1 Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 12 ARCHIVED on 20-Dec-2016 ISR26232 Implementing Agencies: Eletrobras Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:03-Jun-2010 Planned Mid Term Review Date:08-Apr-2013 Original Closing Date:30-Jun-2015 Project Development Objectives Effectiveness Date:23-May-2011 Actual Mid-Term Review Date:28-May-2013 Revised Closing Date:31-Mar-2017 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The higher level objective of the proposed Project is to improve the quality of electricity service provided by the Eletrobrás-managed distribution companies to the population in the States of Acre, Alagoas, Amazonas, Piaui, Rondonia and the City of Boa Vista, as a means to improve the quality of life and foster economic growth. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Public Disclosure Authorized Name Component 1: Service Quality Improvement and Loss Reduction:(Cost $ M) Component 2: Institutional Strengthening:(Cost $20.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions 12/20/2016 Page 1 of 24

2 The project is expected to achieve its objectives. Components regarding the improvement of the quality of service are coming to a close, with results starting to show in terms of reduced duration of outages (DEC) as well as frequency of the outages (FEC). The very substantial tariffs increase and the ongoing severe economic crisis have fueled bill payment default rates, which are offsetting the early effects of reducing the non-technical loss through the regularization campaigns, replacement of old meters and the implementation of the Advanced Metering Infrastructure in the six different distribution companies. Initial analysis shows that were it not for these interventions, the situation regarding losses could worsen. As these activities further progresses and are eventually completed, these indicators are expected to improve. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Moderate Substantial Macroeconomic -- Substantial Substantial Sector Strategies and Policies -- Low Low Technical Design of Project or Program -- Substantial Substantial Institutional Capacity for Implementation and Sustainability -- Moderate Moderate Fiduciary -- Low Moderate Environment and Social -- Low Low Stakeholders -- Low Low Other Overall -- Moderate Moderate Results Project Development Objective Indicators Duration of Service Interruptions (DEC): Amazonas (Text, Custom) Value Date 31-Dec Dec Oct Mar-2017 Duration of Service Interruptions (DEC): Eletroacre (Text, Custom) 12/20/2016 Page 2 of 24

3 Value Date 31-Dec Dec Oct Mar-2017 Duration of Service Interruptions (DEC): Boa Vista Energia (Text, Custom) Value Date 31-Dec Dec Oct Mar-2017 Comments External factors have been affecting this indicator, namely the transmission line from Venezuela which has been causing the interruptions. Eletrobras has analyzed the data, splitting the causal factors into external and internal DEC, and in fact the internal DEC has shown a decrease in value. The details are shown in the Aide-Memoire. Duration of Service Interruptions (DEC): CEAL (Text, Custom) Value Date 31-Dec Dec Oct Mar-2017 Duration of Service Interruptions (DEC):CEPISA (Text, Custom) Value Date 31-Dec Dec Oct Mar-2017 Duration of Service Interruptions (DEC): CERON (Text, Custom) 12/20/2016 Page 3 of 24

4 Value Date 31-Dec Dec Oct Mar-2017 Frequency of Service Interruption (FEC): Amazonas (Text, Custom) Value Date 31-Dec Dec Oct Mar-2017 Frequency of Service Interruption (FEC): Eletroacre (Text, Custom) Value Date 31-Dec Dec Oct Mar-2017 Frequency of Service Interruption (FEC): Boa Vista Energia (Text, Custom) Value Date 31-Dec Dec Oct Mar-2017 Comments External factors have been affecting this indicator, namely the transmission line from Venezuela which has been causing the interruptions. Eletrobras has analyzed the data, splitting the causal factors into external and internal FEC, and in fact the internal FEC has shown a decrease in value. The details are shown in the Aide-Memoire. Frequency of Service Interruption (FEC): CEAL (Text, Custom) 12/20/2016 Page 4 of 24

5 Value Date 31-Dec Dec Oct Mar-2017 Frequency of Service Interruption (FEC): CEPISA (Text, Custom) Value Date 31-Dec Dec Oct Mar-2017 Frequency of Service Interruption (FEC): CERON (Text, Custom) Value Date 31-Dec Dec Oct Mar-2017 Total losses: Amazonas (Text, Custom) Value 41% 40.43% 43.1% 28% Date 31-Dec Dec Oct Mar-2017 Total losses: Eletroacre (Text, Custom) 12/20/2016 Page 5 of 24

6 Value 26% 23.32% 24.3% 15% Date 31-Dec Dec Oct Mar-2017 Effectiveness of social action and communication programs (Text, Custom) Value No social action and communication programs The first two programs were evaluated in April 2014 with varying results. In terms of population aware of campaigns, the percentages were: Acre 41.8%, Alagoas 29.6%, Amazonas 21%, Piaui 32.3%, Rondonia 51.6% and Roraima 15%. Of these, the percentages that thoughtthe messages were clear are: Acre 94.1%, Alagoas 57.6%, Amazonas 76.1%, Piaui 74.4%, Rondonia 68.4% and Roraima 56.4%.The Campaigns were using all types of media (TV, radio, newspapers and outdoors), and the findings from the initial evaluation are being used to further customize the next campaigns to ensure the best medium is being used. The first two programs were evaluated in April 2014 with varying results. In terms of population aware of campaigns, the percentages were: Acre 41.8%, Alagoas 29.6%, Amazonas 21%, Piaui 32.3%, Rondonia 51.6% and Roraima 15%. Of these, the percentages that thoughtthe messages were clear are: Acre 94.1%, Alagoas 57.6%, Amazonas 76.1%, Piaui 74.4%, Rondonia 68.4% and Roraima 56.4%.The Campaigns were using all types of media (TV, radio, newspapers and outdoors), and the findings from the initial evaluation are being used to further customize the next campaigns to ensure the best medium is being used. 70% of total consumers in survey areas are aware of messages 95% of total DisCos staff understand messages Date 30-Jun Nov Nov Mar-2017 Introduction of best practices for environmental and social management (Text, Custom) Value Best practices not introduced Five of the ten expected products have been delivered. Five of the ten expected products have been delivered. These are: (1) Manuals adopted in the six Distribution 12/20/2016 Page 6 of 24

7 These are: (1) Report on Social & Environmental activites developed by the EDEs; (2) report on the norms & procedures of the energy firms in Brazil; (3) Report identifying and consolidating strengths and bestpractices observed in the firms, seeing what can be replicated among the EDEs; (4) Report compiling an analysis of the federal, state and municipal laws in the areas where Eletrobras engages, that shall be part of the adopted guidelines; and (5) Environmental manual for works, with the uniqueness of each EDE. Report on Social & Environmental activites developed by the EDEs; (2) report on the norms & procedures of the energy firms in Brazil; (3) Report identifying and consolidating strengths and bestpractices observed in the firms, seeing what can be replicated among the EDEs; (4) Report compiling an analysis of the federal, state and municipal laws in the areas where Eletrobras engages, that shall be part of the adopted guidelines; and (5) Environmental manual for works, with the uniqueness of each EDE. Companies Date 30-Jun Nov Nov Mar-2017 Collection rates: CERON (Text, Custom) Value 96.1% 96.5% 98% 99.5% Date 31-Dec Apr Oct Mar-2017 Collection rates: CEPISA (Text, Custom) Value 90.4% 91.7% 98.2% 99.5% Date 31-Dec Apr Oct Mar-2017 Collection rates: CEAL (Text, Custom) 12/20/2016 Page 7 of 24

8 Value 91.2% 89.7% 96.2% 99.5% Date 31-Dec Apr Oct Mar-2017 Collection rates: Boa Vista (Text, Custom) Value 85.7% 92.4% 92.9% 99.5% Date 31-Dec Apr Oct Mar-2017 Comments This indicator is also negatively affected by the problems experienced from the Venezuela transmission line, whereby consumers, not happy with the service, are not paying. Collection rates: Eletroacre (Text, Custom) Value 92.4% 100.4% 97.3% 99.5% Date 31-Dec Apr Apr Mar-2017 Comments It should be noted that the previous value reflects the collection of past due outstanding bills, thus the decline for this reading does not necessarily reflect a decrease in collections per-se. Collection rates: Amazonas (Text, Custom) Value 91.9% 94.4% 87.9% 99.5% Date 31-Dec Apr Oct Mar /20/2016 Page 8 of 24

9 Total losses: CERON (Text, Custom) Value 33% 26.74% 29.1% 17% Date 31-Dec Dec Oct Mar-2017 Total losses: CEPISA (Text, Custom) Value 36% 30.48% 30.6% 22% Date 31-Dec Dec Oct Mar-2017 Total losses: CEAL (Text, Custom) Value 32% 25.32% 26.5% 14% Date 31-Dec Dec Oct Mar-2017 Total losses: Boa Vista Energia (Text, Custom) Value 16% 11.57% 12.5% 8% Date 31-Dec Dec Oct Mar-2017 Overall Comments Very substantial increase of tariffs and the very severe economic crisis have fuelled bill payment defaults rates, thus more than compensating in the short term the still very early effect of the non-technical loss reductions via the Advanced Metering System and regularization campaigns, which both started only a few weeks/months ago in the six different distribution companies. Furthermore, a political decision to not contract out metering inspectors, but rather only use in-house personnel, has curbed the number of inspections taking place to avoid theft and fraud, as the companies do not have all the necessary capacity (numbers) to carry out the required task. However, a detailed analysis into the receivables of the companies show the project is having positive results in that, without it, the 12/20/2016 Page 9 of 24

10 losses would be even greater. A preliminary analysis shows that the companies have been able to recover costs from the mediumlevel consumers, and reduce recurrent theft and fraud. The Aide-Memoire details the gains from the installation of the AMI alone, and Eletrobras is preparing a technical note detailing how the interventions have guarded against even greater losses. Intermediate Results Indicators Length of MV and LV lines rehabilitated/ upgraded circuits: Amazonas Energia (Kilometers, Custom) Value Length of MV and LV lines rehabilitated/ upgraded circuits: Eletroacre (Kilometers, Custom) Value Length of MV and LV lines rehabilitated/ upgraded circuits: Boa Vista Energia (Kilometers, Custom) Value Comments This indicator is linked to what was originally counterpart funding work. The PAD targets for it where established (2010) before the contract documents were issued (2011) and finalized (2012), at which point the target value was revised downwards from 142km to 32.28km. 12/20/2016 Page 10 of 24

11 Length of MV and LV lines rehabilitated/ upgraded circuits: CEAL (Kilometers, Custom) Value Date 30-Jun Nov Nov Mar-2017 Comments Nov/31/ This component was part of the counterpart funding sections of the project. Eletrobras is verifying the numbers to ensure the accuracy of the length of rehabilitated lines. The PAD targets for it where established (2010) before the contract documents were issued (2011) and finalized (2012), at which point the target value was revised downwards from 660km to 380km. Length of MV and LV lines rehabilitated/ upgraded circuits: CEPISA (Kilometers, Custom) Value Comments This indicator is linked to what was originally counterpart funding work. The PAD targets for it where established (2010) before the contract documents were issued (2011) and finalized (2012), at which point the target value was revised downwards from 115km to 92.5km. Length of MV and LV lines rehabilitated/ upgraded circuits: CERON (Kilometers, Custom) Value Comments This indicator is linked to what was originally counterpart funding work. The PAD targets for it where established (2010) before the contract documents were issued (2011) and finalized (2012), at which point the target value was revised downwards from 580km to 559km. 12/20/2016 Page 11 of 24

12 Length of new MV lines: Amazonas Energia (Kilometers, Custom) Value Date 30-Jun Nov Nov Mar-2017 Comments November/30/ Eletrobras is verifying the accuracy of the amount of new lines built. Length of new MV lines: Eletroacre (Kilometers, Custom) Value Length of new MV lines: Boa Vista Energia (Kilometers, Custom) Value Length of new MV lines: CEAL (Kilometers, Custom) Value Date 30-Jun Nov Nov Mar-2017 Comments This component was part of the counterpart funding sections of the project. Eletrobras is verifying the accuracy of the amount constructed. 12/20/2016 Page 12 of 24

13 Length of new MV lines: CEPISA (Kilometers, Custom) Value Length of new MV lines: CERON (Kilometers, Custom) Value Date 30-Jun Nov Nov Mar-2017 Comments November 30, This component was part of the counterpart funding sections of the project. Eletrobras is verifying the accuracy of the amount constructed. Installed automated reclosers: Amazonas Energia (Number, Custom) Value Installed automated reclosers: Eletroacre (Number, Custom) Value /20/2016 Page 13 of 24

14 Installed automated reclosers: Boa Vista Energia (Number, Custom) Value Comments The numbers of Reclosers is corrected to be 30. There was a clerical error indicating 50 in the previous ISR. Installed automated reclosers: CEAL (Number, Custom) Value Installed automated reclosers: CEPISA (Number, Custom) Value Installed automated reclosers: CERON (Number, Custom) Value /20/2016 Page 14 of 24

15 Installed voltage regulators and banks of capacitors: Amazonas Energia (Number, Custom) Value Date 30-Jun Dec Oct Mar-2017 Installed voltage regulators and banks of capacitors: Eletroacre (Number, Custom) Value Date 30-Jun Dec Oct Mar-2017 Installed voltage regulators and banks of capacitors: Boa Vista Energia (Number, Custom) Value Date 30-Jun Dec Oct Mar-2017 Installed voltage regulators and banks of capacitors: CEAL (Number, Custom) Value Date 30-Jun Dec Oct Mar /20/2016 Page 15 of 24

16 Installed voltage regulators and banks of capacitors: CEPISA (Number, Custom) Value Date 30-Jun Dec Oct Mar-2017 Installed voltage regulators and banks of capacitors: CERON (Number, Custom) Value Date 30-Jun Dec Oct Mar-2017 Adoption and implementation of environmental and social guidelines across six DisCos (Text, Custom) Value Environmental and social guidelines not adopted Five of the ten expected products have been delivered. These are: (1) Report on Social & Environmental activites developed by the EDEs; (2) report on the norms & procedures of the energy firms in Brazil; (3) Report identifying and consolidating strengths and bestpractices observed in the firms, seeing what can be replicated among the EDEs; (4) Report compiling an analysis of the federal, state and municipal laws in the areas where Eletrobras engages, that shall be part of the adopted guidelines; and (5) Environmental manual for works, with the uniqueness of each EDE. Five of the ten expected products have been delivered. These are: (1) Report on Social & Environmental activites developed by the EDEs; (2) report on the norms & procedures of the energy firms in Brazil; (3) Report identifying and consolidating strengths and bestpractices observed in the firms, seeing what can be replicated among the EDEs; (4) Report compiling an analysis of the federal, state and municipal laws in the areas where Eletrobras engages, that shall be part of the adopted guidelines; and (5) Environmental manual for works, with the uniqueness of each EDE. Guidelines adopted in the six DisCos 12/20/2016 Page 16 of 24

17 Date 30-Jun Nov Nov Mar-2017 Implementation of a social/communication campaign (Text, Custom) Value Social/communication program not implemented The first two programs were evaluated in April 2014 with varying results. In terms of population aware of campaigns, the percentages were: Acre 41.8%, Alagoas 29.6%, Amazonas 21%, Piaui 32.3%, Rondonia 51.6% and Roraima 15%. Of these, the percentages that thoughtthe messages were clear are: Acre 94.1%, Alagoas 57.6%, Amazonas 76.1%, Piaui 74.4%, Rondonia 68.4% and Roraima 56.4%.The Campaignswere using all types of media (TV, radio, newspapers and outdoors), and the findings from the initial evaluation are being used to further customize the next campaigns to ensure the best medium is being used.the next communication capaign is scheduled for early2015to be done ahead of the redastration exercise, as well as the campaign ahead of the installing and substituting of old meteresfor the new AMI. The first two programs were evaluated in April 2014 with varying results. In terms of population aware of campaigns, the percentages were: Acre 41.8%, Alagoas 29.6%, Amazonas 21%, Piaui 32.3%, Rondonia 51.6% and Roraima 15%. Of these, the percentages that thoughtthe messages were clear are: Acre 94.1%, Alagoas 57.6%, Amazonas 76.1%, Piaui 74.4%, Rondonia 68.4% and Roraima 56.4%.The Campaignswere using all types of media (TV, radio, newspapers and outdoors), and the findings from the initial evaluation are being used to further customize the next campaigns to ensure the best medium is being used.the next communication capaign is scheduled for early2015to be done ahead of the redastration exercise, as well as the campaign ahead of the installing and substituting of old meteresfor the new AMI. Campaigns launched 12/20/2016 Page 17 of 24

18 Date 30-Jun Nov Nov Mar-2017 UGP functioning and progress reports provided for project (Text, Custom) Value No UGP The UGP has been functioning satisfactorily, following Project Management Institute (PMI) norms. While there has been some turnover in the UGP staffing, appropriate measures have been put into place to ensure it keeps functioning satisfactorily, following Project Management Institute (PMI) norms. UGP functioning Date 30-Jun Dec Oct Mar-2017 Distribution lines constructed or rehabilitated under the project (Kilometers, Core) Value , , , Date 03-Jun Nov Nov Mar-2017 Distribution lines constructed under the project (Kilometers, Core Breakdown) Value , Date 03-Jun Nov Nov Mar /20/2016 Page 18 of 24

19 Length of new MV lines: Amazonas Energia (Kilometers, Custom Breakdown) Value Date 03-Jun Nov Nov Mar-2017 Length of new MV lines: Eletroacre (Kilometers, Custom Breakdown) Value Date 03-Jun Nov Oct Mar-2017 Length of new MV lines: Boa Vista Energia (Kilometers, Custom Breakdown) Value Date 03-Jun Nov Oct Mar-2017 Length of new MV lines: CEAL (Kilometers, Custom Breakdown) Value Date 03-Jun Nov Nov Mar /20/2016 Page 19 of 24

20 Length of new MV lines: CEPISA (Kilometers, Custom Breakdown) Value Date 03-Jun Nov Oct Mar-2017 Length of new MV lines: CERON (Kilometers, Custom Breakdown) Value Date 03-Jun Nov Nov Mar-2017 Distribution lines rehabilitated under the project (Kilometers, Core Breakdown) Value , Date 03-Jun Nov Nov Mar-2017 Length of MV and LV lines rehabilitated/ upgraded circuits: Amazonas Energia (Kilometers, Custom Breakdown) Value Date 03-Jun Nov Oct Mar /20/2016 Page 20 of 24

21 Length of MV and LV lines rehabilitated/ upgraded circuits: Eletroacre (Kilometers, Custom Breakdown) Value Date 03-Jun Nov Oct Mar-2017 Length of MV and LV lines rehabilitated/ upgraded circuits: Boa Vista Energia (Kilometers, Custom Breakdown) Value Date 03-Jun Nov Oct Mar-2017 Length of MV and LV lines rehabilitated/ upgraded circuits: CEAL (Kilometers, Custom Breakdown) Value Date 03-Jun Nov Nov Mar-2017 Length of MV and LV lines rehabilitated/ upgraded circuits: CEPISA (Kilometers, Custom Breakdown) Value Date 03-Jun Nov Oct Mar /20/2016 Page 21 of 24

22 Length of MV and LV lines rehabilitated/ upgraded circuits: CERON (Kilometers, Custom Breakdown) Value Date 03-Jun Nov Oct Mar-2017 Full implementation of ERPs in the six DisCos (Text, Custom) Value ERP not installed -- For the ERP, in order to maintain consistency with other Eletrobras companies, the SAP system had been chosen. However, the license cost, which was high, could not be covered by the Bank's loan. At the same time this discussion was ongoing, the Board of Eletrobras started exploring the possibility of privatizing the six DISCOs, and the expectation is that the company that acquired each DISCO would have their own system to put in place. As such, this indicator is considered not achieved. ERP implemented in the six DisCos Date 30-Jun Aug Jun Mar-2017 Full implementation of the CMS in the six DisCos (Text, Custom) Value CMS not installed -- During the project implementation, an independent evaluation of Eletrobras' existing AJURI CMS system took place in late The outcome of the evaluation was that the system was deemed adequate, with only CMS implemented in the six DisCos 12/20/2016 Page 22 of 24

23 some strengthening needed to the customer base system. As such, this indicator is is considered achieved. Date 30-Jun Oct Jun Mar-2017 Installation of AMI systems in each DisCo (Text, Custom) Value AMI systems not installed 4,173 MT clients and 0 BT clients integrated into the AMI 7,060 AMI meters were installed, plus an additional 879 legacy meters, totaling 7,939 MT clients (100%)and 2,326 BT clients integrated into the AMI 100% of customer target Date 30-Jun Apr Oct Mar-2017 Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P IBRD Effective USD % Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P IBRD Effective 03-Jun Feb May Jun Mar-2017 Cumulative Disbursements 12/20/2016 Page 23 of 24

24 Restructuring History Level 2 Approved on 30-Jun-2015 Related Project(s) There are no related projects. 12/20/2016 Page 24 of 24

Implementation Status & Results Brazil ELETROBRAS Distribution Rehabilitation (P114204)

Implementation Status & Results Brazil ELETROBRAS Distribution Rehabilitation (P114204) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil ELETROBRAS Distribution Rehabilitation (P114204) Operation Name: ELETROBRAS Distribution

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Albania Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 16-Aug-2017

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 29-Dec-2017 ISR30320 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Mali Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 10 ARCHIVED on 29-Jun-2015 ISR20110 Implementing Agencies: Eenrgie du Mali (EDM-SA) Public Disclosure

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Mali Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 11 ARCHIVED on 10-Feb-2016 ISR22432 Implementing Agencies: Eenrgie du Mali

More information

SÃO PAULO METRO LINE 4 (PHASE 2) (P106390)

SÃO PAULO METRO LINE 4 (PHASE 2) (P106390) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 13 ARCHIVED on 08-Jun-2016 ISR23671 Implementing Agencies:

More information

Urban Water Supply Project (P156739)

Urban Water Supply Project (P156739) AFRICA Cote d'ivoire Water Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 04-Oct-2018 ISR33891 Implementing Agencies: Republic of Cote d'ivoire, Cellule de Coordination

More information

Rio de Janeiro Strengthening Public Sector Management Technical Assistance Project (P127245)

Rio de Janeiro Strengthening Public Sector Management Technical Assistance Project (P127245) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Macroeconomics, Trade and Investment Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 8 ARCHIVED on 18-Jan-2018 ISR29371

More information

EC Ibarra Transport Infrastructure Improvement Project (P147280)

EC Ibarra Transport Infrastructure Improvement Project (P147280) LATIN AMERICA AND CARIBBEAN Ecuador Transport Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 6 ARCHIVED on 04-Feb-2019 ISR35827 Implementing Agencies: Municipality of Ibarra, Municipality

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 9 ARCHIVED on 28-Dec-2017 ISR30636

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Belize Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 19-Dec-2017

More information

The World Bank Ethiopia: National Quality Infrastructure Development Project (P160279)

The World Bank Ethiopia: National Quality Infrastructure Development Project (P160279) Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 22-Jun-2017 ISR28689 Implementing Agencies: Ministry

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 16 ARCHIVED on 27-Dec-2017 ISR30480 Implementing Agencies:

More information

The World Bank Cusco Regional Development (P117318)

The World Bank Cusco Regional Development (P117318) LATIN AMERICA AND CARIBBEAN Peru Urban Development Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 3 ARCHIVED on 27-Jan-2015 ISR16645 Implementing Agencies: Cusco Regional Government

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Belize Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 18-Jun-2018

More information

Public Disclosure Copy

Public Disclosure Copy EAST ASIA AND PACIFIC Indonesia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 14 ARCHIVED on 27-Dec-2017 ISR31097 Implementing Agencies: Republic of Indonesia,

More information

The World Bank Regional Infrastructure Development Fund (P154947)

The World Bank Regional Infrastructure Development Fund (P154947) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 06-Dec-2017

More information

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 2 ARCHIVED on 09-Dec-2014 ISR17411 Implementing Agencies: Heilongjiang

More information

The World Bank Zambia Water Resources Development Project (P114949)

The World Bank Zambia Water Resources Development Project (P114949) Public Disclosure Authorized AFRICA Zambia Water Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 8 ARCHIVED on 13-Jan-2018 ISR28939 Implementing Agencies: Republic of Zambia, Ministry

More information

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158)

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 9 ARCHIVED on 27-Jun-2016 ISR23590 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Iraq Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 27-May-2016

More information

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

The World Bank China: Qinghai Xining Urban Transport Project (P127867) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 27-Jun-2016 ISR24068 Implementing Agencies:

More information

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives.

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives. Public Disclosure Authorized AFRICA Kenya Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 24-Oct-2017 ISR29813 Implementing Agencies: Kenya Power

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Bangladesh Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 21-Mar-2018 ISR31666 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Mexico Education Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 21-Jun-2018 ISR33033 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Uganda Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 28-May-2016 ISR23244 Implementing Agencies: UETCL Public

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 16 ARCHIVED on 26-Jun-2018 ISR33043 Implementing Agencies:

More information

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Public Disclosure Authorized AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration AFRICA Africa Energy & Extractives Global Practice IBRD/IDA Investment

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 16 ARCHIVED on 01-Jun-2018 ISR31660

More information

Public Disclosure Copy

Public Disclosure Copy EUROPE AND CENTRAL ASIA Macedonia, former Yugoslav Republic of Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 23-Dec-2014 ISR17578 Implementing Agencies:

More information

The World Bank OECS Regional Tourism Competitiveness (P152117)

The World Bank OECS Regional Tourism Competitiveness (P152117) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN OECS Countries Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 28-Jan-2018

More information

Public Disclosure Copy. Implementation Status & Results Report Emergency Agricultural Livelihoods and Climate Resilience Project (P166328)

Public Disclosure Copy. Implementation Status & Results Report Emergency Agricultural Livelihoods and Climate Resilience Project (P166328) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominica Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 18-Jul-2018 ISR33480 Implementing Agencies:

More information

Sierra Leone Energy Access Project - Sierra Leone Infrastructure Development Fund (P126180)

Sierra Leone Energy Access Project - Sierra Leone Infrastructure Development Fund (P126180) Public Disclosure Authorized AFRICA Sierra Leone Energy & Extractives Global Practice Recipient Executed Activities Specific Investment Loan FY 2013 Seq No: 5 ARCHIVED on 15-Apr-2016 ISR23021 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Bangladesh Trade & Competitiveness Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 13-Oct-2017 ISR29718 Implementing Agencies:

More information

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Local and Regional Competitiveness Project (P154263) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Macedonia, former Yugoslav Republic of Trade & Competitiveness Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq

More information

Key Dates. Project Development Objectives. Components. Overall Ratings

Key Dates. Project Development Objectives. Components. Overall Ratings Public Disclosure Authorized EAST ASIA AND PACIFIC Philippines Water Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 2 ARCHIVED on 20-Jun-2018 ISR33067 Implementing Agencies: Department

More information

The World Bank Zambia Water Resources Development Project (P114949)

The World Bank Zambia Water Resources Development Project (P114949) Public Disclosure Authorized AFRICA Zambia Water Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 9 ARCHIVED on 25-Jun-2018 ISR32561 Implementing Agencies: Republic of Zambia, Ministry

More information

The World Bank Pakistan: Third Punjab Education Sector Project (P154524)

The World Bank Pakistan: Third Punjab Education Sector Project (P154524) Public Disclosure Authorized SOUTH ASIA Pakistan Education Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 14-Apr-2017 ISR27416 Implementing Agencies: Public Disclosure

More information

Public Disclosure Copy

Public Disclosure Copy EUROPE AND CENTRAL ASIA Bulgaria Water Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 14 ARCHIVED on 07-Feb-2016 ISR22610 Implementing Agencies: Ministry of Regional Development and

More information

The World Bank Fortaleza Sustainable Urban Development Project (P153012)

The World Bank Fortaleza Sustainable Urban Development Project (P153012) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 21-Sep-2017

More information

The World Bank Guilin Integrated Environment Management (P133017)

The World Bank Guilin Integrated Environment Management (P133017) EAST ASIA AND PACIFIC China Water Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 22-Feb-2018 ISR31453 Implementing Agencies: People's Republic of China, Guilin PMO

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 08-Dec-2017 ISR30255 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Nigeria Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 30-Jun-2017 ISR28944 Implementing Agencies: Federal Ministry

More information

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019) Public Disclosure Authorized SOUTH ASIA Sri Lanka Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 10-Sep-2017 ISR29482 Implementing Agencies: Ministry of

More information

The World Bank Community Development Program Support Project-Phase III (P144637)

The World Bank Community Development Program Support Project-Phase III (P144637) Public Disclosure Authorized AFRICA Cameroon Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 21-Dec-2017 ISR30226

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA India Water Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 13 ARCHIVED on 20-Mar-2017 ISR27142 Implementing Agencies: Public Disclosure Authorized

More information

Zambia - Mining and Environmental Remediation and Improvement Project (P154683)

Zambia - Mining and Environmental Remediation and Improvement Project (P154683) AFRICA Zambia Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 26-Nov-2018 ISR34605 Implementing Agencies: Ministry of Mines and Mineral

More information

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156) Public Disclosure Authorized AFRICA Swaziland Health, Nutrition and Population Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 17-Jun-2015 ISR19302 Implementing Agencies:

More information

Public Disclosure Copy. Implementation Status & Results Report REVITALIZING EDUCATION DEVELOPMENT IN SIERRA LEONE (P133070)

Public Disclosure Copy. Implementation Status & Results Report REVITALIZING EDUCATION DEVELOPMENT IN SIERRA LEONE (P133070) Public Disclosure Authorized AFRICA Sierra Leone Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 27-Jun-2016 ISR24052 Implementing Agencies:

More information

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583) SOUTH ASIA Bangladesh Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 22-Apr-2016 ISR23210 Implementing Agencies: Directorate General, Ministry of Food Key

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Rwanda Energy & Extractives Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 15-Oct-2017 ISR29580 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Water Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 11 ARCHIVED on 30-Jun-2017 ISR28569 Implementing Agencies: SEMARH,

More information

The World Bank Dam Operational Improvement and Safety (P096532)

The World Bank Dam Operational Improvement and Safety (P096532) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Water Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 17-Jun-2017 ISR27994 Implementing Agencies: Republic

More information

The World Bank Mali Reconstruction and Economic Recovery (P144442)

The World Bank Mali Reconstruction and Economic Recovery (P144442) Public Disclosure Authorized AFRICA Mali Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Emergency Recovery Loan FY 2014 Seq No: 7 ARCHIVED on 30-Jun-2017 ISR28723 Implementing

More information

Public Disclosure Copy. Implementation Status & Results Report Somali Core Economic Institutions and Opportunities Program (SCORE) (P152241)

Public Disclosure Copy. Implementation Status & Results Report Somali Core Economic Institutions and Opportunities Program (SCORE) (P152241) Public Disclosure Authorized AFRICA Somalia Trade & Competitiveness Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 29-Nov-2016 ISR25649 Implementing

More information

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738)

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738) Public Disclosure Authorized AFRICA Benin Water Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 04-Dec-2017 ISR30468 Implementing Agencies: The Republic of Benin, Agence

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Rwanda Energy & Extractives Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 07-May-2018 ISR32125 Implementing

More information

The World Bank Indonesia National Slum Upgrading Project (P154782)

The World Bank Indonesia National Slum Upgrading Project (P154782) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 04-Apr-2018

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Ecuador Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 25-Aug-2016 ISR24487 Implementing Agencies:

More information

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590) Public Disclosure Authorized AFRICA Uganda Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 18-Dec-2017 ISR30767 Implementing Agencies: REPUBLIC OF UGANDA,

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Mongolia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 18-Dec-2017 ISR30626 Implementing Agencies:

More information

The World Bank Senegal Tourism and Enterprise Development Project (P146469)

The World Bank Senegal Tourism and Enterprise Development Project (P146469) Public Disclosure Authorized AFRICA Senegal Trade & Competitiveness Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 03-Nov-2017 ISR29333 Implementing Agencies: Republic

More information

The World Bank Earthquake Housing Reconstruction Project (P155969)

The World Bank Earthquake Housing Reconstruction Project (P155969) Public Disclosure Authorized SOUTH ASIA Nepal Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 1 ARCHIVED on 18-Nov-2015 ISR20331

More information

The World Bank Ho Chi Minh City Green Transport Development (P126507)

The World Bank Ho Chi Minh City Green Transport Development (P126507) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 25-Dec-2017 ISR31002 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 9 ARCHIVED on 02-Jun-2017 ISR28009 Implementing Agencies:

More information

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Transport Connectivity and Asset Management Project (P132833) Public Disclosure Authorized SOUTH ASIA Sri Lanka Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 23-Mar-2018 ISR30586 Implementing Agencies:

More information

Key Dates. Project Development Objectives. Components. Overall Ratings

Key Dates. Project Development Objectives. Components. Overall Ratings Public Disclosure Authorized EAST ASIA AND PACIFIC Philippines Water Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 21-Dec-2017 ISR30930 Implementing Agencies: Department

More information

The World Bank PE Water Resources Management Modernization (P107666)

The World Bank PE Water Resources Management Modernization (P107666) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Peru Water Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 10 ARCHIVED on 20-Apr-2015 ISR18506 Implementing Agencies: Public Disclosure

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 1 ARCHIVED on 03-Nov-2016 ISR25240 Implementing

More information

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Water Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 22-Dec-2017 ISR30831 Implementing Agencies: Socialist

More information

The World Bank Georgia National Innovation Ecosystem (GENIE) Project (P152441)

The World Bank Georgia National Innovation Ecosystem (GENIE) Project (P152441) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Georgia Trade & Competitiveness Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 1 ARCHIVED on 28-Jun-2016 ISR24271 Implementing

More information

Key Dates. Project Development Objectives. Components. Overall Ratings

Key Dates. Project Development Objectives. Components. Overall Ratings Public Disclosure Authorized EAST ASIA AND PACIFIC Myanmar Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 27-Jan-2017 ISR26127 Implementing Agencies:

More information

Second Tamil Nadu Road Sector Project (P143751)

Second Tamil Nadu Road Sector Project (P143751) Public Disclosure Authorized SOUTH ASIA India Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 08-Feb-2018 ISR31260 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA India Water Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 11 ARCHIVED on 17-Mar-2016 ISR21556 Implementing Agencies: National Mission for Clean

More information

West Bank and Gaza: Finance for Jobs (P151089)

West Bank and Gaza: Finance for Jobs (P151089) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA West Bank and Gaza Finance & Markets Global Practice Special Financing Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 21-Nov-2017 ISR29815

More information

The World Bank Third National Urban Water Sector Reform Project (P123513)

The World Bank Third National Urban Water Sector Reform Project (P123513) Public Disclosure Authorized AFRICA Nigeria Water Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 27-Jun-2017 ISR28879 Implementing Agencies: Federal Republic of Nigeria,

More information

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019) Public Disclosure Authorized SOUTH ASIA Sri Lanka Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 09-Jan-2018 ISR31203 Implementing Agencies: Ministry of

More information

The World Bank. DRC Electricity Access & Services Expansion (EASE) (P156208) Key Dates. Project Development Objectives. Components.

The World Bank. DRC Electricity Access & Services Expansion (EASE) (P156208) Key Dates. Project Development Objectives. Components. Public Disclosure Authorized AFRICA Congo, Democratic Republic of Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 05-Sep-2017 ISR29389 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Nigeria Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 5 ARCHIVED on 03-Jan-2017 ISR26446 Implementing Agencies: FEDERAL MINISTRY

More information

The World Bank Caribbean Regional Communications Infrastructure Program (P114963)

The World Bank Caribbean Regional Communications Infrastructure Program (P114963) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Caribbean Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2012 Seq No: 9 ARCHIVED on 25-Jan-2017 ISR26209 Implementing Agencies:

More information

The World Bank Can Tho Urban Development and Resilience (P152851)

The World Bank Can Tho Urban Development and Resilience (P152851) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 30-Jul-2018

More information

The World Bank MA- Noor Ouarzazate Concentrated Solar Power Project (P131256)

The World Bank MA- Noor Ouarzazate Concentrated Solar Power Project (P131256) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Morocco Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 22-May-2018 ISR31943 Implementing

More information

The World Bank BiH Floods Emergency Recovery Project (P151157)

The World Bank BiH Floods Emergency Recovery Project (P151157) EUROPE AND CENTRAL ASIA Bosnia and Herzegovina Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 4 ARCHIVED on 22-Jun-2016 ISR22737

More information

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Local and Regional Competitiveness Project (P154263) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Macedonia, former Yugoslav Republic of Finance, Competitiveness and Innovation Global Practice Recipient Executed Activities Investment Project Financing

More information

SUSTAINABLE CITIES (P128605)

SUSTAINABLE CITIES (P128605) EUROPE AND CENTRAL ASIA Turkey Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 26-Sep-2017 ISR29555 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy EUROPE AND CENTRAL ASIA Uzbekistan Water Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 12-Jan-2018 ISR30728 Implementing Agencies: Ministry of Agriculture and Water

More information

Sri Lanka Strategic Cities Development Project (P130548)

Sri Lanka Strategic Cities Development Project (P130548) SOUTH ASIA Sri Lanka Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 10 ARCHIVED on 21-Dec-2018 ISR35436 Implementing Agencies:

More information

The World Bank Ecuador - Sustainable Family Farming Modernization Project (P151963)

The World Bank Ecuador - Sustainable Family Farming Modernization Project (P151963) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Ecuador Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 17-Nov-2017 ISR30151 Implementing Agencies:

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized AFRICA Uganda Energy and Mining Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 10 ARCHIVED on 10-Mar-2015 ISR16830 Implementing Agencies: Public Disclosure

More information

NI - INTEGRATED PUBLIC PROVISION OF HEALTH CARE SERVICES (P164452)

NI - INTEGRATED PUBLIC PROVISION OF HEALTH CARE SERVICES (P164452) LATIN AMERICA AND CARIBBEAN Nicaragua Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 2 ARCHIVED on 26-Dec-2018 ISR35016 Implementing Agencies: Ministry

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized AFRICA Uganda Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 1 ARCHIVED on 16-Nov-2015 ISR21261 Implementing Agencies: Ministry

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Guinea Water Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 14-Apr-2018 ISR31899 Implementing Agencies: Ministry of Energy and Hydraulics

More information

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

The World Bank Ethiopia Geothermal Sector Development Project (P133613) Public Disclosure Authorized AFRICA Ethiopia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 13-Mar-2018 ISR31676 Implementing Agencies: Ethiopian

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Myanmar Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 6 ARCHIVED on 16-Jul-2018 ISR32389 Implementing Agencies:

More information

The World Bank Mali Reconstruction and Economic Recovery (P144442)

The World Bank Mali Reconstruction and Economic Recovery (P144442) Public Disclosure Authorized AFRICA Mali Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 19-Dec-2017 ISR30326 Implementing

More information

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965) Public Disclosure Authorized AFRICA Uganda Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 2 ARCHIVED on 08-Apr-2016 ISR23131 Implementing Agencies: Office

More information

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525)

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 4 ARCHIVED on 11-Dec-2015 ISR21753 Implementing Agencies:

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized AFRICA Uganda Energy & Extractives Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 11 ARCHIVED on 26-Oct-2015 ISR21123 Implementing Agencies: Public Disclosure

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Myanmar Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 18-Jan-2018 ISR29499 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Haiti Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Emergency Recovery Loan FY 2011 Seq No:

More information