Managing Director s Presentation AGM 2006

Size: px
Start display at page:

Download "Managing Director s Presentation AGM 2006"

Transcription

1 Managing Director s Presentation AGM 2006 Good morning Ladies and Gentlemen. It has been an interesting and busy first year for Monax. What I propose to do with my presentation today is to review the operations of the Company to date. Tenement Status During the year Monax has been granted an additional 3 tenements at Punt Hill, Dingo Hill, Brimpton Lake and Eureka Bluff. As the Chairman has already mentioned, the Company has increased its tenement holdings with applications over additional ground that now comprise our Mulgathing, Kimono Tank, Kolendo, Indooroopilly, Pioneer Bend and Dingo Hill West projects. All our projects are 100% owned. Program of Geophysics Acquisition Monax has undertaken an intensive gravity acquisition program over the majority of it s tenements during the last financial year. Over 6,500 new gravity data points have been collected covering over 3,945 km 2 of Monax s tenements. This data is essential for defining new targets for iron oxide copper-gold (IOCG) mineralisation, palaeochannel hosted uranium, Archaean VHMS copper-zinc deposits, komatiite hosted nickel, Broken Hill style silver-lead-zinc and iron ore targets. In addition to the intensive gravity acquisition program, Monax Mining Limited has contracted the acquisition of detailed aeromagnetics and radiometrics over the majority of its tenements. The survey is being undertaken from September 2006 through to March of 2007 and will collect over 40,000 line kilometres of new detailed areomagnetic and radiometric data. Over 21,000 line kilometres have been collected to date. Bonaventura Prospect Kangaroo Island Monax holds EL 3376 (Parndana) and EL 3088 (Western River), which cover a combined area of 401 km 2 of cleared grazing country, centred about 40 km southwest of Kingscote. The tenements were acquired from Havilah Resources NL, which intersected up to % zinc at shallow depth in RC holes drilled in 2003.

2 Company Exploration Historical drilling failed to penetrate to depth, so Monax aimed to drill a number of deeper drillhole traverses during a drilling campaign in May and June this year. This drilling program was strategically designed to test both the depth extent and eastward continuation of mineralisation underneath this highly encouraging prospect. Cover over the prospect is very thin and mineralisation extends almost to the surface. Drilling has confirmed zinc mineralisation over an area of 300 metres across the controlling structure and 250 metres along strike. The mineralisation is open in all directions and at depth with the three most southerly holes (BVRC08, BVRC10, BVRC11) ending in mineralisation. The drill program has confirmed the possibilities of high grade zinc-lead veins and potential bulk mineable lower grade mineralisation consisting of veins and veinlets. Intersections included: 1.96% Zn & 0.26% Pb from 52m (including 3.65% Zn) BVRC03 BVRC08 BVRC % Zn & 2.15% Pb from 16m % Zn and 0.66% Pb from 34m (including 6.3% Zn and 1.2% Pb) % Zn (ended in mineralisation) - 3.3% Zn & 4.58% Pb from 56m % Zn &1.12% Pb from 63m % Zn (including 9.95% Zn) from 91m % Zn from 98m (ended in mineralisation) % Zn & 1.09% Pb from 76m % Zn from 78m % Pb from 82m (ended in mineralisation) Due to the high influx of groundwater most of the holes could not be completed to target depth using the reverse circulation percussion rig contracted to Monax for the project. A follow up diamond drilling program is planned for the near future to complete all holes to the target depth and test the depth and lateral extent of mineralisation. An additional geologist has been hired to manage this program who is a base metals expert in this geological environment.

3 Punt Hill Punt Hill (EL 3457), covering 887 km 2 is located on the eastern margin of the Gawler Craton within the Olympic Iron-Oxide-Copper-Gold (IOCG) Province. The Olympic IOCG Province is host to the world class Olympic Dam deposit, Prominent Hill, and recently discovered Carrapateena Prospect 1.83% Cu & 0.64 g/t Au). Punt Hill is situated ~25 km south of Carrapateena. Company Exploration Since granting of the tenement in late November 2005 the company has undertaken a semi-detailed 1,000 m by 500 m gravity survey followed by a 250 m by 250 m infill survey over significant anomalies. Interpretation of this new gravity data along with detailed aeromagnetics flown by the State Government has revealed numerous coincident/semi-coincident gravity and magnetic anomalies, which appear to be structurally controlled along a regional north-west fault complex. Monax believes that Punt Hill is situated in the same geological environment as the Carrapateena discovery, Olympic Dam and Prominent Hill and therefore is highly prospective for copper-gold-uranium mineralisation. Drilling of the first three targets at Whistlepig, Woodchuck and Groundhog have confirmed the presence of a large iron oxide copper gold style alteration system with visible copper sulphides identified in each hole over a strike length of 3.6 km. Preliminary assay results from the first hole (WPDD1) have been received and have outlined a broad zone of low grade copper and gold mineralisation of 0.13% copper and 0.03 g/t gold from 788m. Monax is currently awaiting the assay results from the second and third holes which intersected more significant visible copper mineralisation. These holes are located along the same gravity anomaly as WPDD1 which extends for over 8.5 km. The current results confirm the presence of a large mineralising system along the Groundhog Gravity Trend. The Flickertail drillhole was completed early yesterday. The drillhole intersected Hiltaba Suite Granite intruded by mafic dykes at 364m with minor hematite and chlorite alteration. The drillhole was terminated at approximately 450m in granite. Further potential for IOCG style mineralisation exists on a parallel gravity ridge to the east at the Marmot and Prairie Dog targets. The Marmot residual gravity anomaly covers and area of 4km by 2km. Drilling of this target will commence early next year.

4 ACN

5 Contents Tenement Status Geophysical data acquisition program Drilling Programs Bonaventura Prospect Kangaroo Island Punt Hill - Iron Oxide Copper Gold

6

7 Tenement Status During the year Punt Hill, Dingo Hill, Eureka Bluff and Brimpton Lake EL s granted Kimono Tank, Mulgathing, Indoorroopilly, Kolendo, Dingo Hill West and Pioneer Bend exploration licences applications

8 TENEMENT STATUS Project Tenement Status Acquired Area km 2 Ambrosia EL 3358 Mt Hope EL 3355 Moorlands EL 3356 Parndana EL 3376 Western River EL 3088 Wynbring EL 3359 Eureka Bluff EL 3458 Dingo Hill EL 3394 Mattaweara EL 2964 Waddikee EL 3357 Punt Hill EL 3457 Brimpton Lake EL 3561 Granted 100% 854 Granted 100% 320 Granted 100% 324 Granted 100% 100 Granted 100% 188 Granted 100% 247 Granted 100% 549 Granted 100% 516 Granted 100% 119 Granted 100% 1004 Granted 100% 887 Granted 100% km 2

9 TENEMENT STATUS Project Tenement Status Acquired Area km 2 Mulgathing ELA 134/06 Kimono Tank ELA 136/06 Dingo Hill West ELA 173/06 Kolendo ELA 202/06 Indooroopilly ELA 315/06 Pioneer Bend ELA 557/06 Application 100% 258 Application 100% 234 Application 100% 195 Application 100% 130 Application 100% 570 Application 100% km 2

10 Geophysics Acquisition 6500 new gravity data have been collected over various Monax tenements during the year, ~ 3000 on our Punt Hill tenement out of line km detailed aeromagnetics have been flown. The survey will be completed early next year.

11 Geophysics Acquisition Residual gravity image Ambrosia tenement Residual gravity image Punt Hill tenement

12 Bonaventura Prospect Kangaroo Island

13 Bonaventura Prospect Kangaroo Island 11 reverse circulation drill holes completed between 80 and 179m deep Targeted extensions of previous high grade zinc intercepts by Havilah Resources Dr Justin Gum has been appointed to undertake follow up drilling

14 Bonaventura Prospect Kangaroo Island

15 Bonaventura Prospect Kangaroo Island Drill section Bonaventura Prospect Drill plan Bonaventura Prospect

16 Punt Hill IOCG Project

17 Punt Hill Iron oxide copper gold (IOCG) project 6 deep diamond drill holes completed to date Targeted two distinct alteration systems First 3 holes have intersected IOCG style alteration and visible copper mineralisation in the first system Second 3 holes hit the western margin of a second alteration system with minor copper sulphides

18 Punt Hill Iron oxide copper gold (IOCG) project

19 Punt Hill Main zone of interest is the Groundhog Gravity Trend Covers an area of 25 km x 8 km Current drilling has demonstrated source of gravity is caused by IOCG style alteration of basement rocks Residual gravity image

20 Punt Hill Two main zones of alteration identified to date Confirmed by the first six drill holes All 6 drill holes drill within the tenement to date have intersected IOCG style alteration Implies a large alteration and potentially mineralising system First vertical derivative magnetic image

21 Punt Hill Faults Whistlepig, Woodchuck and Grounhog drill holes intersected IOCG style alteration and mineralisation Gravity anomaly is over 8.5 km long, 2 km wide System is controlled by north-west structural corridor with cross cutting north-east faults Residual gravity image Gravity ridge to the north-east yet to be tested

22 Whistlepig Drill Core Bornite in hematite-albite altered volcanics Bornite in amphibole-chloritehematite altered volcanics Bornite in hematite-albite-chlorite altered volcanics

23 Whistlepig % Cu and 0.03 g.t Au Whistlepig 2 to be drilled

24 Woodchuck Drill Core Bornite and minor chalcopyrite in hematiteamphibole-chlorite alteration Bornite in hematite altered volcanics Chalcopyrite in chlorite-hematitecarbonate alteration Chalcopyrite in chlorite-hematite alteration

25 Groundhog Drill Core Examples of copper sulphide mineralisation in the Groundhog drill hole (blue = bornite, yellow = chalcopyrite)

26 Residual Gravity Plan to drill Marmot target early next year Significantly larger target on a 10 km by 2 km gravity anomaly

27 Magnetics Marmot occurs in the eastern part of the hydrothermal alteration zone

28 Residual Gravity Plan to drill Marmot target early next year Significantly larger target on a 4 km by 2 km residual gravity anomaly

29 Ladies and Gentlemen, that completes my presentation. In closing I would like to take this opportunity to thank all the Monax staff and my fellow directors for their support during the past year.

ACN ND DECEMBER 2005

ACN ND DECEMBER 2005 ACN 110 336 733 ST BARBARA S DAY 2 ND DECEMBER 2005 ABOUT MONAX MINING Listed on the ASX 21 st September 2005 Market capitalisation A$10 million at 20c per share ~ $5 million in cash 11 exploration licences

More information

ASX RELEASE. Punt Hill Project Update

ASX RELEASE. Punt Hill Project Update Exploration Office Unit 2, 81 Harrison Road Dudley Park SA 5008 ABN: 96 110 336 733 Tel: +61 8 8245 4900 Fax: +61 8 8245 4999 www.monaxmining.com.au For Immediate Release Monday 15 June, 2015 ASX RELEASE

More information

For personal use only

For personal use only 28 th November 2018 Market Announcements Platform ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 AMENDMENT ANNOUCEMENT AUROCH STAKES HIGHLY-PROSPECTIVE IOCG PROJECT AT LAKE TORRENS Auroch

More information

ASX RELEASE. Drilling Commenced at Monax s Punt Hill Copper-Gold Project

ASX RELEASE. Drilling Commenced at Monax s Punt Hill Copper-Gold Project Exploration Office Warehouse I, 5 Butler Blvd BurbridgeBusinessPark Adelaide Airport SA 5950 Postal Address PO Box 247 Export Park SA 5950 ABN: 96 110 336 733 Tel: +61 8 8375 3900 Fax: +61 8 8375 3999

More information

Redbank Granted IOCG Prospective Tenements in Gawler Craton, SA

Redbank Granted IOCG Prospective Tenements in Gawler Craton, SA ASX ANNOUNCEMENT 7 NOVEMBER 2018 Redbank Granted IOCG Prospective Tenements in Gawler Craton, SA HIGHLIGHTS 2018 Project Generation activities for Redbank identified highly prospective Olympic Dam-style

More information

For personal use only

For personal use only Renascor Resources Limited ASX code: RNU The Eastern Eyre Copper Project Presented at the Australian Copper Conference Brisbane, 16 June 2015 David Christensen, Managing Director Renascor Resources 1 Renascor

More information

For personal use only

For personal use only Limited ASX code: RNU The Eastern Eyre Copper Project Presented at the South Australian Resources and Energy Investment Conference Adelaide, 14 April 2015 David Christensen, Managing Director 1 Eastern

More information

NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR

NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR Activities Report Background NT Resources Limited ( NT Resources or the Company ) holds six granted Exploration

More information

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April OZ Minerals Limited Carrapateena Mineral Resources Statement April 14 2011 CARRAPATEENA MINERAL RESOURCE STATEMENT April 14, 2011 The Carrapateena Resource Statement relates to an upgrading to an Inferred

More information

Ni-Cu-Au-U TYPE AIRBORNE ANOMALIES OUTLINED

Ni-Cu-Au-U TYPE AIRBORNE ANOMALIES OUTLINED ABN 28 122 180 205 www.juttholdings.com ASX ANNOUNCEMENT (ASX Code: JUT) 29 February 2008 Ni-Cu-Au-U TYPE AIRBORNE ANOMALIES OUTLINED Tay - Munglinup Project: near Ravensthorpe in the SW of Western Australia

More information

KINGSTON RESOURCES LIMITED

KINGSTON RESOURCES LIMITED KINGSTON RESOURCES LIMITED ASX:KSN ACN 009 148 529 9 April 2015 Company Announcements Office Australian Securities Exchange Six Mile Hill Exploration Update - April 2015 Highlights: Detailed 3D gravity

More information

ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA

ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA ASX / MEDIA RELEASE 5 JULY 2010 ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA Peel Exploration is pleased to announce that recent drilling at the Company s Attunga and May Day projects

More information

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

NEW COBAR-STYLE COPPER DISCOVERY IN NSW ASX / MEDIA RELEASE 2 AUGUST 2011 NEW COBAR-STYLE COPPER DISCOVERY IN NSW Broad zone of copper-polymetallic mineralisation intersected at 4-Mile prospect Highlights: Wide zone of copper-silver-gold-lead-zinc

More information

High Grade Gold Intercepts at Bangaba

High Grade Gold Intercepts at Bangaba 20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com

More information

Exploration Update: RC Drilling Commenced at Lucky Strike

Exploration Update: RC Drilling Commenced at Lucky Strike L efroy ASX Announcement LEFROY EXPLORATION LIMITED Western Australian Focused Gold Explorer ASX Code: LEX Shares on Issue: 64.5m Current Share Price: 17c Market Capitalisation: $11m Board of Directors

More information

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005 ABN 63 110 396 168 FOR THE PERIOD ENDED 31 About Atlas Gold Limited The Company has four projects at varying stages of exploration located at Farrel Well, Pardoo, Mt Minnie and Pearana in the Pilbara region,

More information

For personal use only

For personal use only For personal use only AGM Presentation 2 November 2016 Greg Solomon Chairman 3 Investment in Eden Energy Ltd (ASX:EDE) Tasman holds 493 million shares (42%) in the issued capital of Eden and 101 million

More information

For personal use only

For personal use only 22 April 2013 Drilling to commence at Majada, Copper-Gold Prospect, Chile. Red Gum Resources Limited (ASX: RGX, Red Gum or the Company ) is pleased to announce that drilling of its Majada Copper-Gold Prospect,

More information

Sipa Resources Limited

Sipa Resources Limited 30 October 2012 Sipa Resources Limited ABN 26 009 448 980 September Quarter 2012 Quarterly ASX Report HIGHLIGHTS The September Quarter, and through October, has seen a very high level of drilling and geophysical

More information

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 20 September 2010 EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT Boddington South Gold

More information

Drilling program commences on Cloncurry and Mount Isa projects

Drilling program commences on Cloncurry and Mount Isa projects 1P P May UASX/Media Announcement st 2009 Drilling program commences on Cloncurry and Mount Isa projects Key Points 1,700 metres reverse circulation drilling program over two prospects on untested geochemical,

More information

Quarterly Activities Report For the Period Ended March HIGHLIGHTS

Quarterly Activities Report For the Period Ended March HIGHLIGHTS Quarterly Activities Report For the Period Ended March 31 2008 HIGHLIGHTS Merceditas Project, Chile Genesis Minerals Limited secured an Option to acquire a 100% interest in the significant Merceditas copper

More information

ASX RELEASE. Exploration Update

ASX RELEASE. Exploration Update Exploration Office Warehouse I, 5 Butler Blvd BurbridgeBusinessPark Adelaide Airport SA 5950 Postal Address PO Box 247 Export Park SA 5950 ABN: 96 110 336 733 Tel: +61 8 8375 3900 Fax: +61 8 8375 3999

More information

Bass Metals records further positive drill results & progress at 3 prospects.

Bass Metals records further positive drill results & progress at 3 prospects. 16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret

More information

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE ASX ANNOUNCEMENT 10 FEBRUARY 2015 APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE HIGHLIGHTS 2014 Exploration 2015 Plans Project 1: Eaglehawk IOCG & TiO 2-Phosphate o Confirmed IOCG age geology, alteration

More information

Quarterly Report for the period ended 31 March 2006

Quarterly Report for the period ended 31 March 2006 96 Parry Street PERTH WA 6000 PO Box 8178 PERTH BUSINESS CENTRE WA 6849 Ph: (08) 9328 9292 Fax: (08) 9227 6011 Email: info@nsrltd.com, Web: www.nsrltd.com Quarterly Report for the period ended 31 March

More information

UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT

UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT ASX ANNOUNCEMENT 1 April 2015 UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT Attached for shareholders information, is an announcement made to the market by Apollo Minerals Limited (ASX:

More information

Drilling Program Commences on Iron Oxide Copper Gold Targets

Drilling Program Commences on Iron Oxide Copper Gold Targets 3 June 2008 Manager Company Announcements Company Announcements Office Australian Stock Exchange Limited Level 10, 20 Bond Street SYDNEY NSW 2000 ABN 42 082 593 235 Electronic delivery No of pages: 6 Drilling

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 1 May 2015 GOLD AND IOCG DRILLING COMMENCES AT THE TITAN PROJECT, SOUTH AUSTRALIA HIGHLIGHTS Planned 2,150m RC drilling campaign has commenced at the Titan Project in South Australia to

More information

SECOND DRILL HOLE IHAD2 INTERSECTS MINERALIZED TAPLEY HILL FORMATION AND MINERALIZED BASEMENT IRON FORMATION

SECOND DRILL HOLE IHAD2 INTERSECTS MINERALIZED TAPLEY HILL FORMATION AND MINERALIZED BASEMENT IRON FORMATION Suite 304, 22 St Kilda Road St Kilda Vic 3182 Ph: +61 3 9692 7222; Fax: +61 3 9529 8057 For Immediate Release 14 th September 2007 SECOND DRILL HOLE IHAD2 INTERSECTS MINERALIZED TAPLEY HILL FORMATION AND

More information

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland 1 July 2008 The Manager, Companies Australian Securities Exchange Ltd Electronic Announcement System Dear Sir, AXIOM MINING LIMITED (ASX CODE: AVQ) ASX Announcement Axiom Nightflower Drilling Progress

More information

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2008

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2008 QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2008 Highlights Surface sampling identified a potential mineralized zone at the Emperor zinc prospect at the Quartz Circle Project in Western Australia Desktop

More information

Chalice, Higginsville Drilling

Chalice, Higginsville Drilling Chalice, Higginsville Drilling 31 May 2006 Eastern Goldfields Higginsville Chalice First results from Chalice Gold Mines Limited s (Chalice Gold Mines or Company) drilling program have been received. Chalice

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 31 August 2012 DRILLING SUCCESS CONTINUES AT GUCHAB Near surface copper mineralisation in drill core from GCDD0002 HIGHLIGHTS The pilot programme of diamond drilling at Guchab continues

More information

SOUTHERNGOLD. Southern Gold Limited ACN

SOUTHERNGOLD. Southern Gold Limited ACN Southern Gold Limited ACN 107 424 519 Company Update November 2005 Southern Gold Limited ACN 107 424 519 ASX Code : SAU Current Share Price: ~$0.20 Shares on Offer: 45M Market Cap ~$9M Date Listed 24 April

More information

SQUARE POST PROJECT CHARTERS TOWERS NORTH QUEENSLAND AUSTRALIA

SQUARE POST PROJECT CHARTERS TOWERS NORTH QUEENSLAND AUSTRALIA SQUARE POST PROJECT CHARTERS TOWERS NORTH QUEENSLAND AUSTRALIA Square Post - Summary PROJECT DETAILS - SQUARE POST The Square Post exploration permit (EPM 18510) contains two styles of mineralisation:

More information

ASX:RDM SACOME DECEMBER 2017 RED METAL SOUTH AUSTRALIA

ASX:RDM SACOME DECEMBER 2017 RED METAL SOUTH AUSTRALIA ASX:RDM SACOME DECEMBER 2017 RED METAL SOUTH AUSTRALIA IOCG Systems Iron Fe3+ Hematite Olympic Dam Copper IOCG Systems Iron Fe2+ Hematite Olympic Dam Copper Magnetite Candelaria Ernest Henry Sossego Salabo

More information

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width

More information

For personal use only

For personal use only 25 January 2017 HIGH GRADE ZINC, LEAD AND SILVER RESULTS UPDATE Korab Resources Ltd ( Korab, or Company ) () refers to the ASX report dated 23 November 2016 which discussed the review of historical RC

More information

QUARTERLY ACTIVITIES REPORT ENDING 30 SEPTEMBER 2010 HIGHLIGHTS

QUARTERLY ACTIVITIES REPORT ENDING 30 SEPTEMBER 2010 HIGHLIGHTS Date: 29 th October 2010 QUARTERLY ACTIVITIES REPORT ENDING 30 SEPTEMBER 2010 HIGHLIGHTS Encouraging nickel results received for the Falcon Bridge Project. Second round of drilling at Falcon Bridge Project

More information

ASX ANNOUNCEMENT 19 NOVEMBER 2015 SIGNIFICANT GOLD PROSPECT CONFIRMED AT APOLLO S SA GOLD PROJECT NEAR CHALLENGER

ASX ANNOUNCEMENT 19 NOVEMBER 2015 SIGNIFICANT GOLD PROSPECT CONFIRMED AT APOLLO S SA GOLD PROJECT NEAR CHALLENGER ASX ANNOUNCEMENT 19 NOVEMBER 2015 HIGHLIGHTS SIGNIFICANT GOLD PROSPECT CONFIRMED AT APOLLO S SA GOLD PROJECT NEAR CHALLENGER Independent expert, Dr. Kevin Wills, involved in discovering the Challenger

More information

For personal use only

For personal use only ASX ANNOUNCEMENT ASX: IVG Date: 30 April 2012 Number: 030_300412 MARCH 2012 QUARTERLY REPORT SUMMARY Market Cap A$2.23m ($0.062 p/s) Issued Capital 36,006,006 Assay data and mineral alteration studies

More information

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE ASX ANNOUNCEMENT 21 APRIL 2017 TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE RC Blade drilling commences at Tandarra Gold Project Up to 3,800 metres planned in 67

More information

SILVER CITY MINERALS LIMITED ABN Silver City Minerals

SILVER CITY MINERALS LIMITED ABN Silver City Minerals ABN 68 130 933 309 ASX Code: SCI Silver City Minerals Annual General Meeting 20 November 2014 SILVER CITY MINERALS SNAPSHOT BROKEN HILL (Ag-Pb-Zn) Project Review and Prioritization: Focus and Plan Razorback

More information

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER ASX / MEDIA RELEASE 6 MAY 2011 4-MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER Highlights: Silver-lead-zinc discovery at 4-Mile; mineralisation intersected in all

More information

For personal use only

For personal use only INTEGRATED RESOURCES GROUP LIMITED REPORT ON ACTIVITIES, MARCH 2012 QUARTER HIGHLIGHTS Announcement of company transforming Maryborough Basin project acquisition, expected to be completed in June 2012.

More information

SIGNIFICANT GOLD INTERCEPTS INCLUDING AN END OF HOLE INTERCEPT OF 4.71 g/t GOLD AT THE AXFORD PROSPECT, LAKE WELLS PROJECT

SIGNIFICANT GOLD INTERCEPTS INCLUDING AN END OF HOLE INTERCEPT OF 4.71 g/t GOLD AT THE AXFORD PROSPECT, LAKE WELLS PROJECT 29 th August 2012 MEDIA RELEASE / ASX ANNOUNCEMENT SIGNIFICANT GOLD INTERCEPTS INCLUDING AN END OF HOLE INTERCEPT OF 4m @ 4.71 g/t GOLD AT THE AXFORD PROSPECT, LAKE WELLS PROJECT Significant end-of-hole

More information

For personal use only

For personal use only ASX/MEDIA ANNOUNCEMENT 16 NOVEMBER 2012 ASX Code: HOR Management Mr Jeremy Shervington Non Executive Chairman Mr Neil Marston Managing Director Mr Michael Fotios Non Executive Director Mr Stuart Hall Non

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 7 March 2012 High Priority Gold Drilling Targets at Marymia Project COMPANY DIRECTORS Mr Ian Tchacos Non-Executive Chairman Mr Bruce Franzen Executive Director HIGHLIGHTS High priority

More information

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam ASX Announcement 28 January 2010 Drill results indicate large Porphyry Copper Gold System at Peenam Highlights: 270 metres of visible copper (gold) mineralisation in first diamond core hole at Peenam Prospect

More information

ASX Announcement NAKRU DRILLING AND TRENCHING INTERSECTS 11 METRES AT 2.84 G/T GOLD AND 28.4 METRES AT 1.1% COPPER

ASX Announcement NAKRU DRILLING AND TRENCHING INTERSECTS 11 METRES AT 2.84 G/T GOLD AND 28.4 METRES AT 1.1% COPPER ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement

More information

MOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE

MOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE ASX/Media Announcement 20 th September 2010 MOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE MT DOROTHY: Phase 2 diamond drilling to commence. ELAINE DOROTHY New copper zone discovered and to be drilled.

More information

For personal use only

For personal use only ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 28 NOVEMBER 2012 DRILLING UPDATE MABILO PROJECT The Directors of Sierra Mining Limited ( Sierra ) are pleased to announce further results from reconnaissance

More information

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT ASX ANNOUNCEMENT 8 March 2011 LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT New true-width intercepts along strike from Katanning Deposit include: o BSRC0050-10m

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 29 JANUARY 2015 HIGHLIGHTS QUARTERLY ACTIVITIES REPORT IOCG AND GOLD PROJECTS Drilling programme completed at Mars Aurora Tank and Eaglehawk JV project areas for 9 holes totalling 1,845

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 29 July 2011 KATANNING UPDATE GOLD DISCOVERED AT JACKSON First-pass drilling at Jackson confirms presence of primary gold mineralisation Potential for third ore body at the Katanning Gold

More information

For personal use only

For personal use only ACN 097 088 689 ASX Announcement 1 EXPLORATION SUCCESS CONTINUES AT RAVENSWOOD RC drilling targeting shallow portions of Welcome breccia returns a number of significant new results including: 7m @ 7.84g/t

More information

Acquisition of Kilfoyle Project, Northern Territory

Acquisition of Kilfoyle Project, Northern Territory ASX Announcement 31 May 2018 Level 1, 135 Fullarton Road Rose Park, SA 5067 Australia Telephone +61 (0) 8 8364 3188 Facsimile +61 (0) 8 8364 4288 info@pnxmetals.com.au www.pnxmetals.com.au Acquisition

More information

For personal use only

For personal use only ACN 092 471 513 6 February 2012 ASX Release New drill assays up to 4% Cu confirm high grade copper continues at depth at Empire s Yuinmery project in WA 3m @ 4.0% Cu within 6m @ 3.0% Cu in drill hole YRC11-41D

More information

For personal use only

For personal use only 23 September 2016 ASX Code: AGS WILCHERRY PROJECT, SOUTH AUSTRALIA ACQUISITION & JOINT VENTURE PROSPECTIVE FOR GOLD AND BASE METALS POTENTIAL NEW TIN PROVINCE Alliance Resources Limited (Alliance) has

More information

For personal use only

For personal use only Quarterly Report for quarter ended 30 September 2016 Meteoric Resources NL ABN 64 107 985 651 ASX Code: MEI Ground Floor 10 Outram Street West Perth WA 6005 T +61 8 9485 2836 F +61 8 9321 6571 E info@meteoric.com.au

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 8 October 2012 FRESH REVIEW OF HIGH GRADE GOLD LODES ON BATANGAS PROJECT SOUTH OF MANILA A new review of available data on high grade epithermal gold lodes including beneath an historic

More information

MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT HIGHLIGHTS

MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT HIGHLIGHTS MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT ASX RELEASE 21 MARCH 2011 HIGHLIGHTS Recently completed auger soil geochemistry program has defined a 130m

More information

Queensland Mining Corporation Limited

Queensland Mining Corporation Limited Queensland Mining Corporation Limited ABN 61 109 962 469 ASX Release 29 th July 2011 Drilling Commenced at Duck Creek Copper-Gold Project, Cloncurry, North-west Queensland Highlights RC drilling has commenced

More information

For personal use only

For personal use only 10 July 2012 Encouraging New Gold Results from Gunung Rosa Drilling Highlights Assay results from three drill holes at depth under the Cap Palu section confirm significantly wider intercepts of gold-copper-base

More information

For personal use only

For personal use only BOARD OF DIRECTORS Mr Oscar Aamodt Non-Executive Chairman Ms Sofia Bianchi Non-Executive Director Mr Lindsay Dudfield Non-Executive Director Mr Anthony Ho Non-Executive Director ISSUED CAPITAL SHARES 156,852,955

More information

Encouraging drill results from Paroo Range

Encouraging drill results from Paroo Range 17 July 2012 The Manager ASX Company Announcements Office PO Box H224, Australia Square SYDNEY NSW 2001 Encouraging drill results from Paroo Range Highlights Significant uranium mineralisation at the 100%

More information

QUARTERLY REPORT For the period ended 31 December 2007

QUARTERLY REPORT For the period ended 31 December 2007 QUARTERLY REPORT For the period ended 31 December 2007 CORPORATE SUMMARY ASX CODE GXY ISSUED CAPITAL Shares 44.6 million Options 11.2 million MARKET CAP A$22 million CASH A$0.41 million DIRECTORS Craig

More information

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS Magmatic Resources Ltd Level 1, 11 Lucknow Place West Perth WA 6005 Phone: +61 8 6102 2709 www.magmaticresources.com ASX / MEDIA ANNOUNCEMENT 21 August 2017 RC DRILLING TO RESUME THIS WEEK AT CARLISLE

More information

Significant Copper-Gold JORC Exploration Target

Significant Copper-Gold JORC Exploration Target 12 March 2013 Highlights: ASX & MEDIA ANNOUNCEMENT Significant Copper-Gold JORC Exploration Target ü JORC i Exploration Target 1 of 4.8-6.2Mt @ 2.00-2.78% Cu and 1.23-2.23g/t Au confirmed. ü Opportunity

More information

DORAY SIGNS LANDMARK EXPLORATION FARM-IN AGREEMENT WITH ILUKA RESOURCES IN SOUTH AUSTRALIA

DORAY SIGNS LANDMARK EXPLORATION FARM-IN AGREEMENT WITH ILUKA RESOURCES IN SOUTH AUSTRALIA ASX Announcement 17 November 2014 DORAY SIGNS LANDMARK EXPLORATION FARM-IN AGREEMENT WITH ILUKA RESOURCES IN SOUTH AUSTRALIA Doray signs gold exploration Farm-in Agreement with Iluka in South Australia

More information

COPPERSTONE RESOURCES AB INTERCEPTS ZONE OF CHALCOPYRITE-ARSENOPYRITE- BORNITE MINERALIZATION AT SVARTLIDEN IN FIRST DEEP DRILLHOLE FROM 720m-810m

COPPERSTONE RESOURCES AB INTERCEPTS ZONE OF CHALCOPYRITE-ARSENOPYRITE- BORNITE MINERALIZATION AT SVARTLIDEN IN FIRST DEEP DRILLHOLE FROM 720m-810m COPPERSTONE RESOURCES AB INTERCEPTS ZONE OF CHALCOPYRITE-ARSENOPYRITE- BORNITE MINERALIZATION AT SVARTLIDEN IN FIRST DEEP DRILLHOLE FROM 720m-810m In mid-january 2017 Copperstone Resource published a geological

More information

SUMMARY. QUARTERLY REPORT for the Quarter Ended 31 March km uranium zone with grades up to 0.03% U 3 O 8 at Lake Seabrook.

SUMMARY. QUARTERLY REPORT for the Quarter Ended 31 March km uranium zone with grades up to 0.03% U 3 O 8 at Lake Seabrook. QUARTERLY REPORT for the Quarter Ended 31 March 2009 Magnetic Resources NL ABN 34 121 370 232 SUMMARY ASX Code: MAU 35 Outram Street West Perth WA 6005 T +61 8 9226 1777 F +61 8 9485 2840 E info@magres.com.au

More information

Spectacular uranium assays from rock sampling. at FYI s Yarlarweelor project in Western Australia

Spectacular uranium assays from rock sampling. at FYI s Yarlarweelor project in Western Australia Tuesday 6 July, 2010 ASX Release (ASX code: FYI ) Spectacular uranium assays from rock sampling at FYI s Yarlarweelor project in Western Australia Uranium assays of 7,992 parts per million (ppm), 4,062

More information

QUARTERLY REPORT for the Quarter Ended 31 December Jubuk resource drilling imminent.

QUARTERLY REPORT for the Quarter Ended 31 December Jubuk resource drilling imminent. QUARTERLY REPORT for the Quarter Ended 31 December 2010 HIGHLIGHTS Magnetic Resources NL ABN 34 121 370 232 IRON ORE ASX Codes: MAU and MAUCA Level 2, 16 Ord Street West Perth WA 6005 T +61 8 9226 1777

More information

FURTHER DISCOVERY KM COPPER PROJECT

FURTHER DISCOVERY KM COPPER PROJECT FURTHER DISCOVERY KM COPPER PROJECT ASX Release 24 October 2011 VOYAGER RESOURCES LIMITED ACN 076 390 451 Level 1 / 33 Richardson Street WEST PERTH stralia Tel: +61 8 9200 6264 Fax: +61 8 9200 4469 Contact:

More information

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate 29 th July 2010 June December 2010 Quarterly Report Report 2008 Highlights Wa Project Kandia Prospect» RC drilling defines open ended zones of sediment hosted gold mineralisation at the site of the Kandia

More information

SUMBA EXPLORATION UPDATE

SUMBA EXPLORATION UPDATE ASX RELEASE Tuesday, 23 November 2010 SUMBA EXPLORATION UPDATE Hillgrove Resources Limited (ASX:HGO) today announces a planned airborne geophysical survey, Pelitalira prospect progress and final results

More information

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM ASX RELEASE 4 April 2007 REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM The Directors of Hemisphere Resources Limited ( Hemisphere or the Company ) are pleased to announce that a review has been conducted

More information

Mountain Maid Gold System Displays Major Size Potential

Mountain Maid Gold System Displays Major Size Potential 29 July 2008 The Manager, Companies Australian Securities Exchange Ltd Electronic Announcement System Dear Sir, AXIOM MINING LIMITED (ASX CODE: AVQ) ASX Announcement Mountain Maid Gold System Displays

More information

ASX Announcements & Media Release

ASX Announcements & Media Release ASX Announcements & Media Release October 15, 2010 Fast Facts ASX Code: RNS Shares on issue: 62.2 million Cash at bank: $5 million (Sept 2010) Board & Management Rick Hart, Chairman Justin Tremain, Managing

More information

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts MARCH 2012 QUARTERLY REPORT Highlights Magnetic and radiometric survey acquired for Wyloo Anomalous gold zones identified at Wyloo from desktop study Ongoing exploration program completed at Wyloo Application

More information

******************* *******************

******************* ******************* This announcement lifts the trading halt requested by the Company on the 13 September 2012 Announcement to the Australian Securities Exchange Monday 17 September 2012 COMPANY UPDATE PARTIALLY UNDERWRITTEN

More information

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011 4 July 2011 ASX Announcement New economic gold results confirm Dave East as an exciting new discovery Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 24 JUNE 2015 APOLLO MINERALS WINS FUNDING GRANT FOR DRILLING AT FRASER RANGE PROJECT HIGHLIGHTS Apollo Minerals awarded $150,000 funding grant for its Fraser Range project The grant was

More information

Kalman Mineral Resource Update

Kalman Mineral Resource Update 10 September 2008 The Manager Company Announcements Office stralian Stock Exchange Via Online Electronic Lodgement Kalman Mineral source Update The Directors are pleased to announce an updated mineral

More information

GREATLAND GOLD PLC (AIM:GGP) ERNEST GILES PROJECT - EASTERN YILGARN

GREATLAND GOLD PLC (AIM:GGP) ERNEST GILES PROJECT - EASTERN YILGARN GREATLAND GOLD PLC (AIM:GGP) ERNEST GILES PROJECT - EASTERN YILGARN Ownership Greatland Pty Ltd 100% Area 1,800 square kilometres Licences E38/2204 Calanchini Granted E38/2882 Carnegie Granted E38/3183

More information

Aurora Tank Gold Drilling Update

Aurora Tank Gold Drilling Update ASX ANNOUNCEMENT 19 December 2016 Marmota Limited (ASX: MEU) ( Marmota ) Aurora Tank Gold Drilling Update Marmota is pleased to advise that 31 RC holes at Aurora Tank have now been completed. KEY POINTS

More information

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project ASX ANNOUNCEMENT 4 December 2018 ASX: NWM Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project Norwest Minerals listed on the ASX 29 th November following its successful $6.6

More information

EIS sponsored Diamond drilling to commence at Zanex

EIS sponsored Diamond drilling to commence at Zanex L efroy ASX Announcement LEFROY EXPLORATION LIMITED Western Australian Focused Gold Explorer ASX Code: LEX Shares on Issue: 64.5m Current Share Price: 16.5c Market Capitalisation: $10.6m Board of Directors

More information

PRESS RELEASE 16th SEPTEMBER 2008 BEOWULF ANNOUNCES INFERRED RESOURCE FOR THE LULEPOTTEN COPPER-GOLD DEPOSIT, BALLEK JOINT VENTURE, SWEDEN

PRESS RELEASE 16th SEPTEMBER 2008 BEOWULF ANNOUNCES INFERRED RESOURCE FOR THE LULEPOTTEN COPPER-GOLD DEPOSIT, BALLEK JOINT VENTURE, SWEDEN PRESS RELEASE 16th SEPTEMBER 2008 BEOWULF ANNOUNCES INFERRED RESOURCE FOR THE LULEPOTTEN COPPER-GOLD DEPOSIT, BALLEK JOINT VENTURE, SWEDEN 16 September 2008: Beowulf Mining PLC ('Beowulf' AIM:BEM, Aktietorget:BEO),

More information

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season 29 th October 2010 September December Quarterly 2010 Quarterly Report 2008 Report Highlights RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season Major drill programs

More information

SUMMARY HIGHL. The project is located close to road and gas pipeline infrastructure and a large service centre.

SUMMARY HIGHL. The project is located close to road and gas pipeline infrastructure and a large service centre. INDEPENDENCE GROUP NL COMPANY DETAILS A SX A N NOUNCEMENT 2 1 s t JANUARY 2008 5 Pages IGO Acquires the Karlawinda Gold Project ASX CODE: IGO ABN: 46 092 786 304 DIRECTORS Rod Marston Non-Exec Chairman

More information

FIRST 2 DRILL HOLES AT NAKRU-2 PROSPECT BOTH INTERSECT SIGNIFICANT HIGHER GRADE COPPER MINERALISATION

FIRST 2 DRILL HOLES AT NAKRU-2 PROSPECT BOTH INTERSECT SIGNIFICANT HIGHER GRADE COPPER MINERALISATION ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement

More information

For personal use only

For personal use only ASX QUARTERLY REPORT GEOPACIFIC RESOURCES NL ACN 003 208 393 ASX Code: GPR info@geopacific.com.au www.geopacific.com.au AUSTRALIAN OFFICE Suite 6, 125 Melville Parade Como, WA 6152 SEPTEMBER 2012 QUARTERLY

More information

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement

More information

DRILLING EXPANDS SIGNIFICANT COPPER-GOLD PORPHYRY SYSTEM AT IVANHOE S KHARMAGTAI PROJECT IN MONGOLIA

DRILLING EXPANDS SIGNIFICANT COPPER-GOLD PORPHYRY SYSTEM AT IVANHOE S KHARMAGTAI PROJECT IN MONGOLIA For immediate release November 26, 2002 DRILLING EXPANDS SIGNIFICANT COPPER-GOLD PORPHYRY SYSTEM AT IVANHOE S KHARMAGTAI PROJECT IN MONGOLIA ULAANBAATAR, MONGOLIA Ivanhoe Mines Chairman Robert Friedland

More information

Sipa Resources Limited ABN

Sipa Resources Limited ABN Sipa Resources Limited ABN 26 009 448 980 Aims of Diamond Drilling Programme Achieved The copper sulphide chalcopyrite, intersected in each of three holes, at two locations at Enigma: best copper intersection

More information

For personal use only

For personal use only ASX/MEDIA RELEASE NICKEL SULPHIDE DISCOVERY AT FISHER EAST Highlights RC drilling at Fisher East discovers nickel sulphides Sulphide mineralisation coincident with EM conductors Mineralisation encountered

More information

Northern Mining Limited 2012 Annual General Meeting Presentation

Northern Mining Limited 2012 Annual General Meeting Presentation NORTHERN MINING LIMITED Northern Mining Limited 2012 Annual General Meeting Presentation www.northernmining.com.au 23 November 2012 NORTHERN MINING LIMITED DISCLAIMER This presentation has been prepared

More information