Fact Sheet. Goldcorp Tailings Stewardship and Construction Methods. Background

Size: px
Start display at page:

Download "Fact Sheet. Goldcorp Tailings Stewardship and Construction Methods. Background"

Transcription

1 Fact Sheet Goldcorp Stewardship and Construction Methods Background are created as mined ore is processed into particles of fine sand through crushing, grinding and milling. Mined ore rock is moved to the milling circuit where the rock is reduced into sand and silt sized particles and then mixed with water and moved as slurry through the gold, silver and copper recovery process. The valuable minerals are separated from the rest of the milled rock particles either through physical or chemical recovery processes. After removing the valuable minerals, the remaining milled rock slurry, now referred to as tailings, is pumped or flows by gravity to an engineered impoundment area. Hollinger Management Area Stewardship Goldcorp s Stewardship Program was initiated in as part of our commitment to the safe and environmentally responsible development, operation and management of tailings storage facilities and to minimize risks by ensuring good practices are implemented at all Goldcorp tailings storage facilities and qualifying water dams. The program is based on regulatory requirements, incorporates industry best practices and Goldcorp s desire to be an industry leader in our sustainability practices. Construction Methods Upstream Upstream embankment construction begins with developing a starter dyke. The tailings are then discharged from the dam crest and form the foundation for future raises. The downstream dam toe remains fixed for the life of the facility and the dam centerline moves upstream. Figure 1 shows an overview of the construction stages. stewardship is designed to identify issues and concerns, manage liabilities, identify opportunities for operational efficiency, provide input into design, construction, operation and mine closure, educate operators, improve data management, provide a standardized review process, and prepare for upsets. stewardship applies to all tailings dams, and qualifying water dams defined as dams exceeding three (3) metres high or storing more than 100,000 m3 of liquid. Figure 1: Upstream construction method

2 Stewardship (continued) All active Goldcorp tailings dams and qualifying water dams have a Steward and an Engineer of Record (EoR), and all inactive tailings dams still storing water also have a Steward. All but one inactive tailings site also have EoRs, and the final site is being assigned an EoR in Dam Safety Inspections (DSI) are performed annually and separately by the Steward and by the EoR. Construction Methods Downstream Downstream dam construction begins with an impervious starter dyke and normally includes an internal drainage system as shown on Figure 2. The tailings are first deposited behind the dyke and the embankment is raised overtime. Both the dam centerline and downstream toe move further downstream with each subsequent raise. Each DSI group performs their reviews independently and publishes and submits separate reports. EoRs submit their reports to site, and Stewards submit their reports to Corporate. Dam Safety Reviews (DSR), a much more intensive effort, are performed every 5 years for all dams by the Stewards. Risk Assessments are updated annually supported by the Stewards and the EoRs for every dam. Summary reports are provided to each site and corrective actions are reviewed. Goldcorp recognizes tailings management as a significant issue shared by the company and the company s stakeholders. Goldcorp s aim is to manage tailings in a manner that effectively mitigates environmental, public health and safety, and community impacts while maintaining the long-term security of the tailings facility and sustainable land use options. The company assesses risks associated with tailings facilities (including physical and chemical risks), assesses alternatives to select site-appropriate technology and location for facilities, and applies good practices to manage those risks, such that tailings facilities are located, designed, constructed, operated and closed in a manner so that: facilities are managed commensurate with the risks they pose, with the objectives of preventing performance failures and meeting environmental requirements All solids and water are managed within designated areas that meet design intent All aspects of tailings management comply with regulatory requirements and conform to sound engineering practice, company standards, tailings management framework, and commitments to communities of interest including Indigenous groups. Figure 2: Downstream construction method Centerline The centerline method builds upon previous dam raises and only a portion of each raise is supported by tailings. Unlike the upstream method, the majority of dam fill is downstream of the tailings and the dam toe continues to progress downstream. The dam centerline remains fixed. The embankment is raised vertically and any internal drainage can be maintained as shown on Figure 3. Modified centerline is a combination of upstream and centerline methods and is done to reduce the volume of construction material that is required to be placed downstream from the embankment. at Cerro Negro Figure 3: Centerline construction method

3 Musselwhite RLGM - Red Lake Complex Ontario RLGM - Campbell Complex PGM - Dome No. 6 TMA Goldcorp (Active) Cerro Negro Santa Cruz, Argentina Peñasquito Zacatecas, México Company Site Name & Location Qualifying Dam Structure Type Raise Methodology Description North Dam dam Centerline Coarse tailings zone upstream and a downstream rock fill shell West Dam dam Centerline Coarse tailings zone upstream and a downstream rock fill shell South Dam dam Centerline Coarse tailings zone upstream and a downstream rock fill shell Max Dam Height (m) Most Recent DSI 90 August 2018 Fresh Water Storage Pond Water dam Geomembrane lined compacted clay fill, horse-shoe shaped dam August 2018 Most Recent DSR November November Nearest Downstream Town or receiving water Las Mesas Chile Colorado Pit EoR Golder Total Qualifying * Impoundments Dam 1 /water dam Downstream Zoned earthfill dam lined with bituminous geomembrane 38 October 2018 Dam 2 dam Downstream lined with bituminous geomembrane Dam 3 Seepage pond dam for Downstream lined with bituminous geomembrane 8 October 2018 dam 1 Dam 4 Seepage pond dam for Downstream lined with bituminous geomembrane 7 October 2018 dam 2 Pileta de Tratamiento de Aguas Water Ring dike shaped earthfill dam 8 October 2018 residuales Pileta Construccion Water Ring dike shaped earthfill dam with geomembrane liner 4 October 2018 Pileta 0 Pileta 1 Pileta 2 2 to 4 October 2018 Pileta 3 Pileta 4 Pileta Superior Pileta Inferior 4 to 8 October 2018 Pileta Emergencias Lodos E1 E2 2 to 10 October 2018 E3 E4 E5 North Dam Perimeter dam/water retaining Downstream Zoned earthfill dam with geomembrane barrier East Dam Perimeter dam Downstream with geomembrane barrier South Dam Perimeter dam Centerline transition to with geomembrane barrier downstream 33 June 2018 August South Dam Extension Perimeter dam Downstream with geomembrane barrier West Dam Perimeter dam Downstream with geomembrane barrier Separator Dyke Internal Structure South Dam /water dam Modified Centerline Coarse tailings zone upstream and a downstream zoned earth fill. West Dam /water dam Modified Centerline Coarse tailings zone upstream and a downstream zoned earth fill. North West Dam /water dam Centerline Zoned earth fill. September North Dam /water dam Modified Centerline Zoned earth fill June 2018 Settling/Polishing Pond Dykes Water/sedimentation dam Downstream Primary Clear Water Pond Water Secondary Clear Water Pond Water North Dam /water dam Modified Centerline Coarse tailings zone upstream and a downstream zoned earth fill. East End Dam /water dam Modified Centerline Coarse tailings zone upstream and a downstream zoned earth fill. Splitter Dyke 1 /water dam Downstream Zoned earthfill dam September Splitter Dyke 2 /water dam Downstream Zoned earthfill dam 15 June 2018 Primary Pond Dam /water dam Zoned earthfill dam Secondary Pond (North and South) /water dam Modified Centerline Coarse tailings zone upstream and a downstream zoned earth fill. Dam A Perimeter dam Centerline Zoned earthfill dam Dam B Perimeter dam Centerline Zoned earthfill dam Dam C Perimeter dam Centerline Zoned earthfill dam Dam D Perimeter dam Centerline Zoned earthfill dam 15 Dam E Perimeter dam Centerline Zoned earthfill dam Dam F Perimeter dam Centerline Zoned earthfill dam July 2018 October Dam G Perimeter dam Centerline Zoned earthfill dam Discharge Dykes dam Internal upstream within perimeter dams Permeter dams encircle tailings discharge dykes - internal compacted tailings sand lifts 10 Polishing Pond Dam Water dam Centerline Zoned earthfill dam 3 - Timmins - South Porcupine - Porcupine Lake - Balmertown - Red Lake, 6km south west - Balmertown - Red Lake, 6km south west - Opapimiskan Lake - Zeemel Lake - Lake 282 Stantec BGC AMEC AMEC Golder Total Grand Total (with inactive)

4 Cocheno ur Aunor A Pamour T3 McIntyre Goldcorp (Inactive) Dome 2A Ontario, Dome 2 Dome 1 Dona Lake Equity British Columbia, Broulan Reef Marlin San Marcos, Guatemala Company Site Name & Location Qualifying Dam Structure Type Raise Methodology Description Dam max Height (m) Most Recent DSI Most Recent DSR Nearest Downstream Town or receiving water TSF Main Dam /water dam Downstream Zoned earthfill dam TSF East Saddle Dam /water dam Downstream Zoned earthfill dam 82.5 Sediment Dyke 1 Downstream Rockfill dam 15 - San Jose Ixcaniche Stantec August 2018 July - Aldea Siete Platos Sediment Dyke 2 Downstream Rockfill dam 5 - Rio Cuilco Cochis Sediment Pond Downstream Rockfill dam 10 North Dam dam Butressed Upstream Coarse tailings East Dam dam Butressed Upstream Coarse tailings South Dam dam Butressed Upstream Coarse tailings 20 June Timmins KCB West Dam dam Butressed Upstream Coarse tailings Dam No. 1 /water dam Downstream transition to Coarse Taililngs/Earthfill + Coarse centerline 61 Dam No. 2 /water dam Centerline Earthfill/Coarse Taililngs - Houston August Lu Lake Dam No. 1 Seepage pond dam Water dam Downstream Rockfill dam KCB Diversion Dam /water dam Centerline Earthfill/Coarse Taililngs 38 EoR Total Qualifying Impoundments Dam C Water Centerline Earthfill/Coarse Taililngs Dyke 3 dam Upstream Coarse tailings 15 June 2018 February Pickle Lake KCB NW Starter Dam dam Upstream Coarse tailings North Dam dam Upstream Coarse tailings West Dam dam Upstream Coarse tailings South Dam dam Upstream Coarse tailings East Dam dam Upstream Coarse tailings 24 June 2018 June Timmins KCB 5 5 North dam Upstream Coarse tailings South dam Upstream Coarse tailings 21 June 2018 June Timmins KCB North dam Upstream Coarse tailings East dam Upstream Coarse tailings South dam Upstream Coarse tailings Dam 1 dam Upstream Coarse tailings ERG dam Dam 2 dam Upstream Coarse tailings Dam 3 dam Upstream Rock & Coarse tailings Dam 4 dam Dam 5 dam Upstream Coarse tailings Northwest Extension dam Upstream Coarse tailings North & Northwest Dam dam Upstream Coarse tailings West Dam dam Upstream Coarse tailings South Dam dam Upstream Coarse tailings East & Southeast Dam dam Upstream Coarse tailings Splitter Dyke dam Upstream Coarse tailings Perimeter Dam dam Upstream Coarse tailings Perimeter Dam dam Upstream Coarse tailings Perimeter Dam dam Upstream Coarse tailings Perimeter Dam dam Upstream Coarse tailings Dam #3 dam Centerline Earthfill/Coarse Taililngs South Dam dam Centerline Earthfill/Coarse Taililngs Dam #2 dam Earthfill/Coarse Taililngs North Dam dam Centerline Earthfill/Coarse Taililngs 21 June 2018 June Timmins KCB 3 3 June 2018 May Timmins - Porcupine River Golder June 2018 May Timmins KCB June Timmins Golder June Town of Cochenour - Red Lake Total

5 Cautionary Note Regarding Forward-Looking Statements This press release contains "forward-looking statements" within the meaning of Section 27A of the United States Securities Act of 1933, as amended, Section 21E of the United States Exchange Act of 1934, as amended, the United States Private Securities Litigation Reform Act of 1995, or in releases made by the United States Securities and Exchange Commission, all as may be amended from time to time, and "forward-looking information" under the provisions of applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of Goldcorp. Forward-looking statements include, but are not limited to, statements relating to expected synergies and pre-tax Net Asset Value estimates of the Nevada Joint Venture; the potential for additional Tier One assets; the expected impact on the value of Newmont's planned acquisition of Goldcorp; the expected terms, timing and closing of the proposed transaction, including receipt of required approvals and satisfaction of other customary closing conditions; estimates of future production, including expected annual production range and reserve base; estimates of future capital expenditures; and expectations of future plans and benefits. Generally, these forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "believes", or variations or comparable language of such words and phrases or statements that certain actions, events or results "may", "could", "would", "should", "might" or "will", "occur" or "be achieved" or the negative connotation thereof. Forward-looking statements are necessarily based upon a number of factors and assumptions that, if untrue, could cause the actual results, performances or achievements of Goldcorp to be materially different from future results, performances or achievements expressed or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which Goldcorp will operate in the future, including the price of gold, anticipated costs and ability to achieve goals. Certain important factors that could cause actual results, performances or achievements to differ materially from those in the forward-looking statements include, among others, delays or failure to obtain the required approvals; competitive responses to the announcement of the transaction; litigation or challenges to the proposed transaction; changes to the current scientific and technical information; permitting, development, operations and expansion of Barrick's, Newmont's and Goldcorp's operations and projects being consistent with current expectations and mine plans, including without limitation receipt of export approvals; planning and integration assumptions; gold price volatility, discrepancies between actual and estimated production, mineral reserves and mineral resources and metallurgical recoveries, mining operational and development risks, litigation risks, regulatory restrictions (including environmental regulatory restrictions and liability), changes in national and local government legislation, taxation, controls or regulations and/or change in the administration of laws, policies and practices, expropriation or nationalization of property and political or economic developments in, the United States and other jurisdictions in which the Company does or may carry on business in the future, delays, suspension and technical challenges associated with capital projects, higher prices for fuel, steel, power, labour and other consumables, currency fluctuations, the speculative nature of gold exploration, the global economic climate, dilution, share price volatility, competition, loss of key employees, additional funding requirements and defective title to mineral claims or property. Although Goldcorp believes its expectations are based upon reasonable assumptions and has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Forward-looking statements are subject to known and unknown risks, uncertainties and other important factors that may cause the actual results, level of activity, performance or achievements of Goldcorp to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: the inherent uncertainty associated with financial or other projections; the prompt and effective integration of Newmont's and Goldcorp's businesses; the ability to achieve the anticipated synergies and value-creation contemplated by the proposed transaction and the Nevada Joint Venture; the risk associated with Newmont's and Goldcorp's ability to obtain the approval of the proposed transaction by their shareholders required to consummate the proposed transaction and the timing of the closing of the proposed transaction, including the risk that the conditions to the transaction are not satisfied on a timely basis or at all and the failure of the transaction to close for any other reason; the risk that a consent or authorization that may be required for the proposed transaction is not obtained or is obtained subject to conditions that are not anticipated; the outcome of any legal proceedings that may be instituted against the parties and others related to the arrangement agreement; unanticipated difficulties or expenditures relating to the transaction, the response of business partners and retention as a result of the announcement and pendency of the transaction; risks relating to the value of the Newmont's common stock to be issued in connection with the transaction; the anticipated size of the markets and continued demand for Newmont's and Goldcorp's resources and the impact of competitive responses to the announcement of the transaction; and the diversion of management time on transaction-related issues as well as those factors discussed in the section entitled "Description of the Business Risk Factors" in Goldcorp's most recent annual information form available on SEDAR at and on EDGAR at Although Goldcorp has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Forward-looking statements are made as of the date hereof and, accordingly, are subject to change after such date. Except as otherwise indicated by Goldcorp, these statements do not reflect the potential impact of any non-recurring or other special items or of any disposition, monetization, merger, acquisition, other business combination or other transaction that may be announced or that may occur after the date hereof. Forward-looking statements are provided for the purpose of providing information about management's current expectations and plans and allowing investors and others to get a better understanding of Goldcorp's operating environment. Goldcorp does not intend or undertake to publicly update any forward-looking statements that are included in this document, whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws.

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina TSX-V: MSR August 17, 2016 Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina Program features preliminary test of Epithermal Au-Ag Vein

More information

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO TORONTO, ONTARIO - (April 21, 2015) - McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to announce drill results that we expect will

More information

V Sample from C.O.D vein 15 metres southwest of V

V Sample from C.O.D vein 15 metres southwest of V TSX-V: GGX Gold Drop Property Multiple Gold Bearing Rock Samples including 19.6 g/t Gold at Historic C.O.D Shaft And 14.1 g/t Gold at New Vein Showing Greenwood BC Vancouver, British Columbia June 8, 2017

More information

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia NEWS RELEASE TSX: ELD NYSE: EGO September 6, 2016 Eldorado Announces Drilling Results from KMC Project, Serbia VANCOUVER, BC, September 6, 2016 Eldorado Gold Corporation, ( Eldorado or the Company ) is

More information

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

Junior Uranium explorer in the Athabasca Basin. Patterson Claims Junior Uranium explorer in the Athabasca Basin Patterson Claims Cautionary Note Regarding Forward-Looking Statements This Presentation and the exhibits attached herein contain forward-looking statements

More information

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER 122.7 METRES March 1, 2012, Toronto, Ontario, Canada: Lexam VG Gold Inc. (TSX: LEX), (FRANKFURT: VN3A), (OTCQX:

More information

MCEWEN MINING ANNOUNCES ATTRACTIVE INTERCEPTS AT THE SAN JOSÉ MINE IN ARGENTINA

MCEWEN MINING ANNOUNCES ATTRACTIVE INTERCEPTS AT THE SAN JOSÉ MINE IN ARGENTINA MCEWEN MINING ANNOUNCES ATTRACTIVE INTERCEPTS AT THE SAN JOSÉ MINE IN ARGENTINA TORONTO, ONTARIO February 13, 2012 McEwen Mining Inc. (NYSE & TSX: MUX) is pleased to announce high- grade and exceptionally

More information

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24%

More information

Detour Gold Reports Drilling Results from Lower Detour

Detour Gold Reports Drilling Results from Lower Detour December 17, 2015 NEWS RELEASE Detour Gold Reports Drilling Results from Lower Detour Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports final results from its 2015 summer drilling

More information

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER 22.84 METRES AND 12.15% ZINC+LEAD OVER 17.00 METRES AT PINE POINT (Montreal November 19, 2018) Osisko Metals Incorporated (the Company or Osisko Metals )

More information

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3. August 2, 2011 AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND 26.39 G/T Au OVER 3.0 METRES Toronto, Ontario -- Avion Gold Corporation

More information

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling: TSX: RMX OTCQX: RBYCF Rubicon Minerals Provides Additional Drill Results and Observations from its 2017 Exploration Program and Commences Exploratory Underground Development TORONTO, Ontario, November

More information

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY February 5, 2018, Toronto, Ontario Troilus Gold Corp. (TSX- V: TLG) ( Troilus or the Company ) is pleased to announce the commencement

More information

Asmara Mining Conference

Asmara Mining Conference 2014 BISHA MINING EXPLORATION An OVERVIEW Asmara Mining Conference October 1 st, 2014 Rob Foy BMSC Exploration Manager FORWARD LOOKING STATEMENTS This Presentation contains forward-looking statements within

More information

MCEWEN MINING ANNOUNCES NEW SILVER DISCOVERY AT THE EL GALLO COMPLEX IN MEXICO

MCEWEN MINING ANNOUNCES NEW SILVER DISCOVERY AT THE EL GALLO COMPLEX IN MEXICO MCEWEN MINING ANNOUNCES NEW SILVER DISCOVERY AT THE EL GALLO COMPLEX IN MEXICO TORONTO, ONTARIO March 13, 2012 McEwen Mining Inc. (NYSE & TSX: MUX) is pleased to announce new exploration drill results

More information

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO Toronto, Ontario and Vancouver, British Columbia Minera Alamos

More information

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX 555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M7 604.998.4175 June 13, 2017 SBB NR-17-12 SBB TSX SABINA GOLD & SILVER INTERCEPTS LLAMA MINERALIZATION 300 METERS DOWN PLUNGE OF CURRENT RESOURCE Deposit

More information

GoviEx completes acquisition of African Energy s Zambian uranium assets

GoviEx completes acquisition of African Energy s Zambian uranium assets October 30, 2017 GoviEx completes acquisition of African Energy s Zambian uranium assets VANCOUVER, CANADA GoviEx Uranium Inc. (TSX-V: GXU; OTCQB: GVXXF) ( GoviEx ) announced today the completion of its

More information

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT NEWS RELEASE NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT June 25, 2018: NGEx Resources Inc. (TSX: NGQ) (Nasdaq Stockholm: NGQ) ( NGEx or the Company ) is pleased to report encouraging copper-gold

More information

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project September 24, 2018 News Release Release #15 2018 Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project Vancouver, B.C. Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) ("Monument"

More information

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program NEWS RELEASE September 17, 2018 TSX and NASDAQ: MPVD Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program Toronto and New York, September 17, 2018 Mountain

More information

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES TORONTO, ON September 18, 2017 INV Metals ( INV Metals or Company ) (TSX: INV) is very pleased

More information

Interval (meters) To (meters)

Interval (meters) To (meters) 200 Burrard Street, Suite 650 Tel: 604.801.5432 Vancouver, BC V6C 3L6 Fax: 604.662.8829 TSX-V: VG NEWS RELEASE Shallow RC drilling at the WAMA property returns intervals of 4m @ 30.57 g/t Au, 3m @ 19.39

More information

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program NEWS RELEASE May 23, 2018 TSX and NASDAQ: MPVD Mountain Province Diamonds Completes the Kennady North Winter Exploration Program Toronto and New York, May 23, 2018 Mountain Province Diamonds Inc. ( Mountain

More information

News Release. Infill Drilling Program

News Release. Infill Drilling Program TSX:RMX NYSE.MKT:RBY News Release January 7, 2015 Rubicon s Infill Drilling Program Confirms Continuity and Grade of the F2 Deposit and Continues to Encounter High-Grade Mineralization in Sparsely Drilled

More information

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS NEWS RELEASE OA GOLD REPORTS CONTINUED SUCCESS AT GSS May 26, 2014 Orca Gold Inc. (TSX.V:ORG) ( Orca or the Company ) is pleased to provide an update on exploration at its Galat Sufar South ( GSS ) prospect

More information

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East NEWS RELEASE 11/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Highlights: Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East Near-surface intercept grading 3.2 g/t Au over 45.5

More information

Prophecy: Pacamayo, Paca North and El Abra Return Anomalous Silver, Zinc, Lead and Antimony Assay Results

Prophecy: Pacamayo, Paca North and El Abra Return Anomalous Silver, Zinc, Lead and Antimony Assay Results Prophecy: Pacamayo, Paca North and El Abra Return Anomalous Silver, Zinc, Lead and Antimony Assay Results Vancouver, British Columbia, August 27, 2015 Prophecy Development Corp. ( Prophecy or the Company

More information

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold October 8, 2015 News Release 15-24 Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold Vancouver, British Columbia October 8, 2015; Pretium Resources Inc. (TSX/NYSE:PVG) ( Pretivm or

More information

Goldcrest Resources Ltd.

Goldcrest Resources Ltd. Goldcrest Resources Ltd. PRESS RELEASE Goldcrest Announces Results from its 1,385 Metre RC Drilling Program at the Kampti Gold Project in Burkina Faso Toronto, ON - January 25, 2007 -- Goldcrest Resources

More information

September 24, 2012 #

September 24, 2012 # Suite 1250 999 West Hastings Street Vancouver BC Canada V6C 2W2 Phone 1-778-724-4700 Fax 1-604-558-4700 September 24, 2012 #2012-23 Midas Gold Reports Significant Results from Infill & Step-out Drilling

More information

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres NEWS RELEASE 07/2017 Symbol: TSX-V: PRB Shares Issued: 93,328,938 Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

More information

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia Suite 3114, 1055 Dunsmuir Street Four Bentall Centre Vancouver, BC V7X 1G4 tel 604 488 0822 toll free 866 488 0822 fax 604 899 1240 web www.tigray.ca email investors@tigray.ca NEWS RELEASE Tigray Intersects

More information

Los Chapitos- Copper/Silver Project

Los Chapitos- Copper/Silver Project Los Chapitos- Copper/Silver Project October 2, 2017 CAUTIONARY STATEMENT Disclaimer: The information contained herein, while obtained from sources which we believe are reliable, is not guaranteed as to

More information

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia Bellhaven Announces Updated NI 43-101 Mineral Resource for La Mina Project, Colombia Vancouver, B.C. October 24, 2016. Bellhaven Copper & Gold Inc. (TSX-Venture: BHV) ( Bellhaven or the Company ) is pleased

More information

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine North American Palladium Announces Positive Exploration Results from Lac des Iles Mine Toronto, Ontario, October 24, 2017 North American Palladium Ltd. ( NAP or the Company ) (TSX: PDL) (OTC PINK: PALDF)

More information

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT

More information

DRILLING FURTHER EXTENDS MINERALIZATION AT EXETER S CASPICHE GOLD-COPPER PORPHYRY PROJECT IN CHILE

DRILLING FURTHER EXTENDS MINERALIZATION AT EXETER S CASPICHE GOLD-COPPER PORPHYRY PROJECT IN CHILE For Immediate Release: NR 09-01 DRILLING FURTHER EXTENDS MINERALIZATION AT EXETER S CASPICHE GOLD-COPPER PORPHYRY PROJECT IN CHILE Vancouver, B.C., January 13, 2009 - Exeter Resource Corporation (AMEX:XRA,

More information

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION May

More information

IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL

IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL TORONTO, May 21, 2013 IAMGOLD Corporation ( IAMGOLD or the Company ) today announced additional drilling results

More information

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) 998-4175 Tel: (888) 648-4218 www.sabinagoldsilver.com March 6, 2018 SBB NR 18-05 SBB TSX Sabina Gold & Silver Reports 2018

More information

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15. NEWS RELEASE 10/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over

More information

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE High-grade, visible-gold mineralization intersected 120 metres ( m ) down-plunge of Swan Zone Inferred Mineral Resource and 210

More information

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 27.96 GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS RESULTS FROM

More information

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT. 202-930 West First Street, North Vancouver, B.C. 604.998.4175 July 31, 2014 SBB NR-14-10 SBB TSX SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT. 2014 Drilling confirms

More information

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag Golden, Colorado /Globe Newswire/ July 12, 2018 Golden Minerals Company (NYSE American and

More information

- CHU PROJECT - MOLYBDENUM IN THE NECHAKO PLATEAU

- CHU PROJECT - MOLYBDENUM IN THE NECHAKO PLATEAU - CHU PROJECT - MOLYBDENUM IN THE NECHAKO PLATEAU THIS PRESENTATION CONTAINS CERTAIN FORWARD-LOOKING STATEMENTS, WHICH INCLUDE ESTIMATES, FORECASTS, AND STATEMENTS AS TO MANAGEMENT S EXPECTATION WITH RESPECT

More information

Photo: Jean Laforest, Qiqavik Property, Nunavik

Photo: Jean Laforest, Qiqavik Property, Nunavik Photo: Jean Laforest, Qiqavik Property, Nunavik Kuujjuaq Mining Workshop April 2016 Cautionary Statements Concerning Forward-Looking Statements This presentation contains "forward-looking information"

More information

Press Release Thunder Bay: August 2, 2018

Press Release Thunder Bay: August 2, 2018 Press Release Thunder Bay: August 2, 2018 PREMIER GOLD CONFIRMS NEW HIGH-GRADE EXTENSIONS AT MERCEDES Drill results include 21.95 m at 36.65 g/t Au and 171.30 g/t Ag PREMIER GOLD MINES LIMITED ( Premier

More information

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura July 11, 2016 News Release Release 15-2016 Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura Vancouver, B.C., July 11, 2016, Monument Mining Limited (TSX-V: MMY and FSE: D7Q1)

More information

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND 65 Queen Street West Suite 815 Toronto, Ontario Canada M5H 2M5 QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND Toronto, Ontario January 8th, 2019 - QMX Gold

More information

POSITIVE RESULTS FROM FIRST PHASE OF CORE DRILLING AT JEFFERSON PROJECT, SOUTH CAROLINA FOR NEAR-SURFACE GOLD MINERALIZATION

POSITIVE RESULTS FROM FIRST PHASE OF CORE DRILLING AT JEFFERSON PROJECT, SOUTH CAROLINA FOR NEAR-SURFACE GOLD MINERALIZATION NEWS RELEASE FOR IMMEDIATE RELEASE TSX Venture Exchange Symbol: FIX POSITIVE RESULTS FROM FIRST PHASE OF CORE DRILLING AT JEFFERSON PROJECT, SOUTH CAROLINA FOR NEAR-SURFACE GOLD MINERALIZATION VANCOUVER,

More information

HIGHLIGHTS INCLUDE: ^ Includes 466g/t Au Includes 153g/t Au + Includes 45.3g/t Au

HIGHLIGHTS INCLUDE: ^ Includes 466g/t Au Includes 153g/t Au + Includes 45.3g/t Au Atlantic Gold Announces Additional Drill Results From Resource Extension Drilling At The Cochrane Hill Gold Deposit HIGHLIGHTS INCLUDE: COCHRANE HILL GOLD DEPOSIT 11m @ 43.65 g/t Au from 227m^ 7m @ 23.69

More information

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written

More information

Fortuna Updates Reserves and Resources

Fortuna Updates Reserves and Resources Fortuna Updates Reserves and Resources Vancouver, February 22, 2018-- Fortuna Silver Mines, Inc. (NYSE: FSM) (TSX: FVI) is pleased to report updated Mineral Reserve and Mineral Resource estimates as of

More information

Coeur Mining Provides Silvertip Exploration Update

Coeur Mining Provides Silvertip Exploration Update Coeur Mining Provides Silvertip Exploration Update Positive results include 6.0 meters (19.7 feet) at 925.7 g/t (27.0 oz/t) silver, 16.0% zinc and 15.2% lead, or (2,076.9 g/t (60.6 oz/t) AgEq 1 ) in Discovery

More information

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Continues to Expand Gold Zones At Val-d Or East NEWS RELEASE 02/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742 Highlights: Probe Metals Continues to Expand Gold Zones At Val-d Or East New Beliveau Deposit resource expansion drilling to the West returned

More information

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP TORONTO, March 20 th, 2012 Belo Sun Mining Corp. (TSX:BSX) (the "Company" or "Belo

More information

Kelly Creek Basin. EXPLORATION UPDATE June 23, Reno Office 10 Greg Street, Suite 170 Sparks, Nevada

Kelly Creek Basin. EXPLORATION UPDATE June 23, Reno Office 10 Greg Street, Suite 170 Sparks, Nevada Kelly Creek Basin EXPLORATION UPDATE June 23, 2016 Reno Office 10 Greg Street, Suite 170 Sparks, Nevada 89431 775-359-7740 Vancouver Office 1500 885 West Georgia Street Vancouver, B.C. V6C 3E8 604-601-2006

More information

Highlights from the four holes announced in this news release include:

Highlights from the four holes announced in this news release include: November 20, 2017 OTCQB: SVBL, TSX: SVB SILVER BULL INTERSECTS 9 METERS OF SULPHIDE MINERALIZATION GRADING 20.7% ZINC, 1% LEAD AND 98G/T SILVER, INCLUDING 3.65 METERS OF MASSIVE SULPHIDE MINERALIZATION

More information

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release CANARC RESOURCE CORP. 810-625 Howe Street Vancouver, BC V6C 2T6 T: 604.685.9700 F: 604.6685-9744 www.canarc.net CCM: TSX CRCUF: OTCQX News Release Canarc Intersects Significant Gold Mineralization in First

More information

QUITO PROJECT. December Northwest Mining Association Annual Conference. Austin, Nevada BVA:TSX.V BRT: FSE

QUITO PROJECT. December Northwest Mining Association Annual Conference. Austin, Nevada BVA:TSX.V BRT: FSE QUITO PROJECT Austin, Nevada December 2011 Northwest Mining Association Annual Conference Forward-looking Statement Some of the statements contained in this presentation may be deemed forward-looking statements.

More information

Wallbridge Completes Successful Initial Drill Program at Beschefer

Wallbridge Completes Successful Initial Drill Program at Beschefer Wallbridge Completes Successful Initial Drill Program at Beschefer Toronto, Ontario December 17, 2018 Wallbridge Mining Company Limited (TSX:WM, FWB:WC7) ( Wallbridge or the Company ) is pleased to announce

More information

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE 257.2 metres with 0.53% Cu, 1.20 g/t Au, and 1.59 g/t Ag (1.19% Cu Eq or 2.39 g/t Au Eq) including 54.5 metres with 1.34% Cu,

More information

For personal use only

For personal use only 1 ASX: BRW Drilling for Exploration Success Building an Australian Base Metal Company Resources Rising Stars 27 September 2011 David Hutton, Managing Director Disclaimer 2 Certain oral and written statements

More information

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND PRESS RELEASE CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND Confirmed Continuity of High-Grade Zinc Zone and Addition of Gold to the Expanded Copper Zone Montreal, March

More information

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties NEWS RELEASE Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties Toronto, Ontario, March 1, 2018 Orford Mining Corporation ( Orford ) (TSX-V:

More information

Pacific Empire Minerals Provides Copper King RC Drilling Results

Pacific Empire Minerals Provides Copper King RC Drilling Results Pacific Empire Minerals Provides Copper King RC Drilling Results November 1, 2018 - Vancouver, BC, Canada - Pacific Empire Minerals Corp. (TSXV: PEMC) ( Pacific Empire, PEMC or the Company ), a hybrid

More information

MCEWEN MINING EXPANSION DRILLING INTERSECTS 0.53% COPPER OVER 351 METERS AT THE LOS AZULES PROJECT

MCEWEN MINING EXPANSION DRILLING INTERSECTS 0.53% COPPER OVER 351 METERS AT THE LOS AZULES PROJECT MCEWEN MINING EXPANSION DRILLING INTERSECTS 0.53% COPPER OVER 351 METERS AT THE LOS AZULES PROJECT TORONTO, ONTARIO - (May 10, 2012) - McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) announces that expansion

More information

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending June 17, 2015 NYSE-MKT: SVBL, TSX: SVB SILVER BULL IDENTIFIES NEW MASSIVE SULPHIDE MINERALIZATION GRADING 690G/T SILVER, 1% COPPER, 4.8% LEAD AND 15.25% ZINC AT THE SIERRA MOJADA PROJECT, COAHUILA, MEXICO.

More information

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C Form 6-K

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C Form 6-K UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 Form 6-K REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934 For the month

More information

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT TORONTO, January 28 th, 2013 Belo Sun Mining Corp. (TSX:BSX) reports assays for 86 additional drill holes (corresponding

More information

Details of the NI compliant mineral resource estimate are as follows. Total Inferred 7,603,

Details of the NI compliant mineral resource estimate are as follows. Total Inferred 7,603, ADEX ANNOUNCES NI 43-101 COMPLIANT INDICATED MINERAL RESOURCE ESTIMATE OF 10.88 MILLION TONNES FOR THE NORTH ZONE S TIN-INDIUM-ZINC DEPOSIT AT MOUNT PLEASANT Toronto April 6, 2009 Adex Mining Inc. ( Adex

More information

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013 A New Direction Copper-Gold Deposit at Thor August 11, 2016 May 2013 TSX.V:COL FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements for

More information

North American Palladium Provides Update on Lac des Iles Exploration Program

North American Palladium Provides Update on Lac des Iles Exploration Program North American Palladium Provides Update on Lac des Iles Exploration Program 4/5/2018 TORONTO, April 05, 2018 (GLOBE NEWSWIRE) -- North American Palladium Ltd. ("NAP" or the "Company") (TSX:PDL) (OTC PINK:PALDF)

More information

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein May 17, 2011 PROSPERO INTERSECTS 781 g/t Ag, 1.2% Cu, 4.1% Zn OVER 2.62 METERS; DISCOVERS NEW ZINC RICH CANAL ZONE AT SAN LUIS DEL CORDERO PROJECT, MEXICO Vancouver, B.C. - Prospero Silver Corp. (TSX VENTURE:

More information

Carlin Gold. Exploring Nevada. Carlin Gold Corporation CGD:TSXV

Carlin Gold. Exploring Nevada.   Carlin Gold Corporation CGD:TSXV Carlin Gold Exploring Nevada Carlin Gold Corporation Forward Looking Statements Forward looking statements: This presentation contains certain forward-looking information within the meaning of Canadian

More information

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT 65 Queen Street West CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT July 6, 2011 Crocodile Gold Corp. (TSX:CRK) (OTCQX:CROCF) (Frankfurt:XGC) (

More information

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project Sudbury, July 27, 2017 Canadian Gold Miner Corp ( CGM, the Company) and Transition Metals Corp. (XTM TSX.V,

More information

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold Wallbridge Options 100% of the Beschefer Project near Fenelon Gold Toronto, Ontario October 17, 2018 Wallbridge Mining Company Limited (TSX:WM, FWB: WC7) ( Wallbridge or the Company ) is pleased to announce

More information

CAUTIONARY STATEMENT

CAUTIONARY STATEMENT AUGUST 2018 RLG CAUTIONARY STATEMENT Some of the statements contained in this presentation are forward-looking statements. Such forward-looking statements involve known and unknown risks, uncertainties

More information

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au SAN GOLD CORPORATION TSX: SGR OTCQX: SGRCF FOR IMMEDIATE RELEASE October 15, 2014 San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au WINNIPEG, MANITOBA

More information

Bringing Nevada Expertise to the Yukon

Bringing Nevada Expertise to the Yukon Bringing Nevada Expertise to the Yukon February 2012 FORWARD LOOKING STATEMENTS Forward looking statements: This presentation contains certain forward-looking information within the meaning of Canadian

More information

CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING

CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING TORONTO, ONTARIO (June 12, 2013) McEwen Mining Inc. (NYSE:

More information

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia 1,000-Metre Diamond Drill Program to Test Alacran Porphyry and Northern Extension Targets

More information

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT TORONTO, July 24 th, 2013 Belo Sun Mining Corp. (TSX:BSX) has received assays for 74 additional drill holes (corresponding

More information

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses July 15, 2015 News Release 15-13 Valley of the Kings Underground Infill Drilling Progresses Vancouver, British Columbia July 15, 2015; Pretium Resources Inc. (TSX/NYSE:PVG) ( Pretivm or the Company ) is

More information

A LEADING CANADIAN GOLD EXPLORATION AND DEVELOPMENT COMPANY

A LEADING CANADIAN GOLD EXPLORATION AND DEVELOPMENT COMPANY A LEADING CANADIAN GOLD EXPLORATION AND DEVELOPMENT COMPANY May 2018 WWW.OSISKOMINING.COM TSX:OSK CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION This presentation (the "Presentation") contains

More information

MINISTRY OF ENERGY AND MINES Mines and Mineral Resources. REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act)

MINISTRY OF ENERGY AND MINES Mines and Mineral Resources. REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act) MINISTRY OF ENERGY AND MINES Mines and Mineral Resources REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act) Name of Property: Permit No.: M-203 General Manager: Company:

More information

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project. Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project. Vancouver, British Columbia, July 6, 2018 Blox, Inc. (OTCQB: BLXX), ( Blox or the Company ) is pleased to announce that a new

More information

AVINO SILVER & GOLD MINES LTD.

AVINO SILVER & GOLD MINES LTD. AVINO SILVER & GOLD MINES LTD. T 604.682.3701 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P1 www.avino.com August 14, 2017 NYSE-MKT: ASM TSX-V: ASM FSE: GV6 AVINO ANNOUNCES

More information

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East June 18, 2018 News Release 18-07 Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East Vancouver, British Columbia, June 18, 2018; Pretium Resources Inc. (TSX/NYSE:PVG)

More information

A Leading Canadian Gold Exploration and Development Company

A Leading Canadian Gold Exploration and Development Company A Leading Canadian Gold Exploration and Development Company April 2018 Cautionary Statement Regarding Forward-Looking Information This presentation (the "Presentation") contains "forward-looking information"

More information

GROWTH OPTIMIZATION INNOVATION PEOPLE

GROWTH OPTIMIZATION INNOVATION PEOPLE Bulgaria Brownfields Exploration: Krumovgrad DPM Exploration April 3, 2015 Kupel North GROWTH OPTIMIZATION INNOVATION PEOPLE Forward Looking Statements This presentation contains forward looking information

More information

MCEWEN MINING BLACK FOX EXPLORATION NEWS

MCEWEN MINING BLACK FOX EXPLORATION NEWS MCEWEN MINING BLACK FOX EXPLORATION NEWS TORONTO, July 25, 2018 - McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) reports additional encouraging exploration results from its ongoing $15 million exploration program

More information

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL Ascot Resources Ltd. Suite 1550-505 Burrard St. Vancouver, B.C., V7X 1M5 T: 778-725-1060 F: 778-725-1070 TF: 855-593-2951 www.ascotgold.com For Immediate Release NR18.17 DRILLING AT ASCOT S PREMIER PROPERTY

More information

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres NEWS RELEASE 23/2016 Symbol: TSX-V: PRB Shares Issued: 85,458,906 Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres Toronto, December 6,

More information

NEWS RELEASE. March 22, 2017

NEWS RELEASE. March 22, 2017 NEWS RELEASE March 22, 2017 Ashanti Gold Announces Remaining Drill Results from Anumso, Highlight intersections include 9m @ 1.60g/t, 4m @ 1.73g/t and 3m @ 4.95g/t VANCOUVER, BC 03/22/2017 Ashanti Gold

More information

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East NEWS RELEASE 06/2017 Symbol: TSX-V: PRB Shares Issued: 92,851,188 Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East Toronto, March 6, 2017 PROBE METALS INC. (TSX-V: PRB)

More information

Suite West Hastings Street Vancouver BC CANADA V6C 2W2 Tel: Fax:

Suite West Hastings Street Vancouver BC CANADA V6C 2W2 Tel: Fax: Suite 1250 999 West Hastings Street Vancouver BC CANADA V6C 2W2 Tel: 1.778.724.4700 Fax: 1.604.558.4700 December 12, 2011 #2011 20 Midas Gold Reports Discovery of New Mineralized Zones at its Golden Meadows

More information