SHORELINE AND BEACH PROCESSES: PART 2 Implications for Coastal Engineering Objectives of the lecture: Part 2 Show examples of coastal engineering Discuss the practical difficulties of ocean engineering

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Coastal Environment. Introduction. 4.1 Coastal Environment. Extent of Coastal Environment

Coastal Environment. Introduction. 4.1 Coastal Environment. Extent of Coastal Environment 4 The primary objective (set out in Chapter 2) to be implemented by this Chapter is Objective 2.4 ; the following objectives are also relevant due to the objectives integrated nature: 2.1 Tāngata whenua

More information

Instream Erosion Control General

Instream Erosion Control General Instream Erosion Control General EROSION CONTROL TECHNIQUES Revegetation Temperate Climates Short-Term Non Vegetation Wet Tropics Long-Term Weed Control [1] Semi-Arid Zones Permanent [1] Weed control attributes

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Phillip Island Nature Parks Coastal Process Study 8 October 2014

Phillip Island Nature Parks Coastal Process Study 8 October 2014 Phillip Island Nature Parks Coastal Process Study 8 October 2014 Project Overview Coastal Geology Basaltic and fragmented lavas, granite at Pyramid Rock and Cape Woolamai Weathered basalt (>10m thick)

More information

The Coast: Beaches and Shoreline Processes

The Coast: Beaches and Shoreline Processes 1 2 3 4 5 6 7 8 9 The Coast: es and Shoreline Processes Trujillo & Thurman, Chapter 10 Oceanography 101 Chapter Objectives Recognize the various landforms characteristic of beaches and coastal regions.

More information

The Coast: Beaches and Shoreline Processes Trujillo & Thurman, Chapter 10

The Coast: Beaches and Shoreline Processes Trujillo & Thurman, Chapter 10 The Coast: es and Shoreline Processes Trujillo & Thurman, Chapter 10 Oceanography 101 Chapter Objectives Recognize the various landforms characteristic of beaches and coastal regions. Identify seasonal

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA

SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA SEGMENTED BREAKWATERS AND THEIR USE IN COASTAL LOUISIANA Prepared by: Louisiana Coastal Protection and Restoration Authority Engineering Division March 2016 The geology of Louisiana s coastal zone is intimately

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

The Marine Environment

The Marine Environment The Marine Environment SECTION 16.1 Shoreline Features In your textbook, read about erosional landforms, beaches, estuaries, longshore currents, and rip currents. For each statement below, write or. 1.

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION DEPARTMENT OF THE ARMY SAN FRANCISCO DISTRICT, U.S. ARMY CORPS OF ENGINEERS 1455 MARKET STREET SAN FRANCISCO, CALIFORNIA 94103-1398 SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

Shoreline and Climate Change Adaptation Alternatives for The Letter Parcel, Bolinas Lagoon

Shoreline and Climate Change Adaptation Alternatives for The Letter Parcel, Bolinas Lagoon Shoreline and Climate Change Adaptation Alternatives for The Letter Parcel, Bolinas Lagoon Scenic shoreline vista of Bolinas Lagoon and ridges, from Letter Parcel, March 2016 Peter Baye, Coastal Ecologist

More information

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

The Marine Environment

The Marine Environment The Marine Environment SECTION 16.1 Shoreline Features In your textbook, read about erosional landforms, beaches, estuaries, longshore currents, and rip currents. For each statement below, write true or

More information

Map 9: Ayrshire Coast: Stevenston Pier to Barassie Map Content Descriptions

Map 9: Ayrshire Coast: Stevenston Pier to Barassie Map Content Descriptions Map 9: Ayrshire Coast: Stevenston Pier to Barassie Map Content Descriptions 1. Built Heritage and Archaeology A total of thirteen sites were recorded in the area covered by Map 9. Of these five were previously

More information

Coastal Processes and Shoreline Erosion on the Oregon Coast, Cascade Head to Cape Kiwanda

Coastal Processes and Shoreline Erosion on the Oregon Coast, Cascade Head to Cape Kiwanda State of Oregon Department of Geology and Mineral Industries Vicki S. McConnell, State Geologist Open File Report OFR O-04-11 Coastal Processes and Shoreline Erosion on the Oregon Coast, Cascade Head to

More information

June 2018 Sediments and Dredging at GBR Ports

June 2018 Sediments and Dredging at GBR Ports June 2018 Sediments and Dredging at GBR Ports Reef 2050 Long Term Sustainability Plan The Great Barrier Reef is over 2000 km long and covers an area of approximately 350,000 square kilometres. It is a

More information

Managing and adapting to coastal erosion on the West Coast: Ngakawau & Hector

Managing and adapting to coastal erosion on the West Coast: Ngakawau & Hector Managing and adapting to coastal erosion on the West Coast: Ngakawau & Hector NIWA Client Report: HAM2007-007 January 2007 NIWA Project: EVL07201 Managing and adapting to coastal erosion on the West Coast:

More information

In-channel coarse sediment trap Best Management Practice

In-channel coarse sediment trap Best Management Practice In-channel coarse sediment trap Best Management Practice By Henry R. Hudson July 2002 Environmental Management Associates Ltd., Christchurch Complexity Environmental Value Cost Low Moderate High Low Moderate

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Rock Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent installations

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

Protecting the Storm Damage Prevention and Flood Control Interests of Coastal Resource Areas

Protecting the Storm Damage Prevention and Flood Control Interests of Coastal Resource Areas Protecting the Storm Damage Prevention and Flood Control Interests of Coastal Resource Areas Presented by: Massachusetts Department of Environmental Protection & Massachusetts Office of Coastal Zone Management

More information

Lyme Regis. Environmental Improvements Phase 2. Securing the future of Lyme Regis

Lyme Regis. Environmental Improvements Phase 2. Securing the future of Lyme Regis Lyme Regis Environmental Improvements Phase 2 Securing the future of Lyme Regis Wave attack on Marine Parade The spectacular scenery around Lyme Regis is a result of erosion by the sea and landsliding

More information

Weathering of Rocks. Weathering - Breakdown of rocks into pieces (sediment) 2 main types of weathering to rocks

Weathering of Rocks. Weathering - Breakdown of rocks into pieces (sediment) 2 main types of weathering to rocks Weathering of Rocks Weathering - Breakdown of rocks into pieces (sediment) 2 main types of weathering to rocks Mechanical weathering requires physical forces to break rocks into smaller pieces. Chemical

More information

Annual transport rates at two locations on the fore-slope.

Annual transport rates at two locations on the fore-slope. Sediment Transport by Currents Fore-slope Sediment transport rates and sediment concentrations were computed from the hydrodynamic model runs as well as from direct measurements of current velocities at

More information

CHANGES IN BEACH SURFACE SEDIMENT COMPOSITION

CHANGES IN BEACH SURFACE SEDIMENT COMPOSITION CHANGES IN BEACH SURFACE SEDIMENT COMPOSITION Compiled by Tamsin Watt. Edited by Rendel Williams and Cherith Moses 1 Aims...2 2 Introduction...2 3 Sites...2 4 Survey methodology...2 5 Analysis procedure...3

More information

TECHNIQUES FOR ASSESSING COASTAL HAZARD AREAS FOR THE GISBORNE DISTRICT COAST

TECHNIQUES FOR ASSESSING COASTAL HAZARD AREAS FOR THE GISBORNE DISTRICT COAST TECHNIQUES FOR ASSESSING COASTAL HAZARD AREAS FOR THE GISBORNE DISTRICT COAST July 1994 C.R. 1994/12 Jeremy G Gibb 2009 All rights reserved. This work is entitled to the full protection given by the Copyright

More information

Weathering & Erosion

Weathering & Erosion Name Test Date Hour Earth Processes#1 - Notebook Weathering & Erosion LEARNING TARGETS I can explain the process of weathering. I can explain why weathering is important. I can describe the difference

More information

QU: Where does sand do jail time? AIM: To explain the sediment cell concept as a system and what human and natural factors create/upset a dynamic

QU: Where does sand do jail time? AIM: To explain the sediment cell concept as a system and what human and natural factors create/upset a dynamic QU: Where does sand do jail time? AIM: To explain the sediment cell concept as a system and what human and natural factors create/upset a dynamic equilibrium. ST: On your copy draw and label future depositional

More information

Redcliffs Park Coastal inundation and coastal erosion

Redcliffs Park Coastal inundation and coastal erosion 48 Hereford Street Christchurch 8013 Attention: Deb Taylor Dear Deb 1 Introduction The (MoE) are looking to relocate Redcliffs School to a new school development at and are currently undertaking their

More information

Template for Sediment and Erosion Control Plan General Instructions

Template for Sediment and Erosion Control Plan General Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

Chapter 11. Rivers: Shaping our landscape

Chapter 11. Rivers: Shaping our landscape Chapter 11 Rivers: Shaping our landscape Learning outcomes In this presentation you will learn: Common terms associated with rivers About the three stages of a river About the processes of river erosion

More information

Chutes Part 5: Rock linings

Chutes Part 5: Rock linings Chutes Part 5: Rock linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] Chutes

More information

Resource Consent Application Form 14A

Resource Consent Application Form 14A Resource Consent Application Form 14A To extract gravel from the bed of a river This application is made under Section 88 of the Resource Management Act 1991 (as amended) Phone: 0800 474 082 Website: www.orc.govt.nz

More information

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 EXISTING CONDITION The proposed Carmel River Bank Stabilization at Rancho San Carlos Road Project

More information

Project Proposal. Lyme Brook. Newcastle-under-Lyme. 3 rd July 2015

Project Proposal. Lyme Brook. Newcastle-under-Lyme. 3 rd July 2015 Project Proposal Lyme Brook Newcastle-under-Lyme 3 rd July 2015 Contents Page 1.0 Introduction... 1.0 2.0 Background and rationale... 2.0 3.0 Proposed measures... 5 4.0 Summary of Recommendations... 10

More information

IMPORTANCE OF GEOLOGIC CHARACTERIZATION FOR LEVEE FOUNDATION AND BORROW MATERIALS AS STUDIED AT THE INDIAN GRAVES LEVEE DISTRICT, ADAMS COUNTY, IL

IMPORTANCE OF GEOLOGIC CHARACTERIZATION FOR LEVEE FOUNDATION AND BORROW MATERIALS AS STUDIED AT THE INDIAN GRAVES LEVEE DISTRICT, ADAMS COUNTY, IL IMPORTANCE OF GEOLOGIC CHARACTERIZATION FOR LEVEE FOUNDATION AND BORROW MATERIALS AS STUDIED AT THE INDIAN GRAVES LEVEE DISTRICT, ADAMS COUNTY, IL Conor Watkins Missouri University of Science and Technology

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

Coastal Sediment Transport

Coastal Sediment Transport Coastal & Marine Coastal Sediment Transport Mazen Abualtayef Assistant Prof., IUG, Palestine Sediment Transport Sediment is any particulate matter that can be transported by fluid flow and which eventually

More information

DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6.

DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6. DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6. The Eklutna River was divided into study reaches (figure 1) prior to this site visit. Prominent geologic or

More information

Term Knowledge Using and applying Grade Criteria Autumn 1 Assessment window October Natural hazards pose major risks to people and property.

Term Knowledge Using and applying Grade Criteria Autumn 1 Assessment window October Natural hazards pose major risks to people and property. Assessment Schedule Year 9 2015/6 Term Knowledge Using and applying Grade Criteria Autumn 1 Assessment window October 2015 3.1.1.2 Tectonic Natural hazards pose major risks to people and property. Definition

More information

Geotechnical Engineering and Resilience

Geotechnical Engineering and Resilience Chapter 14 Part G VOLUME 2 Geotechnical Engineering and Resilience Page 192 Overview Key geotechnical aspects of the Project include: Cut slopes in dune sand, including erodibility and erosion protection;

More information

Risks to Estuarine Biota under Proposed Development in the Whitford Catchment Summary Report

Risks to Estuarine Biota under Proposed Development in the Whitford Catchment Summary Report Risks to Estuarine Biota under Proposed Development in the Whitford Catchment Summary Report August 2003 TP204 Auckland Regional Council Technical Publication No. 204, 2003 ISSN 1175-205X ISBN -1-877353051

More information

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637 December 16, 2015 Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637 RE: Response to SWFWMD Supplemental Information Request Dear Mr.

More information

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2 MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report

More information

Erosion Information Paper - South Naknek, Alaska Current as of November 14, 2007

Erosion Information Paper - South Naknek, Alaska Current as of November 14, 2007 U.S. Army Corps of Engineers ALASKA BASELINE EROSION ASSESSMENT Erosion Information Paper - South Naknek, Alaska Current as of November 14, 2007 Community Information South Naknek (NACK-neck), originally

More information

Science EOG Review: Landforms

Science EOG Review: Landforms Mathematician Science EOG Review: Landforms Vocabulary Definition Term canyon deep, large, V- shaped valley formed by a river over millions of years of erosion; sometimes called gorges (example: Linville

More information

Erosion Information Paper - Barrow, Alaska Current as of September 14, 2007

Erosion Information Paper - Barrow, Alaska Current as of September 14, 2007 U.S. Army Corps of Engineers ALASKA BASELINE EROSION ASSESSMENT Erosion Information Paper - Barrow, Alaska Current as of September 14, 2007 Community Information Barrow (BARE-row, a.k.a. Ukpeagvik), population

More information

Page 1 of 9 Name: Base your answer to the question on the diagram below. The arrows show the direction in which sediment is being transported along the shoreline. A barrier beach has formed, creating a

More information

Required Documents. Title: Number: AEP Administration 2017 No. 1. Provincial Wetlands and Water Boundaries Section. Effective Date: September 1, 2017

Required Documents. Title: Number: AEP Administration 2017 No. 1. Provincial Wetlands and Water Boundaries Section. Effective Date: September 1, 2017 Title: Number: Program Name: Provincial Wetlands and Water Boundaries Section Effective Date: September 1, 2017 This document was updated on: August 25, 2017 The Provincial Wetlands and Water Boundaries

More information

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along

More information

Rock Sizing for Small Dam Spillways

Rock Sizing for Small Dam Spillways Rock Sizing for Small Dam Spillways STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined spillway on a construction site sediment basin Photo 2 Rock-lined spillway on a small farm dam 1. Introduction A chute

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

Archaeological Monitoring of Land at Seacrest, Cliff Drive, Warden, Isle of Sheppey, Kent

Archaeological Monitoring of Land at Seacrest, Cliff Drive, Warden, Isle of Sheppey, Kent Archaeological Monitoring of Land at Seacrest, Cliff Drive, Warden, Isle of Sheppey, Kent Site Code SEA/WB/15 Report for Kevin & Lesley O Brian Date of report 14/10/2015 SWAT ARCHAEOLOGY Swale and Thames

More information

Geol 117 Lecture 18 Beaches & Coastlines. I. Types of Coastlines A. Definition:

Geol 117 Lecture 18 Beaches & Coastlines. I. Types of Coastlines A. Definition: I. Types of Coastlines A. Definition: 1. Shore = narrow zone where ocean meets land (e.g. beach) 2. Coast is a broad area where both ocean and land processes act a. Includes onshore marshes, dunes, sea

More information

6.11 Naas River Management Unit

6.11 Naas River Management Unit 6.11 Naas River Management Unit 6.11.1 Site 41 Issue: Bed and bank erosion Location: E 0685848 N 6058358 Waterway: Naas River Management Unit: Naas River Facing downstream from Bobeyan Rd bridge Facing

More information

Soil erosion susceptibility and coastal evolution: examples in southern New Caledonia

Soil erosion susceptibility and coastal evolution: examples in southern New Caledonia Pacific Island Countries GIS /RS User Conference Soil erosion susceptibility and coastal evolution: examples in southern New Caledonia Pascal DUMAS et Olivier COHEN University of New-Caledonia (EA 4242/

More information

Australian Coastal Councils Conference

Australian Coastal Councils Conference Australian Coastal Councils Conference 11 March 2015 Estimating Future Coastal Inundation and Erosion Hazards Dr Andrew McCowan Dr Christine Lauchlan-Arrowsmith Warwick Bishop Background Victorian Future

More information

Supplemental Slides. Shore: Junction of Land & Water. Junction of Land & Water. Sea Level Variations. Shore vs. Coast. Sea Level Variations

Supplemental Slides. Shore: Junction of Land & Water. Junction of Land & Water. Sea Level Variations. Shore vs. Coast. Sea Level Variations Shore: Junction of Land & Water Supplemental Slides Sediments come off land Most get dumped at the beach Sediment interacts with ocean waves and currents Junction of Land & Water Features: Breaking waves,

More information

Shore: Junction of Land & Water. Sediments come off land Most get dumped at the beach Sediment interacts with ocean waves and currents

Shore: Junction of Land & Water. Sediments come off land Most get dumped at the beach Sediment interacts with ocean waves and currents Shore: Junction of Land & Water Supplemental Slides Sediments come off land Most get dumped at the beach Sediment interacts with ocean waves and currents Junction of Land & Water Features: Breaking waves,

More information

CE415L Applied Fluid Mechanics Laboratory

CE415L Applied Fluid Mechanics Laboratory Applied Fluid Mechanics Laboratory Learning Objective Following completion of this experiment and the analysis of the data, you should be able to 1. generalize results of introducing changes to a natural

More information

CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH

CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH 5.1 Overview Plaquemines Parish is the area where the last portion of the Mississippi River flows out into the Gulf of Mexico (see Figures

More information

An Assessment of Coastal Erosion at the Malagawatch Graveyard Archeological Site

An Assessment of Coastal Erosion at the Malagawatch Graveyard Archeological Site Report of Activities 2010 21 An Assessment of Coastal Erosion at the Malagawatch Graveyard Archeological Site P. W. Finck Introduction The Geological Services Division of the Nova Scotia Department of

More information

Map Introduction: South Uist Map 1

Map Introduction: South Uist Map 1 96 Map Introduction: Map This map section covers part of the south coast of, including the head of the causeway which links the island to Eriskay. It extends from South Glen Dale to Taobh a'caolas. There

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

Tom Blackman Project Lead. Mékell Mikell Communications Representative

Tom Blackman Project Lead. Mékell Mikell Communications Representative Sediment Cleanup Middle River Complex, 2016-17 Season 1 Project Photo Tour Updated November 15, 2016 Tom Blackman Project Lead Mékell Mikell Communications Representative 1 Sediment Cleanup - Season 1

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

**Temporary Erosion Control**

**Temporary Erosion Control** Construction operations And methods **Temporary Erosion Control** The test will more than likely just have a basic word problem dealing with Erosion control, if it has anything on the test. So just review,

More information

Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton

Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton REPORT Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton REPORT Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton Report

More information

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY Town of Bowden Box 338, 2101 20 th Ave Bowden, Alberta, T0M 0K0 Town of Bowden Province of Alberta Policy Document (2019-01) SNOW REMOVAL POLICY 1 INTRODUCTION The purpose of this policy is to establish

More information

7.34 Spartina (Spartina anglica)

7.34 Spartina (Spartina anglica) 7.34 Spartina (Spartina anglica) Why is it a threat? Spartina is a sward forming grass that originates from the United Kingdom. It grows from underground rhizomes. The rhizomes break off and establish

More information

STUDENT NAME. Science Grade 5. Read each question and choose the best answer. Be sure to mark all of your answers.

STUDENT NAME. Science Grade 5. Read each question and choose the best answer. Be sure to mark all of your answers. FORMATIVE MINI ASSESSMENTS First Grading Period 2010-11 September 21-24 STUDENT NAME DATE Science Grade 5 Read each question and choose the best answer. Be sure to mark all of your answers. 1 Which is

More information

Advanced Geologic Exploration, Inc.

Advanced Geologic Exploration, Inc. Advanced Geologic Exploration, Inc. Scientists of the Earth PO Box 1956, Chester, CA 96020 Voice: (530) 258-4228 Fax (530) 258-4339 www.advancedgeologic.com January 23, 2009 Job No. G-081201 Terri Barber,

More information

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management

More information

Instream Sediment Control Systems

Instream Sediment Control Systems Instream Sediment Control Systems INSTREAM PRACTICES Photo 1 Photo 2 Modular sediment The information contained within this series of fact sheets deals only with the design of temporary instream sediment

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

Construction Exits Vibration grids

Construction Exits Vibration grids Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]

More information

1. Any process that causes rock to crack or break into pieces is called physical weathering. Initial product = final product

1. Any process that causes rock to crack or break into pieces is called physical weathering. Initial product = final product Weathering 1. Any process that causes rock to crack or break into pieces is called physical weathering. Initial product = final product End Result of physical weathering is increased surface area. 2. Physical

More information

Erosion and Deposition

Erosion and Deposition CHAPTER 3 LESSON 2 Erosion and Deposition Landforms Shaped by Water and Wind Key Concepts What are the stages of stream development? How do water erosion and deposition change Earth s surface? How do wind

More information

The use of MIKE21 to study the. barrier beach system of Inner Dingle Bay, Co. Kerry, Ireland. Dr. Michael O Shea Malachy Walsh and Partners

The use of MIKE21 to study the. barrier beach system of Inner Dingle Bay, Co. Kerry, Ireland. Dr. Michael O Shea Malachy Walsh and Partners The use of MIKE21 to study the morphodynamic evolution of the mid-bay barrier beach system of Inner Dingle Bay, Co. Kerry, Ireland Dr. Michael O Shea Malachy Walsh and Partners Contents Why Study Morphodynamics

More information

SEARCHING FOR SEDIMENT SOURCES IN SPRING CREEK

SEARCHING FOR SEDIMENT SOURCES IN SPRING CREEK SEARCHING FOR SEDIMENT SOURCES IN SPRING CREEK Christopher Frederick, Department of Earth Sciences, University of South Alabama, Mobile, AL 36688. E-mail: cjf702@jaguar1.usouthal.edu. Sediment deposition

More information

2.2.7 Backbarrier flats

2.2.7 Backbarrier flats FIGURE 24. VERTICAL PHOTOGRAPH SHOWING THE DEVELOPMENT OF SMALL PARABOLIC DUNES FROM BLOWOUTS IN A LARGE RELICT FOREDUNE NORTHWEST OF HUNTER'S CREEK. PHOTOGRAPH COURTESY OF CAR'T'ER HOLT HARVEY FORESTS

More information

Chapter 3 Erosion in the Las Vegas Wash

Chapter 3 Erosion in the Las Vegas Wash Chapter 3 Erosion in the Las Vegas Wash Introduction As described in Chapter 1, the Las Vegas Wash (Wash) has experienced considerable change as a result of development of the Las Vegas Valley (Valley).

More information

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD. OEL File 1563-1 May 30, 2017 Doug Wall PO Box 774 Salmon Arm, BC V1E 4N7 Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan

More information

Scenarios for the NI coast in the 21 st Century

Scenarios for the NI coast in the 21 st Century Scenarios for the NI coast in the 21 st Century Prof Julian Orford Geography, Archaeology & Palaeoecology Queen s University, Belfast Challenging perspective Living by the coast is good for your health!

More information

UGRC 144 Science and Technology in Our Lives/Geohazards

UGRC 144 Science and Technology in Our Lives/Geohazards UGRC 144 Science and Technology in Our Lives/Geohazards Flood and Flood Hazards Dr. Patrick Asamoah Sakyi Department of Earth Science, UG, Legon College of Education School of Continuing and Distance Education

More information

Cliff stabilisation. Adaptation Option Climate-ADAPT

Cliff stabilisation. Adaptation Option Climate-ADAPT Cliff stabilisation Adaptation Option Climate-ADAPT Cover design: EEA Cover photo: EEA Layout: EEA Legal notice The contents of this publication do not necessarily reflect the official opinions of the

More information

Area-wide geotechnical information summary for CERA zoning review panel

Area-wide geotechnical information summary for CERA zoning review panel Area-wide geotechnical information summary for CERA zoning review panel This document contains all the area-wide geotechnical information which was considered by CERA as part of the process for making

More information