Unlocking Value in Mineral Assets. C o r p o r a t e P r e s e n t a t i o n - N o v e m b e r

Size: px
Start display at page:

Download "Unlocking Value in Mineral Assets. C o r p o r a t e P r e s e n t a t i o n - N o v e m b e r"

Transcription

1 Unlocking Value in Mineral Assets C o r p o r a t e P r e s e n t a t i o n - N o v e m b e r

2 Forward Looking Statements This presentation includes statements containing forward-looking information about Monument, its business and future plans ( forward-looking statements ). Forward-looking statements are statements that involve expectations, plans, objectives or future events that are not historical facts and include the Company s plans with respect to its mineral projects and the timing and results of proposed programs and events referred to in this presentation. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". The forward-looking statements in this presentation are subject to various risks, uncertainties and other factors that could cause actual results or achievements to differ materially from those expressed or implied by the forward-looking statements. These risks and certain other factors include, without limitation: risks related to general business, economic, competitive, geopolitical and social uncertainties; uncertainties regarding the results of current exploration activities; uncertainties in the progress and timing of development activities; foreign operations risks; other risks inherent in the mining industry and other risks described in the management discussion and analysis of the Company and the technical reports on the Company s projects, all of which are available under the profile of the Company on SEDAR at Material factors and assumptions used to develop forward-looking statements in this presentation include: expectations regarding the estimated cash cost per ounce of gold production and the estimated cash flows which may be generated from the operations, general economic factors and other factors that may be beyond the control of Monument; assumptions and expectations regarding the results of exploration on the Company s projects; assumptions regarding the future price of gold of other minerals; the timing and amount of estimated future production; the expected timing and results of development and exploration activities; costs of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; exchange rates; and all of the factors and assumptions described in the management discussion and analysis of the Company and the technical reports on the Company s projects, all of which are available under the profile of the Company on SEDAR at Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forwardlooking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking statements, except in accordance with applicable securities laws. 2

3 Monument- At-A-Glance Selinsing Gold Portfolio 150 km² 282Koz Au PRODUCED Murchison Gold Portfolio 259 km² Mengapur Copper-Iron Portfolio 9 km² 3

4 Why Own Monument? 4

5 Investment Highlights Gold producer, developer, explorer and acquirer - $254.3 million mineral property portfolio in Malaysia and Western Australia Selinsing Gold Mine in Malaysia - 9 years in production for 282,105 ounces with $377.9 million revenue and cash cost of $470/oz to the end of fiscal Mineral Resources of 764Koz including Mineral Reserves of 279koz Au at 1.4 g/t, $23 million NPV* - Exploration potential over 1Moz Murchison Gold Portfolio in Western Australia - Completing a scoping study to assess underground opportunities and strategize Burnakura production for secondary cash flow generation - 381Koz Au NI Mineral Resources with 293Koz Indicated, 88Koz Au Inferred** - Exploration potential over 1Moz for multiple surface and underground mines Mengapur Copper-Iron Project in Malaysia 5 - Long term potential with economic scale, application for 10 years tax holiday - New NI Mineral Resource Estimation Technical Report (October 2018)*** * NI technical report produced by Snowden Mining Industry Consultants Pty Ltd Sedar filed in December 2016 ** NI technical report produced by SRK Consulting (Australasia) Pty Ltd Sedar filed in July 2018 ***NI technical report produced by Snowden Mining Industry Consultants Pty Ltd Sedar filed October 2018

6 Growth Focus with Strong Balance Sheet Based on Audited Balance Sheet to June 30, 2018 Balance Sheet (in thousands of US dollars) June 30, 2018 June 30, 2017 June 30, 2016 $ $ $ Current assets 33,935 29,419 34,576 Non-current assets 220, , ,478 Total assets 254, , ,054 Current liabilities 6,831 4,970 6,238 Non-current liabilities 19,710 12,773 14,205 Equity attributable to shareholders 227, , ,611 Total liabilities and shareholders' equity 254, , ,054 Working Working capital (including restricted cash) Capital 27,104 24,449 28,338 $27.1 M 6

7 Management Team Robert Baldock Executive Chairman Cathy Zhai President & CEO Zaidi Harun VP, Business Development Matthew Antill General Manager, Operations Neil Rauert Senior Project Manager, Technical Support Charlie Northfield General Manager, Selinsing Gold Mine Roger Stangler Chief Managing Geologist Kelvin Lee CFO, VP, Finance & Administration 7

8 2019 Objectives The aim for fiscal 2019 is to unlock value in our development assets by progressing from studies into financing, construction, and then production Selinsing Gold Mine in Malaysia - Complete the Sulphide Project Feasibility Study, deliver an execution plan for project financing and commencement of construction Murchison Gold Portfolio in Western Australia - Complete a scoping study to assess underground opportunities and strategize Burnakura production for secondary cash flow generation Mengapur Copper-Iron Project in Malaysia - Complete metallurgical testwork to work towards a feasibility study Our ultimate objective is to build on our current gold assets through acquisitions and return value to our shareholders 8

9 Selinsing Success Story Acquired Tenements in June 2007 Started Selinsing Gold Mine commercial production in September Upgraded mill capacity to 1 million tpa in August 2012 Replaced more than 100% of the gold inventory in December Identified BIOX as the optimum solution to treat gold sulphides in 2017 Cash costs (project to June, ) $470 per ounce Produced 282koz of gold (project to June, ) at Selinsing Gold Mine, US$378 million gross revenue Defined upside potential exploration targets for both open pit and underground opportunities

10 Selinsing Gold Mine in Malaysia Located at Bukit Selinsing, 160 km north of Kuala Lumpur, the Capital of Malaysia. Covering 150 km² on Peninsular Malaysia Gold Belts containing multiple mining centres. Aggregation of 4 major projects of: Selinsing Felda Land Block 7 Buffalo Reef Famehub 1.00 million tpa CIL processing plant and associated infrastructure located at Selinsing Exploration Potential to all directions and underground opportunities 10

11 Selinsing Reserves Fully replaced GOLD inventory for 6 years life of mine Selinsing/Buffalo Reef/Block 7 (NI , Snowden Dec. 2016) Category OXIDE (above approx. 0.3 g/t Au cut-off) Table 1: Selinsing-Buffalo Reef/Felda Reserves as of June 30, 2016 (Snowden) 279 KOZ GOLD TRANSITION (above approx. 0.7 g/t Au cut-off) SULPHIDE (above approx. 0.7 g/t Au cut-off) OXIDE + TRANSITION + SULPHIDE ktonnes g/t Au (koz) ktonnes g/t Au (koz) ktonnes g/t Au (koz) ktonnes g/t Au (koz) Mineral Reserves (based on a US$1,255/oz gold price) Proven* 2, , Probable , , P+P 2, , , *Proven Reserve is entirely stockpile material; Probable Reserve comprises in situ material occurring in Selinsing and Buffalo Reef/Felda deposits 11 NI Technical Report: Selinsing Gold Mine and Buffalo Reef Project, Malaysia, filed on December 14, 2016 prepared in independent consultants Snowden Mining Industry Consultants Pty. Ltd

12 Selinsing Resources Selinsing/Buffalo Reef/Block 7 (NI , Snowden Dec. 2016) Table 2: Selinsing-Buffalo Reef/Felda Resources as of June 30, 2016 (Snowden) 764 KOZ GOLD Category OXIDE (above 0.3 g/t Au cutoff) TRANSITION (above 0.7 g/t Au cut-off) SULPHIDE (above 0.7 g/t Au cut-off) OXIDE + TRANSITION + SULPHIDE ktonnes g/t Au (koz) ktonnes g/t Au (koz) ktonnes g/t Au (koz) ktonnes g/t Au (koz) Mineral Resources, reported inclusive of Reserves (based on a US$1,776/oz gold price) Measured* 2, , Indicated , , M+I 2, , , Inferred , , *Measured Resource is entirely stockpile material; Indicated and Inferred Resource comprises in situ material occurring in Selinsing and Buffalo Reef/Felda deposits 12 NI Technical Report: Selinsing Gold Mine and Buffalo Reef Project, Malaysia, filed on December 14, 2016 prepared in independent consultants Snowden Mining Industry Consultants Pty. Ltd

13 Selinsing Financial Results Based on Audited Financial Statements to June 30, 2018 Growth focused Expenditure for NEW GOLD: Fiscal year Project to Date Selinsing_Buffalo Reef_Felda (in US$ 000s) Acquisition in cash 15, ,614 17,234 Buildings, plant and equipment ,898 8,257 2,093 7,395 1, ,499 1,342 1,410 34,492 Mine development ,270-3, ,861 2, ,439 14,075 Exploration - 2,479 1, ,229 3,705 6,111 3,835 4,250 3,008 1,311 1,061 30,694 Result: Selinsing Reserves Fully replaced in Fiscal

14 Selinsing NI PFS December 2016 Economic model after taxation at gold price US$1,255 per ounce Item Unit Value at $1,255 /oz Au Net cash flow $ M 37.2 NPV8 $ M 23.1 IRR % 34.8 Economic model before taxation Item Unit Value at $1,255 /oz Au Net cash flow $ M 47.7 NPV8 $ M 31.4 IRR % 43.5 Selinsing Project economic model inputs Item Unit Value Life of Project production years 6.74 LOM ore mined kt 3,990 LOM ore processed kt 6,252 LOM waste mined kt 32,864 LOM average Au grade g/t Au 1.10 LOM average Au recovery % 79.0 LOM recovered ounces koz 227 Plant throughput Mt/a 0.95 LOM Au price $/oz Cash flow sensitivity graph 14 All information is extracted from the Prefeasibility Study-NI Technical Report: Selinsing Gold Mine and Buffalo Reef Project, Malaysia, filed on December 14, 2016 prepared in independent consultants Snowden Mining Industry Consultants Pty. Ltd

15 Selinsing Gold Processing Plant UPGRADED EXISTING The Outotec BIOX Process is for the treatment of refractory gold concentrates and has been in commercial operation for 30 years with 13 successful BIOX plants commissioned worldwide. To date, over 22 million ounces of gold have been produced through BIOX. Selinsing batch testwork programme results reported by Outotec showed that over 90% sulphide oxidation occurred after 9 days, 98% after 15 days and 99% after the full 24 days. 15

16 Selinsing Oxide Exploration Peranggih 10km North of Selinsing Peranggih Buffalo Reef Selinsing Peranggih Completed drilling program at Peranggih in 2018 High grade gold zone confirmed Follow-up with bulk sample testwork program and further exploration works 16 Highlight of the Best Intercepts at Peranggih *all holes dipping 60 degrees to Azimuth 270 degrees HOLE ID* From(m) To (m) Drilled Width (m) ~True Width (m) Au g/t PGDD PGDD PGDD PGRC PGRC

17 17 Selinsing Geology

18 Selinsing Sulphide Exploration 18 Selinsing long-term exploration potential is on Sulphide Resources Large Underground potential Underground mine design in progress for Pit 4 deeps Large potential extension to the south where favourable host rock interacts with Steep dipping shears Ready to be drill tested

19 Murchison Operation in Western Australia Located 40km southeast of Meekatharra within the highly endowed Murchison Gold province of Western Australia Coverage of 32km of strike on greenstone sequences prospective for gold 258.8km² for 3 projects with multiple pits, trucking distance to the Burnakura Gold Plant: Burnakura (144.1km²) Tuckanarra (63.7km²) Gabanintha (50.9km²) 260,000 tpa CIL processing plant and operational camp upgraded for early production Exploration Potential with both open pit and underground opportunities 19

20 Burnakura Resources Total JORC historical (at time of acquisitions): NI reported (July 2018): Burnakura Property NI Resources Deposit NOA1-6 ANA Authaal Federal City Category Lower cut-off (Au g/t) Tonnes (Kt) Au (g/t) Gold (Koz) Indicated 0.5 1, Inferred Indicated 0.5 2, Inferred Indicated Inferred Indicated Inferred TOTAL* Indicated 0.5 3, NOA7-8** GRAND-TOTAL Updated Mineral Resources, Burnakura Gold Project (SRK, July 2018) Inferred 0.5 1, Indicated Inferred Indicated 4, Inferred 1, (1) Small discrepancies may occur due to rounding. (2) All Mineral Resources have been reported on a dry tonnage basis. (3) SRK is unaware of any issues that materially affect the Mineral Resources in a detrimental sense. (4) Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. (5) Mineral Resources estimated by David Slater (Principal Consultant, SRK), QP. (6) *Open pit Resources (NOA1-6, ANA, Authaal, Federal City) are constrained in a Lerchs Grossman pit shell, **Underground Resources (NOA7-8) are constrained to >3g/t and 200m vertical depth. 644Koz 381Koz Updated NI at Burnakura shows increases in both Indicated and Inferred Mineral Resources JORC Historical Resources Tonnes (kt) Indicated Grade (g/t) Gold (koz) Tonnes (kt) Inferred Grade (g/t) Gold (koz) 20 NI Technical Report: Updated Mineral Resources, Burnakura Gold Project, Western Australia, Australia, filed on July 18, 2018 prepared by independent consultants, SRK Consulting (Australasia) Pty Ltd. JORC Murchison Historical Resources (1) 3, , Historical Resources are resources at time of acquisition. They are reported to 1g/ and were not prepared in accordance with National Instrument ( NI ) and have not been verified by a Qualified Person

21 Burnakura Mine Site 21

22 Murchison Gold Area Continuing Study Delivering a Preliminary Economic Assessment Report under NI standards Providing a long term economic scope of the Burnakura project Potential to grow overall gold inventory from both open pit and underground sources Monument has identified significant regional exploration upside at the Burnakura gold project through identification of several prospective untested shear structures. These untested structures are in a similar geological setting to the already established mineralization trends, and therefore present good potential to host a new discovery. The Burnakura mineral field is a highly fertile gold district with no significant greenfield exploration drilling in the last 20 years. 22

23 Murchison Production History Burnakura produced >250,000 ounces since discovery from 15 open pits and underground workings Tuckanarra produced >130,000 ounces since discovery from the Cable, Bollard, Maybelle and Bottle Dump pits and historical underground workings Gabanintha produced >160,000 ounces since discovery from the Terrells, Canterbury, Yagahong and Tumblegum pits 23

24 Nuggets Discovered at Murchison Tenements Nugget Discovery (Tuckanarra) 24

25 Murchison High Grade Underground Results Coarse gold is visible in the centre and left hand side of the core sample. Enlarging this image shows that the coarse patches of gold consist of fine-grained disseminations. Pyrite on the right third of the photo has a duller color. Drill hole 8NOAD012, 141.2m. Interval to141.5m assayed 529g/t gold 25

26 Murchison Geology Gold mineralization within the Murchison Domain is typically related to major faults and shear zones within the greenstone belts and preferentially associated with banded iron-formation, and ultramafic and mafic rocks of the lower part of the stratigraphic succession 26

27 Burnakura Underground Exploration Burnakura on average has been tested to 100m depth. Similar projects in the area have proven deeper mineralization: Westgold Reedys: 500m + Westgold Paddys Flat: 600m + Monument plans to test the underground depth extensions to 500m with upcoming deep drilling programs 27

28 Burnakura Exploration Targets NOA Trend Deep Potential for direct extensions of known mineralization Potential for Repeats of controlling shallow north plunging structures Open at depth only been tested down to 200m NOA 9 NOA 9 target identified through regional aeromagnetic interpretation Prospective NNW trending structure-mapped which is known to control the mineralization Geological setting is identical to the already proven NOA line of mineralization-hosts >300koz 28 Alliance Deeps Simple tabular high grade vein, continuous and predictable Narrow vein Underground internal mining study underway

29 Tuckanarra Historical Resources and Opportunities 80,200oz Historical Resource Historical pit optimizations completed Several historical Underground workings not yet tested 29

30 Gabanintha Historical Resources Gabanintha has a total historical resource of 153,000oz Historical pit optimization studies indicated 63,000oz as mineable Within 40 km trucking distance to the Burnakura gold plant 30

31 31 Mengapur Copper-Iron Project

32 Mengapur Mineral Resource Estimate Mengapur August 2018 Mineral Resource estimate (0.3% Cu lower cut-off) Indicated Mineral Resource Material type Tonnes Mt Cu % Au g/t Ag g/t Contained Cu t Contained Au oz Contained Ag oz Oxide ,300 34,000 1,960,000 Transitional ,800 47,000 3,060,000 Fresh , ,000 3,400,000 Total Indicated , ,000 8,380,000 Inferred Mineral Resource Type Tonnes Mt Cu % Au g/t Ag g/t Contained Cu t Contained Au oz Contained Ag oz Oxide ,600 29,900 9,520,000 Transitional ,000 38,600 6,560,000 Fresh , ,300 5,190,000 Total Inferred , ,000 21,270, (1) Small discrepancies may occur due to rounding. (2) All Mineral Resources have been reported on a dry tonnage basis. (3) Snowden is unaware of any issues that materially affect the Mineral Resources in a detrimental sense. (4) Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. (5) Mineral Resources estimated by John Graindorge (Principal Consultant, Snowden), QP. (6) The majority of the interpreted mineralization is within 200m of the surface and as such considered by Snowden to be within the limits of extraction by open-pit mining. NI Technical Report: Mineral Resource Estimate, Mengapur Cu-Au Deposit, Malaysia, filed on October 29, 2018 prepared by independent consultants Snowden Mining Industry Consultants Pty. Ltd The 0.3% Cu cut-off grade represents an assumption of a bulk open-pit mining approach with limited selectivity Further study is required to assess mining and processing options, along with costs

33 Capital Structure Listed on TSX Venture Listed on Frankfurt Market capitalization Issued Shares RSUs Fully Diluted Symbol: MMY Symbol: D7Q1 C$21.1 million million 19.4 million million 52 week trading range $ $0.09 Recent Price (October 29,2018) $

34 Community & Government Support We contribute to the economic stimulus of the local community and the state government of Pahang state in Malaysia Our Social Responsibility programs aim to develop the community in a sustainable way and support the cultural and socio-economic development of the local community The surrounding community and Pahang State government have supported our development and sustainable growth since the beginning 34

35 Investor Relations Contacts Richard Cushing Wolfgang Seybold Monument Mining Ltd. AXINO GmbH T: x102 T:

BUILDING on our Foundation

BUILDING on our Foundation BUILDING on our Foundation Gold focus, Value creation, emerging to mid-tier Gold Producer M o n u m e n t M i n i n g L i m i t e d - M a y 2 0 1 7 Forward Looking Statements This presentation includes

More information

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project September 24, 2018 News Release Release #15 2018 Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project Vancouver, B.C. Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) ("Monument"

More information

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura July 11, 2016 News Release Release 15-2016 Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura Vancouver, B.C., July 11, 2016, Monument Mining Limited (TSX-V: MMY and FSE: D7Q1)

More information

Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda

Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda April 11, 2016 News Release Release 10-2016 Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda Vancouver, B.C., April 11, 2016, Monument Mining Limited (TSX-V: MMY and FSE: D7Q1)

More information

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE TORONTO, ON, December 15, 2016 -- Mandalay Resources Corporation ("Mandalay" or the "Company") (TSX: MND)

More information

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY February 5, 2018, Toronto, Ontario Troilus Gold Corp. (TSX- V: TLG) ( Troilus or the Company ) is pleased to announce the commencement

More information

New Drilling Program Commences at Mutiny s Deflector Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern

More information

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION May

More information

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver 2012-19 Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver September 26, 2012 Toronto, Ontario - QUEENSTON

More information

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017. MANDALAY RESOURCES CORPORATION ANNOUNCES 2018 MINERAL RESOURCES AND RESERVES UPDATE FOR ITS COSTERFIELD OPERATION, INCLUDING MAIDEN RESOURCES AND RESERVES ESTIMATE FOR THE YOULE LODE TORONTO, ON, January

More information

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24%

More information

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East NEWS RELEASE 11/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Highlights: Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East Near-surface intercept grading 3.2 g/t Au over 45.5

More information

Ausgold awarded EIS grant for Jinkas deep drilling

Ausgold awarded EIS grant for Jinkas deep drilling ASX Release 21 June 2018 Ausgold awarded EIS grant for Jinkas deep drilling Highlights: EIS grant will support drilling at the Katanning Gold Project to a value of $150,000 Grant will partly fund four

More information

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project NEWS RELEASE June 11, 2015 Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project Toronto, Ontario June 11, 2015 Red Pine Exploration Inc. (TSX-V: RPX) (the Company

More information

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT MEDIA RELEASE 12 April 2013 OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT (MELBOURNE) OceanaGold Corporation (ASX: OGC, TSX: OGC, NZX: OGC) (the

More information

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15. NEWS RELEASE 10/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over

More information

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE High-grade, visible-gold mineralization intersected 120 metres ( m ) down-plunge of Swan Zone Inferred Mineral Resource and 210

More information

Cove Gold Project 2201 Discovery Update, May 2014

Cove Gold Project 2201 Discovery Update, May 2014 Proven Management Proven Gold Districts Safe Jurisdictions Cove Gold Project 2201 Discovery Update, May 2014 Symbol: Exchange: PG TSX 1-888-346-1390 DISCLAIMER: This presentation may contain "forward looking

More information

Highlights from the four holes announced in this news release include:

Highlights from the four holes announced in this news release include: November 20, 2017 OTCQB: SVBL, TSX: SVB SILVER BULL INTERSECTS 9 METERS OF SULPHIDE MINERALIZATION GRADING 20.7% ZINC, 1% LEAD AND 98G/T SILVER, INCLUDING 3.65 METERS OF MASSIVE SULPHIDE MINERALIZATION

More information

TriAusMin Limited LEWIS PONDS PROJECT

TriAusMin Limited LEWIS PONDS PROJECT TriAusMin Limited LEWIS PONDS PROJECT TSX: TOR November 2010 ASX: TRO Disclaimer The Information contained in this presentation has been prepared using the information available to TriAusMin at the time

More information

Disclaimer. Forward-Looking Statements. Competent Person s Statement

Disclaimer. Forward-Looking Statements. Competent Person s Statement Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director Resources Rising Stars, May 29-30 2018 Disclaimer Forward-Looking Statements Some statements

More information

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au SAN GOLD CORPORATION TSX: SGR OTCQX: SGRCF FOR IMMEDIATE RELEASE October 15, 2014 San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au WINNIPEG, MANITOBA

More information

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT. 202-930 West First Street, North Vancouver, B.C. 604.998.4175 July 31, 2014 SBB NR-14-10 SBB TSX SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT. 2014 Drilling confirms

More information

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Continues to Expand Gold Zones At Val-d Or East NEWS RELEASE 02/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742 Highlights: Probe Metals Continues to Expand Gold Zones At Val-d Or East New Beliveau Deposit resource expansion drilling to the West returned

More information

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7) FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7) Vendetta Increases Pegmont Lead-Zinc Mineral Resource to 5.8 Million Tonnes and 8.3 Million Tonnes of. Open Pit Constrained Mineral Resource now

More information

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3. August 2, 2011 AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND 26.39 G/T Au OVER 3.0 METRES Toronto, Ontario -- Avion Gold Corporation

More information

Goldcrest Resources Ltd.

Goldcrest Resources Ltd. Goldcrest Resources Ltd. PRESS RELEASE Goldcrest Announces Results from its 1,385 Metre RC Drilling Program at the Kampti Gold Project in Burkina Faso Toronto, ON - January 25, 2007 -- Goldcrest Resources

More information

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND PRESS RELEASE CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND Confirmed Continuity of High-Grade Zinc Zone and Addition of Gold to the Expanded Copper Zone Montreal, March

More information

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz) SILVER BEAR RESOURCES ANNOUNCES UPDATED MINERAL RESOURCE ESTIMATE FOR THE MANGAZEISKY SILVER PROJECT, YAKUTIA, RUSSIA: INDICATED MINERAL RESOURCE INCREASE BY OVER 30% February 26, 2015 Toronto, Ontario

More information

Comparison Between July 2012 Technical Report and December 2012 Mineral Resource Statement July 2012 December 2012 Percentage Difference.

Comparison Between July 2012 Technical Report and December 2012 Mineral Resource Statement July 2012 December 2012 Percentage Difference. BELO SUN INCREASES MEASURED AND INDICATED RESOURCES TO 4.1 MILLION OUNCES OF GOLD PLUS INFERRED RESOURCES OF 2.8 MILLION OUNCES OF GOLD AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL TORONTO, December 18, 2012

More information

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine North American Palladium Announces Positive Exploration Results from Lac des Iles Mine Toronto, Ontario, October 24, 2017 North American Palladium Ltd. ( NAP or the Company ) (TSX: PDL) (OTC PINK: PALDF)

More information

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT SALAZAR ANNOUNCES AN UPDATED 43-101 RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT VANCOUVER, BRITISH COLUMBIA, January 12, 2012 - Salazar Resources Ltd.

More information

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia Bellhaven Announces Updated NI 43-101 Mineral Resource for La Mina Project, Colombia Vancouver, B.C. October 24, 2016. Bellhaven Copper & Gold Inc. (TSX-Venture: BHV) ( Bellhaven or the Company ) is pleased

More information

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER 122.7 METRES March 1, 2012, Toronto, Ontario, Canada: Lexam VG Gold Inc. (TSX: LEX), (FRANKFURT: VN3A), (OTCQX:

More information

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project. Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project. Vancouver, British Columbia, July 6, 2018 Blox, Inc. (OTCQB: BLXX), ( Blox or the Company ) is pleased to announce that a new

More information

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project 5 th July 2017 Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project Intensive site based exploration has commenced at Dobsina Co-Ni Project. Activities include:

More information

Fura Gems Inc. FURA ANNOUNCES MAIDEN MINERAL RESOURCE ESTIMATE FOR THE COSCUEZ EMERALD MINE, A FIRST FOR THE COLOMBIAN EMERALD SECTOR

Fura Gems Inc. FURA ANNOUNCES MAIDEN MINERAL RESOURCE ESTIMATE FOR THE COSCUEZ EMERALD MINE, A FIRST FOR THE COLOMBIAN EMERALD SECTOR Fura Gems Inc. FURA ANNOUNCES MAIDEN MINERAL RESOURCE ESTIMATE FOR THE COSCUEZ EMERALD MINE, A FIRST FOR THE COLOMBIAN EMERALD SECTOR For Immediate Release: December 12, 2018 TORONTO, ONTARIO - Fura Gems

More information

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) 998-4175 Tel: (888) 648-4218 www.sabinagoldsilver.com April 8, 2018 SBB NR 18-10 SBB TSX Sabina Gold & Silver continues

More information

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT TORONTO, January 28 th, 2013 Belo Sun Mining Corp. (TSX:BSX) reports assays for 86 additional drill holes (corresponding

More information

2018 Drilling Underway at Juruena Gold Project

2018 Drilling Underway at Juruena Gold Project 2018 Drilling Underway at Juruena Gold Project Crusader Resources (ASX:CAS) ( Crusader ) is pleased to announce the commencement of its initial 2018 exploration program over its highly prospective and

More information

CAUTIONARY STATEMENT

CAUTIONARY STATEMENT AUGUST 2018 RLG CAUTIONARY STATEMENT Some of the statements contained in this presentation are forward-looking statements. Such forward-looking statements involve known and unknown risks, uncertainties

More information

ASX:TLM. Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011

ASX:TLM. Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011 ASX:TLM Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011 Disclaimer and Competent Person s Statements 2 Disclaimer This presentation is not a prospectus nor an offer

More information

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT

More information

Interval (meters) To (meters)

Interval (meters) To (meters) 200 Burrard Street, Suite 650 Tel: 604.801.5432 Vancouver, BC V6C 3L6 Fax: 604.662.8829 TSX-V: VG NEWS RELEASE Shallow RC drilling at the WAMA property returns intervals of 4m @ 30.57 g/t Au, 3m @ 19.39

More information

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update June 4, 2014 News Release 14-13 Valley of the Kings Exploration Program Underway; Project Update Vancouver, British Columbia June 4, 2014; Pretium Resources Inc. (TSX/NYSE:PVG) ( Pretivm ) is pleased to

More information

MASSAWA GOLD PROJECT. 2.6 Moz 30 % TOTAL RESERVES RANDGOLD RESOURCES

MASSAWA GOLD PROJECT. 2.6 Moz 30 % TOTAL RESERVES RANDGOLD RESOURCES MASSAWA GOLD PROJECT TOTAL RESERVES 2.6 Moz 30 % 74 ANNUAL REPORT 2016 Massawa and Sofia are grassroots exploration discoveries located on the Kanoumba permit in eastern Senegal. The project is about 700

More information

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release CANARC RESOURCE CORP. 810-625 Howe Street Vancouver, BC V6C 2T6 T: 604.685.9700 F: 604.6685-9744 www.canarc.net CCM: TSX CRCUF: OTCQX News Release Canarc Intersects Significant Gold Mineralization in First

More information

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES TORONTO, ON September 18, 2017 INV Metals ( INV Metals or Company ) (TSX: INV) is very pleased

More information

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending June 17, 2015 NYSE-MKT: SVBL, TSX: SVB SILVER BULL IDENTIFIES NEW MASSIVE SULPHIDE MINERALIZATION GRADING 690G/T SILVER, 1% COPPER, 4.8% LEAD AND 15.25% ZINC AT THE SIERRA MOJADA PROJECT, COAHUILA, MEXICO.

More information

ASX Code: ORN Compelling Nickel-Copper Targets Defined at Fraser Range Project

ASX Code: ORN   Compelling Nickel-Copper Targets Defined at Fraser Range Project ASX Code: ORN www.oriongold.com.au Compelling Nickel-Copper Targets Defined at Fraser Range Project 1 Disclaimer and Forward-Looking Statements Certain statements contained in this presentation, including

More information

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased PRESS RELEASE CZN-TSX CZICF-OTCQB FOR IMMEDIATE RELEASE March 26, 2015 NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE Measured + Indicated and Inferred Resource Tonnages Increased Underground Exploration

More information

GASCOYNE RESOURCES LIMITED

GASCOYNE RESOURCES LIMITED GASCOYNE RESOURCES LIMITED A Developing Australian Gold Focused Company March 2012 1 DISCLAIMER & COMPETENT PERSON STATEMENT This presentation contains forward looking statements that are subject to risk

More information

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE MEDIA RELEASE 21 July 2010 OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE (MELBOURNE) OceanaGold Corporation (ASX: OGC, TSX: OGC, NZX: OGC) ( the

More information

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT TORONTO, July 24 th, 2013 Belo Sun Mining Corp. (TSX:BSX) has received assays for 74 additional drill holes (corresponding

More information

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS NEWS RELEASE OA GOLD REPORTS CONTINUED SUCCESS AT GSS May 26, 2014 Orca Gold Inc. (TSX.V:ORG) ( Orca or the Company ) is pleased to provide an update on exploration at its Galat Sufar South ( GSS ) prospect

More information

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization NEWS RELEASE Foran Mining Intersects High Grade Zinc at McIlvenna Bay Results expand area of known mineralization Vancouver, BC (February 20, 2018) - Foran Mining Corporation (TSX.V: FOM) ( Foran or the

More information

For personal use only

For personal use only 1 ASX: BRW Drilling for Exploration Success Building an Australian Base Metal Company Resources Rising Stars 27 September 2011 David Hutton, Managing Director Disclaimer 2 Certain oral and written statements

More information

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling: TSX: RMX OTCQX: RBYCF Rubicon Minerals Provides Additional Drill Results and Observations from its 2017 Exploration Program and Commences Exploratory Underground Development TORONTO, Ontario, November

More information

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP TORONTO, March 20 th, 2012 Belo Sun Mining Corp. (TSX:BSX) (the "Company" or "Belo

More information

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT NEWS RELEASE November 29, 2016 AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT Toronto, Ontario November 29, 2016 - The Manager, Red Pine Exploration

More information

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES PRESS RELEASE DUBUISSON NORTH DRILLING CUTS 45.05 g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES Toronto, Ontario November 19, 2014 Wesdome Gold Mines Ltd (TSX: WDO) today

More information

JUNE 25, 2015 TSX: WDO

JUNE 25, 2015 TSX: WDO JUNE 25, 2015 TSX: WDO PRESS RELEASE WESDOME CONFIRMS CONTINUITY OF THE S50 EAST AND PRESQU ILE ZONES AT VAL D OR PROPERTIES Hole S783 intersects 89.72 g Au/tonne over 3.1 metres Toronto, Ontario June

More information

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina TSX-V: MSR August 17, 2016 Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina Program features preliminary test of Epithermal Au-Ag Vein

More information

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp TORONTO, ON October 8, 2014 - Marathon Gold Corporation ( Marathon or

More information

KIRKLAND LAKE GOLD REPORTS WIDE, HIGH-VALUE GOLD INTERCEPTS AT SWAN ZONE UP TO 200 METRES FROM CURRENT MINERAL RESERVES

KIRKLAND LAKE GOLD REPORTS WIDE, HIGH-VALUE GOLD INTERCEPTS AT SWAN ZONE UP TO 200 METRES FROM CURRENT MINERAL RESERVES KIRKLAND LAKE GOLD REPORTS WIDE, HIGH-VALUE GOLD INTERCEPTS AT SWAN ZONE UP TO 200 METRES FROM CURRENT MINERAL RESERVES Infill drilling at Swan Zone ( Swan ) continues to return intercepts with extremely

More information

April Exploring for Canadian Gold in the Rainy River District of Ontario

April Exploring for Canadian Gold in the Rainy River District of Ontario April 2013 Exploring for Canadian Gold in the Rainy River District of Ontario 1 Forward Looking Statements This presentation may contain forward-looking statements including but not limited to comments

More information

Northern Dynasty Minerals Ltd.

Northern Dynasty Minerals Ltd. Northern Dynasty Minerals Ltd. 1020 800 W Pender St. Vancouver BC Canada V6C 2V6 Tel 604 684-6365 Fax 604 684-8092 Toll Free 1 800 667-2114 http://www.northerndynasty.com RESOURCE ESTIMATE FOR PEBBLE EAST

More information

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres NEWS RELEASE 23/2016 Symbol: TSX-V: PRB Shares Issued: 85,458,906 Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres Toronto, December 6,

More information

CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING

CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING TORONTO, ONTARIO (June 12, 2013) McEwen Mining Inc. (NYSE:

More information

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts October 2017 Investor Presentation Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts 2 Disclaimer Forward-Looking Statements Some statements in this report regarding

More information

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT For Immediate Release NR 13-10 FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT (Vancouver, BC, September 16, 2013) Falco Pacific Resource Group Inc. ( Falco Pacific

More information

KIRKLAND LAKE GOLD REPORTS STRONG GROWTH IN MINERAL RESERVES AND MINERAL RESOURCES

KIRKLAND LAKE GOLD REPORTS STRONG GROWTH IN MINERAL RESERVES AND MINERAL RESOURCES KIRKLAND LAKE GOLD REPORTS STRONG GROWTH IN MINERAL RESERVES AND MINERAL RESOURCES Fosterville: increase to 1.7 million ounces at 23.1 g/t Swan Zone Mineral Reserve doubles to over a million ounces at

More information

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East NEWS RELEASE 06/2017 Symbol: TSX-V: PRB Shares Issued: 92,851,188 Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East Toronto, March 6, 2017 PROBE METALS INC. (TSX-V: PRB)

More information

Yellowknife Gold Project

Yellowknife Gold Project Yellowknife Gold Project This presentation contains forward-looking statements within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, that address

More information

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred Suite 700 1620 Dickson Ave. Kelowna, BC V1Y 9Y2 rich@fissionuranium.com www.fissionuranium.com TSX SYMBOL: FCU OTCQX SYMBOL: FCUUF January 9, 2015 FRANKFURT SYMBOL: 2FU Fission s Initial Resource Totals

More information

Kalana Main Diluted Mineral Resource Estimate Above a 0.9 g/t Au Cut-off Grade 1,2

Kalana Main Diluted Mineral Resource Estimate Above a 0.9 g/t Au Cut-off Grade 1,2 Avnel Reports that Measured plus Indicated Resource Increases to 2.81 Million Ounces of Gold at a Diluted Grade of 2.85 g/t at Kalana Main Deposit at $1,100/oz ST. PETER PORT, GUERNSEY, OCTOBER 5, 2015

More information

Brookfield Place Tel: (416) Bay Street, Suite 3630 Fax: (416) FOR IMMEDIATE RELEASE February 7, 2012

Brookfield Place Tel: (416) Bay Street, Suite 3630 Fax: (416) FOR IMMEDIATE RELEASE February 7, 2012 FOR IMMEDIATE RELEASE Brookfield Place Tel: (416) 367-5500 181 Bay Street, Suite 3630 Fax: (416) 367-5505 Toronto, Ontario M5J 2T3 E: info@romarco.com NEWS RELEASE FOR IMMEDIATE RELEASE February 7, 2012

More information

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST NEWS RELEASE 15/2018 Symbol: TSX: ME FOR IMMEDIATE RELEASE MONETA INTERCEPTS 5.30 m @ 7.63 g/t GOLD INCLUDING 0.80 m @ 22.40 g/t GOLD AND 7.13 m @ 5.06 g/t GOLD INCLUDING 1.98 m @ 12.47 g/t GOLD AT SOUTH

More information

August 20, 2018 SBB NR SBB TSX

August 20, 2018 SBB NR SBB TSX Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) 998-4175 Tel: (888) 648-4218 www.sabinagoldsilver.com August 20, 2018 SBB NR 18-18 SBB TSX Sabina Gold & Silver Drills

More information

Alamos Gold Reports Mineral Reserves and Resources for the Year-Ended 2018

Alamos Gold Reports Mineral Reserves and Resources for the Year-Ended 2018 F O R I M M E D I A T E R E L E A S E ALAMOS GOLD INC. Brookfield Place, 181 Bay Street, Suite 3910, P.O. Box #823 Toronto, Ontario, Canada M5J 2T3 Telephone: (416) 368-9932 or 1 (866) 788-8801 All amounts

More information

GoviEx completes acquisition of African Energy s Zambian uranium assets

GoviEx completes acquisition of African Energy s Zambian uranium assets October 30, 2017 GoviEx completes acquisition of African Energy s Zambian uranium assets VANCOUVER, CANADA GoviEx Uranium Inc. (TSX-V: GXU; OTCQB: GVXXF) ( GoviEx ) announced today the completion of its

More information

Ulysses: Genesis of a significant new underground gold mine near Leonora, WA. Michael Fowler, Managing Director. 22 February 2018

Ulysses: Genesis of a significant new underground gold mine near Leonora, WA. Michael Fowler, Managing Director. 22 February 2018 Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director 22 February 2018 Disclaimer Forward-Looking Statements Some statements in this report regarding

More information

Bass Metals records further positive drill results & progress at 3 prospects.

Bass Metals records further positive drill results & progress at 3 prospects. 16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret

More information

News Release. Infill Drilling Program

News Release. Infill Drilling Program TSX:RMX NYSE.MKT:RBY News Release January 7, 2015 Rubicon s Infill Drilling Program Confirms Continuity and Grade of the F2 Deposit and Continues to Encounter High-Grade Mineralization in Sparsely Drilled

More information

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK Orko Announces a Significant Upgraded Resource at the La Preciosa Project in Durango, Mexico; A Superpit is now being considered as the preferred

More information

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

More information

PRESS RELEASE. Banro Announces a Mineral Reserve Estimate at its Namoya Gold Mine, Democratic Republic of the Congo

PRESS RELEASE. Banro Announces a Mineral Reserve Estimate at its Namoya Gold Mine, Democratic Republic of the Congo PRESS RELEASE Banro Announces a Mineral Reserve Estimate at its Namoya Gold Mine, Democratic Republic of the Congo - Banro s total Proven & Probable Mineral Reserves now 2.36 Moz Au - Banro s total Measured

More information

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) 998-4175 Tel: (888) 648-4218 www.sabinagoldsilver.com March 6, 2018 SBB NR 18-05 SBB TSX Sabina Gold & Silver Reports 2018

More information

Frankfield Gold Project Corporate Presentation

Frankfield Gold Project Corporate Presentation Frankfield Gold Project Corporate Presentation July 2010 www.gowestgold.com Forward Looking Statement Some of the statements contained herein may be forward-looking statements which involve known and unknown

More information

Orezone s Bomboré Gold Project Reaches World Class Size

Orezone s Bomboré Gold Project Reaches World Class Size Orezone s Bomboré Project Reaches World Class Size Measured and Indicated Mineral Resources up 160% and grade up 27% August 27, 2012- Orezone Corporation ( ORE: TSX ) is pleased to announce that gold mineral

More information

QUITO PROJECT. December Northwest Mining Association Annual Conference. Austin, Nevada BVA:TSX.V BRT: FSE

QUITO PROJECT. December Northwest Mining Association Annual Conference. Austin, Nevada BVA:TSX.V BRT: FSE QUITO PROJECT Austin, Nevada December 2011 Northwest Mining Association Annual Conference Forward-looking Statement Some of the statements contained in this presentation may be deemed forward-looking statements.

More information

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST NEWS RELEASE 13/2018 Symbol: TSX: ME FOR IMMEDIATE RELEASE MONETA INTERCEPTS 25.00 m @ 2.48 g/t GOLD INCLUDING 4.50 m @ 5.00 g/t GOLD AT SOUTH WEST Toronto, Ontario September 13, 2018 - Moneta Porcupine

More information

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE 257.2 metres with 0.53% Cu, 1.20 g/t Au, and 1.59 g/t Ag (1.19% Cu Eq or 2.39 g/t Au Eq) including 54.5 metres with 1.34% Cu,

More information

FALCO ANNOUNCES INITIAL HORNE 5 DRILLING RESULTS. Confirmation Holes in Line with Historical Data

FALCO ANNOUNCES INITIAL HORNE 5 DRILLING RESULTS. Confirmation Holes in Line with Historical Data For Immediate Release TSX.V - FPC FALCO ANNOUNCES INITIAL HORNE 5 DRILLING RESULTS Confirmation Holes in Line with Historical Data (July 6, 2015) Montreal, Québec Falco Resources (FPC: TSX-V) ( Falco )

More information

Goldplay President and CEO Marcio Fonseca commented

Goldplay President and CEO Marcio Fonseca commented February 7, 2019 GOLDPLAY ANNOUNCES ITS MAIDEN MINERAL RESOURCE, CONTAINING 36 MILLION Oz AgEq (INDICATED) AND 11 MILLION Oz AgEq (INFERRED), AT THE SAN MARCIAL PROJECT Vancouver, BC - Goldplay Exploration

More information

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL ASX ANNOUNCEMENT 16 SEPTEMBER 2011 Phillips River Mining NL ABN 61 004 287 790 Unit 46/328 Albany Highway VICTORIA PARK WA 6100 T: 08 6250 4600 F: 08 6250 4699 info@phillipsriver.com.au CONTACT Jason Stirbinskis

More information

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER 22.84 METRES AND 12.15% ZINC+LEAD OVER 17.00 METRES AT PINE POINT (Montreal November 19, 2018) Osisko Metals Incorporated (the Company or Osisko Metals )

More information

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq. GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH 46.0 METERS @ 129 gpt AgEq. August 28, 2018, Vancouver, BC - Goldplay Exploration

More information

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 20 September 2010 EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT Boddington South Gold

More information

Fortuna Updates Reserves and Resources

Fortuna Updates Reserves and Resources Fortuna Updates Reserves and Resources Vancouver, February 22, 2018-- Fortuna Silver Mines, Inc. (NYSE: FSM) (TSX: FVI) is pleased to report updated Mineral Reserve and Mineral Resource estimates as of

More information