Hits of up to 150gpt reinforce forecasts for increased grades, production and cashflow

Size: px
Start display at page:

Download "Hits of up to 150gpt reinforce forecasts for increased grades, production and cashflow"

Transcription

1 Hits of up to 150gpt reinforce forecasts for increased grades, production and cashflow Fresh results come from high-grade zone at heart of projected CY13 cash surplus of $65-85 million ASX ANNOUNCEMENT 24 AUGUST 2012 Australian Securities Exchange Code: NST Board of Directors Mr Chris Rowe Non-Executive Chairman Mr Bill Beament Managing Director Mr Michael Fotios Non-Executive Director Mr Peter Farris Non-Executive Director Mr Peter O Connor Non-Executive Director Ms Karen Brown Company Secretary Issued Capital Shares M Options 20M Current Share Price $1.135 Market Capitalisation $465 million Cash/Bullion in Bank: 30 Jun 2012 $75 million Projects Paulsens Ashburton Range Emull Commodities gold gold gold, silver Zn, Cu, gold Investments Commodities Venturex (15%) Cu, Zn, Ag & gold Highlights Outstanding results of up to 150gpt provide more firm evidence that Northern Star will deliver on its CY2013 strategy for increases in grade, production and cashflow Latest results come from recently-discovered high-grade extension zone at Paulsens Voyager 1 lode which underpins CY2013 forecasts The results increase the confidence of the zone s 25gpt resource grade, which compares with Voyager 1 s historical grade of ~8gpt First ore from extension zone intersected ahead of schedule. Average 12gpt development grade so far Mine and processing upgrade on track. This will start increasing Paulsens production from ~80,000ozpa to 100, ,000ozpa in CY2013 Record Mining physicals achieved in July Significant results from Voyager 1 include (uncut); g/t gold (true width 6.0m) 534mRL UZ including g/t g/t gold (true width 7.5m) 513mRL UZ including 88.6 g/t g/t gold (true width 0.7m) 561mRL UZ g/t gold (true width 4.3m) 521mRL UZ g/t gold (true width 1.4m) 432mRL LZ g/t gold (true width 0.5m) 411mRL g/t gold (true width 5.3m) 535mRL UZ g/t gold (true width 3.5m) 531mRL UZ 36.5 g/t gold (true width 8.8m) 610mRL UZ g/t gold (true width 2.2m) 512mRL UZ g/t gold (true width 2.3m) 518mRL LZ g/t gold (true width 3.8m) 496mRL UZ 17.6 g/t gold (true width 7.0m) 508mRL UZ g/t gold (true width 5.7m) 578mRL UZ g/t gold (true width 6.2m) 578mRL UZ Further assays pending for Voyager 1

2 Northern Star Resources (ASX: NST) is pleased to announce that fresh drilling results of up to 150gpt have provided more firm evidence that it is well on track to deliver the sharp increases in production and cash generation it has forecast for This latest batch of outstanding infill and resource drilling results from the recently announced 25gpt extension zone at Paulsens' flagship Voyager 1 lode show that grades at Paulsens are set to increase substantially in 2013 from the current head-grade of ~7gpt (see Figure 1). This increase in head grade will in turn help drive a rise in production to as much as 115,000oz, lowering costs and resulting in surplus cash generation of $65-$85 million next calendar year. Northern Star has intersected the extension zone ahead of its initial timeframe of the December Quarter 2012, meaning the sharply higher-grade ore will boost the project's production profile sooner. The first development level in the extension has been underway for the past month with face grades averaging 12gpt so far. The first extension zone level is one of the highest grade levels ever developed in the seven-year history of Paulsens. Future head-grade is also expected to be boosted by the fact that historical mine performance indicates stoping/production grades are normally higher than development grades. The Voyager 1 lode is currently the main ore source at Paulsens and has produced 170,000 ounces over the past two years. The lode continues to be open down plunge and the Company believes this lode will continue to grow and be the mainstay for production for a number of years. The high-grade extension zone formed the major part of Northern Star's recently released resource upgrade on the Paulsens Project to 403,000oz 1 (see ASX release 02 August 2012). All these latest drilling results from Voyager 1 are excluded from the new resource estimate of 403,000oz 1. Figure 1 - Long Section View of Significant drill results for Voyager One including the Extension zone

3 These results provide more evidence that the grade at the key Voyager 1 lode continues to increase with depth (see Figure 2). The figure is a long section view of the Voyager 1 lode and shows that the Extension zone has a significantly higher grade than past and present mining areas. Figure 2 - Long Section View of Voyager One Lode with the Extension zone development grade averaging 12gpt Plans to increase the mine and processing plant capacity to 450,000 tonnes per annum by the end of the year are on track. The major capital upgrade to the mine ventilation is nearing completion, the 600m raisebore has broken through to the surface and the new fan is expected to be operational in September. The new mobile mining fleet is further improving the mine productivity, with record ore tonnage and development metres achieved in the month of July. 38,742 ore tonnes were mined, 465,000t annualised. "These latest drilling results reinforce our strategy to deliver sharply higher production and cashflow next year," Northern Star Managing Director Bill Beament said. "At the same time, we have a multi-pronged exploration program underway in and around Paulsens and at our neighbouring Ashburton project. "We are confident that these programs will be generating substantial growth in our inventory and further increases in mine life, production and cashflow." Further announcements will be released regarding the ongoing underground diamond drilling as results become available. Assay results from underground diamond drilling completed on Voyager 1 since the last release on 04 th July 2012 are listed in the attached tables.

4 Yours faithfully, Bill Beament Managing Director Northern Star Resources Ltd Measured Indicated Inferred Total Tonnes Grade Tonnes Grade Tonnes Grade Tonnes Grade Oz Au 30 June 2012 (,000) (g/t) (,000) (g/t) (,000) (g/t) (,000) (g/t) (,000) Open Pit Paulsens Upper Levels Voyager Voyager 1 Extension Voyager Paulsens Stockpiles 11 Belvedere Merlin Mt Clement JV Total Table 1 - Paulsens 2.5g/t Au Lower Cut-Off Underground and 1.0g/t Au Lower Cut-Off Open Pit Competent Persons Statements The information in this announcement that relates to Paulsens Project and Ashburton mineral resource estimation, exploration results, data quality, geological interpretations, potential for eventual economic extraction and estimates of exploration potential, is based on information compiled by or under the supervision of Brook Ekers, (Member AIG), who is a full-time employee of Northern Star Resources Ltd. Mr Ekers has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Ekers consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Forward Looking Statements Northern Star Resources Limited has prepared this announcement based on information available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this announcement. To the maximum extent permitted by law, none of Northern Star Resources Limited, its directors, employees or agents, advisers, nor any other person accepts any liability, including, without limitation, any liability arising from fault or negligence on the part of any of them or any other person, for any loss arising from the use of this announcement or its contents or otherwise arising in connection with it. This announcement is not an offer, invitation, solicitation or other recommendation with respect to the subscription for, purchase or sale of any security, and neither this announcement nor anything in it shall form the basis of any contract or commitment whatsoever. This announcement may contain forward looking statements that are subject to risk factors associated with gold exploration, mining and production businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including but not limited to price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve estimations, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory changes, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates.

5 Downhole Intersection Est. True Thickness VOYAGER ONE RESOURCE DRILLING Gram/mts (cut) Ore zone and comments PDU Vein in dyke 451mRL PDU Vein in Gabbro 438mRL PDU VOY1 UZ2 453mRL PDU VOY1 UZ 535mRL PDU Vein in Gabbro 489mRL PDU VOY1 UZ 524mRL PDU VOY1 UZ 521mRL PDU Vein in gabbro 483mRL PDU Vein in gabbro 462mRL PDU veins in gabbro 439mRL PDU Veins in gabbro 441mRL PDU qtz/varb vein in seds 439mLR PDU VOY1 UZ 508mRL PDU VOY1 UZ 489mRL PDU VOY1 UZ 483mRL PDU VOY1 LZ 458mRL PDU VOY1 UZ 512mRL PDU VOY1 UZ2 508mRL PDU Vein in dyke 501mRL PDU VOY1 UZ 513mRL including PDU VOY1 UZ 494mRL PDU Qtz/carb vein in gabbro 443mRL PDU Vein in Gabbro 422mRL PDU Vein in Gabbro 414mRL PDU Vein in Gabbro 411mRL PDU Vein in Gabbro 371mRL PDU VOY1 UZ 496mRL PDU VOY1 UZ2 483mRL PDU VOY1 UZ 459mRL PDU VOY1 UZ 456mRL PDU VOY1 UZ 449mRL PDU VOY1 UZ2 443mRL PDU VOY1 LZ 432mRL PDU2115 NSR PDU VOY1 UZ Extension 478mRL PDU gabbro in quartz 466mRL PDU Quartz in gabbro 459mRL PDU Quartz in gabbro 455mRL PDU Quartz in gabbro 404mRL PDU Quartz in gabbro 413mRL PDU Quartz in gabbro 363mRL PDU VOY1 UZ Extension 476mRL PDU Vein in Gabbro 451mRL PDU Vein in Gabbro 446mRL PDU Vein in Gabbro 435mRL PDU Vein in Gabbro 417mRL PDU VOY1 UZ Extension 452mRL PDU VOY1 UZ Extension 447mRL PDU VOY1 UZ 2 440mRL PDU Vein in Gabbro 431mRL

6 PDU Vein in Gabbro 426mRL Downhole Est. True Gram/mts Ore zone and Intersection Thickness (cut) comments PDU Veins in Dyke 414mRL PDU Veins in Dyke 411mRL PDU2122 NSR PDU2123 NSR PDU Quartz in gabbro 520mRL PDU Quartz in gabbro 529mRL PDU VOY1 UZ Extension 531mRL PDU VOY1 UZ2 Exyension 527mRL PDU Vein in gabbro 513mRL PDU VOY1 UZ Extension 550mRL PDU2156 NSR PDU VOY1 HW SPLAY 409mRL PDU Vein in HW seds 400mRL VOYAGER ONE GRADE CONTROL DRILLING Downhole Intersection Est. True Thickness Gram/mts (cut) Ore zone and comments PDU VOY1 LZ 839mRL PDU VOY1 UZ2 872mRL PDU VOY1 UZ 870mRL PDU VOY1 UZ2 855mRL PDU VOY1 LZ 857mRL PDU Gabbro ore 870mRL PDU VOY1 LZ 284mRL PDU VOY1 UZ 517mRL PDU VOY1 LZ 503mRL PDU VOY1 UZ 523mRL PDU VOY1 UZ 526mRL PDU VOY1 UZ 541mRL PDU Quartz vein in FW seds 492mRL PDU Vein in Gabbro 463mRL PDU Vein in Gabbro 462mRL PDU VOY1 UZ 551mRL PDU Quartz vein in FW seds 528mRL PDU Quartz vein in FW seds 525mRL PDU VOY1 UZ 561mRL PDU Qtz in FW seds 551mRL PDU VOY1 UZ 544mRL PDU VOY1 UZ2 539mRL PDU VOY1 UZ2 548mRL PDU VOY1 UZ SPLAY 566mRL PDU VOY1 UZ 539mRL PDU Vein in dyke 537mRL PDU VOY1 UZ 529mRL PDU VOY1 UZ 553mRL PDU vein in gabbro 539mRL PDU qtz in gabbro 537mRL PDU qtz in gabbro 534mRL PDU qtz carb vein 533mRL PDU vein in gabbro 504mRL PDU VOY1 UZ 528mRL

7 Downhole Intersection Est. True Thickness Gram/mts (cut) Ore zone and comments PDU VOY1 LZ 579mRL PDU VOY1, b/n UZ & LZ qtz. 579mRL PDU VOY1 UZ 578mRL PDU VOY1 LZ 559mRL PDU VOY1 LZ 551mRL PDU VOY1 UZ 532mRL PDU VOY1 LZ 570mRL PDU VOY1 UZ 561mRL PDU Vein in dyke 523mRL PDU VOY1 UZ2 558mRL PDU VOY1 UZ 517mRL PDU VOY1 UZ 519mRL PDU VOY 1 UZ 849mRL PDU VOY 1 UZ 844mRL PDU VOY1 UZ2 872mRL PDU VOY1 LZ 861mRL PDU VOY1 LZ 864mRL PDU2122A VOY1 LZ 879mRL PDU VOY1 LZ 868mRL PDU VOY1 LZ 893mRL PDU VOY1 LZ 579mRL PDU Qtz UZ & LZ VOY1 578mRL PDU VOY1 UZ 578mRL PDU dyke 578mRL PDU VOY1 UZ 567mRL PDU VOY1 UZ 566mRL PDU VOY1 LZ 568mRL PDU VOY1 UZ 564mRL PDU VOY1 LZ 566mRL PDU VOY1 UZ 563mRL PDU VOY1 UZ 615mRL PDU VOY1 LZ 616mRL PDU VOY1 UZ2 609mRL PDU VOY1 LZ 608mRL PDU VOY1 UZ 615mRL PDU VOY1 LZ 619mRL PDU VOY1 UZ 610mRL PDU VOY1 UZ Extension 506mRL PDU VOY1 UZ2 494mRL PDU HW splay 531mRL PDU HW splay, qtz/carb vein 527mRL PDU VOY1 UZ Extension 522mRL PDU VOY1 UZ Extension 525mRL PDU VOY1 UZ 534mRL including PDU VOY1 UZ 526mRL PDU Quartz in gabbro 516mRL PDU Quartz in gabbro 652mRL PDU VOY1 UZ Extension 559mRL PDU VOY1 UZ Extension 556mRL PDU Qtz/carb vein in HW seds 578mRL PDU VOY1 UZ Extension 570mRL

8 Downhole Intersection Est. True Thickness Gram/mts (cut) Ore zone and comments PDU VOY1 UZ Extension 522mRL PDU VOY1 UZ2 Extension 513mRL PDU VOY1 UZ 566mRL PDU HW splay 571mRL PDU Quartz in gabbro 569mRL PDU Quartz in gabbro 570mRL PDU Quartz in gabbro 573mRL PDU Quartz in gabbro 559mRL PDU VOY1 LZ 575mRL PDU Mineralisation in Gabbro 569mRL PDU VOY1 LZ 560mRL PDU VOY1 LZ 549mRL PDU Quartz in gabbro 518mRL PDU Quartz in gabbro 503mRL PDU VOY1 UZ 518mRL PDU VOY1 LZ 518mRL PDU HW splay 554mRL PDU VOY1 UZ Extension 553mRL PDU Vein in gabbro 531mRL PDU Mineralised fault contact 528mRL PDU VOY1 UZ Extension 571mRL PDU VOY1 UZ2 Extension 569mRL PDU Qtz/pyrite in FW SEDS 568mRL PDU HW splay 583mRL PDU VOY1 UZ Extension 580mRL PDU VOY1 UZ 587mRL PDU VOY1 LZ 583mRL PDU VOY1 LZ 579mRL PDU VOY1 UZ 578mRL PDU VOY 1 LZ 582mRL PDU VOY1 UZ 588mRL PDU VOY1 LZ 582mRL PDU VOY1 UZ 585mRL PDU VOY1 UZ 579mRL PDU VOY1 HW SPLAY 579mRL At a nominal 3g/t lower cut off and a 150g/t upper cut off NSR means no significant result Quality Control Paulsens, All core is logged and whole core samples (if LTK60 size, NQ2 sized core is cut and half cored) are marked and prepared for shipping at the Paulsens Mine Property and sent to an independent Laboratory for assay. The remaining half core is stored on site. All samples from which information in this document is derived were received by ALS Chemex Australian Laboratory Services Pty ( ALS ) Limited in Perth, Western Australia. Samples are weighed and crushed to 70% passing -6mm mesh. The crushed material is split and a portion is pulverised. A 100-gram pulp is sent to ALS Perth, Western Australia for assay. A 30-gram portion of the pulp is treated by fire assay method with atomic absorption finish (Au-AA25). Sample rejects are discarded after 90 days. Limit samples (>100 grams per tonne gold) are re-analysed using ALS dilution method (Au-DIL). Northern Star Resources inserts one standard in each hole, and one blank is now inserted in each ore zone. Laboratory standards and blanks are inserted by ALS and several pulp duplicates are also assayed as a determinant of mineralisation variability. ALS has AS/NZS ISO 9001:2000 certification in Perth.

For personal use only

For personal use only ASX ANNOUNCEMENT 07 JUNE 2012 Australian Securities Exchange Code: NST Board of Directors Mr Chris Rowe Non-Executive Chairman Mr Bill Beament Managing Director Mr Michael Fotios Mr Peter Farris Mr Peter

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 16 NOVEMBER 2012 Australian Securities Exchange Code: NST Board of Directors Mr Chris Rowe Non-Executive Chairman Mr Bill Beament Managing Director Mr Michael Fotios Non-Executive Director

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 27 AUGUST 2012 Australian Securities Exchange Code: NST Board of Directors Mr Chris Rowe Non-Executive Chairman Mr Bill Beament Managing Director Mr Michael Fotios Non-Executive Director

More information

HITS OF UP TO 231GPT EXTEND VOYAGER 2 LODE BY 200M

HITS OF UP TO 231GPT EXTEND VOYAGER 2 LODE BY 200M AMENDED HITS OF UP TO 231GPT EXTEND VOYAGER 2 LODE BY 200M Mining of this parallel lode at Paulsens will further cut costs and extend mine life KEY POINTS Outstanding drilling results from Paulsens Voyager

More information

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce

More information

New Drilling Program Commences at Mutiny s Deflector Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern

More information

Northern Star on track to be 200,000ozpa producer after exceeding all 2011 guidance

Northern Star on track to be 200,000ozpa producer after exceeding all 2011 guidance Northern Star on track to be 200,000ozpa producer after exceeding all 2011 guidance QUARTERLY REPORT DECEMBER 2011 ASX ANNOUNCEMENT 30 JANUARY 2012 Australian Securities Exchange Code: NST Board of Directors

More information

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project ASX ANNOUNCEMENT 22 August 2013 General Mining Corporation ABN: 95 125 721 075 Hits of up to 123gpt show Chesterfield emerging as a high grade gold project Prospects are ideally located close to existing

More information

New High Grade Lode Discovered at Wagtail South

New High Grade Lode Discovered at Wagtail South 23 April 2013 ASX Announcement New High Grade Lode Discovered at Wagtail South Bulletin Resources Limited (ASX: BNR) is pleased to announce the receipt of further assay results from the 5,000 metre reverse

More information

For personal use only

For personal use only Building an Australian Copper House Resources Rising Stars Investor Luncheon Series, 3-5 December 2012 Disclaimer Competent Persons Statement The information in this announcement that relates to Exploration

More information

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

King of the Hills Gold Project, Leonora, to commence production in Q2 2011 King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher

More information

For personal use only

For personal use only ASX/MEDIA ANNOUNCEMENT 16 NOVEMBER 2012 ASX Code: HOR Management Mr Jeremy Shervington Non Executive Chairman Mr Neil Marston Managing Director Mr Michael Fotios Non Executive Director Mr Stuart Hall Non

More information

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY June 29, 2007 ASX & TSX: WSA News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY The Board of Western Areas is pleased to announce that the

More information

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project Bulletin Resources is the 100% owner of the Lamboo and Golden Crown Gold Projects located near Halls Creek in the East Kimberley region of Western Australia. The projects have a combined open pit and underground

More information

ASX ANNOUNCEMENT 21 MARCH 2011

ASX ANNOUNCEMENT 21 MARCH 2011 ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights

More information

Ausgold awarded EIS grant for Jinkas deep drilling

Ausgold awarded EIS grant for Jinkas deep drilling ASX Release 21 June 2018 Ausgold awarded EIS grant for Jinkas deep drilling Highlights: EIS grant will support drilling at the Katanning Gold Project to a value of $150,000 Grant will partly fund four

More information

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS Heron Resources Limited ABN: 30 068 263 098 Level1, 37 Ord Street, West Perth WA 6005 Phone: +61 (0) 8 9215 4444 Website: www.heronresources.com.au Email: info@heronresouces.com.au ASX: HRR ASX Release

More information

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. 30 April 2008 60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. Perilya Limited (ASX: PEM) is pleased to announce a 60% increase in the mineral resource estimate for the

More information

For personal use only

For personal use only ASX RELEASE 2 August 2011 Significant Gold intersections at Chameleon Prospect Maiden 15 hole RC drilling programme (3,170 metres) completed by Scotia Gold Rights JV partner, Aphrodite Gold at the Chameleon

More information

Annual General Meeting

Annual General Meeting Slide 1 Annual General Meeting 8 November 2010 Slide 2 INVESTMENT HIGHLIGHTS Boddington South Gold Project Located within the Southwest Yilgarn region of Western Australia Gold mineralisation similar to

More information

For personal use only

For personal use only 18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand

More information

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

More information

KINGSTON RESOURCES LIMITED

KINGSTON RESOURCES LIMITED KINGSTON RESOURCES LIMITED ASX Announcement 26 September 2018 ASX Code: KSN Share Price: A$0.022 Shares Outstanding: 1,223,198,383 Market Capitalisation: A$26.9m Cash: A$4.4m (30 June 2018) Visible gold

More information

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT September 18 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT Two tier one Australian banks mandated to arrange

More information

FIVE RIGS DRILLING AT KARLAWINDA

FIVE RIGS DRILLING AT KARLAWINDA FIVE RIGS DRILLING AT KARLAWINDA Major resource in-fill and extensional drill program well underway at Karlawinda Gold Project with 88 holes already completed ASX ANNOUNCMENT 2 September 2016 Australian

More information

Disclaimer. Forward-Looking Statements. Competent Person s Statement

Disclaimer. Forward-Looking Statements. Competent Person s Statement Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director Resources Rising Stars, May 29-30 2018 Disclaimer Forward-Looking Statements Some statements

More information

EXPLORATION SUCCESS AT COYOTE GOLD MINE

EXPLORATION SUCCESS AT COYOTE GOLD MINE 19 November 2012 Jon Latto COMPANY SECRETARY Jane Bown EXECUTIVE ASSISTANT EXPLORATION SUCCESS AT COYOTE GOLD MINE COYOTE GOLD MINE HIGHLIGHTS Ongoing exploration drilling continues to return high grade

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

High Grade Gold Drill Results Extend Buccaneer

High Grade Gold Drill Results Extend Buccaneer ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 14 June, 2012 High Grade Gold Drill Results Extend 31 metres averaging 3.68g/t gold including 14 metres averaging 7.56g/t gold ABM Resources NL ( ABM or The Company

More information

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24%

More information

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL ASX ANNOUNCEMENT 16 SEPTEMBER 2011 Phillips River Mining NL ABN 61 004 287 790 Unit 46/328 Albany Highway VICTORIA PARK WA 6100 T: 08 6250 4600 F: 08 6250 4699 info@phillipsriver.com.au CONTACT Jason Stirbinskis

More information

Maximising Gold Resources in Senegal

Maximising Gold Resources in Senegal ASX: BSR Maximising Gold Resources in Senegal Senegal International Mining Conference, Dakar 6-8 Disclaimer & Competent Persons Statement This presentation has been prepared by Bassari Resources Limited

More information

For personal use only

For personal use only ASX Announcement 15 March 2017 HIGHLIGHTS Drill contractors have been engaged with drilling to commence April 2017 pending access approvals Two mineralised lodes within the oxide volcanogenic massive sulphide

More information

Co-O MINE MINERAL RESOURCE UPDATE

Co-O MINE MINERAL RESOURCE UPDATE MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written

More information

ASX Announcements & Media Release

ASX Announcements & Media Release ASX Announcements & Media Release October 15, 2010 Fast Facts ASX Code: RNS Shares on issue: 62.2 million Cash at bank: $5 million (Sept 2010) Board & Management Rick Hart, Chairman Justin Tremain, Managing

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 19th October, 2012 Phase 4: Longitudinal Surface Vein Sampling Extends the Western Limb of Old Pirate with a further 71m strike length from surface vein sampling

More information

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS Vancouver, British Columbia September 19, 2018 Copper Mountain Mining Corporation (TSX: CMMC ASX:C6C) (the

More information

NEW DISCOVERIES AT THE RED OCTOBER MINE

NEW DISCOVERIES AT THE RED OCTOBER MINE 23 July 2013 ASX & MEDIA RELEASE NEW DISCOVERIES AT THE RED OCTOBER MINE The Directors of Saracen Mineral Holdings Limited (the Company ) are pleased to provide an update on the Red October underground

More information

ASX Announcement. Bulletin grows resource base and tenement position

ASX Announcement. Bulletin grows resource base and tenement position Bulletin Resources is the 100% owner of the Nicolson s Gold Project located near Halls Creek in the Kimberley region of Western Australia. The project has a combined open pit and underground Mineral Resource

More information

ASX announcement 16 May 2016

ASX announcement 16 May 2016 ASX announcement 16 May 2016 Adelaide Resources Limited ABN: 75 061 503 375 Corporate details: ASX Code: ADN Cash: $0.701million (at 31 Mar 2016) Issued Capital: 357,922,352 ordinary shares 37,222,104

More information

ASX/Media Announcement

ASX/Media Announcement ASX/Media Announcement 25 March 2013 MAIDEN HIGH-GRADE JUDY LODE RESOURCE INDICATES POTENTIAL TO INCREASE ANDY WELL MINE LIFE 106,000 ounce high-grade resource (Indicated & Inferred) Judy South (137,000t

More information

For personal use only

For personal use only ASX Release 2 February 2012 ENCOURAGING DIAMOND DRILLING RESULTS CONTINUE AT THE FEKOLA PROJECT Papillon Resources Limited ( Papillon or the Company ) is pleased to release the assay results from two additional

More information

FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION

FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION 27 October 2009 FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION Drake Resources (ASX: DRK, Drake ) is pleased to announce that the first assays for the drilling programme at Falun,

More information

High-grade Copper and Gold Discovered at Productora

High-grade Copper and Gold Discovered at Productora ASX ANNOUNCEMENT Tuesday 25th September 2012 High-grade Copper and Gold Discovered at Productora Potential for High-grade Copper-Gold Shoots to Add New Dimension to Productora High-grade copper-gold discovered

More information

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East NEWS RELEASE 11/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Highlights: Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East Near-surface intercept grading 3.2 g/t Au over 45.5

More information

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width

More information

For personal use only

For personal use only ACN 092 471 513 28 November 2016 ASX Release PENNY S FIND GOLD MINE UPGRADED POTENTIAL FOR MINE LIFE EXTENSION Empire Resources Limited ( Empire, ASX code: ERL) is pleased to give an update on the progress

More information

Gold Discovery at Tasiast South in Mauritania. May 2012

Gold Discovery at Tasiast South in Mauritania. May 2012 . Gold Discovery at Tasiast South in Mauritania May 2012 Company interests Corporate profile ASX Code: Share price:* DRK 19c Shares on issue: 82.5M Market capitalisation: Cash position: A$16.5M A$6.18M

More information

76,000 Ounce Gold Resource at Akoko North

76,000 Ounce Gold Resource at Akoko North 31 st March 2009 76,000 Ounce Gold Resource at Akoko North 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Scoping study (assuming toll milling) estimates $A24M

More information

Cash-flow, exploration and growth in WA s premier gold districts. Resources Rising Stars, May 2017 / Michael Fowler, Managing Director

Cash-flow, exploration and growth in WA s premier gold districts. Resources Rising Stars, May 2017 / Michael Fowler, Managing Director Cash-flow, exploration and growth in WA s premier gold districts Resources Rising Stars, 30-31 May 2017 / Michael Fowler, Managing Director 2 Disclaimer Forward-Looking Statements Some statements in this

More information

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling: TSX: RMX OTCQX: RBYCF Rubicon Minerals Provides Additional Drill Results and Observations from its 2017 Exploration Program and Commences Exploratory Underground Development TORONTO, Ontario, November

More information

Diamond Drilling Extends the Netiana Lodes at Depth

Diamond Drilling Extends the Netiana Lodes at Depth ASX/Media Announcement 21 December 2012 Diamond Drilling Extends the Netiana Lodes at Depth New diamond hole intersections include: o 13m at 22.0 g/t gold from 42m, including 1m at 123 g/t gold from 42m

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

Northern Dynasty Minerals Ltd.

Northern Dynasty Minerals Ltd. Northern Dynasty Minerals Ltd. 1020 800 W Pender St. Vancouver BC Canada V6C 2V6 Tel 604 684-6365 Fax 604 684-8092 Toll Free 1 800 667-2114 http://www.northerndynasty.com RESOURCE ESTIMATE FOR PEBBLE EAST

More information

For personal use only

For personal use only Alloy Regains Control of the Horse Well Gold Project ASX Release 29 January 2018 Capital Structure ABN 20 109 361 195 ASX Code AYR Issued Shares 1,266,993,360 Unlisted Options 29,000,000 Corporate Directory

More information

Canadian Major to Earn Back into Las Opeñas Gold Project following highly promising results

Canadian Major to Earn Back into Las Opeñas Gold Project following highly promising results ASX Release 6 February 2013 ASX Code: GMD Issued Capital 122.1 million shares 53.8 million options Current Share Price $0.04 Market Capitalisation $5 million Board Members Michael Haynes Chairman Michael

More information

For personal use only

For personal use only About Artemis Resources Artemis Resources is an ASX-listed mineral exploration company with a focus on gold: Key Projects Gold Mt Clement (WA) Yandal (WA) Rare Metals Yangibana (WA) Buchanan's Creek (QLD)

More information

An ASX listed Perth-based gold explorer focused on Ghana in West Africa

An ASX listed Perth-based gold explorer focused on Ghana in West Africa An ASX listed Perth-based gold explorer focused on Ghana in West Africa Africa Down Under Conference August 2012 www.vikingashanti.com Disclaimer and Competent Person s Statement This presentation has

More information

BUNDARRA RESOURCE UPDATE

BUNDARRA RESOURCE UPDATE t Friday 15 April 2011 Company Announcement ASX ANNOUNCEMENT ASX CODE: TMX, TMXOA CAPITAL STRUCTURE TMX - Shares on Issue 217.98m TMXOA - Options on Issue 18.24m - Unlisted Options 56.81m DIRECTORS & KEY

More information

ASX:TLM. Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011

ASX:TLM. Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011 ASX:TLM Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011 Disclaimer and Competent Person s Statements 2 Disclaimer This presentation is not a prospectus nor an offer

More information

Highlights from the four holes announced in this news release include:

Highlights from the four holes announced in this news release include: November 20, 2017 OTCQB: SVBL, TSX: SVB SILVER BULL INTERSECTS 9 METERS OF SULPHIDE MINERALIZATION GRADING 20.7% ZINC, 1% LEAD AND 98G/T SILVER, INCLUDING 3.65 METERS OF MASSIVE SULPHIDE MINERALIZATION

More information

FIRST RESULTS FROM RC DRILLING AT KONONGO

FIRST RESULTS FROM RC DRILLING AT KONONGO ASX Release Monday 29 March 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 FIRST RESULTS FROM RC DRILLING AT KONONGO Signature

More information

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME ASX ANNOUNCEMENT 28 March 2013 FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME Focus Minerals Ltd. (ASX: FML) is pleased to announce the first round of results

More information

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts October 2017 Investor Presentation Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts 2 Disclaimer Forward-Looking Statements Some statements in this report regarding

More information

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT 65 Queen Street West CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT July 6, 2011 Crocodile Gold Corp. (TSX:CRK) (OTCQX:CROCF) (Frankfurt:XGC) (

More information

High-grade Gold in First Drilling Undertaken at Productora South

High-grade Gold in First Drilling Undertaken at Productora South ASX ANNOUNCEMENT Wednesday 10th October 2012 High-grade Gold in First Drilling Undertaken at Productora South Shallow, high-grade, narrow-vein gold area adds further up-side to Productora Sierra Zapallo

More information

Detour Gold Reports Drilling Results from Lower Detour

Detour Gold Reports Drilling Results from Lower Detour December 17, 2015 NEWS RELEASE Detour Gold Reports Drilling Results from Lower Detour Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports final results from its 2015 summer drilling

More information

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017. MANDALAY RESOURCES CORPORATION ANNOUNCES 2018 MINERAL RESOURCES AND RESERVES UPDATE FOR ITS COSTERFIELD OPERATION, INCLUDING MAIDEN RESOURCES AND RESERVES ESTIMATE FOR THE YOULE LODE TORONTO, ON, January

More information

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER 122.7 METRES March 1, 2012, Toronto, Ontario, Canada: Lexam VG Gold Inc. (TSX: LEX), (FRANKFURT: VN3A), (OTCQX:

More information

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT

More information

MASSIVE AND SEMI MASSIVE SULPHIDES CONTINUE TO BE INTERSECTED AT ROCKLANDS SOUTH - SIGNIFICANT ZONE OF COPPER MINERALISATION BEING DEFINED

MASSIVE AND SEMI MASSIVE SULPHIDES CONTINUE TO BE INTERSECTED AT ROCKLANDS SOUTH - SIGNIFICANT ZONE OF COPPER MINERALISATION BEING DEFINED ACN. 000 317 251 MARKET RELEASE 2 nd July 2013 ROCKLANDS COPPER PROJECT (CDU 100%) MASSIVE AND SEMI MASSIVE SULPHIDES CONTINUE TO BE INTERSECTED AT ROCKLANDS SOUTH - SIGNIFICANT ZONE OF COPPER MINERALISATION

More information

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA ASX Release 4 th November 2009 SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce commencement of site works at the A1 Gold Mine in eastern

More information

AGM Presentation 12 November 2013

AGM Presentation 12 November 2013 AGM Presentation 12 November 2013 Disclaimer Exploration Results and Mineral Resources The information in this report that relates to Exploration Results, Exploration Targets, Mineral Resources or Ore

More information

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Excellent Results Received for the Six BZ Holes Highest grade intercepted was 1 metre at 58 g/t gold

More information

For personal use only

For personal use only CLASSIC CONTINUES HUNT FOR HIGH GRADE GOLD WITH COMMENCEMENT OF RC DRILLING PROGRAM Highlights: ~3000m of RC drilling underway at Kat Gap, Lady Lila, Lady Magdalene and Van Uden West Assay results expected

More information

For personal use only

For personal use only About Convergent ASX Code: CVG CVG owns 100% of the Bounty Goldfield in Western Australia with 872,000 ounces of gold Our Aim CVG s key objective is to define high grade gold and to recommence gold production

More information

Australian Mines Limited RIU Explorers Conference, February 2016

Australian Mines Limited RIU Explorers Conference, February 2016 Australian Mines Limited RIU Explorers Conference, February 2016 Disclaimer Competent Person s Statement Information in this report that relates to Exploration Result is based on information compiled by

More information

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES ASX ANNOUNCEMENT ASX CODE: MMX 3 September 2009 MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL 400-1000 MILLION TONNES Murchison Metals Limited (Murchison) is

More information

Pegasus Metals Limited AGM PRESENTATION

Pegasus Metals Limited AGM PRESENTATION Pegasus Metals Limited AGM PRESENTATION November 2018 Disclaimer Competent Persons Statement 1 The information in this report that relates to the geology and Exploration Results relating to the Dablo Project

More information

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT No. 01/07 IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT Toronto, Ontario, January 17, 2007 IAMGOLD Corporation ( IAMGOLD or the Company ) is pleased to announce results of 10

More information

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS NEWS RELEASE OA GOLD REPORTS CONTINUED SUCCESS AT GSS May 26, 2014 Orca Gold Inc. (TSX.V:ORG) ( Orca or the Company ) is pleased to provide an update on exploration at its Galat Sufar South ( GSS ) prospect

More information

For personal use only

For personal use only BOARD OF DIRECTORS Mr Oscar Aamodt Non-Executive Chairman Ms Sofia Bianchi Non-Executive Director Mr Lindsay Dudfield Non-Executive Director Mr Anthony Ho Non-Executive Director ISSUED CAPITAL SHARES 156,852,955

More information

New World Gold A high-grade investment opportunity. Mark Papendieck Managing Director

New World Gold A high-grade investment opportunity. Mark Papendieck Managing Director New World Gold A high-grade investment opportunity Mark Papendieck Managing Director ASX:OGX December 2012 Disclaimer This presentation does not constitute investment advice. Neither this presentation

More information

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE 29 August 2011 CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE Outstanding drill results extend scope of Mining Study for Jambreiro Iron Ore Project,

More information

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT ABN 17 124 444 122 10 June 2009 The Manager Company Announcements Office Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 Dear Sir/Madam HIGHLIGHTS TWO HIGH-GRADE GOLD ZONES DISCOVERED AT

More information

For personal use only

For personal use only 18 April 2013 ASX CODE: KAS OUR PRIME COMMODITY IS TIN HIGHLIGHTS Drilling Confirms Continuity & Grade at Achmmach Drilling on sections 3130mE, 3170mE and 3290mE has successfully confirmed position, continuity

More information

Ovoot Coking Coal Project (100%)

Ovoot Coking Coal Project (100%) NEW MAJOR MONGOLIAN COAL RESOURCE Ovoot Coking Coal Project (100%) ASX Announcement 13/10/2010 14/10/2010 ASPIRE MINING LIMITED ABN 46 122 417 243 Unit 2, 454 Roberts Road Subiaco, WA, 6008 P.O. Box 1918

More information

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT ASX ANNOUNCEMENT 8 March 2011 LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT New true-width intercepts along strike from Katanning Deposit include: o BSRC0050-10m

More information

For personal use only Heemskirk Tin Project - Tasmania

For personal use only Heemskirk Tin Project - Tasmania Heemskirk Tin Project - Tasmania CEO Peter Blight International Tin Conference 24-25 April 2012 Focused on Tin Rapidly advancing Heemskirk Tin near Zeehan, Tasmania single commodity - single project focus

More information

Option agreement with Randgold set to commercialise Massigui Gold Project

Option agreement with Randgold set to commercialise Massigui Gold Project ASX Announcement 4 November 2016 Option agreement with Randgold set to commercialise Massigui Gold Project Option agreement with the Morila mine-operator provides potential low risk and low cost processing

More information

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA HIGHLIGHTS New claims staked covering ~9km 2 to secure a 100% interest in the McCleery Copper-Cobalt Project in the Yukon Territory, Canada ABN

More information

High Grade Gold Intercepts at Bangaba

High Grade Gold Intercepts at Bangaba 20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com

More information

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag Golden, Colorado /Globe Newswire/ July 12, 2018 Golden Minerals Company (NYSE American and

More information

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST NEWS RELEASE 13/2018 Symbol: TSX: ME FOR IMMEDIATE RELEASE MONETA INTERCEPTS 25.00 m @ 2.48 g/t GOLD INCLUDING 4.50 m @ 5.00 g/t GOLD AT SOUTH WEST Toronto, Ontario September 13, 2018 - Moneta Porcupine

More information

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement

More information

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April. 16 March 2018 Company Announcement Officer ASX Limited 20 Bridge Street SYDNEY NSW 2000 Highlights CORPORATE UPDATE Inaugural Bowdens Reserve Statement due early April. Feasibility Study being finalised

More information

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST NEWS RELEASE 15/2018 Symbol: TSX: ME FOR IMMEDIATE RELEASE MONETA INTERCEPTS 5.30 m @ 7.63 g/t GOLD INCLUDING 0.80 m @ 22.40 g/t GOLD AND 7.13 m @ 5.06 g/t GOLD INCLUDING 1.98 m @ 12.47 g/t GOLD AT SOUTH

More information

Exploration targets identified to increase Browns Range Project s mine life

Exploration targets identified to increase Browns Range Project s mine life Exploration targets identified to increase Browns Range Project s mine life Highlights Exploration Target estimate demonstrates the potential for very significant increases in Total Mineral Resource at

More information

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT 2 September 2013 ASX Release ASX Code: CXX P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT Highlights Project is on schedule, with completion of the preliminary economic assessment study on target for Quarter

More information