Developing a Digital Elevation Model using ANUDEM for the Coarse Sandy Hilly Catchments of the Loess Plateau, China

Size: px
Start display at page:

Download "Developing a Digital Elevation Model using ANUDEM for the Coarse Sandy Hilly Catchments of the Loess Plateau, China"

Transcription

1 Developing a Digital Elevation Model using ANUDEM for the Coarse Sandy Hilly Catchments of the Loess Plateau, China QinKe Yang, Tom G. Van Niel, Tim R. McVicar Michael F. Hutchinson and LingTao Li CSIRO Land and Water Technical Report 7/05

2 Developing a Digital Elevation Model using ANUDEM for the Coarse Sandy Hilly Catchments of the Loess Plateau, China QinKe Yang, Tom G. Van Niel, Tim R. McVicar, Michael F. Hutchinson, and LingTao Li CSIRO Land and Water Technical Report 7/05 September 2005

3 Copyright and Disclaimer 2005 CSIRO To the extent permitted by law, all rights are reserved and no part of this publication covered by copyright may be reproduced or copied in any form or by any means except with the written permission of CSIRO Land and Water. Important Disclaimer: CSIRO advises that the information contained in this publication comprises general statements based on scientific research. The reader is advised and needs to be aware that such information may be incomplete or unable to be used in any specific situation. No reliance or actions must therefore be made on that information without seeking prior expert professional, scientific and technical advice. To the extent permitted by law, CSIRO (including its employees and consultants) excludes all liability to any person for any consequences, including but not limited to all losses, damages, costs, expenses and any other compensation, arising directly or indirectly from using this publication (in part or in whole) and any information or material contained in it. Authors: QinKe Yang a*, Tom G. Van Niel b, Tim R. McVicar c, Michael F. Hutchinson d, and LingTao Li e a Institute of Soil and Water Conservation, Chinese Academy of Sciences and Ministry of Water Resources, 26 Xinong Road, Yangling, , Shaanxi Province, China, Tel.: , qkyang@ms.iswc.ac.cn b CSIRO Land and Water, Private Bag No. 5, Wembley, 6913,WA, Australia Tel.: , tom.vanniel@csiro.au c CSIRO Land and Water, GPO Box 1666, Canberra, 2601, ACT, Australia Tel.: , tim.mcvicar@csiro.au d Centre for Resource and Environmental Studies, Australian National University, Canberra, 0200, ACT, Australia Tel.: , hutch@cres.anu.edu.au e CSIRO Land and Water, GPO Box 1666, Canberra, 2601, ACT, Australia Tel.: , lingtao.li@csiro.au Cover: The main photograph is a typical landscape of the Coarse Sandy Hilly Catchments of the Loess Plateau, China. Severe gullying is present, some of which almost reach the ridges, to reduce erosion rates large areas of re-vegetation can be seen; this re-vegetation also reduces the water yield from this landscape. Summer cropping is conducted on the terraces and extensive grazing of sheep is undertaken throughout the landscape. This photo was taken by XianMo Zhu near Yan an City, Shaanxi Province, May The bottom left insert shows a worker tending 5-year old pines; photo by Tim McVicar, Pianguan County, Shanxi Province, 7th October The top right insert shows the resulting digital elevation model with the red line defining the Coarse Sandy Hilly Catchments study site. For bibliographic purposes, this document may be cited as: Yang, Q.K., Van Niel, T.G., McVicar, T.R., Hutchinson, M.F. and Li, L.T. (2005) Developing a digital elevation model using ANUDEM for the Coarse Sandy Hilly Catchments of the Loess Plateau, China. CSIRO Land and Water Technical Report 7/05, Canberra, Australia, 74 pp. A PDF version is available at: ISBN CSIRO Land and Water Page ii

4 Contents Acknowledgements...iv Executive Summary...v 1. Introduction Correcting the CSHC input data Contour and spot height correction River and lake correction Impact of data corrections on the resulting DEM quality Calculating sink number and frequency distributions Results for the iterative improvement of the input datasets Optimising key ANUDEM parameters Determining the optimum spatial resolution Determining the number of iterations Determining the relative amounts of profile and total curvatures Assessing changes at specific locations in the landscape Stream network analysis New lines, drainage enforcement, and sinks analysis Determining changes in elevation and slope Using independent higher quality data as a validation dataset Minimising positional difference between YHB and CSHC datasets Spot height comparison Contour comparison Pooled spot height and contour centroid comparison Application and assessment of the ANUDEM output Generating sub-catchments for the CSHC Comparing outputs from the ANUDEM and TIN algorithms Conclusions References Appendix A check_fnodes.aml Appendix B centreline_using_circle.ave Appendix C multipnt_to_pnt.ave Appendix D pnt2multipnt.ave Appendix E multip2plyline.ave Appendix F sum_grid.ave...74 CSIRO Land and Water Page iii

5 Acknowledgements The research was funded by Australian Centre for International Agricultural Research (ACIAR), specifically project LWR1/2002/018, Chinese Academy of Sciences (CAS) Institute of Soil and Water Conservation, and CSIRO Land and Water, and CAS Innovation Project KZCX3-SW-421 / Impacts of Soil and Water Conservation on Environmental Factors in Loess Plateau of China: Project of Knowledge Innovation Program of CAS, KZCX3-SW-421). We received helpful comments from Dr John Gallant and Mr Trevor Dowling, both from CSIRO Land and Water Canberra, while performing this research. Mr Cade McTaggart, from Centre for Resource and Environmental Studies, Australian National University, Canberra, provided assistance by ensuring that we had the latest version of ANUDEM. Dr Yun Chen and Mr Ron DeRose are to be thanked for assisting us by using some of the SedNet suite of tools to determine the sub-catchments for the study site. CSIRO Land and Water Page iv

6 Executive Summary Current and planned re-vegetation programs to assist the reduction of soil erosion in the Loess Plateau, China are likely to result in decreases of regional water yield, as perennial vegetation (trees, shrubs and grasses) use more water then the annual vegetation they replace. A hydrologically correct digital elevation model (DEM) forms the basis of successfully monitoring and modelling this impact. For example, the DEM is critical for modelling the water balance, modelling surface climate, and mapping vegetation suitability for replanting schemes. These are all key objectives in the Australian Centre for International Agricultural Research (ACIAR) project LWR1/2002/018. Therefore, ensuring that a high quality DEM was available for the project study site, the Coarse Sandy Hilly Catchments (CSHC), was critical for project success. In this technical report, we inspect two central issues concerning the quality of the CSHC DEM. These include: (1) assessing and improving the quality of the 1:250,000 source topographic data (i.e., contours, spot heights, rivers, lakes held in Geographical Information System (GIS)); and (2) optimising the parameters used in the interpolation algorithm (ANUDEM Version 5.1). An iterative process involving the careful analysis of the ANUDEM output and diagnostic files identified problems that were subsequently corrected (where possible) in the input topographic data. The ANUDEM parameters that were optimised for the CSHC included: (a) output grid resolution; (b) number of iterations; and (c) the amount of profile curvature used as governed by the 2 nd roughness penalty. To optimise the 2 nd roughness five DEM related attributes were assessed; the first four involved analysis of the output DEM, whereas the final assessment was an independent validation using higher resolution (1:100,000) spot height data available for part of the CSHC, specifically the YanHe Basin (YHB). The spot height analysis required the minimisation of positional differences between the CSHC and YHB data. Important improvements in the quality of the CSHC DEM were achieved by: (1) fixing over 1,100 errors in the input topographic data; and (2) optimising key ANUDEM parameters. As a result of these CSIRO Land and Water Page v

7 procedures, we have high confidence in the quality of subsequent modelling exercises that will use this DEM. 摘要 多年的水土治理, 特别是近年来退耕还林 ( 草 ) 工程的实施, 对区域土壤侵蚀和地表径 流具有重要影响 数字高程模型 (DEM) 是区域水文地貌定量分析 ( 流域划分 流水线 提取 流域出口面积量测等 ) 流域径流和侵蚀产沙模拟 气候要素空间插值 太阳辐 射计算 ( 主要与坡度和坡向有关 ) 区域植被适宜性评价和水土保持措施优化配置等研 究的基础 为了满足澳大利亚农业研究中心项目 ( 区域植被恢复的水环境效应研究, LWR1/2002/018) 和中国科学院知识创新方向项目 ( 黄土高原水土保持的区域环境效应, KZCX3-SW-421) 研究工作需要, 我们引进专业化 DEM 插值软件 ANUDEM, 以多种 比例尺数字地形图上的地形信息 ( 等高线, 高程点, 河流 湖泊和水库 ) 为基本数据源, 在世界上水土流失最为严重的黄土高原, 开展了 DEM 建立方法的研究 本研究报告报 道了该项研究的部分内容, 即利用 1:25 万数字地形图建立黄土高原多沙粗沙区中等分 辨率 DEM 的方法 主要内容包括 : (1) 源数据质量错误检验和校改 ;(2) ANUDEM 运 行参数优化, 包括 : 最佳栅格尺寸 插值叠代次数 地形粗糙度等 ;(3) 与大比例尺 测绘资料 ( 延河流域 1:10 万地形图 ) 对比进行 DEM 定位精度评价 ;(4) 黄土高原多 沙粗沙区 100 米栅格 DEM 应用说明和示范 该研究取得了三个方面研究结果 :(1) 建立了基于数字地形图和 ANUDEM 软件建立水文地貌关系正确 DEM 的工作流程 ;(2) 提出了基于 1:25 万地形图建立丘陵地区中分辨率 DEM 的关键参数 ;(3) 建立了黄土 高原多沙粗沙区 100 米栅格 DEM( 包括经过错误校改的矢量地形图 ) 本研究对基于 1:25 万地形图建立更大区域 DEM, 和基于更大比例尺数字地形图建立高分辨率 DEM, 均具有参考和指导意义, 同时也对 ANUDEM 的使用方法做出了示范和介绍 CSIRO Land and Water Page vi

8 1. Introduction In many developing countries, including China, moderate resolution (10 to 250 m planar resolution or 1:10,000 to 1:250,000 scale) digital elevation models (DEMs) are not routinely available from government mapping agencies, or if they are available, then the quality of the DEM does not often meet the user requirements. Given that in most spatial environmental research (e.g., hydrology, geomorphology, vegetation prediction, and land-use monitoring, see Wilson and Gallant 2000) hydrologically correct DEMs are critical input, many researchers in developing countries are forced to generate their own DEMs to meet research needs. While a DEM can be considered any digital representation of the topographic landscape, it must also meet the criteria for which it will be used. While there are potentially many relatively new data sources from which to generate moderate resolution DEMs (ranging from ground survey with kinematic GPS to airborne photogrammetry, interferometry, and radar or laser altimetry, see Hutchinson and Gallant 2000), by far the most popular data source is digital topographic data used in an interpolation algorithm to generate a DEM. These data typically include contours, spot heights, rivers and lakes, and while this use of such topographic data appears straightforward, results can vary greatly as a function of both the quality of the input data and of the processing algorithm used. For example, while a DEM can be generated using a Triangular Irregular Network (TIN) approach, the resultant DEM will often not be hydrologically correct. This can be seen by artificial features being present such as spurious triangular-shaped sinks or peaks, resulting in incorrect derived stream networks, contributing areas and catchment boundaries calculations. Additionally, surfaces of slope and aspect (produced as the first and second derivatives from the DEM) can contain obvious errors. CSIRO Land and Water Page 1

9 To meet the challenging demand of creating hydrologically correct DEMs from digital topographic data (e.g., contours, spot heights, rivers and lakes), an algorithm developed by the Australian National University (called ANUDEM) has evolved over the last 20 years (Hutchinson 1988; Hutchinson 1989; Hutchinson 2004a). In many developing countries these digital topographic data required by ANUDEM are relatively accessible, especially for projects addressing major national concerns that include personnel from the developing country. In the Loess Plateau of China major soil erosion (of the order of 20,000 t/km 2 /year, Xiang-zhou et al. 2004) has resulted in the Chinese central government developing a Green Hills / Clean Rivers policy whereby large areas of upland catchments will be re-vegetated with perennial species with the aim to reduce soil erosion (see The positive impact of this development has been shown in many small experimental plots but it is yet to be calculated over large regions. One important consideration associated with this reduction in regional soil erosion is the coupled reduction in regional water yield due to increased regional evapotranspiration of perennial vegetation (trees, shrubs and grasses) compared to the annual vegetation they replace (Xiubin et al. 2003; Huang and Zhang 2004). With the average annual water yield from the Yellow River already overcommitted (Xiubin et al. 2003), with the river less frequently reaching the ocean (specifically the Bohai Sea Li 2003), balanced planning of the timing, area and location of ongoing re-vegetation programs in the Loess Plateau is a major concern for local-, regional-, and national-land and water resource managers. Models that estimate the interactions between water balance, soil erosion, meteorological surfaces, and vegetation suitability across the landscape are all based on a DEM. Having access to a high quality, hydrologically correct DEM is very important for generating accurate models that will ultimately be used to make management decisions and determine environmental policy. CSIRO Land and Water Page 2

10 In this technical report we discuss two main issues regarding the improvement of the DEM used for our research project: (1) quality control and error checking performed on the original digital topographic data obtained by the Chinese Central Government; and (2) methods for optimising key ANUDEM parameters. These are introduced in turn in the following paragraphs. An iterative process was used to improve the quality of the input topographic data (i.e., contours, spot heights, rivers, lakes) with careful analysis of the ANUDEM output and diagnostic files undertaken to identify problems that were subsequently corrected (where possible) in the input topographic data. This process had to be iterative as large errors can mask smaller errors, and not all errors will be detected in a single run of ANUDEM. Intensive use was made of the output ANUDEM diagnostics files; these are aimed at assisting users to generate the highest quality DEM possible by identifying locations of errors in the input topographic data (it is then up to the user to correct these errors). If mechanisms can be established so that errors fixed in the ANUDEM processing by research organisations can be communicated to the central government mapping agencies this will be beneficial to all other users of this data. Additionally, to address topic 2 above three key ANUDEM parameters were optimised, including: (a) output grid resolution; (b) number of iterations; and (c) the amount of profile curvature used as governed by the 2 nd roughness penalty. The ability to change the amount of profile curvature is new in ANUDEM Version 5.1 and careful analysis of its impact was needed. To perform this optimisation, five DEM related attributes were assessed; the first four involved analysis of the output DEM, whereas the final assessment was independent validation. To perform this independent validation, we made use of higher resolution (1:100,000) spot height data available for the YanHe Basin (YHB). The YHB lies within the 1:250,000 Coarse Sandy Hilly Catchments (CSHC see Figure 1). Prior to conducting the spot height analysis, we CSIRO Land and Water Page 3

11 minimised the positional differences between the CSHC 1:250,000 input data and the 1:00,000 YHB data. Conducting the input data quality improvement in an iterative manner, using the ANUDEM output data-files and diagnostic log-files, meant that over 1,100 input data errors were identified and corrected. This, coupled with optimisation of several key ANUDEM parameters, means that the resultant DEM for the CSHC will be of high quality, as it will have been generated using the current best available topographic and best practice algorithm. It should also be noted that the ANUDEM algorithm will continue to be iteratively improved (as has been done in the past) with new releases capturing the enhancements to the algorithm. The best available input topographic data set developed here can be used in the future with new releases of ANUDEM to develop a new (and hopefully improved) DEM. Also the future releases of ANUDEM may contain improved error checking diagnostics, thereby allowing the input topographic data to be further improved. The validation spot height analysis will also allow for multi-resolution comparison studies to be conducted (specifically with the YanHe Basin and CSHC DEMs, see Figure 1 and Table 1). A large positional offset would prohibit a direct comparison between two independent datasets because it forces matching landscape positions in the two datasets (e.g., hill top-to-hill top, mid slope-to-mid slope, or valley bottom-to-valley bottom) to be in different geographical space, and thus potentially causes a mismatch between these features (e.g., hill top-to-mid slope, or mid slope-to-valley bottom). This means that when one dataset is, for example, subtracted from the other, the differences in elevation values are not very realistic, as they are at least partly (and sometimes mostly) caused by positional offset between the two datasets. However, if this positional offset is measured and subsequently minimised to within an acceptable distance (e.g., within 1 pixel), then any direct comparison will more closely match associated map features on the two separate CSIRO Land and Water Page 4

12 datasets and the results will be more attributable to actual differences than to the confounding influence of mis-matched landscape positions. The methods developed in this report can also be used when generating the other higher resolution contour and spot height based DEMs, see Table 1. While the 1:250,000 input databases used to generate the CSHC DEM cover the entire Loess Plateau (Figure 1), this report only discusses the DEM development for the CSHC study area. Figure 1. The insert map shows the location of the 623,586 km 2 Loess Plateau (shaded) on the middle reaches of the Yellow River that supports a population of 82 million people (Xiubin et al. 2003). The main map shows the location of the 112,728 km 2 Coarse Sandy Hilly Catchments (CSHC), with the location of the YanHe Basin (YHB) test area shown by the dark grey rectangle overlaid on the main map. CSIRO Land and Water Page 5

13 Table 1. Listing of contour based datasets from which DEMs can be derived; similar data used for the CSHC has been obtained for the entire Loess Plateau (see Figure 1). The column labelled CI is the contour interval and in the comments column, NGCC represents the National Geographic Centre of China, and ISWC is the Institute of Soil and Water Conservation; the name of the lead authors organisation. Note that the area column is the rectangle that the DEMs will be developed in to cover the entire catchment or study area (which is given in brackets below). Name of Dataset (Abbreviation) Coarse Sandy Hilly Catchments (CSHC) * YanHe Basin (YHB) Yan an Demonstration Area (YDA) JiuYuanGou Area 1 (JYG_1) ChaBaGou Catchment (CBG) JiuYuanGou Area 2 (JYG_2) YanGou Catchment (YG) XianNanGou Catchment (XNG) Area (km 2 ) 215,055 (112,728) 20,169 (7,673) 2,475 (1,200) 369 (369) 456 (211) 101 (101) 120 (47) 140 (44) Map Scale Publication Date CI (m) Comments 1:250, Data obtained from NGCC. 1:100, Contours, spot heights and rivers digitised by ISWC. 1:50, Contours digitised by ISWC, spot heights and rivers still to do. 1:50, Contours digitised by ISWC, spot heights and rivers still to do. 1:10, Contours digitised by ISWC, spot heights and rivers still to do. 1:10, Contours digitised by ISWC, spot heights and rivers still to do. 1:10, Contours digitised by ISWC, spot heights and rivers still to do. 1:10, Contours, spot heights and rivers digitised by ISWC. * Over 85% of the contours in the CSHC have a 100 m CI; see Table 2 for more information. Figure 2 shows the locations of a series of photos illustrating typical terrain of the CSHC (and also areas where more detailed analysis are performed in this report); Figure 3 shows the photos themselves. The report is organised as follows: the topic was introduced in Section 1; Section 2 discusses the processes used to correct the 1:250,000 input topographic data from which the CSHC DEM is generated; Section 3 describes the optimisation of key ANUDEM parameters; Section 4 discusses minimising of positional accuracy for the higher resolution YHB 1:100,000 data that were used for independent validation in Section 3; and Section 5 discuses the outputs, including the generation of a set of 42 sub-catchments compromising the CSHC and CSIRO Land and Water Page 6

14 qualitative comparisons between DEMs generated using the ANUDEM and TIN algorithms. Conclusions are drawn in Section 6. Figure 2. Locations of photos presented in Figure 3 are shown, and the shaded areas are the locations of detailed areas used in Figure 4, Figure 8 and Figure 16. The dotted box is the YHB test area, and the boundary of the CSHC is given by the solid line. Figure 3. Twelve photos showing the typical landforms of the CSHC, see the following 2 pages. CSIRO Land and Water Page 7

15 (a) Typical landform in the hill-gully portion of the CSHC, showing 30 year old trees planted on the ridge, with farmer houses built into the hill-side, soybean and vegetable crops in the foreground, with the meteorological instrumentation of Ansai field station being examined by Tim McVicar. Ansai, 5 th October 2004, photo by Tom Van Niel. (b) The Suide Bureau of Soil and Water Conservation meet the ACIAR project team in a sediment earth dam over-flow channel. Apples are grown on the dam wall, with high yielding crops (corn, sorghum millet, and market garden vegetables) grown on the flat land behind the dam. Suide, 8 th Oct 2004, photo by Tim McVicar. (c) Re-vegetation occurring on the steeper slopes in the Yan an area, 4 th Oct 2004, photo by Tim McVicar (d) Re-vegetation planting in a steep narrow (< 50m) gully. Jingbian, 5 th Oct 2004, photo by Tim McVicar. (e) Dune fields subject to wind erosion typical of the flatter Ordos Plateau landscape; northwest of the CSHC study area. Yulin, 5 th Oct 2004, photo by Tim McVicar. (f) Re-vegetation to stabilise dunes. Crop stubble is bound into a rope that is laid out in a grid, and individual plants are planted at each grid intersection. Yulin, 5 th Oct 2004, photo by Tim McVicar. CSIRO Land and Water Page 8

16 (g) Typical gullied landscape in Suide county, modified by terraces to reduce the speed of surface runoff and hence reduce water erosion and fertilizer loss. Suide, 8 th Oct 2004, photo by Tim McVicar. (h) An extremely steep slope (almost vertical for some 200m) that meets the base rock at the lower level of the loess deposition. Jingbian, 5 th Oct 2004, photo by Tim McVicar. (i) Typical landscape showing how aspect is important to determining the location of re-vegetation. The person (Ms Liu YongMei) in the left mid-ground provides relative scale. Pianguan, 7 th Oct 2004, photo by Mu Xingmin. (j) A typical hilly-gully landscape, showing agricultural activity near the village in the valley, with some steep gullies extending to almost the ridge line. Suide, 8 th Oct 2004, photo by Tim McVicar. (k) Typical land colour near and after the harvest season in the heavily cultivated Loess Plateau. Suide, 8 th Oct 2004, photo by Tim McVicar. (l) Sediment trapped in a small earth-dam. Jingbian, 5 th Oct 2004, photo by Tim McVicar. CSIRO Land and Water Page 9

17 2. Correcting the CSHC input data Creation of the CSHC DEM consisted of two basic steps: (1) quality control and correction of the input topographic data (i.e., contours, spot heights, rivers, and lakes) and testing the impact of these various versions on the quality of the output DEM; and (2) running ANUDEM and testing the impact of various ANUDEM parameters on the quality of the output DEM. This current section concerns the first step, while section 3 deals with the second step. All corrections made to the CSHC source datasets were performed over the entire CSHC area. However, when optimising the ANUDEM parameters meant that multiple runs of ANUDEM were performed. The entire CSHC site required 8 hours of processing time to generate the full CSHC DEM at 100 m x- and y- resolution (using a PC with a 1.6 GHz processor, and 768 MB of random access memory (RAM)). Therefore, to assess the influence of input data corrections and the optimising of ANUDEM parameters, we limited our processing to the YHB test area, see Figure 1 and 2. The YHB test area is representative of the overall landscape, and is a small enough area to create a 100 m resolution DEM using ANUDEM in less than 30 minutes on a computer with the above specifications. Using a small test area allowed for multiple tests to be run relatively rapidly and greatly reduced the disk space required to store these various tests. Any mention of the term test, test area, or YHB area in this section is thus associated with the processing of the CSHC data over the YHB area only. The input data densities of the key input datasets for the YHB test area are slightly higher than those for the entire CSHC (see Table 2) due to the relatively flat Ordos Plateau (see Figure 3e and Figure 3f) that is located in the north-west of the CSHC (and extends past the catchment boundary of the CSHC to the north-west). In Table 2 data density summaries of similar data from Canberra, Australia reveal that the CSIRO Land and Water Page 10

18 Canberra data densities of contours and spot heights are less than the same metrics for both the entire CSHC and the YHB test area. However, for the river network it should be noted that the density from the Canberra region was higher than for both China areas, see Table 2. Given that the local relative relief in the Loess Plateau is higher than that for the Canberra region this river density result was surprising, but is thought to be due to the higher quality of the original Australian river network maps (i.e., most, possibly all, 1 st order streams were captured in the original paper maps) than that of the mapping of the river network for the Loess Plateau (i.e., it is likely that not all 1 st order streams were captured on the paper maps). For both countries the river network on the original paper maps were fully captured digitally. Results presented later (Figure 21) empirically confirm that the relatively lower data density of the river network in the input CSHC 1:250,000 dataset compared to the stream network derived from ANUDEM is mainly driven by the data density of the input contour data. The input source data to ANUDEM consisted of four basic datasets. These were: (1) contours; (2) spot heights; (3) rivers; and (4) lakes and reservoirs. Throughout the many iterations of processing data over the entire CSHC area, a few basic problems with the source datasets were observed and subsequently resolved. Primarily, these consisted of: 1. contours containing the wrong elevation attribute; 2. contours that were digitised incorrectly (e.g., where writing on the source map obscured the contour below it, sometimes contours were connected when they should not have been or alternately unconnected when they should have been connected); 3. spot heights containing the wrong elevation attribute; 4. spot heights in the wrong position; 5. rivers and lakes were originally not separated; 6. rivers flowing in the wrong direction (i.e., flowing uphill); CSIRO Land and Water Page 11

19 7. man-made canals included in the river network resulting in spurious DEM values; and 8. large rivers were represented by two lines (one on each bank) instead of a single line down the centre (all smaller rivers were represented as single lines). Table 2. Comparing the data densities of the input datasets for the: (1) entire CSHC; (2) YHB Test Area; and (3) Canberra, Australia. For each area the statistics for the contours, spot heights and rivers datasets are given. The units of the column density are km/km 2 for the contours and rivers, and points/km 2 for the spot heights. For spot heights it is not applicable (n/a) that there be a length statistic reported. Data type Number Length (m) Density Entire CSHC (215,055 km 2 ) Contours (All) * 64, ,318, m 55, ,387, m 9,285 56,931, Spot heights 4,903 n/a Rivers 17,204 55,684, YHB Test Area (20,169 km 2 ) Contours 11,684 78,947, Spot heights 461 n/a Rivers 3,267 8,720, Canberra, Australia ** (15,099 km 2 ) Contours 3, Spot heights 251 n/a Rivers 3, * For the CSHC dataset the contours with an interval of 100 m are 85.69% of the total number and 88.78% of the total length. There are no 50 m interval contours in the YHB test area. ** From Geoscience Australia (accessed 31 st March 2005), the Map Sheet Code is I-55-16, the map sheet covers the area from E to E and S to S, the data layer identification codes are: contours (i5516cld); spot heights (i5516eld) and drainage (i5516dld). The analysis was performed in an Albers projection using the Australian National spheroid, with a central meridian of 132 E and 1 st and 2 nd standard parallels of S to S, respectively. There was no false easting or northing. The map scale was 1:250,000 and the contour interval was originally 50 m. However in this research, to compare the Australian dataset with the CSHR dataset (1:250,000 and contour interval of 100 m), we only used contours that were a multiple of 100 m. As the resultant DEM generated using ANUDEM will be used: (1) to define the sub-catchments of the study area; (2) to define the river network; (3) to define the areas contributing to measurements made at the hydrology stations located on the CSIRO Land and Water Page 12

20 river network; (4) as a covariate for interpolating surface meteorological variables; (5) in net radiation modelling using the SRAD model that takes into account slope and aspect (Moore et al. 1993; Gallant 1997; Wilson and Gallant 2000); and (6) as a basis for re-vegetation site selection, it is concluded that the DEM is a fundamental dataset; improving the DEM will improve all subsequent spatial analysis conducted for the CSHC in our ACIAR project (and for many other projects). Due to this, strategies were designed to ensure that the DEM was of the highest quality as possible by identifying, and either correcting or deleting, the incorrect features. These issues are addressed below Contour and spot height correction The various contour and spot height errors were mainly addressed by two assessments. The first was to compare large residual points (output by ANUDEM in the log file) to the DEM value at the same location; this would allow for identification of mislabelled spot heights or contours as well as misplaced spot heights and incorrectly digitised contours. The second consisted of identifying inordinately large slopes from the output DEM in order to detect additional mislabelled contours; as these large slopes were not necessarily near a spot height. ANUDEM outputs a text file containing the locations of any input spot heights that have large residual error (Hutchinson 2004a); we refer to these points as residuals or residual points. These large residual points were imported into ArcInfo by using the ArcInfo generate command. Once the points were converted to a GIS dataset, they were linked to the original spot height coverage based on their location, which allowed the original spot height value of all the residuals to be accessed by a field in the topographic dataset; we refer to this field as the original elevation. Another field was added to the GIS dataset which contained the ANUDEM elevation value at all of the residual points by using the ArcInfo latticespot command; this field is called the DEM elevation here. We then selected all of the residuals that had a difference between CSIRO Land and Water Page 13

21 the original elevation and the DEM elevation of greater than or equal to one-half of the contour interval or 50 m in this case. We decided on one-half the contour interval as this is the expected vertical accuracy as stated in Australian and United States of America (denoted US in the following) map accuracy standards. Chinese standards were not known, but were expected to be the same or very similar to the Australian and US values. For the entire CSHC area, 2,097 residuals were defined by ANUDEM. Of these, 155 had a difference between the original elevation and the DEM elevation of greater than or equal to 50 m. Each of the 155 points were manually inspected for errors. In addition to checking the elevation of the points, the surrounding contours were also assessed. If, with respect to the surrounding contours, the spot height was in the correct position (or a possibly correct position), and labelled correctly, and all the contours progressed in elevation value incrementally as expected, then no action was taken. This result was fairly common as the rather coarse output pixel size of the DEM (100 m x- and y-resolution was used) in combination with the relatively high contour interval density would sometimes not allow for the ANUDEM algorithm to change elevation values enough to match both the contour and spot height data. That is, sometimes the spot height elevation at the top of a hill had too much vertical relief between itself and its closest contour when compared to the length of an output pixel (100 m) for it to be adequately reflected in the output DEM. This means that while the residual error was greater than 50 m there were no problems with any of the input data; this was the case for 67 of the 155 residuals manually checked. When there was an inconsistency between the position of the spot height and the surrounding contours, as long as the contours progressed as expected, the spot height was deleted; this action was required 82 times. When the high residual error was caused by a mislabelled contour, the contour attribute was corrected; this occurred 7 times (i.e., at 7 residual points). Finally, there was only 1 residual that was caused by CSIRO Land and Water Page 14

22 an incorrectly digitised contour. This contour was corrected based on the general shape of the nearest neighbour contours. This amounts to 90 actions for the 155 points. This included one residual point that required both the spot height be deleted and a contour attribute be fixed, and one high residual where some contour digitisation was required as well as an adjustment to a contour attribute. Hence, there were 2 extra actions as compared to the number of areas requiring some editing. (a) (b) (c) (d) Figure 4. The slope surfaces were used to detect contour errors. The uncorrected slope data are shown in (a) where several incorrectly labelled contours were identified by extremely high slopes (bright white contours). This allowed the mislabelled contours to be selected in (b) where the thick red contours were labelled 1,050 m but should have been labelled 1,400 m the thick blue contour was labelled 1,700 m but should have been labelled 1,650 m. These mislabelled contours were then corrected in (c), which allowed for a corrected DEM to be calculated as evidenced by the realistic slope surface in (d). The slope units are degrees above the horizontal ranging from 0 (black) to 57 (white) for both (a) and (d), whereas the contours have units of metres above mean sea level increasing from green (1,050 m), though yellows to pink (1,800 m) for both (b) and (c). The location of this area is shown in Figure 2. CSIRO Land and Water Page 15

23 Additionally, slope of the output DEM for the entire CSHC area was calculated and inspected for areas of exceedingly large slopes, defined here as slopes > 39 from horizontal (this threshold would obviously change for higher resolution DEMs which would better represent the extreme slopes present in the CSHC). These very large slopes invariably identified mislabelled contour lines, as these very large slopes predominantly occurred in the same shape as the shape of a contour line (or part of a contour line). This assessment was particularly good at finding mislabelled contours in areas that had no spot height data near it. Figure 4a is an example of a slope surface where several mislabelled contours are clearly evident. After selecting the mislabelled contours in the input data (Figure 4b) and correcting them (Figure 4c), a more realistic DEM and slope surface can be produced, see Figure 4d. This analysis of extreme slopes found several additional contour lines requiring correction of the labelled contour elevation that had not been identified in the previous check of residual points River and lake correction It was seen in the ANUDEM tests (see section 2.3. below) that running ANUDEM without separating the rivers and lakes into separate inputs, resulted in inappropriate processing of the DEM. Therefore, one of the first corrections made was to simply separate these two data sources. The lines comprising the boundaries of lakes were determined manually in ArcEdit, and given a unique identifier (cov-id = 72). These lake lines were selected and saved to a separate topographic dataset, in which they were made to contain polygon topology in preparation for exporting (using the ArcInfo ungenerate command). Next, it was noticed that there was a great deal of man-made canals along some of the bigger rivers. These canals, being man-made, should not be used to enforce drainage by the ANUDEM algorithm (Hutchinson 2004a), and were manually selected and removed from the rivers topographic dataset. CSIRO Land and Water Page 16

24 Next we noticed that some of the rivers (or certain segments of the rivers) were flowing in the wrong direction. An attempt was made to identify these manually, and correct them using the ArcEdit flip command. However, since there were so many lines to check (> 24,000) it was not feasible to perform this manually for the entire 215,055 km 2 rectangle area containing the CSHC, see Table 1. Therefore an arc macro language (aml) program (called check_fnodes.aml) was written to identify many possible locations where parts of the river could be flowing in the wrong direction; see Appendix A and Figure 5a. The aml finds any river intersection points that contain more than one from node (FNODE). The occurrence of more than one FNODE at a single point indicates that the specific intersection has more than one segment flowing out of it (Figure 5b). It is possible for this combination to be correct (if a single stream splits into two), but is most often a result of an error (in most common confluence intersections). Exactly 1,057 occurrences were identified as possible errors, each was manually checked, 805 were confirmed as errors (66 of these were located in the YHB test box) and all 805 were flipped, the remaining 252 were single streams that then split. These, then, were not errors and hence no action was needed. Many of these splitting streams were located in the relative flat Ordos Plateau in the north-west of the CSHC (see Figure 3 photos e and f). Another way of identifying streams that flow in the wrong direction would be to overlay sinks on the stream network. Sinks located at the end of a stream are likely to indicate that the stream is flowing in the wrong direction; we did not perform this check, but will do so for any subsequent processing of the higher resolution datasets. CSIRO Land and Water Page 17

25 (a) (b) (c) Figure 5. In (a), a hypothetical example of a river flow direction error is shown. In this example, the red river segment is flowing in the wrong direction. From nodes (FNODEs) are represented by circles and arrow heads represent To nodes (TNODEs). FNODEs are the start of the line and TNODEs are the ends of lines. The check_fnodes.aml searches each river intersection and identifies those that have more than one FNODE, like the intersection depicted by the red filled circle above. In (b), a hypothetical example of an error not identified by the check_fnodes.aml due to a dangling arc is shown. This results in only one FNODE at any intersection even though there is a river segment still flowing in the wrong direction. In (c), a hypothetical example of an error not identified because of a missing node intersection is shown. The red rectangle identifies the likely location of where the arc should be split (i.e., insert a node). CSIRO Land and Water Page 18

26 There are some known flow direction errors that were not identified by check_fnodes.aml, but were fixed whenever they were identified by chance. For example, the check_fnodes.aml, program would not identify the flow direction error if the river segment in error was not actually intersecting the river network on both ends (these are also called dangling arcs in ArcInfo, see Figure 5b). That is because no river intersection in Figure 5b has more than one FNODE. Also, if a river segment is missing a node (i.e., the single line actually represents two river segments and should be split), then the error is not identified because, again, it does not result in an instance of multiple FNODEs see Figure 5c. Finally, many large rivers in the river network were represented by two lines (one on each bank) as opposed to a single centreline, as was the case with all of the smaller rivers making up the vast majority of lines in the network. This posed a problem with ANUDEM processing and needed to be fixed. We attempted to use the ArcInfo centreline command, but the resulting single-line rivers were not sufficient. Therefore a series of avenue scripts were created in order to help define these centrelines. The main script is called centreline_using_circle.ave see Appendix B. Before running the script, all the dual-line rivers were manually selected and given a unique identifier (cov-id = 711). These dual-line rivers were exported to a separate topographic dataset and lines on opposing sides of the river were given unique attributes. In this case, a field called side was added to the database and opposing sides of the river were arbitrarily labelled as either a 1 or a 2 (but in each case an entire side was labelled 1 and the entire opposite side was labelled 2). The script then separated all lines whose side was equal to 1 into equal 100 m segments; these points are referred to as the originating side or originating side points. Then, all lines with a side equal to 2, were separated into equal 10 m segments; these are referred to as the opposing side or opposing side points. For each originating side point, a circle was created with a radius of 50 m. This circle was iteratively grown by adding 10 m to the radius until it intersected with any point(s) from the opposing side. The locations of all CSIRO Land and Water Page 19

27 intersecting opposing side points were averaged to represent a single location for the opposing side. Then, the originating side point and the single opposing side point were averaged to define the centre point. This was repeated for every originating side point in turn, so the density of centre points was basically 100 m (the same as the originating side density). The centre points were exported to a multipoint GIS dataset. This multipoint dataset was exported as a point topographic dataset using the script called mp2pnt.ave (Appendix C) so each point could be accessed individually. A field called attribute was added to this point dataset and all points belonging to a single river reach were selected and given a unique attribute number (up to 187 reaches were manually selected). Any points that were outside of the original dual-lines were not selected. These points were converted back to 187 multipoints using the script called pnt2mp.ave (Appendix D) and finally to their associated 187 polylines using the script called mp2plyline.ave (Appendix E). The polyline dataset was then edited where required to remove any extraneous lines, and merged with the other single-line rivers. The new single-line topographic dataset (shapefile) was converted to an ArcInfo coverage using the ArcInfo shapearc command. Exactly 12,047 nodes in this new single-line coverage were snapped to their closest arc within 400 m using the ArcEdit snap command (after selecting dangling arcs). This single-line rivers coverage was then merged with the lakes and the dual rivers coverages so that all of the original data were retained. The check_fnodes.aml macro was run again to ensure that any of the new single-line rivers that were running in the wrong direction were flipped (33 multiple fnode intersections were found and manually checked and corrected if necessary). Each different kind of water body was given a unique identifier; cov-id for single rivers equals 71, cov-id for lakes equals 72, and cov-id for dual rivers equals 711. Only the single rivers and lakes coverages were ungenerated in ArcInfo for input into ANUDEM. CSIRO Land and Water Page 20

28 2.3. Impact of data corrections on the resulting DEM quality Without assessing the impact of correcting the input datasets on the resultant DEM quality, it would not be known whether performing such laborious and time consuming actions were necessary. Therefore, after correcting for the abovementioned input data errors, it was necessary to somehow measure DEM data quality improvement. We decided that calculating the number of single-cell and multiple-cell sinks and some summary statistics of their frequency distribution was a good metric (or diagnostic) of the resultant DEM data quality. That is, if after each step in our data correction procedure, above, the number of sinks and the mean depth of these sinks decreased, then we would feel confident that the DEM quality was improving. However, we note that this metric is probably only really useful for estimating coarse-level changes, where smaller changes might not be detectible because all sinks are not a result of an error in the DEM. First we describe how the sink numbers and frequency distributions were calculated and then we report these values for the various steps in the data correction procedures documented above Calculating sink number and frequency distributions As a standard output of ANUDEM, a text file including the location of sinks is created. These sink locations can be imported into a GIS dataset using the ArcInfo generate command; these are referred to as ANUDEM sinks or ANUDEM sink points hereafter. It was decided to use the number of sinks in every output DEM as the main indicator of data quality, and as the area used for testing ANUDEM remained the same (i.e., the YHB test area), quantifying the number of sinks allowed for a direct comparison between various tests. However, after inspection of some output DEMs, we realised that many of the ANUDEM sinks were very small (some on the order of < 1 μm to < 1 m). As a consequence, we decided to also describe the frequency distribution of these sinks as the overall number of sinks was probably inadequate on its own in describing the data quality of the output DEMs. That is, considering that the CSIRO Land and Water Page 21

29 accuracy of the input contour data is around 50 m and ANUDEM considers sinks to a precision of μm, there was a mismatch between the accuracy of the input data and the precision to which errors were being summarised in ANUDEM. Therefore, we have not used the ANUDEM sinks as the indicator of data quality, but rather use ArcInfo to calculate some sink diagnostics. Also, we not only can report the overall number of sinks in ArcInfo, but can also summarise the numbers of sinks based on a few critical thresholds which are more meaningful when compared to the accuracy of the source data. In order to do this, it required using the ArcInfo fill command (the output is called the filled DEM ). We then compared each filled DEM to the input ANUDEM DEM (called the original DEM ). The difference between the filled DEM and the original DEM (called the difference DEM ) gave us the boundary of all of the sinks for that particular test. Since the difference DEM needs to be integer data to summarise the frequency distribution, sinks smaller than some predetermined value were eliminated in the process (e.g., < 1 mm was used in this research see below). Since many sinks in the original DEM would not just be defined by a single-cell, the sink boundaries defined from ArcInfo (called ArcInfo sinks ) contain both single- and multiple-cell sinks. These ArcInfo sinks were then summarised based on a zonalstats command in ArcView using the sum_grid.ave avenue script (see Appendix F). These statistics were summarised in excel separately for single-cell sinks, multiple-cell sinks, and all sinks together. The multiple-cell sinks were summarised based on both the mean depth of each sink and the maximum depth of each sink. The main steps of this process are listed below: 1. Fill the original DEM using ArcInfo (results in filled DEM ); 2. Subtract original DEM from filled DEM, multiplied by 1,000 and integerised (i.e., [[[filled DEM - original DEM]*1,000].int]; results in difference DEM in this way, the number of sinks less than 1 mm are not counted in the final summary they are removed here; CSIRO Land and Water Page 22

30 3. Discretise the difference DEM to 1s and 0s in order to define boundaries of sinks (i.e., sinks are not always single cell); results in boundary GRID ; 4. Convert this boundary GRID to boundary polygons; results in a shapefile called boundary GIS dataset ; 5. Use of sum_grid.ave (Appendix F) to determine statistics for each ArcInfo sink; and 6. Export the dbf of the boundary GIS dataset to an excel file to summarise the frequency distribution Results for the iterative improvement of the input datasets Table 3 shows the improvements by reducing errors in the input CSHC 1:250,000 data sets when generating a DEM for the YHB test area. From these results we see that, as expected, including the river network has a major impact on the resultant DEM quality. Also, separating the rivers and lakes resulted in a big reduction in the number of sinks and an improvement in DEM data quality. The other data error corrections did not have as much of an impact as these first two over the entire site. Some of the summary statistics changed in the wrong direction after a correction (e.g., Num. of Single-cell Sinks after fixing the 187 double river reaches to become single river arcs). However, as discussed above, using the sink metric as the only measure of DEM data quality is inadvisable because sinks are not always caused by an error in the DEM. Therefore, the small increases and decreases in the number of sinks for the last few rows of Table 3 are probably not hydrologically significant and show that the sink metric is not as useful for measuring small-level difference over the entire area. These corrections however should make a relatively large (yet localised) difference to the quality in those areas. Carefully finding as many errors (as possible) in the input datasets and either fixing them (or deleting them) iteratively improved the final CSHC DEM. Next we discuss the optimisation of several key ANUDEM parameters. CSIRO Land and Water Page 23

31 Table 3. Number of single- and multi-cell sinks (and some summary statistics for each case) as a function of reducing errors in the input datasets to develop the DEM for the YHB test area using the CSHC data are shown. For the single-cell sinks cases Num., Min., Max., and Num. > 10 m represent the number, minimum, maximum, and number where the difference between the sink and its 8 neighbouring cells is greater than 10 m. For the multi-cell sink cases average depth of all cells in the sinks are calculated first and then descriptive statistics are then generated. All ANUDEM parameters were default values (i.e., number of iterations = 20 and 2 nd roughness = 0.0) and a spatial resolution of 100 m was used in all cases. Single-cell Sinks Multi-cell Sinks Num. Min. Max. Mean Std Num. > 10m Num. Max. Avg Depth Mean Avg Depth Std Avg Depth Avg Num. Cells Original Data as obtained from NGCC (12,840 Contours and 446 Spot Heights) 7, ,898 14, Original Data with the additional 3,610 waterways arcs, and 96 polygons 4, ,472 7, Waterway arcs separated into rivers (3,208 arcs), lakes (24 polygons) and canals (378 arcs not used) 2, ,110 7, Flow Direction for 66 rivers arcs and id (river or lake) for 55 arcs have been corrected 2, , Elevation attributes for 45 contours corrected and 2 spot heights deleted 2, , The 187 double river reaches edited to become single river arcs 2, , CSIRO Land and Water Page 24

32 3. Optimising key ANUDEM parameters Three ANUDEM parameters were tested in order to define optimal values for the CSHC dataset. These were tested in the YHB test area and include: (1) spatial resolution; (2) the number of iterations; and (3) the relative contribution of profile and total curvatures to the roughness penalty (governed by the ANUDEM 2 nd roughness penalty parameter). The default values provided in the ANUDEM Version 5.1 manual were used for all other parameters. The three optimisation analyses are described in turn Determining the optimum spatial resolution A key factor in most spatial modelling exercises is determining the optimal resolution. A heuristic rule (also termed a rule of thumb ) developed by one of the authors (M. F. Hutchinson) is that the output DEM x- and y-resolution is 10-3 of the map scale. For example, using contour data at a scale of 1:100,000 the output grid resolution would be 100 m, whereas contour data generated from a 1:250,000 scale map would result in a 250 m resolution grid cell. Hutchinson and Gallant (2000) provide a method to analyse the information content of the input data to assist in selecting the final output grid cell resolution. This analysis, conducted on the YHB test area is shown in Figure 6a, where a distinctive break-point was not present in these data (contrary to the example of Hutchinson and Gallant). As the CSHC is a landform of rapidly changing slopes (see Figure 3) we wanted to generate a DEM with the highest x- and y-resolutions that the input data could readily support; to enable better modelling of slopes and meteorological surfaces. Consequently we assessed the rate of change between successive spatial resolutions (see Figure 6b) and also calculated the number of sinks (see Figure 6c). From this analysis it can be concluded that an output resolution of either 50 m or 100 m provided the optimal information content. While this finding is a much higher x- and y-resolution than the previously introduced heuristic rule, given the high input data density present for the CSHC (see Table 2 CSIRO Land and Water Page 25

33 above) it seems sensible that the data can support a 100 m x- and y-resolution DEM. For geomorphic analysis it could be argued that the data support a 50 m x- and y-resolution DEM (see Figure 6b and 6c). However, such a high resolution DEM generated from this dataset might contain more noise than is acceptable and this would largely depend upon local data densities. Additionally the DEM would be 4 times as large to store on disk. This becomes a significant issue when generating monthly meteorological surfaces (not averages) for 21 years (McVicar et al. 2005). In the following sub-sections all runs of ANUDEM were performed at 100 m x- and y-resolution. (a) (b) Figure 6. Impact of spatial resolution for the YHB test area on: (a) the RMS of the slope; (b) the rate of change (or slope) of the RMS slope data presented in (a); and (c) the number of sinks. (c) 3.2. Determining the number of iterations ANUDEM produces a statistic (called the number of new lines ) that is an indicator of the resultant DEM stability, for a specific data set and selection of ANUDEM input CSIRO Land and Water Page 26

34 parameters. The number of new lines are the inferred ridge and stream lines from the contour data, and is essentially a measure of numeric stability of the ANUDEM algorithm. ANUDEM initially produces a low resolution DEM for the spatial extent (this is stored in memory). A series of higher resolution DEMs are also produced in memory (by progressively halving the resolution of the output pixels), resulting with a DEM possessing the user input x- and y-resolution that is written to disk. The theory underpinning the use of this nested grid SOR (successive over-relaxation) iterative method is provided by Hutchinson (2000). For each grid resolution, the number of new lines generated from the penultimate and ultimate iteration is reported in the ANUDEM log file. Small values indicate that the resultant DEM is stable as consecutive iterations produced similar DEMs, and therefore, few new lines were added to describe the profile between ridgelines and streamlines. If this value is not small (a typical low value that may be deemed appropriate is less than 10) then the ANUDEM user specified maximum number of iterations may need to be increased. At each grid resolution, the user specified maximum number of iterations governs the number of iterations available to ANUDEM to produce a stable DEM before progressing to the next finer resolution DEM. For results performed in the YHB test area we found that the number of last new lines using 20 iterations (the default value suggested in the ANUDEM Version 5.1 manual) was approximately 400. This showed that a stable solution was not being generated; we expect this to be solely due to the complexity of the terrain in the CSHC. Consequently we examined the impact of changing the ANUDEM maximum number of iterations user input; the iteration number was varied from 10 to 120, in increments of 10. Figure 7a illustrates that from 40 iterations onwards provides a satisfactorily low number of last new lines. It should be noted that the improvement from 10 to 20 iterations was the most dramatic (see Figure 7a), the improvements beyond the default value of 20 are marginal, yet important for this case. Given that the number of iterations is linearly related to the computational time see Figure 7b we decided CSIRO Land and Water Page 27

35 that setting the ANUDEM maximum number of iterations user input to 40 was necessary to allow the representation of the landscape to become stable given the complexity of the landform within the CSHC. (a) (b) (c) (d) Figure 7. Impact of ANUDEM maximum number of iterations user input on: (a) the number of last new lines; (b) running time; (c) number of drainage enforcements; and (d) number of sinks. Further analysis of the impact of the maximum number of iterations user input on two ANUDEM characteristics, the number of drainage enforcements and number of sinks, are shown in Figure 7c and Figure 7d, respectively. From the results presented in Figure 7a to Figure 7d we see that using 40 iterations is a pragmatic balance that minimises the number of last new lines and sinks, while enforcing drainage, while not taking too long to process. In the following sub-sections all runs of ANUDEM are performed using 40 iterations. CSIRO Land and Water Page 28

36 3.3. Determining the relative amounts of profile and total curvatures The profile curvature, defined as the curvature of the fitted surface in the downslope direction (Gallant and Wilson 2000), is newly introduced in Version 5.1 of ANUDEM (Hutchinson 2004a). The profile curvature, which is locally adaptive (Hutchinson 2000), can be used to partly replace the total curvature. This is controlled by the user specifying the 2 nd roughness penalty. Values for the 2 nd roughness can range from 0.0 to 0.9; a value of 0.0 (the default) means only total curvature is used (there is no profile curvature used), whereas a value of 0.9 means that 0.1 of total curvature and 0.9 of profile curvature is used. Given that profile curvature is newly introduced in Version 5.1 of ANUDEM with users being encouraged to make their own assessment of the optimum value for their data sets, and that profile curvature allows better representation of rapid changes in gradient (a common phenomena in the CSHC), we examined the impact of the 2 nd roughness penalty on the resultant DEM in 5 specific ways. They were: (1) assessing changes at specific locations in the landscape; (2) conducting stream network analysis; (3) performing new line, drainage enforcement and sink analysis from the ANUDEM diagnostic log-file; (4) determining the changes in the elevation and slope for the entire DEM; and most importantly (5) using independent higher resolution 1:100,000 spot height data as a validation dataset. The first four cases are essentially careful analysis of the resultant output DEM or diagnostic log-file, while the last case (5 above) is an independent validation using higher resolution data. Each will be discussed in turn. In all cases the number of iterations was set at 40, the spatial resolution was 100 m, and the highest quality input data set was used; all have been discussed previously. CSIRO Land and Water Page 29

37 Assessing changes at specific locations in the landscape In the southern portion of the CSHC (specifically in southern part of YanHe Basin see Figure 8, near Yan'an) an area covering 487 km 2 (25.29 km north-south and km east-west) was selected for detailed examination of changes in elevation of specific landscape groups resulting from changing the 2 nd roughness penalty. The five landscape groups are: (1) hill tops (HT); (2) saddle points (SP); (3) heads of gullies (HG); (4) stream outlets (SO); and (5) ridges (R). The locations of the 122 points are shown in Figure 8. Figure 8. The locations of the points identifying the five landform types: (1) hill tops (HT); (2) saddle points (SP); (3) heads of gullies (HG); (4) stream outlets (SO); and (5) ridges (R) are shown. The blue lines represent the input river network and the brown lines represent the input contour data with a 100 m interval. The background grey surface is the elevation, which ranges from 925 m to 1,450 m above mean sea level. The location of this area is shown in Figure 2, and the red rectangle (located near the right edge of the figure) is the extent of the zoomed area shown in Figure 11 below. The 2 nd roughness value was incremented in 0.1 steps from 0.0 to 0.9 and the average and standard deviation of the five landform types was calculated, with results are presented in Table 4. For each of the 5 landform groups the divergences from the CSIRO Land and Water Page 30

38 average value are shown in Figure 9 when only total curvature is used (i.e., when the user specified 2 nd roughness penalty is 0.0). Table 4. Impact of changing the 2 nd roughness penalty on the mean and standard deviation (Stdev) of the 5 landform types (HT = hill tops, SP = saddle points, HG = head of gullies, SO = stream outlets and R = ridges) shown on Figure 8. All units are in m above mean sea level. Landform Stat. No. 2 nd roughness penalty Type HT Mean 58 1, , , , , , , , , , Stdev SP Mean 36 1, , , , , , , , , , Stdev HG Mean 12 1, , , , , , , , , , Stdev SO Mean 6 1, , , , , , , , , , Stdev R Mean 10 1, , , , , , , , , , Stdev outlets ridges hill tops head gullies saddles Figure 9. Divergence from the average elevation value when no profile curvature is used (i.e., 2 nd roughness = 0.0), with increasing profile curvature governed by increasing the 2 nd roughness for the 5 landform types introduced in Figure 8 (above). CSIRO Land and Water Page 31

39 Results from Table 4 and Figure 9 show that increasing the 2 nd roughness penalty results in an increase of the average elevation of the hill tops, stream outlets and ridges, whereas the average elevation of saddle points and gully-heads decrease. This means that the local relative relief, and hence slopes, represented by the DEM will increase slightly as more locally adaptive profile curvature is used by ANUDEM (by the user specifying a higher 2 nd roughness penalty). However, in Figure 9 the average elevation of outlets decreases when using a 2 nd roughness penalty of 0.9 compared to when 0.8 was used; this suggests instability when using a 2 nd roughness penalty of 0.9. Given the complex landform of the CSHC (Figure 3) higher relief (more locally adaptive profile curvature) will most likely provide a better representation of the terrain. To further illustrate this, a detailed analysis of the impact of the degree of profile curvature was performed. Two resulting profiles are illustrated: (1) from a ridge to a shoulder; and (2) from an upper hill slope to a stream outlet (shown in Figure 10a and Figure 10b respectively). The location of the points is shown in Figure 11; this is the red rectangle box shown on Figure (a) (b) Figure 10. Detailed examination of the elevation for two profiles for seven different 2 nd roughness penalties: (a) shows the profile from the ridge to the shoulder; and (b) from an upper hillslope to a stream outlet. The locations of the points are detailed in Figure 11, which is shown on Figure 8. CSIRO Land and Water Page 32

40 Figure 11. Location of the detailed sample points used in Figure 10a and Figure 10b is shown. The blue line represents an input river and the brown lines represent the input contour data with a 100 m interval. The background grey surface is the elevation, which ranges from 970 m to 1,235 m above mean sea level. From the analysis of the two profiles we see that the more profile curvature used the steeper the landform becomes. However, it should be noted that where contours exist (elevations of a multiple of 100 m 1,200 m in Figure 10a and 1,000 m in Figure 10b), the elevation value of the pixel is not greatly influenced by the amount of profile curvature as there are input data controlling the resulting value of the DEM at this particular location; this result is entirely expected. These analyses indicate that a high 2 nd roughness should be used (e.g., a 2 nd roughness of 0.8 or 0.9) in order to increase the slope of the profile and better match the relief of the site Stream network analysis The influence of the total stream length and river density as a function of the 2 nd roughness penalty was determined. The results are shown in two ways. Firstly the actual values are provided, and secondly results are provided relative to the length and density when the 2 nd roughness was calculated using the default value of 0.0, see Table 5. That is, the relative difference in length and the relative difference in density were calculated for each successive 2 nd roughness by: rel_diff x = Output x Output 0.0 (1) CSIRO Land and Water Page 33

41 where rel_diff x = relative difference in ANUDEM output; x = is the 2 nd roughness value between 0.1 and 0.9 (incremented by 0.1); Output x = ANUDEM output produced when the 2 nd roughness of x is used; and Output 0.0 = ANUDEM output produced when the default 2 nd roughness of 0.0 is used. In this sub-section ANUDEM output refers to either total stream length and river density. Negative values in the difference columns (denoted diff. in Table 5) reveal that there is a decrease in either river length or density when compared to the same attribute using the default 2 nd roughness value of 0.0. Therefore, the results presented in Table 5 show that there is a gradual decrease in river length and river density as a function of increasing 2 nd roughness penalty from 0.0 to 0.5. From 0.5 to 0.9 the direction reverses; with increasing 2 nd roughness, the river length and river density starts to increase (but are still lower relative to the default value). These practically reach the default values again at a 2 nd roughness of 0.8. A breakpoint is evident between 0.8 and 0.9 by a large difference in both length and density; this breakpoint indicates that using a 2 nd roughness of 0.9 would likely produce unstable results. Careful analysis of the stream network derived from the resultant DEMs illustrated that for the 2 nd roughness of 0.9, there were many more spurious small streams derived than when using a 2 nd roughness of 0.8. The positive values of length diff. and density diff. for a 2 nd roughness of 0.9 indicate that the value is now higher than the optimal value. Using a 2 nd roughness anywhere between 0.0 and 0.8 makes very little difference to either river length or density. Since a value of 0.8 has minimal impact on the stream metrics, yet greatly changes the relative relief (see Figure 9 and Figure 10), this analysis indicates that a 2 nd roughness penalty of 0.8 provides a good representation of the landscape using this input data. CSIRO Land and Water Page 34

42 Table 5. The river network and density statistics and their relative differences (compared to the default 2 nd roughness penalty of 0.0) are listed for the YHB Test area. The input river data length was 8,720, m with a density of m/km 2 see Table 2. The length and density relative differences (denoted diff. in the column headings) were calculated for each 2 nd roughness from 0.1 to 0.9 with respect to the ANUDEM default 2 nd roughness value of 0.0, see equation 1. Length Length diff. Density Density diff. roughness (m) (m) (m/km 2 ) (m/km 2 ) ,283,023 1,204 2 nd ,265,204-17,819 1, ,264,912-18,111 1, ,254,638-28,385 1, ,253,711-29,312 1, ,241,220-41,803 1, ,268,426-14,597 1, ,272,279-10,744 1, ,279,780-3,243 1, ,387, ,832 1, New lines, drainage enforcement, and sinks analysis A similar analysis was run to inspect the impact of changing the 2 nd roughness on the difference in the number of last new lines, the number of drainage enforcements, and the number of sinks. As was done in section , each successive value of 2 nd roughness was run through ANUDEM and both: (i) the actual output values; and (ii) the relative output values compared to the default value results (2 nd roughness = 0.0) were reported. The goal was to minimise both the number of new lines (as this shows a stable result) and the number of sinks (as this is a metric of general improvement in data quality). While the goal is not necessarily to maximise the number of drainage enforcements, a high number shows that the output river network should be well connected and hydrologically correct as ANUDEM is enforcing drainage at places other than where the input stream data exists. Given: (1) our concerns about the input data density of the rivers relative to the contours (Table 2); and (2) the purposes for which the resultant DEM will be used, then generating a well connected and hydrologically correct DEM was a desirable characteristic. CSIRO Land and Water Page 35

43 Table 6. Actual values and the relative difference values for last new lines, drainage enforcements and sinks for the YHB test area. Relative difference values (denoted diff. in the column headings) were referenced to the output when a default 2 nd roughness value of 0.0 was used, see equation 1. No. last No. last new lines No. Drainage No. Drainage No. sinks No. sinks 2 nd roughness new lines diff. Enf. Enf. diff. diff ,187 12, , , , , , , , , , , , , ,514 2,327 12, ,347 7,160 12, ,828 17,641 11, Table 6 reveals that the number of drainage enforcements and number of sinks are reciprocally related. The first increases as the 2 nd roughness penalty increases, while the latter decreases. When the 2 nd roughness penalty is > 0.4 the ratio (number of drainage enforcements / number of sinks) becomes larger. This means that more gullies and ridges will be extracted from the input data (i.e., contours, spot heights and streams), so the resultant DEM can better represent the complex landforms found in CSHC. The minimum number of last new lines, an indicator of algorithm stability, was generated with a 2 nd roughness penalty of 0.8, whereas the minimum number of sinks was found at 0.9. The number of drainage enforcements was high for both 0.8 and 0.9. As the previous stream analysis precludes that 0.9 be chosen, the results from Table 6 suggest, again, that a 2 nd roughness of 0.8 is best for this scale dataset in this landscape. CSIRO Land and Water Page 36

44 Determining changes in elevation and slope The difference in the elevation and slope statistics were calculated using the same two approaches as before: (i) actual values are shown (Table 7), and (ii) relative values with reference to the default 2 nd roughness = 0.0 were calculated (Table 8). These statistics reveal that the mean elevation and slope increase with an increasing 2 nd roughness; the standard deviation of the elevation remains approximately constant and the standard deviation of the slope decreases with increasing 2 nd roughness (Table 7 and Table 8). The more important metric for this analysis is the slope. The increase in mean slope was expected given the changes in elevation at various landform positions discussed above (i.e., as the amount of profile curvature used increases, average elevation of hill tops, stream outlets and ridges increases, while the average elevation of the gully heads and saddles reduces see section above), and is desirable given the landscape extremely steep landscape encountered in the CSHC; see Figure 3. As several times before, a 2 nd roughness of 0.9 is suggested as the best value. However, given that the stream analysis (see section above) found that using a 2 nd roughness of 0.9 was unstable as the resultant stream network derived from the DEM contained many small spurious streams, we again opt for a 2 nd roughness of 0.8. Table 7. Summary statistics for the resultant DEM produced using ANUDEM when varying the 2 nd roughness penalty. There were 1,882, m resolution cells (1,128*1,669) in the YHB test area, the minimum slope was always 0.0 and hence it is not shown in the table. Min., Max., and Stdev represent the minimum, maximum and standard deviation, respectively. 2 nd Elevation (m) Slope ( ) roughness Min. Max. Mean Stdev Max. Mean Stdev , , , , , , , , , , , , , , , , , , , , CSIRO Land and Water Page 37

45 Table 8. Relative difference values for the resultant DEM produced using ANUDEM when varying the 2 nd roughness relative to the output when using the default 2 nd roughness of 0.0. Min., Max., and Stdev represent the minimum; maximum and standard deviation using the data presented in Table 7 (see equation 1). 2 nd Elevation diff. (m) Slope diff. ( ) roughness Min. Max. Mean Stdev Max. Mean Stdev Using independent higher quality data as a validation dataset To independently validate the influence of the 2 nd roughness we assessed the differences between spot heights from a 1:100,000 data set (covering just the YHB introduced in Table 1 and Figure 1 and 2) with the maximum elevation of a 3 by 3 pixel window centred on the same locations as the spot heights for each resultant DEM. Of the 1,594 spot heights in the YHB 1:100,000 data there were 120 that were common with the spot heights in the CSHC 1:250,000 data. The spot heights common to the two data sets were identified as being within 100 m of each other horizontally (post positional accuracy correction of the YHB 1:100,000 dataset see Section 4 below) and having the same elevation. The remaining 1,474 non-common spot heights in the YHB 1:100,000 dataset were used as independent data to assess the impact of the 2 nd roughness penalty on the resultant ANUDEM generated output using the corrected 1:250,000 data as input. In this analysis we assume a spot height represents the landscape local maxima; hence we have taken the difference between the non-common spot heights and the maximum of a 3 by 3 pixel window centred on the same locations to test if any of its neighbours are higher than the spot height. We selected a 3 by 3 pixel window as the RMS error in the x- and y-directions after CSIRO Land and Water Page 38

46 assessing the positional accuracy between the two data sets and shifting the YHB data to minimise the difference were m and m, respectively (or within a 1 pixel radius). See Section 4 below for full details on how the assessment of the positional accuracy between the 1:250,000 CSHC and 1:100,000 YHB data sets was performed. Results presented in Table 9 show that the bias (or average error) between the two sets of height data (calculated as YHB 1:100,000 spot height minus the maximum elevation from ANUDEM output using 1:250,000 data) reveal that the 1:100,000 spot heights are higher than the maximum in the 3 by 3 pixel window derived from the 1:250,000 data. This is to be expected in this landscape (see the photos presented in Figure 3) as given no control it would be difficult for any terrain algorithm to model the true surface. This bias reduces as the amount of profile curvature increases (i.e., increasing the 2 nd roughness penalty user specification), this pattern is also seen in the root mean squared difference. Table 9. Summary statistics of the difference between the 1,474 spot heights from the 1:100,000 data set for the YanHe Basin minus the maximum elevation in each 3 by 3 pixel window (centred on the same location) of the ANUDEM output using the 1:250,000 CSHC data as input as a function of 2 nd roughness. All units are m above sea level, with the calculations being YHB spot height CSHC DEM elevation value. Statistic 2 nd roughness penalty Bias RMSD Where the bias (also known as the mean error) is calculated as n 1 [ ( P O ) i i n i = 1 and RMSD is the root mean squared difference, given as n 1 [ (P O ) ] i i n i= , where P i is the set of 1,474 non-common spot heights from the 1:100,000 YHB data and O i is the maximum elevation from a 3 by 3 window from the resultant ANUDEM output generated from the 1:250,000 topographic source data centred on the corresponding locations. Table 9 shows that there little difference when using a 2 nd roughness penalty between 0.0 and 0.5. CSIRO Land and Water Page 39

47 While Table 9 shows that the minimum difference is shown for a 2 nd roughness penalty of 0.9, as before, the 2 nd roughness of 0.8 provides the second best results, and given our concerns with the stability of the stream network derived from the DEM generated when using a 2 nd roughness of 0.9, using a 2 nd roughness of 0.8 is probably the better choice. Therefore, although the results of this and some of the previous analyses indicate that a 2 nd roughness of 0.9 might be the appropriate parameter value, the instability shown in the stream analysis means that using a 2 nd roughness of 0.8 is probably a better choice given that the 2 nd roughness of 0.8 had very good statistics in each case and did not show this instability in relation to the derived stream network. Additionally, the number of new lines indicate that 2 nd roughness of 0.8 is the most appropriate, and when metrics using a 2 nd roughness of 0.8 are compared to those when using a 2 nd roughness of 0.9, it is apparent that only marginal improvements are made for some aspects of the DEM when using 2 nd roughness of 0.9, compared with the all round capacity of a 2 nd roughness of 0.8 to produce good results. Consequently the 2 nd roughness value of 0.8 will be used in addition to the other non-default ANUDEM parameters decided in the previous sub-sections: (1) the maximum number of iterations was set to 40 (see Section 3.2 above); and (2) the output resolution of 100 m (see Section 3.1 above). The full final set of ANUDEM parameters used to develop the CSHC DEM is given in Table 10. Table 10. The following user directives were applied to ANUDEM Version 5.1 algorithm using the corrected 1:250,000 data to construct the DEM for the CSHC. The ANUDEM user directives that were explored in the report are bolded, input files and output files are not included in this listing. ANUDEM User Directive Value Comments Drainage option 1 Drainage enforced where possible Contour data 1 Data mainly consists of contours Discretisation error factor 1.0 Vertical standard error st roughness penalty 0.0 Determines how much planar (or contour) curvature is used in addition to the default total curvature. Set to 0.0 for contour data. CSIRO Land and Water Page 40

48 ANUDEM User Directive Value Comments 2 nd roughness penalty 0.8 Explored in Section 3.3 (above), determines how much profile curvature is used in addition to the default total curvature Elevation tolerance 50 Half the contour interval of 100m Maximum number of iterations 40 Explored in Section 3.2 (above) Elevation units 1 Elevation units in m Height minima Data points lower than this value ignored, and fitted cells cannot be lower than this. Height maxima Data points higher than this value ignored, and fitted cells cannot be higher than this. Centring option 1 Grid points located at the centre of pixels, for use in ARC-INFO Position units 1 Position units in m X lower * Data points below this value are ignored X upper * Data points above this value are ignored Y lower * Data points below this value are ignored Y upper * Data points above this value are ignored Grid spacing 100 Final grid resolution is 100 m, explored in Section 3.1 (above) Grid margin 2000 This corresponds to twenty 100 m resolution output grid cells. Will vary depending on the user required output resolution. * This specifies the spatial extent of the output DEM, in this case data are in metres based on the following Albers Projection; these neat lines would obviously change for different study areas. The Albers Equal Area Conic projection uses the following parameters: 1st standard parallel: N 2nd standard parallel: N Central meridian: E False easting (meters): False northing (meters): Latitude of projection's origin: Spheroid: KRASOVSKY Xshift: Yshift: While the input data and key ANUDEM parameters were optimised, there were still sinks present in the output DEM. As we did not know if these were valid sinks, we assumed they were artefacts due to the combined interaction between the input CSIRO Land and Water Page 41

49 topographic data and the parameter-optimised ANUDEM algorithm. Consequently the sinks were filled, as discussed previously, prior to the DEM being used in any following analysis. Table 11 lists the number of sinks associated with the changes made to the select ANUDEM parameters (see Table 3 for changes in sinks as the data quality improved). We see that in Table 11 the number of sinks increases when using a 2 nd roughness penalty of 0.8; this may be due to the lower input river density in the YHB test area. The value of the 2 nd roughness penalty is obviously a pragmatic balance between several metrics describing the ability of the DEM to best represent the landform. Table 11. Number of single- and multi-cell sinks (and some summary statistics for each case) as a function of selecting key ANUDEM parameters for the YHB test area using the 1:250,000 CSHC data are shown. For the single-cell sinks cases Num., Min., Max., and Num. > 10 m represent the number, minimum, maximum, and number where the difference between the sink and its 8 neighbouring cells is greater than 10 m. For the multi-cell sink cases average depth of all cells in the sinks are calculated first and then descriptive statistics are then generated. In all cases if ANUDEM parameter(s) are not explicitly specified then the default values were used; in all cases the spatial resolution was 100 m. Single-cell Sinks Multi-cell Sinks Num. Min. Max. Mean Std Num. > 10m Num. ANUDEM default value with best quality data (see Table 3) Max. Avg Depth Mean Avg Depth Std Avg Depth Avg Num. Cells 2, , Optimising the number of iterations parameter (iterations = 40 was used) 2, , Optimising the 2 nd roughness penalty (2 nd roughness = 0.8 and iterations = 40) 4, ,053 8, The following section describes the methods and results used to assess and minimise the positional accuracy between the 1:100, m contour interval (CI) YHB dataset and the 1:250, m CI CSHC dataset (as used in Section 3.3.5). This was only performed for the YHB (not the entire CSHC Area) as the 1:100, m CI data only covered the YHB. In Section 5 we then illustrate and discuss the output ANUDEM for the entire CSHC, where qualitative comparison with output generated from a TIN is also shown. CSIRO Land and Water Page 42

50 4. Minimising positional difference between YHB and CSHC datasets Higher resolution contour and spot height data (than the 1:250,000 scale data with a contour interval primarily of 100 m) existed (see Table 1) over several portions of the CSHC. We decided to use the 1:100,000 map scale spot height and 40 m contour interval data covering the YHB to independently validate the influence of the 2 nd roughness penalty (see Section above). Prior to performing this analysis the positional differences between the CSHC and YHB data needed to be assessed, and minimised if the differences were larger than currently accepted international positional mapping standards. While processing the 40 m contour interval YHB DEM, a shift (appearing to be systematic in nature) was identified between the CSHC source data (contours, spot heights, rivers and lakes) and the source data for the YHB. In this section, we quantify and minimise this positional offset to allow more meaningful comparison between the YHB and CSHC DEMs (and their derivatives) for future studies. A large locational offset between the CSHC and YHB data would greatly reduce the ability to directly compare these datasets, especially in the fast-changing relief that typifies the study site (see Figure 3). To avoid such effects, other multi-resolution DEM analyses have simulated various coarse resolution data from a single fine resolution source DEM (Gallant and Dowling 2003). However, simulating coarse scale data rather than using independent native coarse scale data could possibly introduce dependencies between the datasets that might be due strictly to the simulation (i.e., not due to true structure in the landscape). This means that in any multi-resolution DEM analysis, there exists at least two general concerns that could greatly influence the results of the analysis. These are: (1) positional effects if the various resolutions are based on independent datasets created CSIRO Land and Water Page 43

51 from different native scales; or (2) possible effects introduced by simulating various coarse-scale data from a single fine-scale source. In this study, and particularly in this section, we concentrate on 1 above by assessing the positional difference between these two datasets (the 1:250,000 CSHC and the 1:100,000 YHB) in order to determine both how different the positions of common map features are in these data, and if this positional difference can be minimised to an acceptable level. A future study may address 2, above, depending on these findings. To determine the positional offset, we used common point-based techniques for estimating positional accuracy and guidelines defined for map and digital data accuracy in both Australia and the US. A very brief description of positional accuracy as well as accuracy standards follows. Positional accuracy estimates of any particular GIS dataset are often assessed by comparing locations of well-defined points found on the dataset in question to associated points on an independent dataset of higher accuracy (NMCA 1975; FGDC 1998a; FGDC 1998b; Van Niel and McVicar 2000; Van Niel and McVicar 2001). This higher accuracy dataset is referred to as the reference and the dataset being tested is referred to as either the input or test dataset. For GIS applications, a horizontal accuracy assessment tool was created in ArcView for a previous study and is downloadable from the internet (Van Niel 2000). This tool is described extensively in Van Niel and McVicar (2000). For the purposes of assessing the positional accuracy between the CSHC and YHB datasets, the ability to calculate the bearing between the input and test datasets was added to the original positional accuracy extension. This new functionality calculates the direction of the vector difference between associated points in the test and reference datasets (a new version of the ArcView extension including this functionality is available upon request). Australian map accuracy standards state that not more than 10% of the points used for testing the accuracy of a dataset should exceed an allowable distance (calculated as CSIRO Land and Water Page 44

52 0.5 mm on the source map scale) (NMCA 1975). For example, a 1:250,000 scale map will have an allowable error distance (distance between the reference and the test datasets) of 125 m. Well-defined points are limited to those map features that are both easily visible on the ground and plotable within 0.25 mm on the scale of the source map (e.g., 62.5 m for a 1:250,000 scale map); see NMCA (1975) and Van Niel and McVicar (2000) for more details. Since the binary way of reporting accuracy in the map standards as either passing or failing is not always very pertinent for digital geospatial data, the US has defined National Standards for Spatial Data Accuracy (NSSDA). The NSSDA is defined by a 95% confidence interval around the root-mean-squared error (RMSE) between at least 20 associated well-defined reference and test points see FGDC (1998b) and Van Niel and McVicar (2000) for more details. In the accuracy assessments described below, we report statistics with regard to both Australian map accuracy standards and the US NSSDA. A complication to directly measuring and subsequently minimising positional differences is in defining common well-defined points between independent elevation source data, especially if spot heights are not comparable and/or the difference in scale is considerable. We concentrate on two separate methods for determining well-defined points, and subsequently estimating positional differences between the two elevation source datasets: delineating well-defined points from (1) matching spot heights; and (2) centroid points of matching small enclosed contours. The second method is particularly useful if only contour data is available as matching locations are particularly difficult to accurately identify between non-intersecting line features on datasets of disparate scales (i.e., it is easier to identify common points if line features intersect like in a road network, but harder when the lines never cross, like contour data). Details of the methods used and their results are given below for both of these alternatives (spot height comparison and contour centroid comparison). CSIRO Land and Water Page 45

53 4.1. Spot height comparison Fifty six (56) matching pairs of spot heights distributed throughout the YHB, were arbitrarily chosen to estimate the positional difference between the 1:100,000 YHB and 1:250,000 CSHC datasets (see Figure 12). Due to its coarse scale, less spot heights were available from the CSHC dataset, so this dataset limited the number of matching pairs that could be identified. However, matches were easily identified and we were able to greatly exceed the number of pairs necessary based on Australian and US accuracy standards (20 pairs are needed according to the standards of both countries). Points were matched by linking the elevation fields in the separate spot height topographic point datasets (i.e., linking the elevation field in the YHB to that of the CSHC). This allowed for semi-automated matching of pairs. As a CSHC point of interest was selected, since the databases were linked based on elevation, any YHB spot heights with the same elevation were then also selected. When more than one YHB spot height was selected for a single CSHC spot height, the closest point was retained as the matching point. In every case where multiple YHB points were initially selected, there was always only a single point that was within a kilometre radius of the selected CSHC point. If there were no YHB points selected for an individual CSHC point, or if all the YHB points initially selected were very far away (i.e., >1 km) from the selected CSHC point, then the point was rejected. Points were selected until a relatively equal distribution across the whole YHB was attained. These points were matched through a common field containing an integer identifier between 1 and 56. CSIRO Land and Water Page 46

54 N km Figure 12. Within the YHB, the relatively few available CSHC spot heights are shown as hollow squares, while the more numerous YHB spot heights are shown as filled grey circles. Location of CSHC-YHB spot height pairs used for positional difference estimation (56) are shown as filled black squares. The positional and bearing statistics were generated from these matching points using the positional accuracy extension to ArcView with the YHB serving as the reference dataset and the CSHC serving as the input or test dataset. The mean difference was around 125 m (which is the allowable error distance for a 1:250,000 scale dataset such as the CSHC), so the distances measured were near the expected value (see column labelled S, Table 12). More importantly, the NSSDA value was around 250 m, which signified that 95% of well-defined point-pairs between the YHB and the CSHC would be expected to be less than this value. The mean bearing was calculated to be near 235, with a standard deviation of 47, both from grid North increasing clockwise. That is, the YHB is at a bearing of 235 from the CSHC dataset, and with a low standard deviation, a simple x- and y-offset applied to the YHB dataset CSIRO Land and Water Page 47

55 would be expected to significantly reduce the error. Before applying any shift, the contour data was also assessed Contour comparison The contour data was inspected for identifiable features that could be matched. This proved to be difficult given both the positional shift between the datasets and the generalisation differences due to the disparate scales of the datasets (see Figure 13). However, small enclosed contours served as good places to match the two datasets as their shape was less affected by scale (i.e., the size was different, but the shape remained relatively the same). Also, the centroids of these polygons could be defined objectively using ArcInfo, and thus eliminated user subjectivity in defining the points. First, contour data that were not a multiple of 100 m were eliminated from the YHB dataset (which has a contour interval of 40 m). This made the selection of matching contours easier and, based on the range of elevations in the YHB, the following contour intervals were used: 200; 400; 600; 800; 1,000; 1,200; 1,400; and 1,600 m. From these available contours, 112 matching pairs of small, enclosed contours were arbitrarily chosen within and around the YHB until roughly an even distribution was apparent (Figure 14). It was ensured that any gaps in the enclosed contours were truly closed by using the ArcInfo snap command and any dangling arcs were also eliminated. These line datasets were converted to polygon datasets by using the ArcInfo build command, and labelpoints were created at the centroid of these polygons using the ArcInfo centroidlabels command. These centroid points were exported to an ArcView shapefile and, as before, were linked with a common identifier field (integers from 1 to 112) and difference and bearing statistics were generated using the positional accuracy ArcView extension (again, YHB = reference and CSHC = test ). CSIRO Land and Water Page 48

56 N m N m # # # # (a) (b) Figure 13. An example of matching contour intervals (1,200 m) for the YHB (grey lines) and the CSHC (black lines) are shown before the shift was applied (a) and after the shift was applied (b). Identification of well-defined points is difficult along most of the line due to differences in detail related to scale and the positional offset, but are easily seen at the centroids of small enclosed contours. An example of one of the centroid pairs is shown near the bottom of the figures; the centroid of the small enclosed YHB contour is shown as a grey filled circle and the centroid of the small enclosed CSHC contour is shown as a black filled circle. The shift that was applied to (a) to produce (b) is a block offset of m and degrees from North, as calculated using the pooled spot height and contour analysis presented in Table 12 and discussed in full below. The results of the contour centroid assessment were very similar to those of the spot height assessment (see column labelled C in Table 12). The mean distance was around 120 m, with an NSSDA (95% RMSE) estimate of 220 m, and a mean and standard deviation bearing of around 240 degrees and 32 degrees, both from grid North. A relatively small standard deviation around the mean bearing of the 112 point-pairs again suggested that a single x-, y-offset applied to one of the datasets should significantly reduce the difference distance. Also, the similarity between all of the statistics measured in both the spot height and contour centroid assessments suggested that: (1) they could be pooled (or combined) for this analysis; and (2) for other analyses, they were sufficiently alike that performing just one of these should be sufficient (e.g., if no spot heights are available, the contour centroid method should give a reliable estimate of the differences by itself, or vice versa). CSIRO Land and Water Page 49

57 4.3. Pooled spot height and contour centroid comparison Based on these results, we then pooled the 56 spot height point-pairs and the 112 contour centroid point-pairs and reran the positional difference program with the entire 168 point-pairs after matching these pooled YHB and CSHC datasets with a common identifier. The results are shown in Table 12 in the column labelled S_C_p, where statistics fall in between the original two analyses. With regard to the CSHC DEM resolution, this relates to (at well-defined points) a mean difference of around 1.21 pixels. At 95% of these points, the difference should be less than 2.31 pixels. Using the mean pooled distance and the mean pooled bearing ( m and degrees), all the YHB DEM source datasets were shifted with the ArcInfo move command, including: (1) spot heights; (2) contours; (3) rivers; and (4) lakes and reservoirs. Although the finer scale YHB data is considered to be the reference, we shifted the YHB source data to the CSHC data-space. The YHB data was shifted to the CSHC data-space because the CSHC dataset covers the entire study site and thus, all other resolution DEMs (see Table 1) will be compared to it in the future. Additionally, the 1:250,000 data was obtained from the National Geographic Centre of China (NGCC) we expect it data to meet a higher data quality standard. CSIRO Land and Water Page 50

58 N km Figure 14. Within and around the YHB, the contour centroid point pairs used for positional difference estimation (112) are shown as filled black circles. The boundary of the YHB is given by the thin black line; it is sub-catchment 29 on Figure 15. The positional accuracy statistics were summarised again using the shifted YHB pooled spot heights and contour centroids to determine how close the corrected YHB datasets were to the CSHC dataset (see column labelled S_C_p_s in Table 12). This simple shift reduced the pooled mean difference by m and the NSSDA estimate by m. This shows that the mean difference between the corrected YHB and CSHC DEMs (at well-defined points, at least) is now 0.72 of a CSHC pixel, and that we expect 95% of such points in the DEM to be less than 1.47 of a CSHC pixels. Note the x- and y- resolution of a CSHC pixel is 100 m. CSIRO Land and Water Page 51

59 Table 12. Summary statistics of various positional difference analyses described in the text are shown. The mean distance and bearing used to shift the YHB data are bolded. There are 56 point pairs used for the spot height analysis and 112 point pairs used for the contour centroid analysis. Statistic S C S_C_p S_C_p_s Mean Difference Distance (m) Standard Deviation of Difference Distance (m) Upper Limit for 95% Confidence Interval of Difference (m) RMS Difference Distance (m) RMS X (m) RMS Y (m) Allowable Error Distance (m) NSSDA (m) Mean Bearing ( from grid North) Standard Deviation of Bearing ( from grid North) S = spot height analysis; C = contour centroid analysis; S_C_p = pooled spot height and contour centroid analyses; S_C_p_s = pooled spot height and contour centroid analyses after shifting by mean distance and bearing (i.e., m and from grid North, respectively); RMS = Root Mean Square error; NSSDA = US National Standard for Spatial Data Accuracy positional accuracy estimate; this estimate is calculated as the 95% confidence interval of the RMS error. Next we define the exact area comprising the CSHC, and following this, we discuss the improvements of the ANUDEM Version 5.1 generated DEM compared to the original DEM produced with the TIN algorithm that was previously available for the CSHC. CSIRO Land and Water Page 52

60 5. Application and assessment of the ANUDEM output 5.1. Generating sub-catchments for the CSHC ANUDEM Version 5.1 was run with the best quality datasets (discussed in Section 2) and using the parameters documented in Table 10. Sub-catchments were then defined from this output DEM using the Stream Define tool that is part of the SedNet program (for full details see Wilkinson et al. 2004). From this analysis we see that the CSHC consists of 42 catchments ranging from 127 km 2 to 31,460 km 2 (total area is 112,728 km 2, Figure 15 and Table 13. Figure 15. On the main map the CSHC sub-catchment boundaries are overlaid on the resultant DEM, with each sub-catchment numbered (with additional information provided in Table13). In the inset map the CSHC location in China is represented by the shaded area. CSIRO Land and Water Page 53

61 Table 13. The 42 sub-catchments in the CSHC are listed. For the sub-catchments identified with the term River the watercourse is named, for the other small sub-catchments the rivers are unnamed on the 1:250,000 source map, so they are given the township name (from the province-county-township hierarchy used in China). Rec # Catchment Name 流域名称 Area (km 2 ) 1 Honghe River 红河 5,698 2 Lamawan 喇嘛湾 Longwanggou River 龙王沟 1,777 4 Huangfuchuan River 皇甫川 3,509 5 Yangjiachuan River 杨家川 1,114 6 Kuyehe River 窟野河 9,050 7 Pianguanhe River 偏关河 2,078 8 Qingshuichuan River 清水川 Hequ 河曲 Xianchuanhe River 县川河 1, Gushanchuan River 孤山川 1, Zhujiachuan River 朱家川 2, Baode 保德 Wudinghe River 无定河 31, Tuweihe River 秃尾河 3, Wujiazhuang 武家庄 1, Huashuta-Luzihe River 化树塔 - 芦子河 Lanyihe River 岚漪河 2, Weifenhe River 蔚汾河 1, Zhongzhuang 中川 Jialuhe River 佳芦河 1, Yangjiapu-Zhaojiaping 杨家铺 - 赵家坪 2, Qiushuihe River 湫水河 1, Nuanqushan 暖渠山 Sanchuanhe River 三川河 4, Hedi-Mutouyu 河底 - 木头峪 1, Chengjiazhuang 程家庄 Jinjiazhuang 靳家庄 YanHe River 延河 7, Qingjianhe River 清涧河 4, Lijiashan-Yanchasi 李家山 - 眼岔寺 Quchanhe River 屈产河 1, Yonghe River 雍河 2, Xinshuihe River 昕水河 4, Anhe-Guandao 安河 - 关道 382 CSIRO Land and Water Page 54

62 36 Fenchuanhe River 汾川河 1, Xigelou 西葛沟 Wencheng-Wangjiayao 文城 - 王家窑 Zhouchuan River 州川河 Shiwanghe River 仕望川 2, Ehe River 鄂河 1, Sili-Jiyizhen 寺里 - 集义镇 1,133 Total 112,728 km Comparing outputs from the ANUDEM and TIN algorithms Finally to illustrate the worth of using ANUDEM Version 5.1, over the more widely available TIN method to generate a DEM, for a selected focus area we compared several DEM derived outputs. Figure 16 shows the input data; the location of the focus area in the CSHC is given in Figure 2. As the TIN algorithm does not use the river network we used ANUDEM in two ways: (1) without the river network (to aid direct comparison with the TIN algorithm); and (2) with the river network. For both ANUDEM cases the final optimised parameters (Table 10) were used to generate the DEM. To generate the TIN, the ArcInfo TINLATTICE command was used; the following parameters were set: weed tolerance = 1, proximal_tolerance = 0.5, and no z_factor was applied. For both the ANUDEM and TIN cases we used the highest quality input data available. (a) Figure 16. Source data used for TINLATTICE and ANUDEM comparison, with (a) showing the contours and spot heights (red dots) and (b) the river network (used by ANUDEM only). This focus area is shown on Figure 2. (b) CSIRO Land and Water Page 55

63 The TIN and ANUDEM (no rivers and rivers) outputs compared are: 1. Elevation; units are m above sea level (Figure 17); 2. slope (or the 1 st derivative of elevation); units are from horizontal (Figure 18); 3. aspect (or the 1 st derivative of slope or the 2 nd derivative of elevation); units are from grid North increasing clockwise (Figure 19); 4. hillshade; the DEMs are illuminated from an azimuth of 315 from grid North (i.e., north-west) and an altitude of 45 above the horizon (Figure 20); 5. output river network derived from the DEM using an area threshold of 20 grid cells; each grid cell is 100 m x- and y-resolution (Figure 21); 6. sine of the aspect; this transformation highlights east-west structure (Figure 22); and 7. cosine of the aspect; this transformation highlights north-south structure (Figure 23). (a) (b) 1,749 m 1,210 m (c) Figure 17. Output elevation surfaces in metres above sea level for (a) TIN, (b) ANUDEM (with no rivers) and (c) ANUDEM (with rivers). The input data are shown in Figure 16. CSIRO Land and Water Page 56

64 (a) (b) 39 0 (c) Figure 18. Output slope surfaces in from horizontal for (a) TIN, (b) ANUDEM (with no rivers) and (c) ANUDEM (with rivers). The input data are shown in Figure 17. (a) (b) (c) Figure 19. Output aspect surfaces in from grid North (with North set to 0 and increasing clockwise) for (a) TIN, (b) ANUDEM (with no rivers) and (c) ANUDEM (with rivers). The input data are shown in Figure 18. CSIRO Land and Water Page 57

65 (a) (b) (c) Figure 20. Output hill shade surfaces, using azimuth = 315, altitude = 45 ) for (a) TIN, (b) ANUDEM (with no rivers) and (c) ANUDEM (with rivers). The input data are shown in Figure 17. (a) (b) (c) Figure 21. Output rivers from DEM for (a) TIN, (b) ANUDEM (with no rivers) and (c) ANUDEM (with rivers). Input rivers are shown on (d). (d) CSIRO Land and Water Page 58

66 (a) (b) 1-1 (c) Figure 22. Output sine (aspect) surfaces for (a) TIN, (b) ANUDEM (with no rivers) and (c) ANUDEM (with rivers). The input data are shown in Figure 19. (a) (b) 1-1 (c) Figure 23. Output cosine (aspect) surfaces for (a) TIN, (b) ANUDEM (with no rivers) and (c) ANUDEM (with rivers). The input data are shown in Figure 19. CSIRO Land and Water Page 59

67 The results clearly illustrate the blocky nature of resultant DEMs generated by TINLATTICE compared to those generated from ANUDEM. That is, compare (a TIN) with both (b ANUDEM no rivers) and (c ANUDEM rivers) from Figure 17 to Figure 23. The elevation in the valleys when using ANUDEM (Figure 17c) is lower than for the TIN (Figure 17a), and there is much finer structure in the two ANUDEM outputs compared to the TIN DEM. For elevation (Figure 17) and slope (Figure 18) we see that the TIN DEM is very discontinuous when compared to the outputs from ANUDEM. It appears that the TIN algorithm has great difficulty dealing with the steep gullies with relatively gentle hill tops and ridges. This is especially evident in the aspect (Figure 19), and hillshade (Figure 20) surfaces. Additionally the river network created from the TIN is least reliable; it contains many discontinuous and multiple-line rivers (Figure 21a), when compared to the two ANUDEM outputs (Figure 21b and Figure 21c). It is interesting to note that only small changes can be seen when not using the river network as input to ANUDEM (Figure 21b) compared to when the river network was used as input (Figure 21c); this indicates the high degree of control exhibited on the ANUDEM algorithm from the contour data, and reflects the complex landforms of the CSHC. However in both cases the density of the output river network is greater than that of the 1:250,000 input data (Figure 21d); this confirms our previous suspicions that the river network (especially some of the 1 st order streams) was not well captured in the original 1:250,000 paper maps that were the basis for the digital river network database compared to the contour data; first noted when discussing the input data density (Table 2). The sine of the aspect (highlighting the east-west structure (Figure 22), and the cosine of the aspect (revealing the north-south structure Figure 23) again reinforce the better representation of the terrain surface derived when using ANUDEM compared to the TIN. In addition to using the DEM to define the sub-catchments of the study area (as discussed above), the DEM will also be used to: (1) define the river network; (2) define areas contributing to measurements made at the hydrology stations located on the CSIRO Land and Water Page 60

68 river network; (3) as a covariate for interpolating some surface meteorological variables; (4) used in net radiation modelling (using the SRAD model) that takes into account slope and aspect; and (5) as a basis for re-vegetation site selection. Consequently we needed the DEM to represent the terrain as well as possible (given current data and algorithms). This was the motivating factor behind generating this fundamental dataset for the CSHC, as it underpins most subsequent spatial analysis. CSIRO Land and Water Page 61

69 6. Conclusions This report documents quality control methods and subsequent improvements made to the input data to generate a DEM, using ANUDEM Version 5.1, of the CSHC in the middle reaches of the Yellow River Basin in China. The improvement of the topographic input data quality was performed iteratively using the ANUDEM output data-files and diagnostic log-files. Additionally, careful selection of a variety of key ANUDEM parameters improved the quality of the final DEM over previous DEMs generated using less sophisticated methods. The resultant DEM has already been used to define the boundary of the study area and the 42 sub-catchments that define the CSHC. In our ACIAR project the DEM will ultimately be used to define: (1) the river network; and (2) the polygon of contributing area for each hydrology station. Additionally, the DEM will be used to: (3) ensure elevation dependence is properly captured when using ANUSPLIN (Hutchinson 2004b) to generate surfaces of monthly meteorological variables (not monthly averages) from Jan until Dec (McVicar et al. 2005); (4) model monthly surfaces of net radiation, and it shortwave and longwave incoming and outgoing components, in complex terrain taking elevation, slope and aspect into account using the SRAD model (Moore et al. 1993; Gallant 1997; Wilson and Gallant 2000); and (5) as a basis for re-vegetation site selection. Also, having access to such a high quality DEM, over previous versions, means that any future regional erosion modelling performed for the CSHC study site will be improved. The methods and experience developed here while generating the DEM for the CSHC could be used with the higher resolution contour and spot height datasets (introduced in Table 1) to generate best practice DEMs from these datasets. Given that the previous sections provided a great deal of specific detail, as part of the conclusions it is critical to reiterate the general strategy used for generating a CSIRO Land and Water Page 62

70 hydrologically correct DEM. Presenting the four general steps this facilitates technology transfer; see figure 24 and the following descriptions below. Figure 24. The four-major steps to develop, and use, a hydrologically correct DEM using the ANUDEM algorithm and best available topographic data are highlighted. 1. Data pre-processing: this step includes data acquisition, including purchasing the digital products from relevant survey or mapping agencies, digitising paper topographic maps by technicians, or the numerous other ways to obtain digital CSIRO Land and Water Page 63

Design, Development and Application of Northeast Asia Resources and Environment Scientific Expedition Data Platform

Design, Development and Application of Northeast Asia Resources and Environment Scientific Expedition Data Platform September, 2011 J. Resour. Ecol. 2011 2(3) 266-271 DOI:10.3969/j.issn.1674-764x.2011.03.010 www.jorae.cn Journal of Resources and Ecology Vol.2 No.3 NE Asia Design, Development and Application of Northeast

More information

The dynamic N1-methyladenosine methylome in eukaryotic messenger RNA 报告人 : 沈胤

The dynamic N1-methyladenosine methylome in eukaryotic messenger RNA 报告人 : 沈胤 The dynamic N1-methyladenosine methylome in eukaryotic messenger RNA 报告人 : 沈胤 2016.12.26 研究背景 RNA 甲基化作为表观遗传学研究的重要内容之一, 是指发生在 RNA 分子上不同位置的甲基化修饰现象 RNA 甲基化在调控基因表达 剪接 RNA 编辑 RNA 稳定性 控制 mrna 寿命和降解等方面可能扮演重要角色

More information

Source mechanism solution

Source mechanism solution Source mechanism solution Contents Source mechanism solution 1 1. A general introduction 1 2. A step-by-step guide 1 Step-1: Prepare data files 1 Step-2: Start GeoTaos or GeoTaos_Map 2 Step-3: Convert

More information

Comparison of Intermap 5 m DTM with SRTM 1 second DEM. Jenet Austin and John Gallant. May Report to the Murray Darling Basin Authority

Comparison of Intermap 5 m DTM with SRTM 1 second DEM. Jenet Austin and John Gallant. May Report to the Murray Darling Basin Authority Comparison of Intermap 5 m DTM with SRTM 1 second DEM Jenet Austin and John Gallant May 2010 Report to the Murray Darling Basin Authority Water for a Healthy Country Flagship Report series ISSN: 1835-095X

More information

Rigorous back analysis of shear strength parameters of landslide slip

Rigorous back analysis of shear strength parameters of landslide slip Trans. Nonferrous Met. Soc. China 23(2013) 1459 1464 Rigorous back analysis of shear strength parameters of landslide slip Ke ZHANG 1, Ping CAO 1, Rui BAO 1,2 1. School of Resources and Safety Engineering,

More information

能源化学工程专业培养方案. Undergraduate Program for Specialty in Energy Chemical Engineering 专业负责人 : 何平分管院长 : 廖其龙院学术委员会主任 : 李玉香

能源化学工程专业培养方案. Undergraduate Program for Specialty in Energy Chemical Engineering 专业负责人 : 何平分管院长 : 廖其龙院学术委员会主任 : 李玉香 能源化学工程专业培养方案 Undergraduate Program for Specialty in Energy Chemical Engineering 专业负责人 : 何平分管院长 : 廖其龙院学术委员会主任 : 李玉香 Director of Specialty: He Ping Executive Dean: Liao Qilong Academic Committee Director:

More information

通量数据质量控制的理论与方法 理加联合科技有限公司

通量数据质量控制的理论与方法 理加联合科技有限公司 通量数据质量控制的理论与方法 理加联合科技有限公司 通量变量 Rn = LE + H + G (W m -2 s -1 ) 净辐射 潜热 感热 地表热 通量 通量 通量 通量 Fc (mg m -2 s -1 ) 二氧化碳通量 τ [(kg m s -1 ) m -2 s -1 ] 动量通量 质量控制 1. 概率统计方法 2. 趋势法 3. 大气物理依据 4. 测定实地诊断 5. 仪器物理依据 '

More information

Surveying,Mapping and Geoinformation Services System for the Major Natural Disasters Emergency Management in China

Surveying,Mapping and Geoinformation Services System for the Major Natural Disasters Emergency Management in China Surveying,Mapping and Geoinformation Services System for the Major Natural Disasters Emergency Management in China 21 February 2013, Bangkok, Thailand Contents 2 1 2 3 4 Working Mechanism Geoinformation

More information

黄土丘陵区须根系作物地土壤分离季节变化研究

黄土丘陵区须根系作物地土壤分离季节变化研究 土壤 (Soils), 2016, 48(5): 1015 1021 DOI: 10.13758/j.cnki.tr.2016.05.025 1 黄土丘陵区须根系作物地土壤分离季节变化研究 1,2 1,2 (1 721013 2 721013) : (P0.75 NSE>0.74) S147 6 9 [1 4] [5 6] 1.46 10 5 km 2 22.5% 30.9%

More information

Cooling rate of water

Cooling rate of water Cooling rate of water Group 5: Xihui Yuan, Wenjing Song, Ming Zhong, Kaiyue Chen, Yue Zhao, Xiangxie Li 目录. Abstract:... 2. Introduction:... 2 2.. Statement of the problem:... 2 2.2 objectives:... 2 2.3.

More information

Integrated Algebra. Simplified Chinese. Problem Solving

Integrated Algebra. Simplified Chinese. Problem Solving Problem Solving algebraically concept conjecture constraint equivalent formulate generalization graphically multiple representations numerically parameter pattern relative efficiency strategy verbally

More information

Concurrent Engineering Pdf Ebook Download >>> DOWNLOAD

Concurrent Engineering Pdf Ebook Download >>> DOWNLOAD 1 / 6 Concurrent Engineering Pdf Ebook Download >>> DOWNLOAD 2 / 6 3 / 6 Rozenfeld, WEversheim, HKroll - Springer.US - 1998 WDuring 2005 年 3 月 1 日 - For.the.journal,.see.Conc urrent.engineering.(journal)verhagen

More information

2012 AP Calculus BC 模拟试卷

2012 AP Calculus BC 模拟试卷 0 AP Calculus BC 模拟试卷 北京新东方罗勇 luoyong@df.cn 0-3- 说明 : 请严格按照实际考试时间进行模拟, 考试时间共 95 分钟 Multiple-Choice section A 部分 : 无计算器 B 部分 : 有计算器 Free-response section A 部分 : 有计算器 B 部分 : 无计算器 总计 45 题 /05 分钟 8 题,55 分钟

More information

Measurement of accelerator neutron radiation field spectrum by Extended Range Neutron Multisphere Spectrometers and unfolding program

Measurement of accelerator neutron radiation field spectrum by Extended Range Neutron Multisphere Spectrometers and unfolding program Measurement of accelerator neutron radiation field spectrum by Extended Range Neutron Multisphere Spectrometers and unfolding program LI Guanjia( 李冠稼 ), WANG Qingbin( 王庆斌 ), MA Zhongjian( 马忠剑 ), GUO Siming(

More information

A new operational medium-range numerical weather forecast system of CHINA. NWPD/NMC/CMA (Beijing,CHINA)

A new operational medium-range numerical weather forecast system of CHINA. NWPD/NMC/CMA (Beijing,CHINA) A new operational medium-range numerical weather forecast system of CHINA NWPD/NMC/CMA (Beijing,CHINA) Organizational Chart of CMA NSMC (National Satellite Meteorological Center) NCC (National Climate

More information

Service Bulletin-04 真空电容的外形尺寸

Service Bulletin-04 真空电容的外形尺寸 Plasma Control Technologies Service Bulletin-04 真空电容的外形尺寸 在安装或者拆装真空电容时, 由于真空电容的电级片很容易移位, 所以要特别注意避免对电容的损伤, 这对于过去的玻璃电容来说非常明显, 但对于如今的陶瓷电容则不那么明显, 因为它们能够承载更高的机械的 电性能的负载及热负载 尽管从外表看来电容非常结实, 但是应当注意, 由于采用焊接工艺来封装铜和陶瓷,

More information

上海激光电子伽玛源 (SLEGS) 样机的实验介绍

上海激光电子伽玛源 (SLEGS) 样机的实验介绍 上海激光电子伽玛源 (SLEGS) 样机的实验介绍 Pan Qiangyan for SLEGS collaborators 一. 引言二. 装置布局三. 实验及其结果四. 结论 一, 引言 为建设 SLEGS 光束线提供参考和研制依据, 中科院上海应用物理研究所于 2005 年成立了以徐望研究员为组长的 SLEGS 小组, 开展 SLEGS 样机的实验工作 ; 在中科院知识创新工程方向性项目 (

More information

Hebei I.T. (Shanghai) Co., Ltd LED SPECIFICATION

Hebei I.T. (Shanghai) Co., Ltd LED SPECIFICATION Features/ 特征 : Single color/ 单色 High Power output/ 高功率输出 Low power consumption/ 低功耗 High reliability and long life/ 可靠性高 寿命长 Descriptions/ 描述 : Dice material/ 芯片材质 :AlGaAs Emitting Color/ 发光颜色 : Infrared

More information

Spatial-temporal Changes in Ecological Risk of Land Use before and after Grain-for-Green Policy in Zhengning County, Gansu Province

Spatial-temporal Changes in Ecological Risk of Land Use before and after Grain-for-Green Policy in Zhengning County, Gansu Province March, 2013 Journal of Resources and Ecology Vol.4 No.1 J. Resour. Ecol. 2013 4 (1) 036-042 DOI:10.5814/j.issn.1674-764x.2013.01.005 www.jorae.cn rticle Spatial-temporal Changes in Ecological Risk of Land

More information

Riemann s Hypothesis and Conjecture of Birch and Swinnerton-Dyer are False

Riemann s Hypothesis and Conjecture of Birch and Swinnerton-Dyer are False Riemann s Hypothesis and Conjecture of Birch and Swinnerton-yer are False Chun-Xuan Jiang. O. Box 3924, Beijing 854 China jcxuan@sina.com Abstract All eyes are on the Riemann s hypothesis, zeta and L-functions,

More information

Effects of check-dams on sediment storage-release in Chabagou Watershed

Effects of check-dams on sediment storage-release in Chabagou Watershed 第 26 卷第 2 期农业工程学报 Vol.26 No.2 64 2010 年 2 月 Transactions of the CSAE Feb. 2010 Effects of check-dams on sediment storage-release in Chabagou Watershed Zhang Luan 1,2, Shi Changxing 1, Zhang Hao 3 (1. Key

More information

三类调度问题的复合派遣算法及其在医疗运营管理中的应用

三类调度问题的复合派遣算法及其在医疗运营管理中的应用 申请上海交通大学博士学位论文 三类调度问题的复合派遣算法及其在医疗运营管理中的应用 博士生 : 苏惠荞 导师 : 万国华教授 专业 : 管理科学与工程 研究方向 : 运作管理 学校代码 : 10248 上海交通大学安泰经济与管理学院 2017 年 6 月 Dissertation Submitted to Shanghai Jiao Tong University for the Degree of

More information

d) There is a Web page that includes links to both Web page A and Web page B.

d) There is a Web page that includes links to both Web page A and Web page B. P403-406 5. Determine whether the relation R on the set of all eb pages is reflexive( 自反 ), symmetric( 对 称 ), antisymmetric( 反对称 ), and/or transitive( 传递 ), where (a, b) R if and only if a) Everyone who

More information

Modeling effects of changes in diffuse radiation on light use efficiency in forest ecosystem. Wei Nan

Modeling effects of changes in diffuse radiation on light use efficiency in forest ecosystem. Wei Nan Modeling effects of changes in diffuse radiation on light use efficiency in forest ecosystem Wei Nan 2018.05.04 1 Outline 1. Background 2. Material and methods 3. Results & Discussion 4. Conclusion 2 1

More information

A new approach to inducing Ti 3+ in anatase TiO2 for efficient photocatalytic hydrogen production

A new approach to inducing Ti 3+ in anatase TiO2 for efficient photocatalytic hydrogen production Chinese Journal of Catalysis 39 (2018) 510 516 催化学报 2018 年第 39 卷第 3 期 www.cjcatal.org available at www.sciencedirect.com journal homepage: www.elsevier.com/locate/chnjc Article (Special Issue of Photocatalysis

More information

Galileo Galilei ( ) Title page of Galileo's Dialogue concerning the two chief world systems, published in Florence in February 1632.

Galileo Galilei ( ) Title page of Galileo's Dialogue concerning the two chief world systems, published in Florence in February 1632. Special Relativity Galileo Galilei (1564-1642) Title page of Galileo's Dialogue concerning the two chief world systems, published in Florence in February 1632. 2 Galilean Transformation z z!!! r ' = r

More information

ArcGIS 10.1 for Server OGC 标准支持. Esri 中国信息技术有限公司

ArcGIS 10.1 for Server OGC 标准支持. Esri 中国信息技术有限公司 ArcGIS 10.1 for Server OGC 标准支持 Esri 中国信息技术有限公司 李光辉 DEMO OpenLayers GoogleEarth Map Services udig OWS Image Service 商业 GIS 软件 ArcGIS for Server GP Services Globe Services GeoCoding Services GeoData Services

More information

( 选出不同类别的单词 ) ( 照样子完成填空 ) e.g. one three

( 选出不同类别的单词 ) ( 照样子完成填空 ) e.g. one three Contents 目录 TIPS: 对于数量的问答 - How many + 可数名词复数 + have you/i/we/they got? has he/she/it/kuan got? - I/You/We/They have got + 数字 (+ 可数名词复数 ). He/She/It/Kuan has got + 数字 (+ 可数名词复数 ). e.g. How many sweets

More information

Characterisation of valleys from DEMs

Characterisation of valleys from DEMs 18 th World IMACS / MODSIM Congress, Cairns, Australia 13-17 July 2009 http://mssanz.org.au/modsim09 Characterisation of valleys from DEMs Wang, D. 1,2 and Laffan, S.W. 1 1. School of Biological, Earth

More information

Recovering from the Recovery

Recovering from the Recovery Recovering from the Recovery A Community-level View of Post- Earthquake Planning in the Historic Qiang Minority Ethnic Villages of Sichuan (A Report from the Field) Dan Abramson 艾丹, University of Washington

More information

QTM - QUALITY TOOLS' MANUAL.

QTM - QUALITY TOOLS' MANUAL. 1 2.4.1 Design Of Experiments (DOE) 1. Definition Experimentation is a systematic approach to answer questions and more specifically; how do changes to a system actually affect the quality function or

More information

碳酸盐岩缝洞型油藏开发关键技术. Key Petroleum Development Technologies in Fractured & Caverned Carbonate Reservoirs Illustrated by the Example of Tahe Oilfield

碳酸盐岩缝洞型油藏开发关键技术. Key Petroleum Development Technologies in Fractured & Caverned Carbonate Reservoirs Illustrated by the Example of Tahe Oilfield 碳酸盐岩缝洞型油藏开发关键技术 以塔河油田为例 Key Petroleum Development Technologies in Fractured & Caverned Carbonate Reservoirs Illustrated by the Example of Tahe Oilfield 中国石油化工股份有限公司西北油田分公司 SINOPEC Northwest Oilfield Company

More information

Solar Radiation Climatology Calculation in China

Solar Radiation Climatology Calculation in China June, 214 Journal of Resources and Ecology Vol.5 o.2 J. Resour. Ecol. 214 5 (2) 132-138 DOI:1.5814/j.issn.1674-764x.214.2.5 www.jorae.cn Article Solar Radiation Climatology Calculation in China WAG Chenliang

More information

Popular Mechanics, 1954

Popular Mechanics, 1954 Introduction to GIS Popular Mechanics, 1954 1986 $2,599 1 MB of RAM 2017, $750, 128 GB memory, 2 GB of RAM Computing power has increased exponentially over the past 30 years, Allowing the existence of

More information

Synthesis of PdS Au nanorods with asymmetric tips with improved H2 production efficiency in water splitting and increased photostability

Synthesis of PdS Au nanorods with asymmetric tips with improved H2 production efficiency in water splitting and increased photostability Chinese Journal of Catalysis 39 (2018) 407 412 催化学报 2018 年第 39 卷第 3 期 www.cjcatal.org available at www.sciencedirect.com journal homepage: www.elsevier.com/locate/chnjc Communication (Special Issue of

More information

An IntRoduction to grey methods by using R

An IntRoduction to grey methods by using R An IntRoduction to grey methods by using R Tan Xi Department of Statistics, NUFE Nov 6, 2009 2009-2-5 Contents: A brief introduction to Grey Methods An analysis of Degree of Grey Incidence Grey GM(, )

More information

Effect of lengthening alkyl spacer on hydroformylation performance of tethered phosphine modified Rh/SiO2 catalyst

Effect of lengthening alkyl spacer on hydroformylation performance of tethered phosphine modified Rh/SiO2 catalyst Chinese Journal of Catalysis 37 (216) 268 272 催化学报 216 年第 37 卷第 2 期 www.cjcatal.org available at www.sciencedirect.com journal homepage: www.elsevier.com/locate/chnjc Article Effect of lengthening alkyl

More information

RESEARCH AND APPLICATION OF THE EVAPORATION CAPACITY SPATIAL INTERPOLATION METHOD FOR AGRICULUTRAL ENVIRONMENT / 面向农业环境的蒸发量空间插值方法研究和应用

RESEARCH AND APPLICATION OF THE EVAPORATION CAPACITY SPATIAL INTERPOLATION METHOD FOR AGRICULUTRAL ENVIRONMENT / 面向农业环境的蒸发量空间插值方法研究和应用 RESEARCH AND APPLICATION OF THE EVAPORATION CAPACITY SPATIAL INTERPOLATION METHOD FOR AGRICULUTRAL ENVIRONMENT / 面向农业环境的蒸发量空间插值方法研究和应用 Ph.D. Yinlong JIN 1), Prof. Ph.D. Eng. Jiesheng HUANG 1), Ph.D. Ben

More information

基于可拓物元法的土壤重金属污染程度评价. Hg Cd. Cu Co Ni Sn V ~ N ~ E. 土壤 (Soils), 2013, 45(3): Cd Hg As Cu Pb X142 ( )

基于可拓物元法的土壤重金属污染程度评价. Hg Cd. Cu Co Ni Sn V ~ N ~ E. 土壤 (Soils), 2013, 45(3): Cd Hg As Cu Pb X142 ( ) 土壤 (Soils), 23, 45(3): 57 52 基于可拓物元法的土壤重金属污染程度评价 ( 452) CdHgAsCuPb Cr 6, X42 HgCd PbCr As Zn CuCoNiSnV Hg.5 tcu 34 tpb 5 tmn 5 tni t 4 h 2 64.8% 46.7% 9.7% 8.4% [] [2] [3] [4]. 34 45 ~ 34 57 N8 29 ~ 8

More information

On the Quark model based on virtual spacetime and the origin of fractional charge

On the Quark model based on virtual spacetime and the origin of fractional charge On the Quark model based on virtual spacetime and the origin of fractional charge Zhi Cheng No. 9 Bairong st. Baiyun District, Guangzhou, China. 510400. gzchengzhi@hotmail.com Abstract: The quark model

More information

Chapter 4. Mobile Radio Propagation Large-Scale Path Loss

Chapter 4. Mobile Radio Propagation Large-Scale Path Loss Chapter 4 Mobile Radio Propagation Large-Scale Path Loss The mobile radio channel places fundamental limitations on the performance. The transmission path between the T-R maybe very complexity. Radio channels

More information

Numerical Analysis in Geotechnical Engineering

Numerical Analysis in Geotechnical Engineering M.Sc. in Geological Engineering: Subject No. 8183B2 Numerical Analysis in Geotechnical Engineering Hong-Hu ZHU ( 朱鸿鹄 ) School of Earth Sciences and Engineering, Nanjing University www.slope.com.cn Lecture

More information

2012 Typhoon Activity Prediction

2012 Typhoon Activity Prediction 2012 Typhoon Activity Prediction Published by Shanghai Typhoon Institute of China Meteorological Administration 4 May 2012 Prediction of 2012 Northwest Pacific Basin and South China Sea Tropical Cyclone

More information

A new approach for fast calculation of sloped terrace earthwork based on GIS in the hilly regions

A new approach for fast calculation of sloped terrace earthwork based on GIS in the hilly regions A new approach for fast calculation of sloped terrace earthwork based on GIS in the hilly regions Qingchun Zhang 1 1 Land Consolidation and Rehabilitation Center, the Ministry of Land and Resources; 1

More information

系统生物学. (Systems Biology) 马彬广

系统生物学. (Systems Biology) 马彬广 系统生物学 (Systems Biology) 马彬广 通用建模工具 ( 第十四讲 ) 梗概 (Synopsis) 通用建模工具 ( 数学计算软件 ) 专用建模工具 ( 细胞生化体系建模 ) 通用建模工具 主要是各种数学计算软件, 有些是商业软件, 有些是自由软件 商业软件, 主要介绍 : MatLab, Mathematica, Maple, 另有 MuPAD, 现已被 MatLab 收购 自由软件

More information

课内考试时间? 5/10 5/17 5/24 课内考试? 5/31 课内考试? 6/07 课程论文报告

课内考试时间? 5/10 5/17 5/24 课内考试? 5/31 课内考试? 6/07 课程论文报告 课内考试时间? 5/10 5/17 5/24 课内考试? 5/31 课内考试? 6/07 课程论文报告 Testing Hypotheses and Assessing Goodness of Fit Generalized likelihood ratio tests The likelihood ratio test is optimal for simple vs. simple hypotheses.

More information

Fabrication of ultrafine Pd nanoparticles on 3D ordered macroporous TiO2 for enhanced catalytic activity during diesel soot combustion

Fabrication of ultrafine Pd nanoparticles on 3D ordered macroporous TiO2 for enhanced catalytic activity during diesel soot combustion Chinese Journal of Catalysis 39 (2018) 606 612 催化学报 2018 年第 39 卷第 4 期 www.cjcatal.org available at www.sciencedirect.com journal homepage: www.elsevier.com/locate/chnjc Communication (Special Issue on

More information

GRE 精确 完整 数学预测机经 发布适用 2015 年 10 月考试

GRE 精确 完整 数学预测机经 发布适用 2015 年 10 月考试 智课网 GRE 备考资料 GRE 精确 完整 数学预测机经 151015 发布适用 2015 年 10 月考试 20150920 1. n is an integer. : (-1)n(-1)n+2 : 1 A. is greater. B. is greater. C. The two quantities are equal D. The relationship cannot be determined

More information

Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and

Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and private study only. The thesis may not be reproduced elsewhere

More information

沙强 / 讲师 随时欢迎对有机化学感兴趣的同学与我交流! 理学院化学系 从事专业 有机化学. 办公室 逸夫楼 6072 实验室 逸夫楼 6081 毕业院校 南京理工大学 电子邮箱 研 究 方 向 催化不对称合成 杂环骨架构建 卡宾化学 生物活性分子设计

沙强 / 讲师 随时欢迎对有机化学感兴趣的同学与我交流! 理学院化学系 从事专业 有机化学. 办公室 逸夫楼 6072 实验室 逸夫楼 6081 毕业院校 南京理工大学 电子邮箱 研 究 方 向 催化不对称合成 杂环骨架构建 卡宾化学 生物活性分子设计 沙强 / 讲师 随时欢迎对有机化学感兴趣的同学与我交流! 院系 理学院化学系 从事专业 有机化学 学历 博士研究生 学位 博士 办公室 逸夫楼 6072 实验室 逸夫楼 6081 毕业院校 南京理工大学 电子邮箱 qsha@njau.edu.cn 研 究 方 向 催化不对称合成 杂环骨架构建 卡宾化学 生物活性分子设计 研究方向汇总图个人简介 2010 年毕业于南京理工大学制药工程专业, 获得工学学士学位,

More information

Digital Image Processing. Point Processing( 点处理 )

Digital Image Processing. Point Processing( 点处理 ) Digital Image Processing Point Processing( 点处理 ) Point Processing of Images In a digital image, point = pixel. Point processing transforms a pixel s value as function of its value alone; it it does not

More information

Principia and Design of Heat Exchanger Device 热交换器原理与设计

Principia and Design of Heat Exchanger Device 热交换器原理与设计 Principia and Design of Heat Exchanger Device 热交换器原理与设计 School of Energy and Power Engineering, SDU Presented: 杜文静 E-mail: wjdu@sdu.edu.cn Telephone: 88399000-511 1. Spiral heat exchanger 螺旋板式热交换器 basic

More information

Properties Measurement of H ZZ* 4l and Z 4l with ATLAS

Properties Measurement of H ZZ* 4l and Z 4l with ATLAS Properties Measurement of H ZZ* 4l and Z 4l with ATLAS Haijun Yang (Shanghai Jiao Tong University) LHC mini-workshop Zhejiang University, HangZhou, China November 8-11, 2014 1 Outline o Discovery of the

More information

国际数值预报现状和发展 沈学顺 中国气象局数值预报中心

国际数值预报现状和发展 沈学顺 中国气象局数值预报中心 国际数值预报现状和发展 沈学顺 中国气象局数值预报中心 提纲 背景介绍 国际数值预报现状和水平 未来发展 一 背景介绍 What is Numerical Weather Prediction? The technique used to obtain an objective forecast of the future weather (up to possibly two weeks) by

More information

USTC SNST 2014 Autumn Semester Lecture Series

USTC SNST 2014 Autumn Semester Lecture Series USTC SNST 2014 Autumn Semester Lecture Series Title: Introduction to Tokamak Fusion Energy Nuclear Science and Technology Research and Development (R&D) L8 A: Putting it all together: the box and thinking

More information

Tsinghua-Berkeley Shenzhen Institute (TBSI) PhD Program Design

Tsinghua-Berkeley Shenzhen Institute (TBSI) PhD Program Design 1. SCOPE Tsinghua-Berkeley Shenzhen Institute (TBSI) PhD Program Design (Approved in June, 2018, Applicable to Class 2018) This Ph.D. program is applicable for all doctoral students (including the international

More information

A highly efficient flower-like cobalt catalyst for electroreduction of carbon dioxide

A highly efficient flower-like cobalt catalyst for electroreduction of carbon dioxide Chinese Journal of Catalysis 39 (2018) 914 919 催化学报 2018 年第 39 卷第 5 期 www.cjcatal.org available at www.sciencedirect.com journal homepage: www.elsevier.com/locate/chnjc Article A highly efficient flower-like

More information

Atomic & Molecular Clusters / 原子分子团簇 /

Atomic & Molecular Clusters / 原子分子团簇 / Atomic & Molecular Clusters / 原子分子团簇 / 王金兰 Email: jlwang@seu.edu.cn Department of Physics Southeast University What is nanometer? Nano is Small (10-7 --10-9 m; 1-100 nm) 10 0 m 10-1 m 10-2 m 10-3 m 10-4

More information

Chinese Journal of Applied Entomology 2014, 51(2): DOI: /j.issn 信息物质的化学分析技术 黄翠虹 , ; 2.

Chinese Journal of Applied Entomology 2014, 51(2): DOI: /j.issn 信息物质的化学分析技术 黄翠虹 , ; 2. Chinese Journal of Applied Entomology 204, 5(2): 586 590. DOI: 0.7679/j.issn.2095 353.204.069 信息物质的化学分析技术 * 李静静 雷彩燕 黄翠虹 2 周琳 闫凤鸣 **., 450002; 2., 528333 摘要 - GC-MS HPLC GC-MS 关键词 - Chemical analysis techniques

More information

Firms and People in Place

Firms and People in Place Firms and People in Place Driving Forces for Regional Growth Wenjuan Li Doctoral Thesis Department of Social and Economic Geography Umeå University, Sweden GERUM 2007:1 GERUM Kulturgeografi 2007:1 This

More information

进化树构建方法的概率方法 第 4 章 : 进化树构建的概率方法 问题介绍. 部分 lid 修改自 i i f l 的 ih l i

进化树构建方法的概率方法 第 4 章 : 进化树构建的概率方法 问题介绍. 部分 lid 修改自 i i f l 的 ih l i 第 4 章 : 进化树构建的概率方法 问题介绍 进化树构建方法的概率方法 部分 lid 修改自 i i f l 的 ih l i 部分 Slides 修改自 University of Basel 的 Michael Springmann 课程 CS302 Seminar Life Science Informatics 的讲义 Phylogenetic Tree branch internal node

More information

Remote Sensing Classification of Marsh Wetland with Different Resolution Images

Remote Sensing Classification of Marsh Wetland with Different Resolution Images March, 2016 Journal of Resources and Ecology Vol. 7 No.2 J. Resour. Ecol. 2016 7(2) 107-114 DOI: 10.5814/j.issn.1674-764x.2016.02.005 www.jorae.cn Article Remote Sensing Classification of Marsh Wetland

More information

Science EOG Review: Landforms

Science EOG Review: Landforms Mathematician Science EOG Review: Landforms Vocabulary Definition Term canyon deep, large, V- shaped valley formed by a river over millions of years of erosion; sometimes called gorges (example: Linville

More information

个人简历 冯新龙 : 男, 中共党员, 理学博士, 教授, 博士生导师通信地址 : 新疆大学数学与系统科学学院邮编 :830046

个人简历 冯新龙 : 男, 中共党员, 理学博士, 教授, 博士生导师通信地址 : 新疆大学数学与系统科学学院邮编 :830046 个人简历 冯新龙 : 男, 中共党员, 理学博士, 教授, 博士生导师通信地址 : 新疆大学数学与系统科学学院邮编 :830046 Email: fxlmath@gmail.com 或 fxlmath@xju.edu.cn 研究领域 : 复杂流体的可计算建模与高效算法研究 科学计算与不确定性量化 计算流体力学 保险精算等 1. 学习经历 1994.09-1998.07 新疆大学数学与系统科学学院,

More information

2. The lattice Boltzmann for porous flow and transport

2. The lattice Boltzmann for porous flow and transport Lattice Boltzmann for flow and transport phenomena 2. The lattice Boltzmann for porous flow and transport Li Chen XJTU, 2016 Mail: lichennht08@mail.xjtu.edu.cn http://gr.xjtu.edu.cn/web/lichennht08 Content

More information

0-12H VSR forecasting and nowcasting review and plan in CMA

0-12H VSR forecasting and nowcasting review and plan in CMA 0-12H VSR forecasting and nowcasting review and plan in CMA Xiaoling Zhang, Bo Yang, Yongguang Zheng, Jie Sheng, Yinjing Lin, Wenyuan Tang, Kanghui Zhou National Meteorological Center, China Meteorological

More information

NR402 GIS Applications in Natural Resources

NR402 GIS Applications in Natural Resources NR402 GIS Applications in Natural Resources Lesson 1 Introduction to GIS Eva Strand, University of Idaho Map of the Pacific Northwest from http://www.or.blm.gov/gis/ Welcome to NR402 GIS Applications in

More information

Introduction-Overview. Why use a GIS? What can a GIS do? Spatial (coordinate) data model Relational (tabular) data model

Introduction-Overview. Why use a GIS? What can a GIS do? Spatial (coordinate) data model Relational (tabular) data model Introduction-Overview Why use a GIS? What can a GIS do? How does a GIS work? GIS definitions Spatial (coordinate) data model Relational (tabular) data model intro_gis.ppt 1 Why use a GIS? An extension

More information

X 射线和 γ 射线天文观测 王俊贤 中国科技大学天体物理中心

X 射线和 γ 射线天文观测 王俊贤 中国科技大学天体物理中心 X 射线和 γ 射线天文观测 王俊贤 中国科技大学天体物理中心 Introduction Cherenkov Telescope Detectors A brief history of X-ray astronomy X-ray targets Imaging technique X-ray observatories Future Cosmic X-ray Background (CXB) High

More information

General Physics I. Lecture 22: More Twists on Space and Time. Prof. WAN, Xin ( 万歆 )

General Physics I. Lecture 22: More Twists on Space and Time. Prof. WAN, Xin ( 万歆 ) General Physics I Lecture 22: More Twists on Space and Time Prof. WAN, Xin ( 万歆 ) xinwan@zju.edu.cn http://zimp.zju.edu.cn/~xinwan/ Outline The equivalence principle The consequences of general relativity

More information

Synthesis of anisole by vapor phase methylation of phenol with methanol over catalysts supported on activated alumina

Synthesis of anisole by vapor phase methylation of phenol with methanol over catalysts supported on activated alumina Chinese Journal of Catalysis 37 (216) 72 726 催化学报 216 年第 37 卷第 5 期 www.cjcatal.org available at www.sciencedirect.com journal homepage: www.elsevier.com/locate/chnjc Article Synthesis of anisole by vapor

More information

PROANA A USEFUL SOFTWARE FOR TERRAIN ANALYSIS AND GEOENVIRONMENTAL APPLICATIONS STUDY CASE ON THE GEODYNAMIC EVOLUTION OF ARGOLIS PENINSULA, GREECE.

PROANA A USEFUL SOFTWARE FOR TERRAIN ANALYSIS AND GEOENVIRONMENTAL APPLICATIONS STUDY CASE ON THE GEODYNAMIC EVOLUTION OF ARGOLIS PENINSULA, GREECE. PROANA A USEFUL SOFTWARE FOR TERRAIN ANALYSIS AND GEOENVIRONMENTAL APPLICATIONS STUDY CASE ON THE GEODYNAMIC EVOLUTION OF ARGOLIS PENINSULA, GREECE. Spyridoula Vassilopoulou * Institute of Cartography

More information

LI Yong (1,2), FRIELINGHAUS Monika (1), BORK Hans-Rudolf (1), WU Shuxia (2), ZHU Yongyi (2)

LI Yong (1,2), FRIELINGHAUS Monika (1), BORK Hans-Rudolf (1), WU Shuxia (2), ZHU Yongyi (2) Scientific registration n : Symposium n : 31 Presentation : poster Spatial patterns of soil redistribution and sediment delivery in hilly landscapes of the Loess Plateau Motifs spaciaux de zones d'érosion

More information

复合功能 VZθ 执行器篇 Multi-Functional VZθActuator

复合功能 VZθ 执行器篇 Multi-Functional VZθActuator 篇 Multi-Functional VZθActuator VZθ 系列 VZθ Series 应用 KSS 微型滚珠丝杆花键 (BSSP), 在同一产品里实现直线运动 (z), 旋转 (θ), 吸附 (Vacuum) 功能的模组化产品 The brand new products which applied the KSS miniature Ball Screw with Ball Spline

More information

Study on property and deterioration of whole boned bolt in heat-harm tunnel

Study on property and deterioration of whole boned bolt in heat-harm tunnel Study on the Anti-corrosion Properties of HPC in Contrasting Seasonal Change Environment Study on property and deterioration of whole boned bolt in heat-harm tunnel Dr. Fuhai LI A Prof Southwest Jiaotong

More information

Ultrasonic synthesis of CoO/graphene nanohybrids as high performance anode materials for lithium ion batteries

Ultrasonic synthesis of CoO/graphene nanohybrids as high performance anode materials for lithium ion batteries Trans. Nonferrous Met. Soc. China 22(2012) 2517 2522 Ultrasonic synthesis of CoO/graphene nanohybrids as high performance anode materials for lithium ion batteries CHEN Bing di 1, 2, PENG Cheng xin 1,

More information

Explainable Recommendation: Theory and Applications

Explainable Recommendation: Theory and Applications Explainable Recommendation: Theory and Applications Dissertation Submitted to Tsinghua University in partial fulfillment of the requirement for the degree of Doctor of Philosophy in Computer Science and

More information

Quantitative Measurement of Urban Expansion and Its Driving Factors in Qingdao: An Empirical Analysis Based on County Unit Data

Quantitative Measurement of Urban Expansion and Its Driving Factors in Qingdao: An Empirical Analysis Based on County Unit Data May, 2015 Journal of Resources and Ecology Vol.6 o.3 J. Resour. Ecol. 2015 6 (3) 172-179 DOI:10.5814/j.issn.1674-764x.2015.03.006 www.jorae.cn Article Quantitative Measurement of Urban Expansion and Its

More information

偏微分方程及其应用国际会议在数学科学学院举行

偏微分方程及其应用国际会议在数学科学学院举行 1 偏微分方程及其应用国际会议在数学科学学院举行 2007 年 5 月 28 日至 31 日, 偏微分方程及其应用国际会议 (International Conference on PDEs and Applications) 在北京师范大学数学科学学院举行 国际著名数学家, 世界数学家大会一小时报告人, 美国科学院院士,University of Texas at Austin 教授 Luis Caffarelli

More information

A proof of the 3x +1 conjecture

A proof of the 3x +1 conjecture A proof of he 3 + cojecure (Xjag, Cha Rado ad Televso Uversy) (23..) Su-fawag Absrac: Fd a soluo o 3 + cojecures a mahemacal ool o fd ou he codo 3 + cojecures gve 3 + cojecure became a proof. Keywords:

More information

The preload analysis of screw bolt joints on the first wall graphite tiles in East

The preload analysis of screw bolt joints on the first wall graphite tiles in East The preload analysis of screw bolt joints on the first wall graphite tiles in East AO ei( 曹磊 ), SONG Yuntao( 宋云涛 ) Institute of plasma physics, hinese academy of sciences, Hefei 230031, hina Abstract The

More information

Establishment and data analysis of sea-state monitoring system along Taiwan coast

Establishment and data analysis of sea-state monitoring system along Taiwan coast Vol. 14 No. 1 Marine Science Bulletin May 2012 Establishment and data analysis of sea-state monitoring system along Taiwan coast FENG Xiang-bo 1,2, WANG Hao 1,2, YAN Yi-xin 1,2 1. Key Laboratory of Coastal

More information

ASSESSING THE QUALITY OF OPEN ACCESS JOURNALS

ASSESSING THE QUALITY OF OPEN ACCESS JOURNALS ASSESSING THE QUALITY OF OPEN ACCESS JOURNALS 审核开放获取期刊的质量 S E M I N A R A T C H I N A O P E N A C C E S S W E E K O C T O B E R 1 9, 2 0 1 6, B E I J I N G T O M @ D O A J. O R G E D I T O R - I N - C

More information

Institute of Geographic Sciences and Natural Resources Research, Chinese Academy of Sciences ( IGSNRR, CAS )

Institute of Geographic Sciences and Natural Resources Research, Chinese Academy of Sciences ( IGSNRR, CAS ) Institute of Geographic Sciences and Natural Resources Research, Chinese Academy of Sciences ( IGSNRR, CAS ) Outlines Overview Facilities Research Divisions and Their Achievements 1. OVERVIEW History Institute

More information

Zinc doped g C3N4/BiVO4 as a Z scheme photocatalyst system for water splitting under visible light

Zinc doped g C3N4/BiVO4 as a Z scheme photocatalyst system for water splitting under visible light Chinese Journal of Catalysis 39 (218) 472 478 催化学报 218 年第 39 卷第 3 期 www.cjcatal.org available at www.sciencedirect.com journal homepage: www.elsevier.com/locate/chnjc Article (Special Issue of Photocatalysis

More information

Analysis on the Runoff and Sediment Yielding of 7.26 Rainstorm in 2017 in the Dali River Basin

Analysis on the Runoff and Sediment Yielding of 7.26 Rainstorm in 2017 in the Dali River Basin Analysis on the Runoff and Sediment Yielding of 7.26 Rainstorm in 217 in the Dali River Basin WenYong Gao, ShuangYan Jin and ShaoMeng Guo (Yellow River Institute of Hydrology and Water Resources, Zhengzhou

More information

Remote Sensing Applications in Agricultural Statistics at China NBS. Yu Xinhua Department of Rural Surveys, National Bureau of Statistics(NBS)

Remote Sensing Applications in Agricultural Statistics at China NBS. Yu Xinhua Department of Rural Surveys, National Bureau of Statistics(NBS) Remote Sensing Applications in Agricultural Statistics at China NBS Yu Xinhua Department of Rural Surveys, National Bureau of Statistics(NBS) Outline Introduction Remote Sensing Measurement Area Frame

More information

Workshop on Numerical Partial Differential Equations and Scientific Computing

Workshop on Numerical Partial Differential Equations and Scientific Computing Workshop on Numerical Partial Differential Equations and Scientific Computing On the occasion of Prof. Houde Han's 80th Birthday Department of Mathematical Sciences Tsinghua University May 27-28, 2017

More information

Chapter 22 Lecture. Essential University Physics Richard Wolfson 2 nd Edition. Electric Potential 電位 Pearson Education, Inc.

Chapter 22 Lecture. Essential University Physics Richard Wolfson 2 nd Edition. Electric Potential 電位 Pearson Education, Inc. Chapter 22 Lecture Essential University Physics Richard Wolfson 2 nd Edition Electric Potential 電位 Slide 22-1 In this lecture you ll learn 簡介 The concept of electric potential difference 電位差 Including

More information

Integrating non-precious-metal cocatalyst Ni3N with g-c3n4 for enhanced photocatalytic H2 production in water under visible-light irradiation

Integrating non-precious-metal cocatalyst Ni3N with g-c3n4 for enhanced photocatalytic H2 production in water under visible-light irradiation Chinese Journal of Catalysis 4 (219) 16 167 催化学报 219 年第 4 卷第 2 期 www.cjcatal.org available at www.sciencedirect.com journal homepage: www.elsevier.com/locate/chnjc Article Integrating non-precious-metal

More information

Microbiology. Zhao Liping 赵立平 Chen Feng. School of Life Science and Technology, Shanghai Jiao Tong University

Microbiology. Zhao Liping 赵立平 Chen Feng. School of Life Science and Technology, Shanghai Jiao Tong University 1896 1920 1987 2006 Microbiology By Zhao Liping 赵立平 Chen Feng 陈峰 School of Life Science and Technology, Shanghai Jiao Tong University http://micro.sjtu.edu.cn 1896 1920 1987 2006 Preface : Introduction

More information

Global and Regional Precipitation Measurement and Applications

Global and Regional Precipitation Measurement and Applications Global and Regional Precipitation Measurement and Applications Yang Hong ( 洪阳 ) 清华大学土木水利学院. 水利水电工程系. 水文水资源所 http://hydrosky.org; hongyang@tsinghua.edu.cn 美国国家天气中心 - 遥感水文气象实验室 (http://hydro.ou.edu) Global

More information

ENGRG Introduction to GIS

ENGRG Introduction to GIS ENGRG 59910 Introduction to GIS Michael Piasecki March 17, 2014 Lecture 08: Terrain Analysis Outline: Terrain Analysis Earth Surface Representation Contour TIN Mass Points Digital Elevation Models Slope

More information

澳作生态仪器有限公司 叶绿素荧光测量中的 PAR 测量 植物逆境生理生态研究方法专题系列 8 野外进行荧光测量时, 光照和温度条件变异性非常大 如果不进行光照和温度条件的控制或者精确测量, 那么荧光的测量结果将无法科学解释

澳作生态仪器有限公司 叶绿素荧光测量中的 PAR 测量 植物逆境生理生态研究方法专题系列 8 野外进行荧光测量时, 光照和温度条件变异性非常大 如果不进行光照和温度条件的控制或者精确测量, 那么荧光的测量结果将无法科学解释 叶绿素荧光测量中的 PAR 测量 植物逆境生理生态研究方法专题系列 8 野外进行荧光测量时, 光照和温度条件变异性非常大 如果不进行光照和温度条件的控制或者精确测量, 那么荧光的测量结果将无法科学解释 Yield can vary significantly with light level and with temperature. Without controlling irradiation

More information

三系杂交棉花粉育性对高温和低温胁迫的反应. Reaction of Pollen Fertility to High or Low Temperature Stresses in CMS-Based Hybrid Cotton 邵明彦 1 张海平 张昭伟 朱云国 袁淑娜 1

三系杂交棉花粉育性对高温和低温胁迫的反应. Reaction of Pollen Fertility to High or Low Temperature Stresses in CMS-Based Hybrid Cotton 邵明彦 1 张海平 张昭伟 朱云国 袁淑娜 1 作物学报 ACTA AGRONOMICA SINICA 2009, 35(): 2085 2090 http://www.chinacrops.org/zwxb/ ISSN 0496-3490; CODEN TSHPA9 E-mail: xbzw@chinajournal.net.cn DOI: 0.3724/SP.J.006.2009.02085 三系杂交棉花粉育性对高温和低温胁迫的反应 倪密刘英新

More information

Happy Niu Year 牛年快乐 1

Happy Niu Year 牛年快乐 1 Happy Niu Year 牛年快乐 1 Celebrating in Style 庆新年 Happy Niu Year 牛年快乐 Read the text below and do the activity that follows. 阅读下面的短文, 然后完成练习 : 2008 is now finally in the past as millions of Chinese people

More information

The East Asian summer monsoon and impact of snow cover over HTP

The East Asian summer monsoon and impact of snow cover over HTP 中国气象科学研究院 Chinese Academy of Meteorological Sciences ISSI meeting The East Asian summer monsoon and impact of snow cover over HTP Congwen Zhu Feb.2017 Bejing Outline East Asian Summer Monsoon Seasonal

More information

猪发酵床废弃垫料不同配比基质对辣椒生长及品质的影响

猪发酵床废弃垫料不同配比基质对辣椒生长及品质的影响 土壤 (Soils), 2017, 49(6): 1100 1107 DOI: 10.13758/j.cnki.tr.2017.06.005 1 猪发酵床废弃垫料不同配比基质对辣椒生长及品质的影响 * ( / 210014) (WD) ( ph EC ) T8 (WD.... =9.. 2.. 6) T7(WD.... =9.. 4.. 4) T8 T9(WD.. =9.. 5) ph EC T7

More information

Impact of DEM Resolution on Topographic Indices and Hydrological Modelling Results

Impact of DEM Resolution on Topographic Indices and Hydrological Modelling Results Impact of DEM Resolution on Topographic Indices and Hydrological Modelling Results J. Vaze 1, 2 and J. Teng 1, 2 1 Department of Water and Energy, NSW, Australia 2 ewater Cooperative Research Centre, Australia

More information