1 Building with Maas Water MIRT Maas Venlo Study

2 photo: BVR 2015

3 Summary To meet the challenges of climate change, a lot of hard work is being done in the Delta Programme on measures to further increase the level of protection of the Netherlands against high water. The Maasvallei (Maas Valley) in the province of Limburg needs to be better protected. The Maas Venlo Signpost Project is based on the awareness that fundamental choices now have to be made to shape the way future generations will experience the River Maas. Making the right choices demands an integrated approach. To balance the needs of protection against high water and those of spatial planning, we need to take an integrated view. And we also need to explain our thinking to those who will be affected, whether on a daily basis (spatial planning) or occasionally (high water) the residents of the river area. The City of Venlo started an MIRT study in 2015 to investigate how the requirements of spatial planning and high-water protection can be combined. Together with neighbouring municipalities, water boards, Rijkswaterstaat (Netherlands Ministry of Infrastructure and the Environment), the Province of Limburg and the Delta Programme, a lot of work has been done to create a shared vision on both the water-related and spatial planning aspects of this task. The following goal was central in this process: Goal The Maas Venlo Signpost Project will need to answer the following key question: In view of the questions relating to water safety and the high-water problem, and in view of the spatial planning developments in the regional economy on and along the banks of the Maas in Venlo, what are the opportunities for the high-water problem and for the regional economic development, and how in terms of content, tactical approach and financing can use be made of these opportunities in a combined, integrated way?

4 Structure of the study To get a good and broadly supported answer to the question that has been formulated, we decided to follow an innovative approach for the study. We took a deliberate decision to use two research agencies and to look at two study tracks: one dealing with spatial planning use and the other with the water-related aspects. The spatial-planning track was investigated mainly with the landscape architects of the BVR agency. Based on three perspectives, they showed which spatial planning choices had to be made, and how these related to the high-water protection aspects. Working together with the advisors at LievenseCSO and HKV, the geomorphological characteristics of the Maas near Venlo were identified to show the opportunities for river-related measures and the effects of those measures. The opportunities were then investigated and checked in broadly-based evening information sessions together with the stakeholders and shareholders. These led to broad support for the possible measures because many of the ideas used had come directly from the users themselves. The spatial planning studies carried out by BVR showed many opportunities for changes in this area. A Multilayered Safety Session was therefore held together with the Ministry of Infrastructure and the Environment (DGRW) to discuss the opportunities for spatial planning changes in the Venlo area of the Maas Valley. The study then consisted of bringing together the spatial planning and river-related opportunities. This resulted in hotspots in which both the spatial planning and water-related measures showed a strong potential for mutual reinforcement. Within the hotspots themselves, priorities were then assigned on the basis of urgency (which synergy opportunities are now emerging?). Within the most urgent hotspots, it was then investigated which opportunities there are in the area of financing. Based on discussions with all the involved government organisations and industry, the different financing providers were then identified. This showed a number of finance sources, as well as a number of strong synergy opportunities that would enable a joint working approach or that would lead to substantial cost savings (in other areas). Reporting system Venlo s surrounding region is proud of the attractive nature of the Maas Valley. The area is developing within the important Dutch transport corridors into an economic hub for logistics, agribusiness and urban recreation. Climate change is one of the factors that have led to a new balance between these developments in spatial planning, the economy and the river landscape, with the aim of ensuring the safety of the city and its surrounding area at times of high water in the Maas. The ambitions of Venlo are not only those of the city itself, they are broadly supported. At national level, the position of the Venlo region is embedded in the SVIR (Structure Vision on Infrastructure and Spatial Planning). These ambitions are also laid down in the MIRT regional plan for Limburg and the Provincial Environmental Plan for Limburg. In the municipality, the task for the city and surrounding area in terms of spatial planning and the economy is laid down in the Ruimtelijke Structuurvisie Venlo (Venlo Spatial Planning Structure Vision 2014).

5 This task has a strong impact on the interaction between the city/surrounding area and the river. The high-water protection task in the region, as described in the Voorkeursstrategie Maasvallei (Preferred strategy for the Maas Valley) within the Delta Programme for the Rivers, is far-reaching and has an equally great impact on the interaction between the river and the city/surroundings. This MIRT Koploperproject Maas Venlo (Maas Venlo Signpost Project) study integrates both of these tasks, seeking to link Water, Spatial Planning and Time. The truly integrated approach leads to smart combinations / synergy opportunities, ensuring that no opportunities are overlooked, and that we take no irreversible measures that we may regret in the future. The core of Living with the Maas is that city and river are again unified, so that the quality of spatial planning and the authentic character of the Maas Valley are the basic principles that are followed. The key aim is: providing open spaces where possible, and building dikes where necessary. The chart at the right shows the direction followed by the study. BREED GEDRAGEN AMBITIES RSV Gem. beleid SVIR MIRT-gebiedsagenda POL e.v. IDENTIFICEREN HOTSPOTS KEUZE HOTSPOTS HWBP DELTA- PROGR.- MAAS Systeemwerking MIRTverkenning hotspot 4/5 Uitwerking en (gefaseerde) realisatie Continueren onderzoek overige Hotspots, al dan niet in de toekomst rijp voor nadere (MIRT-) verkenning, uitwerking en (gefaseerde) realisatie

6 Synergy opportunities In the Maas Venlo Signpost Project, we are looking for a future-proof package of high-water measures that will enhance the quality of the public space in both the city and the surrounding region, while also strengthening the economy. But the proposed measured must in any case provide better alternatives than high walls between city and river. The result of the study was the identification of no less than five hotspots along the Maas where possible measures offer the greatest chance of success. The proposed high-water protection measures and the spatial transformation of the five hotspots will create new links between river and city. The city s high-speed corridor together with the east-west transport route (logistics hotspot) and the slow landscape of the Maas Valley will merge in a dynamic riverside landscape between Baarlo and Velden. Hotspot 1: Baarlo Here, the study shows clear opportunities to shift back the dikes, creating more space for the river in combination with natural and/or recreational development. Shifting back the dikes and broadening the river here will create a potentially substantial reduction of the water level. This in turn will greatly benefit the upstream area. Urgency Water: high (HWBP, system effect, many cm) Spatial planning: low (many opportunities, but limited now of never ) Hotspot 2, Molenbossen and VieCuri Hospital area: Making room for the river by shifting back the dikes in combination with relocating the hospital car park and, in the longer term, restructuring flats and possibly relocating the hospital. Urgency Water: moderate (dikes not approved, limited reduction of water level, contribution to resilience) Spatial planning: moderate (Molenbossen flats now to be renovated; the hospital car park will be relocated in the longer term, and a solution is now being sought)

7 Hotspot 3, Venlo centre / Kazerneterrein (Barracks Site): Creating room for the Maas by streamlining the flow profile in combination with completion of the urban development and creation of city centre facilities. Development of the Kazernekwartier area and new riverbank link create opportunities for spatial planning changes. Urgency Water: moderate (dikes not approved, limited reduction of water level, contribution to resilience) Spatial planning: moderate (plans are now being developed for the Kazernekwartier and inner city) Hotspot 4, Industry park and surrounding area Improved dikes in combination with extension of the functions of the Industry Port and the Barge Terminal. Urgency Water: high (dike reinforcement requested by HWBP, dikes not approved) Spatial planning: very high (restructuring of the Industry Port is in full swing, need to relocated the Yacht Harbour in the near future)

8 Hotspot 5, Venlo-Velden: Shifting back the dike and building a secondary channel with natural and recreational functions such as a new yacht harbour. The shifting of the dike and clearing of the river create a potentially substantial reduction of the water level here, greatly benefiting the city of Venlo which is located upstream. Urgency Water: high (HWBP, system effect, many cm) Spatial planning: high (preferred location for the yacht harbour, nature development, KRW, development of the Océ campus) Based on their urgency (where do we need to make choices now to take advantage of opportunities now so we will not regret those decisions in the future), Hotspot 1 and Hotspot 4/5 have been identified as the most urgent. Both have been given a dike reinforcement task by the HWBP, together with the choice of location for the dike. Hotspot 5 also has extra urgency because of the possible combination with the relocation of the yacht harbour from Hotspot 4). Effects of the measures (water-related) The measures within Hotspots 1 and 4/5 have been assessed by HKV for their effect on the water-level reduction. The cumulative effect of these measures is a reduction of more than 35 cm at the Belfeld dam. The water-level reduction affects the river for approximately 45 km upstream. The proposed measures will contribute to the water-level reduction within the new standards. The shifting back of the dike will contribute to a resilient river system and provide a significant reduction of risk. Under this estimate, the phased implementation plan will of course mean that the expected effects are achieved gradually over time. Support All the authorities involved in this task (Province of Limburg, national government, Municipality of Peel and Maas, Peel and Maas Valley Water Board and the Municipality of Venlo) have a shared need to work on the high-water protection task for Venlo. The authorities concerned agreed in the declaration of intent of 7 October 2015 to strengthen the high-water protection along the Maas, as well as to achieve the aims of the Delta Programme and HWBP. They endorse the importance of an integrated approach, in which climate resistance, water protection and water-resilient redevelopment are key factors. No partners favoured a variant of only dike reinforcement without dike shifting. If these measures with an overall system effect are not carried out, this will result in significantly higher water levels upstream (in the City of Venlo), and the hydraulic bottleneck will be shifted. If the dike were to be reinforced now at the present location this would further reduce the accessibility of the region, and the limited possibilities for river broadening would be harder to achieve in the future. It would also be hard to explain this to residents and users of the region, and if it was decided later to shift back the dike this would then represent a divestment. A plan of this size of course requires political and societal support. On the one hand the study had a high level of abstraction in the early phase, although at the same time it also involved some highly in-depth technical aspects. For this reason it was decided to start by communicating with shareholders and stakeholders. A number of sessions and workshops were organised, at which representatives of companies, associations, nature organisations and interest groups were present. These sessions were used to explain the links between the different measures (water-related) and

9 developments (spatial planning, economy, recreation and nature), and allowed valuable information to be collected for the formulation of promising opportunities and outlooks. Focus For Hotspot 1 Baarlo-Laerbroeck, the main emphasis is on water-related synergy opportunities and increasing support, while there is not yet any prospect of financing for spatial planning measures. This leads to the proposal to include shifting back the dike at this location (a system-level measure) in the current HWBP study. This no-regret approach will ensure that there will still be room to take advantage of new synergy opportunities in the future. Based on urgency and spatial planning / project-related arguments the effects of measures, synergy opportunities, support and financing possibilities it is proposed to carry out a further study of Hotspot 4/5 in the near future within the MIRT 1 rules. For the other hotspots, it is advised that the MIRT study be continued so that if there is a change in the urgency and/or financing becomes possible, choices can be made quickly that will contribute to a further improvement of the resilience of the river. This leads to the proposal to the Delta Maas Steering Group to include the entire Hotspot 4/5 (Industry Port Barge Terminal in combination with Venlo-Velden) in the Maas-wide regional proposal to the Ministry. For this part of the Maas Venlo Signpost Project, a decision to start the MIRT study is requested, in combination with the decision to make a withdrawal from the available fund of 100 million euros for river broadening. Regional proposal A made-to-measure approach During the discussion of how to use the available fund of 100 million euros, an investigation was carried out to find which variant should at least be carried out to allow advantage to be taken of the synergy opportunities that are present. The approach followed here was to identify the minimum funding required to allow the available financing contribution resulting from the relocation of the yacht harbour to be used for river broadening. The minimum variant as shown by this investigation was Hotspot 5, Southern section of the channel, practice pool, yacht harbour. However, the minimum variant is not preferred because it provides a significantly lower reduction of the water level than a total implementation of Hotspot 5 (south + north). In accordance with the cost estimate provided by Arcadis, the total implementation of Hotspot 5 requires a government contribution of 75 million euros. At present there is no prospect of financing for this entire hotspot. However we can see enough opportunities to include this variant in the MIRT study for the following reasons: By a total implementation of Signpost Project 4/5, we can see big opportunities for savings on the currently estimated costs. A total approach will provide savings in the start-up costs (engineering), will create opportunities for a joint working approach, will enable low-cost integrated designs, and will ensure that smart choices are made. In addition, a further investigation will clearly show which additional synergy opportunities arise. Up to now, each further step of the study has led to new synergy opportunities and sources of financing being identified. Further investigation is expected to allow new sources to be identified.

10 However, the gap between the estimated and the available sums at present is so great that we cannot yet say there is any prospect of full financing for the total Hotspot 5 project without a substantial government contribution. For Hotspot 4 in combination with the southern section of Hotspot 5, in contrast, there is the prospect of financing. With a regional contribution of 37 million euros, compared with the estimated government contribution of 36 million euros (including system effect), we believe this represents a solid regional proposal.

Cities and Climate Change (P123201)

Cities and Climate Change (P123201) Public Disclosure Authorized AFRICA Mozambique Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 14 ARCHIVED on 04-Nov-2018 ISR33750

More information

Summary. Recommendations on the Fifth Policy Document on Spatial Planning September 2001

Summary. Recommendations on the Fifth Policy Document on Spatial Planning September 2001 Summary Recommendations on the Fifth Policy Document on Spatial Planning September 2001 2 Introduction In December 2000 the Dutch Cabinet issued Part 1 of the Fifth National Policy Document on Spatial

More information

The World Bank Cities and Climate Change (P123201)

The World Bank Cities and Climate Change (P123201) Public Disclosure Authorized AFRICA Mozambique Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 13 ARCHIVED on 17-May-2018 ISR31517

More information

The National Policy Strategy for Infrastructure and Spatial Planning CODE24 CONFERENCE. Emiel Reiding

The National Policy Strategy for Infrastructure and Spatial Planning CODE24 CONFERENCE. Emiel Reiding The National Policy Strategy for Infrastructure and Spatial Planning Emiel Reiding Structure of presentation 1. Spatial planning in the Netherlands 2. National Policy Strategy Aims National interests 3.

More information

Land Use Modelling for Environmental and Ecological Policy Assessment:

Land Use Modelling for Environmental and Ecological Policy Assessment: Judith Borsboom Land Use Modelling for Environmental and Ecological Policy Assessment: Sustainable Netherlands Study in collaboration with: Wageningen University & Research centre WL Delft Hydraulics Arcadis

More information

Urban Climate Resilience

Urban Climate Resilience Urban Climate Resilience in Southeast Asia Partnership Project Introduction Planning for climate change is a daunting challenge for governments in the Mekong Region. Limited capacity at the municipal level,

More information

The World Bank Cusco Regional Development (P117318)

The World Bank Cusco Regional Development (P117318) LATIN AMERICA AND CARIBBEAN Peru Urban Development Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 3 ARCHIVED on 27-Jan-2015 ISR16645 Implementing Agencies: Cusco Regional Government

More information

Urbanization and Sustainable Development of Cities: A Ready Engine to Promote Economic Growth and Cooperation

Urbanization and Sustainable Development of Cities: A Ready Engine to Promote Economic Growth and Cooperation Urbanization and Sustainable Development of Cities: A Ready Engine to Promote Economic Growth and Cooperation Wan Portia Hamzah Institute of Strategic and International Studies (ISIS) Malaysia 10 September

More information

Dutch spatial planning: from implicit to explicit sustainable urban development

Dutch spatial planning: from implicit to explicit sustainable urban development Dutch spatial planning: from implicit to explicit sustainable urban development Jan Goedman (VROM*) Wim Heiko Houtsma (VROM) Wil Zonneveld (Delft University) *Dutch Ministry of Housing, Spatial Planning

More information

Alluvium Consulting Australia Senior integrated water management specialist Position Description March 2018

Alluvium Consulting Australia Senior integrated water management specialist Position Description March 2018 Alluvium Consulting Australia Senior integrated water management specialist Position Description March 2018 Overview of Alluvium We are an employee-owned consulting firm founded in 2006 to provide advice

More information

ACTION PLAN FOR WORLD HERITAGE IN LATIN AMERICA AND THE CARIBBEAN ( )

ACTION PLAN FOR WORLD HERITAGE IN LATIN AMERICA AND THE CARIBBEAN ( ) Annex ACTION PLAN FOR WORLD HERITAGE IN LATIN AMERICA AND THE CARIBBEAN (2014-2024) The current Regional Action Plan for Latin America and the Caribbean for 2014-2024 has been elaborated by the State Parties

More information

Policy framework The Netherlands and the Polar Regions, Summary and priorities

Policy framework The Netherlands and the Polar Regions, Summary and priorities Policy framework The Netherlands and the Polar Regions, 2011-2015 Summary and priorities The policy outlined in this Policy Framework for the Polar Regions (2011-2015) is part of the government s orientation

More information

KUNMING FORUM ON UNITED NATIONS GLOBAL GEOSPATIAL INFORMATION MANAGEMENT CITIES OF THE FUTURE: SMART, RESILIENT

KUNMING FORUM ON UNITED NATIONS GLOBAL GEOSPATIAL INFORMATION MANAGEMENT CITIES OF THE FUTURE: SMART, RESILIENT KUNMING FORUM ON UNITED NATIONS GLOBAL GEOSPATIAL INFORMATION MANAGEMENT CITIES OF THE FUTURE: SMART, RESILIENT and SUSTAINABLE Yunnan Zhenzhuang Guest House, Kunming, China 10 12 May 2017 BACKGROUND CONCEPT

More information

High speed network in Hauts-de-France Region. Värnamo, 17 th May 2018

High speed network in Hauts-de-France Region. Värnamo, 17 th May 2018 High speed network in Hauts-de-France Region Värnamo, 17 th May 2018 Hauts-de-France at the crossroads of the North-West Europe High speed train approach in France In the 1980s: will to link the main cities

More information

The World Bank BiH Floods Emergency Recovery Project (P151157)

The World Bank BiH Floods Emergency Recovery Project (P151157) EUROPE AND CENTRAL ASIA Bosnia and Herzegovina Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 4 ARCHIVED on 22-Jun-2016 ISR22737

More information

Introduction to NWO & Astronomy at NWO Physical Sciences

Introduction to NWO & Astronomy at NWO Physical Sciences Introduction to NWO & Astronomy at NWO Physical Sciences Ronald Stark, Head of Astronomy Nederlandse Organisatie voor Wetenschappelijk Onderzoek FAPESP-NWO, 16 March 2015 About NWO National Research Council

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 1 ARCHIVED on 03-Nov-2016 ISR25240 Implementing

More information

Developing Quality of Life and Urban- Rural Interactions in BSR

Developing Quality of Life and Urban- Rural Interactions in BSR Developing Quality of Life and Urban- Rural Interactions in BSR Sakari Saarinen Union of the Baltic Cities, Commission on Environment Seminar on Quality of Life in Small Communities, 27 May 2010, Kärdla,

More information

Poland, European Territory, ESPON Programme Warsaw, 2 July 2007 STRATEGY OF THE ESPON 2013 PROGRAMME

Poland, European Territory, ESPON Programme Warsaw, 2 July 2007 STRATEGY OF THE ESPON 2013 PROGRAMME Poland, European Territory, ESPON Programme 2007-2013 Warsaw, 2 July 2007 STRATEGY OF THE ESPON 2013 PROGRAMME Territory matters Regional diversity as asset Territorial potentials increasing in importance

More information

Foreword. Vision and Strategy

Foreword. Vision and Strategy GREATER MANCHESTER SPATIAL FRAMEWORK Friends of Walkden Station Consultation Response January 2017 Foreword Friends of Walkden Station are a group of dedicated volunteers seeking to raise the status and

More information

2. Defining fisheries areas

2. Defining fisheries areas What does fisheries area mean in the context of the EFF? Axis 4 of the European Fisheries Fund (EFF) is different from the other three Axes in that it targets fisheries areas (it is titled Sustainable

More information

For the Quality of Limburg draft PEL2014

For the Quality of Limburg draft PEL2014 For the Quality of Limburg draft PEL2014 Executive of the Province of Limburg, 6 May 2014 2. Limburg's ambitions and challenges 2.1 Limburg is in good shape We are proud of our Province. Our residents

More information

Regional Plan 4: Integrating Ecosystem Services Mapping into Regional Land Use Planning

Regional Plan 4: Integrating Ecosystem Services Mapping into Regional Land Use Planning Rural-Urban Outlooks: Unlocking Synergies (ROBUST) ROBUST receives funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No 727988.* October 2018 Natural

More information

Overcoming Complexities on the Interface of Infrastructure and Land Use

Overcoming Complexities on the Interface of Infrastructure and Land Use Date 22-11-2013 1 Overcoming Complexities on the Interface of Infrastructure and Land Use Towards design preconditions for integrated regional development Niels Heeres & Jos Arts University of Groningen,

More information

UN-GGIM: Strengthening Geospatial Capability

UN-GGIM: Strengthening Geospatial Capability Fifth Plenary Meeting of UN-GGIM: Europe Brussels, 6-7 June 2018 UN-GGIM: Strengthening Geospatial Capability Walking the talk to leave no one behind Greg Scott, UN-GGIM Secretariat Environmental Statistics

More information

The World Bank Third National Urban Water Sector Reform Project (P123513)

The World Bank Third National Urban Water Sector Reform Project (P123513) Public Disclosure Authorized AFRICA Nigeria Water Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 27-Jun-2017 ISR28879 Implementing Agencies: Federal Republic of Nigeria,

More information

Launch of the ESPON 2013 Programme. European observation network on territorial development and cohesion

Launch of the ESPON 2013 Programme. European observation network on territorial development and cohesion Launch of the ESPON 2013 Programme European observation network on territorial development and cohesion Framework conditions for the ESPON 2013 Programme Policy development in use of territorial evidence

More information

The Future of Tourism in Antarctica: Challenges for Sustainability

The Future of Tourism in Antarctica: Challenges for Sustainability The Future of Tourism in Antarctica: Challenges for Sustainability Machiel Lamers Thesis summary In the last decade, Antarctic tourism has grown rapidly both in terms of volume and diversity. This growth

More information

16540/14 EE/cm 1 DG E 1A

16540/14 EE/cm 1 DG E 1A Council of the European Union Brussels, 5 December 2014 (OR. en) 16540/14 ENV 965 CULT 139 NOTE From: To: Subject: General Secretariat of the Council Delegations Charter of Rome on Natural and Cultural

More information

The World Bank Education Infrastructure for Resilience (EU Facility for SuTP) (P162004)

The World Bank Education Infrastructure for Resilience (EU Facility for SuTP) (P162004) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Turkey Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No:

More information

Maritime Spatial Planning

Maritime Spatial Planning Maritime Spatial Planning The Dutch experience Kopenhagen 28 november 2012 Lodewijk.Abspoel@minienm.nl North Sea 2 Outline History of MSP in the Netherlands Spatial Plan for the Dutch EEZ, principles and

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Bangladesh Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 3 ARCHIVED on 29-Jun-2016 ISR24379

More information

Governance and Urban Nexus: Closing the gaps

Governance and Urban Nexus: Closing the gaps Governance and Urban Nexus: Closing the gaps Donovan Storey Chief, Sustainable Urban Development, Environment & Development Division National Dialogue on Urban Nexus in Thailand Bangkok, UNCC, 19 March

More information

European Landscape Convention in the Slovak Republic

European Landscape Convention in the Slovak Republic 13th COUNCIL OF EUROPE MEETING OF THE WORKSHOPS FOR THE EUROPEAN LANDSCAPE CONVENTION European Landscape Convention in the Slovak Republic Mrs. Ida Vanáková, state advisor, Department of Spatial Planning

More information

The World Bank JM Youth Employment in Digital and Animation Industries (P148013)

The World Bank JM Youth Employment in Digital and Animation Industries (P148013) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Jamaica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on

More information

The CRP stresses a number of factors that point to both our changing demographics and our future opportunities with recommendations for:

The CRP stresses a number of factors that point to both our changing demographics and our future opportunities with recommendations for: Plan Overview The CRP represents the first broad planning initiative covering Lake, Porter and LaPorte counties. Unlike previous plans released by NIRPC, which focused primarily on transportation, the

More information

Regional stakeholders strategy of Donegal County Council

Regional stakeholders strategy of Donegal County Council Regional stakeholders strategy of Donegal County Council Table of contents The template comprised five steps in the creation of this communication strategy: 1 Starting point. Communication objectives...

More information

Mapping Water Resources and Reservoirs for Climate Resilience in Zambezi River Basin

Mapping Water Resources and Reservoirs for Climate Resilience in Zambezi River Basin Mapping Water Resources and Reservoirs for Climate Resilience in Zambezi River Basin Corné van der Sande, NEO BV Senior Advisor Earth Observation Services for Monitoring Drought and Water Resources in

More information

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Local and Regional Competitiveness Project (P154263) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Macedonia, former Yugoslav Republic of Finance, Competitiveness and Innovation Global Practice Recipient Executed Activities Investment Project Financing

More information

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525)

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 4 ARCHIVED on 11-Dec-2015 ISR21753 Implementing Agencies:

More information

8 th Arctic Regional Hydrographic Commission Meeting September 2018, Longyearbyen, Svalbard Norway

8 th Arctic Regional Hydrographic Commission Meeting September 2018, Longyearbyen, Svalbard Norway 8 th Arctic Regional Hydrographic Commission Meeting 11-13 September 2018, Longyearbyen, Svalbard Norway Status Report of the Arctic Regional Marine Spatial Data Infrastructures Working Group (ARMSDIWG)

More information

Vital city lively neighborhood living center

Vital city lively neighborhood living center From the ugliest place to heart of the suburb Vital city lively neighborhood living center Marja Straver - Nevalainen September 12 th, 2012 If you want to see the sun, t th look next to it to NL FI 10x

More information

New Prospects for Peripheral Rural Regions Helmut Hiess Glasgow, 19th of May 2010

New Prospects for Peripheral Rural Regions Helmut Hiess Glasgow, 19th of May 2010 New Prospects for Peripheral Rural Regions Helmut Hiess Glasgow, 19th of May 2010 ÖROK: Organisation & Tasks Austrian Conference on Spatial Planning (ÖROK, since 1971): Joint organisation by Federal level,

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Albania Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 16-Aug-2017

More information

Sustainable tourism in for Sustaibale Danang

Sustainable tourism in for Sustaibale Danang Sustainable tourism in for Sustaibale Danang A case study of Balearic Ecotax in Spain toward Sustainable tourism Miki Yoshizumi Associate Professor College of Gastronomy Management Ritsumeikan University

More information

DRECHTSTEDEN: WORKING ON A DRIERIVIERENPUNT WITH NO INTERNAL BORDERS

DRECHTSTEDEN: WORKING ON A DRIERIVIERENPUNT WITH NO INTERNAL BORDERS DRECHTSTEDEN: WORKING ON A DRIERIVIERENPUNT WITH NO INTERNAL BORDERS Three rivers the Beneden-Merwede, the Oude Maas and the Noord converge at a point in South Holland, aptly named Drierivierenpunt, or

More information

Strengthening the cooperation in the region: Carpathian, Tisa,, Danube and Black Sea areas

Strengthening the cooperation in the region: Carpathian, Tisa,, Danube and Black Sea areas Strengthening the cooperation in the region: Carpathian, Tisa,, Danube and Black Sea areas 14th October 2009 SEE Annual Conference Advancing development through transnational cooperation in South East

More information

Copernicus Academy. Roles and responsibilities of the Copernicus Academy. user uptake. Focus Data uptake, capacity building and skills development

Copernicus Academy. Roles and responsibilities of the Copernicus Academy. user uptake. Focus Data uptake, capacity building and skills development Copernicus Academy user uptake Roles and responsibilities of the Copernicus Academy The European Commission has launched two Networks, the Copernicus Relays and the Copernicus Academy, to contribute on

More information

USER PARTICIPATION IN HOUSING REGENERATION PROJECTS

USER PARTICIPATION IN HOUSING REGENERATION PROJECTS USER PARTICIPATION IN HOUSING REGENERATION PROJECTS Dr. Hatice Sadıkoğlu Bahçeşehir University, Faculty of Architecture and Design Prof. Dr. Ahsen Özsoy Istanbul Technical University, Faculty of Architecture

More information

38th UNWTO Affiliate Members Plenary Session Yerevan, Armenia, 4 October 2016

38th UNWTO Affiliate Members Plenary Session Yerevan, Armenia, 4 October 2016 38th UNWTO Affiliate Members Plenary Session Yerevan, Armenia, 4 October 2016 17:00-19:00 Open Debate 5: City Tourism Introduced and Moderated by Dr. Donald Hawkins George Washington University World urban

More information

REVIEW OF THE EMERGING ISSUES TASK FORCE

REVIEW OF THE EMERGING ISSUES TASK FORCE REVIEW OF THE EMERGING ISSUES TASK FORCE Conclusions and Recommendations Financial Accounting Standards Board www.fasb.org REVIEW OF THE EMERGING ISSUES TASK FORCE BACKGROUND OF THE EITF The Financial

More information

ESPON evidence on European cities and metropolitan areas

ESPON evidence on European cities and metropolitan areas BEST METROPOLISES Final Conference 18 April 2013, Warsaw ESPON evidence on European cities and metropolitan areas Michaela Gensheimer Structure of Intervention Content Part I: What is the ESPON 2013 Programme?

More information

Jordan's Strategic Research Agenda in cultural heritage

Jordan's Strategic Research Agenda in cultural heritage Jordan's Strategic Research Agenda in cultural heritage Analysis of main results Alessandra Gandini Amman, Jordan 3 rd November 2013 Main objectives The work performed had the main objective of giving

More information

(Emerging?) topics in resilience research perspectives from a critical urban and regional studies view

(Emerging?) topics in resilience research perspectives from a critical urban and regional studies view (Emerging?) topics in resilience research perspectives from a critical urban and regional studies view Thilo Lang Head of Department Regional Geography of Europe Leibniz Institute for Regional Geography

More information

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities Draft Sunshine Coast Planning Scheme Review of Submissions Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities Key Issue: Growth opportunities for Southern Hinterland

More information

CREATING LIVEABLE & SAFE CITIES FOR ALL

CREATING LIVEABLE & SAFE CITIES FOR ALL CREATING LIVEABLE & SAFE CITIES FOR ALL Taking Transit to people s door steps PRERNA V. MEHTA, MANAGER, WRI INDIA RAJEEV G. MALAGI, SR. PROJECT ASSOCIATE, WRI INDIA A product of WRI Ross Center for Sustainable

More information

Council Workshop on Neighbourhoods Thursday, October 4 th, :00 to 4:00 p.m. Burlington Performing Arts Centre

Council Workshop on Neighbourhoods Thursday, October 4 th, :00 to 4:00 p.m. Burlington Performing Arts Centre Council Workshop on Neighbourhoods Thursday, October 4 th, 2012 1:00 to 4:00 p.m. Burlington Performing Arts Centre Agenda Introductions Warm-Up Exercise Presentation Exercise Neighbourhood Planning Break

More information

Zambia - Mining and Environmental Remediation and Improvement Project (P154683)

Zambia - Mining and Environmental Remediation and Improvement Project (P154683) AFRICA Zambia Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 26-Nov-2018 ISR34605 Implementing Agencies: Ministry of Mines and Mineral

More information

AMS E-GOS Local governance and performance of open data policies at municipal level

AMS E-GOS Local governance and performance of open data policies at municipal level AMS E-GOS Local governance and performance of open data policies at municipal level Frederika Welle Donker Knowledge Centre Open Data TU Delft f.m.welledonker@tudelft.nl 1 Knowledge Centre Open Data Research

More information

CLAREMONT MASTER PLAN 2017: LAND USE COMMUNITY INPUT

CLAREMONT MASTER PLAN 2017: LAND USE COMMUNITY INPUT Planning and Development Department 14 North Street Claremont, New Hampshire 03743 Ph: (603) 542-7008 Fax: (603) 542-7033 Email: cityplanner@claremontnh.com www.claremontnh.com CLAREMONT MASTER PLAN 2017:

More information

Fossil Fuels Conference. 10 November The Limpopo Province A Hub for Sustainable Development

Fossil Fuels Conference. 10 November The Limpopo Province A Hub for Sustainable Development Fossil Fuels Conference 10 November 2015 The Limpopo Province A Hub for Sustainable Development AGENDA The Economic Impact of Mining at anational, Provincial and Local Level Mining as a Catalyst for Development

More information

Framework on reducing diffuse pollution from agriculture perspectives from catchment managers

Framework on reducing diffuse pollution from agriculture perspectives from catchment managers Framework on reducing diffuse pollution from agriculture perspectives from catchment managers Photo: River Eden catchment, Sim Reaney, Durham University Introduction This framework has arisen from a series

More information

GOVERNMENT MAPPING WORKSHOP RECOVER Edmonton s Urban Wellness Plan Mapping Workshop December 4, 2017

GOVERNMENT MAPPING WORKSHOP RECOVER Edmonton s Urban Wellness Plan Mapping Workshop December 4, 2017 GOVERNMENT MAPPING WORKSHOP 12.4.17 RECOVER Edmonton s Urban Wellness Plan Mapping Workshop December 4, 2017 In July of 2017, City Council directed administration to develop RECOVER, Edmonton s Urban Wellness

More information

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

The World Bank China: Qinghai Xining Urban Transport Project (P127867) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 27-Jun-2016 ISR24068 Implementing Agencies:

More information

COSTA RICA Limon City-Port Project

COSTA RICA Limon City-Port Project photos by Stefania Abakerli COSTA RICA Limon City-Port Project 2008 2013 Cecilia Corvalan William Reuben Stefania Abakerli Background Request from GoCR following Caldera-Port Concession Reform Since the

More information

why is a national or regional context important?

why is a national or regional context important? The need Accessibility to opportunities, Efficient movement of people and goods, Environmental Health Strength and competitiveness of the economy, Availability and cost of energy, Safety and Security,

More information

The World Bank Ecuador Risk Mitigation and Emergency Recovery Project (P157324)

The World Bank Ecuador Risk Mitigation and Emergency Recovery Project (P157324) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Ecuador Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on

More information

OUR COASTAL FUTURES. A Strategy for the Sustainable Development of the World s Coasts.

OUR COASTAL FUTURES. A Strategy for the Sustainable Development of the World s Coasts. OUR COASTAL FUTURES A Strategy for the Sustainable Development of the World s Coasts www.futureearthcoasts.org Iqaluit, Nunavut, Canada. Photo by Don Forbes Coastal zones are the frontline in our global

More information

Public Disclosure Copy. Implementation Status & Results Report Somali Core Economic Institutions and Opportunities Program (SCORE) (P152241)

Public Disclosure Copy. Implementation Status & Results Report Somali Core Economic Institutions and Opportunities Program (SCORE) (P152241) Public Disclosure Authorized AFRICA Somalia Trade & Competitiveness Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 29-Nov-2016 ISR25649 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Vanuatu Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Technical Assistance Loan FY 2013 Seq No: 7

More information

Strategic Framework Executive Summary JANUARY 2018

Strategic Framework Executive Summary JANUARY 2018 Strategic Framework Executive Summary JANUARY 2018 LETTER FROM OUR BOARD For the people of Los Angeles and the world beyond, the Natural History Family of Museums explores connections between nature, culture,

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Belize Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 19-Dec-2017

More information

The World Bank Mali Reconstruction and Economic Recovery (P144442)

The World Bank Mali Reconstruction and Economic Recovery (P144442) Public Disclosure Authorized AFRICA Mali Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Emergency Recovery Loan FY 2014 Seq No: 7 ARCHIVED on 30-Jun-2017 ISR28723 Implementing

More information

NEPAL: FCPF READINESS GRANT FCPFR - FOREST CARBON PARTNERSHIP FACILITY

NEPAL: FCPF READINESS GRANT FCPFR - FOREST CARBON PARTNERSHIP FACILITY Assignment: TF094724 NEPAL: FCPF READINESS GRANT FCPFR - FOREST CARBON PARTNERSHIP FACILITY Task Team Leader: 00000011824 Approving Manager: 00000253690 - William B. Magrath - Valerie Hickey Summary Information

More information

The World Bank Mali Reconstruction and Economic Recovery (P144442)

The World Bank Mali Reconstruction and Economic Recovery (P144442) Public Disclosure Authorized AFRICA Mali Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 19-Dec-2017 ISR30326 Implementing

More information

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Local and Regional Competitiveness Project (P154263) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Macedonia, former Yugoslav Republic of Trade & Competitiveness Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq

More information

The importance of visioning in urban strategic planning By Peter Robinson. MILE Master Class Urban Strategic Planning March 2016

The importance of visioning in urban strategic planning By Peter Robinson. MILE Master Class Urban Strategic Planning March 2016 The importance of visioning in urban strategic planning By Peter Robinson MILE Master Class Urban Strategic Planning March 2016 Typical strategic planning process Where are we now? Where are we going?

More information

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 2 ARCHIVED on 09-Dec-2014 ISR17411 Implementing Agencies: Heilongjiang

More information

Impact Policies Enabling Value Enhancement of Geospatial Information in Canadian Economy and Society

Impact Policies Enabling Value Enhancement of Geospatial Information in Canadian Economy and Society 1 Impact Policies Enabling Value Enhancement of Geospatial Information in Canadian Economy and Society May 26, 2015 Prashant Shukle, Director General Canada Centre for Mapping and Earth Observation Increased

More information

State initiative following up the 2006 national planning report

State initiative following up the 2006 national planning report 18 ness districts and public institutions, should be integrated with the opportunities for public transport services. State initiative following up the 2006 national planning report The Ministry of the

More information

Territorial Cooperation within the Northern Periphery and the Arctic

Territorial Cooperation within the Northern Periphery and the Arctic Territorial Cooperation within the Northern Periphery and the Arctic 12 March 2013 / By Silvia Curbelo Betancort North charr project, Landösjön lake, Sweden. Source: North Periphery Programme Today we

More information

Let s make integrated land-use and transport modelling useful

Let s make integrated land-use and transport modelling useful Let s make integrated land-use and transport modelling useful Prof. Dr.-Ing. Gebhard Wulfhorst Chair of Urban Structure and Transport Planning Technical University of Munich (TUM) Symposium for the Integration

More information

Sindh Enhancing Response to Reduce Stunting (P161624)

Sindh Enhancing Response to Reduce Stunting (P161624) Public Disclosure Authorized SOUTH ASIA Pakistan Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 01-Oct-2018 ISR33776 Implementing Agencies:

More information

BURGAS CASE STUDY: LAND-SEA INTERACTIONS

BURGAS CASE STUDY: LAND-SEA INTERACTIONS BURGAS CASE STUDY: LAND-SEA INTERACTIONS Dr. Margarita Stancheva IO-BAS, Bulgaria Name of presentation CROSS BORDER MARITIME SPATIAL PLANNING IN THE BLACK SEA ROMANIA AND BULGARIA (MARSPLAN BS) Project

More information

Towards international cooperation in the development of Marine Spatial Plans for the North Pacific: economic, social, and environmental dimensions

Towards international cooperation in the development of Marine Spatial Plans for the North Pacific: economic, social, and environmental dimensions Towards international cooperation in the development of Marine Spatial Plans for the North Pacific: economic, social, and environmental dimensions A.V. Sereda, V.B. Lobanov V.I. Il ichev Pacific Oceanological

More information

ACTION PLAN FOR WORLD HERITAGE IN LATIN AMERICA AND THE CARIBBEAN

ACTION PLAN FOR WORLD HERITAGE IN LATIN AMERICA AND THE CARIBBEAN Final version-to send to the ACTION PLAN FOR WORLD HERITAGE IN LATIN AMERICA AND THE CARIBBEAN 2014-2024 The current Regional Action Plan for Latin America and the Caribbean has been elaborated by the

More information

Concept note. High-Level Seminar: Accelerating Sustainable Energy for All in Landlocked Developing Countries through Innovative Partnerships

Concept note. High-Level Seminar: Accelerating Sustainable Energy for All in Landlocked Developing Countries through Innovative Partnerships Concept note High-Level Seminar: Accelerating Sustainable Energy for All in Landlocked Developing Countries through Innovative Partnerships Date: 24 and 25 October 2016 Venue: Conference Room C3, Vienna

More information

CHAPTER 4 HIGH LEVEL SPATIAL DEVELOPMENT FRAMEWORK (SDF) Page 95

CHAPTER 4 HIGH LEVEL SPATIAL DEVELOPMENT FRAMEWORK (SDF) Page 95 CHAPTER 4 HIGH LEVEL SPATIAL DEVELOPMENT FRAMEWORK (SDF) Page 95 CHAPTER 4 HIGH LEVEL SPATIAL DEVELOPMENT FRAMEWORK 4.1 INTRODUCTION This chapter provides a high level overview of George Municipality s

More information

The World Bank OECS Regional Tourism Competitiveness (P152117)

The World Bank OECS Regional Tourism Competitiveness (P152117) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN OECS Countries Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 28-Jan-2018

More information

TOWARDS STRATEGIC SPATIAL PLANNING IN JAMAICA: THE NATIONAL SPATIAL PLAN

TOWARDS STRATEGIC SPATIAL PLANNING IN JAMAICA: THE NATIONAL SPATIAL PLAN TOWARDS STRATEGIC SPATIAL PLANNING IN JAMAICA: THE NATIONAL SPATIAL PLAN JIEP 5th Biennial Conference on the Environment: Balancing National Development and Environmental Protection June 6, 2011 Jamaica

More information

Shenzhen - Exploration of the Utilization of Underground Space Resource in the Period of Transition to Market Economy

Shenzhen - Exploration of the Utilization of Underground Space Resource in the Period of Transition to Market Economy Shenzhen - Exploration of the Utilization of Underground Space Resource in the Period of Transition to Market Economy Wang Fuhai 1, Gu Xin 1, Tang Yuanzhou 1 1 Urban Planning and Design Institute Shenzhen,

More information

STRATEGY FORMATION IN EASTERN JUTLAND

STRATEGY FORMATION IN EASTERN JUTLAND STRATEGY FORMATION IN EASTERN JUTLAND STRATEGIC SPATIAL PLANNING OR LOBBYISM FOR INFRASTRUCTURE INVESTMENTS? BY KRISTIAN OLESEN, M.SC. URBAN PLANNING & MANAGEMENT, AALBORG UNIVERSITY This paper is an overview

More information

Coastal Inundation Forecasting Demonstration Project (CIFDP)

Coastal Inundation Forecasting Demonstration Project (CIFDP) WMO World Meteorological Organization Working together in weather, climate and water Coastal Inundation Forecasting Demonstration Project (CIFDP) WMO Technical Commission for Oceanography and Marine Meteorology

More information

Experience and perspectives of using EU funds and other funding for the implementation of district renovation projects

Experience and perspectives of using EU funds and other funding for the implementation of district renovation projects Experience and perspectives of using EU funds and other funding for the implementation of district renovation projects Ministry of the Interior of Lithuania Regional policy department Administration, coordination,

More information

Sri Lanka Strategic Cities Development Project (P130548)

Sri Lanka Strategic Cities Development Project (P130548) SOUTH ASIA Sri Lanka Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 10 ARCHIVED on 21-Dec-2018 ISR35436 Implementing Agencies:

More information

GENERAL RECOMMENDATIONS. Session 7. Breakout discussion. discuss on regional and interregional. proposals 1. COLLABORATION BETWEEN PROGRAMMES

GENERAL RECOMMENDATIONS. Session 7. Breakout discussion. discuss on regional and interregional. proposals 1. COLLABORATION BETWEEN PROGRAMMES Session 7 24 July 2016, 9.00-11.00 Breakout discussion on regional and interregional joint project proposals Mr Shahbaz Khan summarized the two days of presentations and exchanges and requested the participants

More information

STATE GEOGRAPHIC INFORMATION DATABASE

STATE GEOGRAPHIC INFORMATION DATABASE STATE GEOGRAPHIC INFORMATION DATABASE Data Information and Knowledge Management STATE GEOGRAPHIC INFORMATION DATABASE EXECUTIVE SUMMARY Utah has developed one of the most comprehensive statewide GIS resources

More information

Public Disclosure Copy. Implementation Status & Results Report Tanzania: Resilient Natural Resource Management for Tourism and Growth (P150523)

Public Disclosure Copy. Implementation Status & Results Report Tanzania: Resilient Natural Resource Management for Tourism and Growth (P150523) Public Disclosure Authorized AFRICA Tanzania Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 05-Dec-2017 ISR30455 Implementing Agencies:

More information

Proposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement

Proposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement Proposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement The scope of work that follows incorporates and covers

More information

Experiences of public-private partnerships in the Euromediterranean relations and in the Po Valley, promoting a more balanced European territory

Experiences of public-private partnerships in the Euromediterranean relations and in the Po Valley, promoting a more balanced European territory Experiences of public-private partnerships in the Euromediterranean relations and in the Po Valley, promoting a more balanced European territory Claudio Tolomelli PolyMetrexPlus project s objectives To

More information