1 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street STORMWATER REPORT February 2017 CPH Project No. W C W. 23rd Street Panama City, FL Phone (850) Fax (850) Yvonne Paguada, P.E

2 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street Stormwater Management System Design Report i TABLE OF CONTENTS DESCRIPTION PAGE/SECTION 1. INTRODUCTION DESIGN CRITERIA...1 Flood Zone Classification...1 Design Storm Event...1 Water Quality...2 Dry Retention Design ENGINEERING ANALYSIS MODELING PARAMETERS...4 Curve Numbers...4 Time of Concentration...4 Soil conditions for Recovery Analysis HYDRAULIC/HYDROLOGIC MODELING...5 Drainage System Connectivity EXISTING CONDITION PROPOSED CONDITION SUMMARY...8 LIST OF TABLES DESCRIPTION PAGE Table 1: Summary of Existing Soils...4 Table 2: Summary of Peak Flow Rates to FDOT ROW, S.R. 85 TW...8 Table 3: Summary of Peak Flow Rates to Okaloosa Co. ROW, N.E.C. Inlet TW..8 Table 4: Summary of Peak Stages...8 LIST OF FIGURES DESCRIPTION FIGURE Aerial Map... Figure 1 W13900

3 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street Stormwater Management System Design Report ii USGS Map... Figure 2 FEMA Map... Figure 3 Soils Map... Figure 4 Pre-Development Drainage Basin Map... Figure 5 Post-Development Drainage Basin Map... Figure 6 LIST OF APPENDICES: Design Calculations Pre- and Post- Development Basin Parameters... Appendix A Pre-Development ICPR Input Data and Storm Routing Results... Appendix B Post-Development ICPR Input Data and Storm Routing Results... Appendix C Ponds Recovery Analysis Input Data and Results... Appendix D W13900

4 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street Stormwater Management System Design Report 1. INTRODUCTION A new Wal-mart Shopping Center is proposed to be located at the Northeast corner of S.R. 85 and South Street in Ft. Walton Beach, Okaloosa County, Florida (refer to Figure 1, Location Map). The proposed improvements will consist of an approx. 43,032 SF Wal-mart grocery store, fuel station, parking, utilities, and a stormwater management system to support the proposed improvements. The total property area is approx acres. The property is bound to the west by Eglin Parkway/S.R. 85, to the south by South St., to the east by Middle Drive, and to the north by First Avenue. There is an existing commercial business at the southeast corner of Eglin Parkway/S.R. 85 and First Avenue that will remain. Wal-mart will be the owner and operating and maintenance entity for the stormwater management system. Stormwater review/approval is required by the Northwest Florida Water Management District (NWFWMD), City of Ft. Walton Beach, FDOT, and Okaloosa County. Accordingly, the proposed stormwater management system for this project is designed to meet the NWFWMD, City of Ft. Walton Beach, FDOT, and Okaloosa County stormwater requirements. 2. DESIGN CRITERIA 2.1 Flood Zone Classification The entire property area is identified as Zone X by the 2002 FEMA Panel 12091C0461H, which is areas outside the 100-year floodplain. Please see attached Figure 3 for reference. 2.2 Design Storm Event The stormwater runoff from the proposed site will be collected through on-site inlets and pipes and conveyed to a system of stormtech chambers designed below the parking lot, and 2 proposed dry retention ponds; as delineated on the basin maps included in this report and the attached plans. The project does not lie within a sensitive karst area. Per NWFWMD requirements, since the proposed project consists greater than 50% impervious area the post development peak discharge rate for the 2 year, 24 hour storm event will be attenuated to be less than or equal to the pre development peak discharge rate. As described in the NWFWMD ERP Applicant s Handbook Volume 2 the NRCS type III rainfall distribution was used to model this storm event. Per the City of Ft. Walton Beach stormwater concurrency requirements, the post development peak discharge rate for the 25 year, 24 hour storm event will be attenuated to be less than or equal to the pre development peak discharge rate. There is existing and proposed discharge to the S.R. 85/FDOT ROW and storm sewer system. Per FDOT requirements and since the receiving storm sewer system lies within an open basin, 1 W13900

5 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street Stormwater Management System Design Report the post development peak discharge rate to the FDOT ROW for the critical storm event from the following storms will be attenuated to be less than or equal to the pre development critical storm peak discharge rate to the FDOT ROW: 2-year, 5-year, 10-year, 25-year, 50-year, and 100-year frequency with 1-hr, 2-hr, 4-hr, 8-hr, 24-hr, and 72-hr duration. There is also existing and proposed discharge to the Okaloosa County ROW and storm sewer system. Per Okaloosa County requirements, the post development peak discharge rate to the Okaloosa County ROW for the critical storm event from the following storms will be attenuated to be less than or equal to the pre development critical storm peak discharge rate rate to the Okaloosa County ROW: 2-year, 5-year, 10-year and 25-year frequency with 1-hr, 2-hr, 4-hr, 8- hr, and 24-hr duration. The critical storm refers to the specific storm event that produces the highest rate of net storm water runoff, defined as the post-development rate of discharge less the pre-development rate of discharge. Water Quality Water quality requirements for this site are dictated by the City of Ft. Walton Beach, FDOT, Okaloosa County and the NWFWMD ERP Applicant s Handbook Vol. 2. For a dry retention pond the first inch (1 ) of runoff from all contributing drainage area is required to be treated. Furthermore the retention pond must be designed to recover the treatment volume completely within 72 hours after a storm event. Wal-mart Design Criteria requires a minimum safety factor of 1.5 which will be accomplished in setting a 2.0 safety factor on the permeability rate used. Please see the attached stormwater calculations in Appendices A through D for the application of this criterion in our design. Dry Retention Design The native soils on the property are characterized as well-draining soils based on the USDA NRCS soil types identified for this site. Please see attached Figure 4 for reference. Based on infiltration testing results provided by the geotechnical engineer, dry retention design has been selected for this site. However, since there is limited pond area underground storm chambers are also being proposed to provide for the balance of the required treatment and storage volumes. The requirements for the pond and underground chambers design include the following: Must recover the required treatment volume within 72 hours after a storm (with an appropriate safety factor depending on the soil permeability test type and a minimum of 1.5). Must provide a controlled outfall so that overflow of the pond does not cause adverse impacts to onsite or offsite properties. Areas must be fenced where pond side slopes are steeper than 4H:1V. 2 W13900

6 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street Stormwater Management System Design Report The dry retention system should be stabilized with pervious material or permanent vegetative cover. Furthermore, permanent vegetative cover must consist of hydrologic group A soils. All of these requirements will be met and are referenced by the enclosed calculations (Appendices A through D) and the attached construction plans. 3. ENGINEERING ANALYSIS A detailed hydrologic/hydraulic engineering analysis has been performed utilizing the computer program entitled Advanced Interconnected Channel and Pond Routing (ICPR, Version 3.02), developed by Streamline Technologies, Inc., to simulate/predict stormwater runoff and the hydraulic responses of the conveyance system during the design storm event. The ICPR program consists of two (2) modules, the hydrologic element which computes the runoff hydrographs and the hydraulic portion which flood routes the hydrographs through various drainage conveyance systems in order to predict the peak flood stages and/or hydraulic gradeline (HGL) elevations based on tailwater conditions, friction and head (minor) losses. The ICPR input data required for this drainage investigation includes the following: Hydrograph Module Drainage Area (acres) Runoff Curve Number (CN) Time of Concentration (minutes) Peak Rate Factor (K) Rainfall Distribution Rainfall Duration (hrs) Rainfall Depth (inches) Hydraulics Module Stage (ft, NAVD) / Storage (acres) Relationships Stage (ft, NAVD) / Time (hrs) Relationships (i.e., tailwater conditions) Pipe Length (feet) and Invert Elevations (feet, NAVD) Pipe Dimensions (inch x inch) Entrance, Exit and/or minor loss coefficients ("k") Manning s Roughness Coefficient ("n") 3 W13900

7 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street Stormwater Management System Design Report A Ponds Recovery Analysis (Ponds, Version 3.2) was also performed to model the required recovery of the Water Quality Volume. The ICPR PercPack Plugin was used to model infiltration and percolation beneath the proposed retention ponds (but not beneath the storm chambers) during the routing of the storm events. 4. MODELING PARAMETERS 4.1 Curve Numbers The existing soils within the study area are classified as hydrologic soil groups (HSG) A and B, as presented in the USDA NRCS Soil Survey. The following table provides a summary of the existing soil types within the study area (refer to Figure 4). Table 1: Summary of Existing Soils Map Symbol Soil Name Hydrologic Soil Group 12 Lakeland Sand, 0-5 percent slopes A 27 Urban land A (based on geotechnical boring) Curve numbers were assigned to areas based upon existing land use conditions and soil types. Refer to Appendix A of this report for calculations associated with the detailed basin parameters. 4.2 Time of Concentration Time of concentration for each basin evaluated was determined using the SCS procedures described in Chapter 3 of Urban Hydrology for Small Watersheds, Technical Release 55, Second Edition (June 1986), Soil Conservation Service, U.S. Department of Agriculture. Time of concentration is separated into travel time components. Travel time is defined as the time for runoff to travel from the hydraulically most distant point of a watershed to a point where there is a change in flow regime (i.e., overland flow to shallow concentrated flow). Time of concentration is the summation of all the travel times for consecutive components of a drainage system. Time of concentration is generally separated into three distinct components; (1) overland flow; (2) shallow concentrated flow; and (3) open channel, gutter or culvert flow. Each component consists of a travel time (T t ) that is summed up for consecutive components to compute time of concentration (T c ). Refer to Appendix A for the pre-condition time of 4 W13900

8 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street Stormwater Management System Design Report concentration calculations. Note that due to the relatively short time of concentrations in the post-developed condition, a default of 10 minutes was used. 4.3 Soil Conditions for Recovery Analysis Soil borings were conducted by the Geotechnical Consultant throughout the proposed pond areas. Lab permeability (falling-head) tests were conducted by the Geotechnical Consultant. Accordingly Saturated Vertical Hydraulic Conductivity (Kv,sat), Unsaturated Vertical Hydraulic Conductivity (Kv,unsat) and Horizontal Saturated Hydraulic Conductivity (Kh,sat) rates were provided. The Kh,sat value provided for the soils that exist at the proposed pond bottoms was estimated to be 40 ft/day and the Kv,unsat was estimated to be 27 ft/day (without applying a safety factor). The following values were used: For Pond 1, a weighted average Kh,sat was used to consider any restriction in flow that may be caused by the proposed retaining wall. o Weighted Kh,sat with a safety factor of 2, ft/day. o Kv,unsat with a safety factor of 2, 13.5 ft/day. o Fillable porosity of 25%. o Estimated SHWL of 5.5 ft NAVD o Base of Aquifer of (-)8.0 ft NAVD. (Aquifer base was not encountered in soil borings so this value is the approx. lowest elevation explored within the ponds.) For Pond 2 and underground chambers: o Average Kh,sat with a safety factor of 2, 20 ft/day. o Average Kv,unsat with a safety factor of 2, 13.5 ft/day. o Fillable porosity of 25%. o Estimated SHWL of 5.5 ft NAVD o Base of Aquifer of (-)8.0 ft NAVD. (Aquifer base was not encountered in soil borings so this value is the approx. lowest elevation explored within the ponds.) Refer to Appendix A for average soil conductivity calculations. 5. HYDRAULIC/HYDROLOGIC MODELING 5.1 Drainage System Connectivity As mentioned previously, ICPR was used to simulate the drainage response of the existing and proposed conveyance systems. These models required a spatial network consisting of nodes 5 W13900

9 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street Stormwater Management System Design Report and reaches to define the drainage system connectivity. Nodes (e.g., upstream and downstream elements of culverts and ditches, inlets, manholes, and tailwater) are used to identify specific locations along a drainage system for which peak flood stages or Hydraulic Gradeline (HGL) elevations are to be computed. Reaches consist of various conveyance systems (e.g., cross culverts, storm sewer pipes, ditches, etc.) that connect nodes. Nodal diagrams for the pre and post development models are included in Appendices C and D, respectively. 6. EXISTING CONDITION In the existing condition drainage areas have been identified and delineated on the predevelopment drainage basin map (refer to Figure 5). These areas are also identified on the Summary of Areas Table provided in Appendix A. Based on existing topography the subject property can be divided into 4 pre development drainage basins. Most of the property is defined by Pre Basin 1. Pre Basin 1 runoff generally flows southeast to an existing grate inlet located on the north side of South St. just west of Middle Drive. This inlet is labeled South St. N DBI in the model, and also collects runoff from South St. which is accounted for in the model as Offsite Basin 1. There is one inlet upstream of this inlet and is included in the model as South St. S DBI. These 2 inlets flow to a couple of manholes located on the west side of Middle Dr. and then flow north to another grate inlet located at the southwest corner of Middle Dr. and First St. This inlet is referred to in the model as N.E.C. Inlet. The N.E.C Inlet collects runoff from Pre Basin 2 as well as runoff from First Street which is accounted for in Offsite Basin 3. This inlet is connected to inlets upstream to the West and downstream to the East. The upstream peak flow was estimated to be 1 CFS based on the approximate upstream drainage area, and is accounted for in the model as a base flow in N.E.C Inlet. Flow is conveyed downstream from this inlet through 36 RCP which discharges to the Bay located approximately 0.15 mile east of the site. The inlet downstream of the N.E.C. Inlet is labeled in the model as N.E.C Inlet TW and was chosen to be used as the tailwater for this storm sewer system in both the pre and post development models. The tailwater elevation was chosen based on staining observed on the headwall just above the 36 outlet pipe into the bay. This elevation was approximated as the pipe full elevation just downstream of the N.E.C. Inlet, approximately 6.00 ft. (NAVD). The remainder of the subject property is defined by Pre Basins 3 and 4. Runoff from Pre Basins 3 and 4 flows west to the S.R. 85/FDOT ROW. There are 2 curb inlets along the east side of S.R. 85, along the property frontage. Pre Basin 3 runoff is captured by the northern curb inlet and Pre Basin 4 runoff is captured by the southern curb inlet. Flow into both curb inlets is conveyed through 15 RCP to a 24 trunkline that appears to flow north along the S.R. 85 ROW. The constant tailwater elevation for this storm sewer system was estimated to be 8.0 NAVD, 6 W13900

10 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street Stormwater Management System Design Report which is the approximated water elevation for the southern 15 RCP (full of water) at where it discharges into the 24 trunkline. 7. PROPOSED CONDITION In the post-development condition, the proposed stormwater management system consists of 2 dry retention ponds and an underground stormwater chamber system. Ponds 1 and 2 are interconnected with the same bottom and top of bank elevations of 7.5 NAVD and 11.5 NAVD, respectively. The underground chamber system is designed with a bottom of stone foundation set at elevation 7.5 NAVD and bottom of chambers at elevation 8 NAVD. The lowest inlet elevation in the parking lot is 11 NAVD which allows for a top of stone elevation at 9.75 NAVD and top of chambers elevation at 9.25 NAVD. The proposed developed site conveys surface runoff through a system of inlets and pipes to the retention ponds and underground chambers. The retention ponds and chambers are designed to retain the required Water Quality Volume and allow it to percolate within 72 hours. This includes treatment over the proposed offsite driveway areas, sidewalk and turn lanes. Since the existing condition of the subject property discharges runoff to the N.E.C. Inlet and the curb inlets along S.R. 85, a controlled discharge structure is proposed to discharge from Pond 1 to the N.E.C. Inlet and another controlled discharge structure is proposed to discharge from Pond 2 to the southern curb inlet along S.R. 85. The southern curb inlet along S.R. 85 is replaced with a grate inlet in the proposed condition. The Pond 1 and Pond 2 control/discharge structures were designed so that the post-development peak discharge rates are attenuated to be equal to or less than the pre-development discharge rates for the required storm events at each respective location. The proposed Pond 1 control/discharge structure top was chosen to be set at El NAVD with a 0.5 circular orifice set at the top of the treatment volume elevation, 8.28 NAVD. The proposed Pond 2 control/discharge structure top was chosen to be set at El NAVD with a 5 circular orifice set at the top of the treatment volume elevation, 8.28 NAVD. The control structures were designed to attenuate the storm events required by NWFWMD, FDOT and Okaloosa County. The proposed condition drainage areas have been identified and delineated on the postdevelopment drainage basin map (refer to Figure 6). These areas are also identified on the Summary of Areas Table (refer to Appendix A). The results of the hydrologic/hydraulic modeling using ICPR are summarized in the following tables. 7 W13900

11 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street Stormwater Management System Design Report Table 2: Summary of Peak Flow Rates to FDOT ROW, S.R. 85 TW Frequency (Years) Pre Post Net Pre Post Net Pre Post Net Pre Post Net Pre Post Net Pre Post Net Duration (Hours) Table 3: Summary of Peak Flow Rates to Okaloosa County ROW, N.E.C. Inlet TW Frequency (Years) Pre Post Net Pre Post Net Pre Post Net Pre Post Net Duration (Hours) Table 4: Summary of Peak Stages Storm Event Proposed Pond 1 Peak Stage Pond 1 Freeboard (Top Bank Elev ) Proposed Pond 2 Peak Stage Pond 2 Freeboard (Top Bank Elev ) 2-YR, 24 HR YR, 24 HR YR, 4 HR YR, 24 HR YR, 24 HR W13900

12 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street Stormwater Management System Design Report 8. SUMMARY As shown within this report, all applicable stormwater standards have been substantially satisfied. These are: Post-Development discharge rates have been attenuated to meet the pre developed discharge rate for the 2 year and 25 year, 24 hour storm events per NWFWMD requirements. Post-Development discharge rates have been attenuated to meet the pre developed discharge rates for the critical duration storm events per Okaloosa County requirements at the proposed discharge to the Okaloosa County ROW. Post-Development discharge rates have been attenuated to meet the pre developed discharge rates for the critical duration storm events per FDOT requirements at the proposed discharge to the FDOT ROW. Based on the Ponds Recovery Analysis for the respective ponds and underground stormwater chambers, a total treatment volume of approximately 17,930 cubic feet (0.41 acft) is recovered within the first 72 hours as required per NWFWMD requirements (Refer to Appendix D, for the Ponds Recovery Analysis Input and Results). It should be noted that the information contained herein was evaluated using the most recent and applicable data available. 9 W13900

13 Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street Stormwater Management System Design Report ii USGS Map... Figure 2 FEMA Map... Figure 3 Soils Map... Figure 4 Pre-Development Drainage Basin Map... Figure 5 Post-Development Drainage Basin Map... Figure 6 LIST OF APPENDICES: Design Calculations Pre- and Post- Development Basin Parameters... Appendix A Pre-Development ICPR Input Data and Storm Routing Results... Appendix B Post-Development ICPR Input Data and Storm Routing Results... Appendix C Ponds Recovery Analysis Input Data and Results... Appendix D W13900

14 Av e APPROXIMATE PROPERTY BOUNDARY Mi dd le Dr Eg l in Pk w y 1s t Path: P:\W\W13900\AERIAL.mxd South St NE Scale: 1 " = 100 ' Date: 11/4/2016 Photo Date: 2013 Project No. W Biologist: GIS: RCO AERIAL PHOTOGRAPH MAP SECTION 1, TOWNSHIP 02 SOUTH, RANGE 24 WEST OKALOOSA COUNTY, FLORIDA

15 APPROXIMATE PROPERTY BOUNDARY LATITUDE: 30 26' 7.191" LONGITUDE: ' 6.835" Path: P:\W\W13900\USGS.mxd Scale: 1 " = 2,000 ' Date: 11/4/2016 Photo Date: 2012 Project No. W Biologist: AED GIS: RCO N USGS MAP - FORT WALTON BEACH FT.WALTONBEACH(EGLIN),FL WAL-MARTNEIGHBORHOODMARKET SECTION 1, TOWNSHIP 02 SOUTH, RANGE 24 WEST OKALOOSA COUNTY, FLORIDA FIGURE 2

16 ZONE X, AREA OF MINIMAL FLOOD HAZARD %( '& $corresponds to areas outside the 100-year floodplains, areas of 100-year sheet flow flooding where average depths are less than 1 foot, areas of 100-year stream flooding where the contributing drainage area is less than 1 square mile, or areas protected from the 100-year flood by levees. No Base Flood Elevations (BFEs) or depths are shown within this zone. 1s t APPROXIMATE PROPERTY LOCATION Av e Mi dd le Dr Eg l in Pk w y % $ Path: P:\W\W13900\FEMA fl.mxd South St NE Scale: 1 " = 100 ' Date: 11/4/2016 Photo Date: 2013 Project No. W Biologist: GIS: RCO FEMA MAP! #! ) #!! SECTION 1, TOWNSHIP 02 SOUTH, RANGE 24 WEST OKALOOSA COUNTY, FLORIDA "

17 " Lakeland sand, 0 to 5 percent slopes Urban land USDA Natural Resources Conservation Service 1s t Av e APPROXIMATE PROPERTY BOUNDARY Eg l in Pk w y Mi dd le Dr Path: P:\W\W13900\SOILS.mxd South St NE Scale: 1 " = 100 ' Date: 11/4/2016 Photo Date: 2012 Project No. W Biologist: AED GIS: RCO SOILS MAP! #! SECTION 1, TOWNSHIP 02 SOUTH, RANGE 24 WEST OKALOOSA COUNTY, FLORIDA

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32 Pre Development Nodal Diagram Nodes A Stage/Area V Stage/Volume T Time/Stage M Manhole Basins O Overland Flow U SCS Unit CN S SBUH CN Y SCS Unit GA Z SBUH GA T:S.R. 85 TW P:85 N 15" A:85 curb inlet N U:Pre Basin 3 U:85 curb inlet N A:N.E.C. Inlet U:Pre Basin 2 U:Offsite Basin 3 P:Middle Dr. 3 P:1st Ave. 36" M:Middle Dr MH N T:N.E.C. Inlet TW Links P Pipe W Weir C Channel D Drop Structure B Bridge R Rating Curve H Breach E Percolation F Filter X Exfil Trench P:85 S 15" A:85 curb inlet S U:85 curb inlet S U:Pre Basin 4 A:South St. N DBI U:Pre Basin 1 U:Offsite Basin 1 P:Middle Dr. 2 M:Middle Dr MH S P:Middle Dr. 1 P:South St. 18" A:South St. S DBI U:Offsite Basin 2 Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc.

33 Pre Development Input Report ========================================================================================== ==== Basins ============================================================================== ========================================================================================== Name: 85 curb inlet N Node: 85 curb inlet N Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh323 Peaking Factor: Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): Time of Conc(min): Area(ac): Time Shift(hrs): 0.00 Curve Number: Max Allowable Q(cfs): DCIA(%): 0.00 Name: 85 curb inlet S Node: 85 curb inlet S Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh323 Peaking Factor: Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): Time of Conc(min): Area(ac): Time Shift(hrs): 0.00 Curve Number: Max Allowable Q(cfs): DCIA(%): 0.00 Name: Offsite Basin 1 Node: South St. N DBI Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh323 Peaking Factor: Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): Time of Conc(min): Area(ac): Time Shift(hrs): 0.00 Curve Number: Max Allowable Q(cfs): DCIA(%): Name: Offsite Basin 2 Node: South St. S DBI Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh323 Peaking Factor: Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): Time of Conc(min): Area(ac): Time Shift(hrs): 0.00 Curve Number: Max Allowable Q(cfs): DCIA(%): Name: Offsite Basin 3 Node: N.E.C. Inlet Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh323 Peaking Factor: Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): Time of Conc(min): Area(ac): Time Shift(hrs): 0.00 Curve Number: Max Allowable Q(cfs): DCIA(%): Name: Pre Basin 1 Node: South St. N DBI Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh323 Peaking Factor: Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 1 of 27

34 Pre Development Input Report Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): Time of Conc(min): Area(ac): Time Shift(hrs): 0.00 Curve Number: Max Allowable Q(cfs): DCIA(%): 0.00 Name: Pre Basin 2 Node: N.E.C. Inlet Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh323 Peaking Factor: Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): Time of Conc(min): Area(ac): Time Shift(hrs): 0.00 Curve Number: Max Allowable Q(cfs): DCIA(%): 0.00 Name: Pre Basin 3 Node: 85 curb inlet N Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh323 Peaking Factor: Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): Time of Conc(min): Area(ac): Time Shift(hrs): 0.00 Curve Number: Max Allowable Q(cfs): DCIA(%): 0.00 Name: Pre Basin 4 Node: 85 curb inlet S Status: Onsite Group: BASE Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh323 Peaking Factor: Rainfall File: Storm Duration(hrs): 0.00 Rainfall Amount(in): Time of Conc(min): Area(ac): Time Shift(hrs): 0.00 Curve Number: Max Allowable Q(cfs): DCIA(%): 0.00 ========================================================================================== ==== Nodes =============================================================================== ========================================================================================== Name: 85 curb inlet N Base Flow(cfs): Init Stage(ft): Group: BASE Warn Stage(ft): Type: Stage/Area Stage(ft) Area(ac) Name: 85 curb inlet S Base Flow(cfs): Init Stage(ft): Group: BASE Warn Stage(ft): Type: Stage/Area Stage(ft) Area(ac) Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 2 of 27

35 Pre Development Input Report Name: Middle Dr MH N Base Flow(cfs): Init Stage(ft): Group: BASE Plunge Factor: 1.00 Warn Stage(ft): Type: Manhole, Flat Floor Stage(ft) Area(ac) Name: Middle Dr MH S Base Flow(cfs): Init Stage(ft): Group: BASE Plunge Factor: 1.00 Warn Stage(ft): Type: Manhole, Flat Floor Stage(ft) Area(ac) Name: N.E.C. Inlet Base Flow(cfs): Init Stage(ft): Group: BASE Warn Stage(ft): Type: Stage/Area Stage(ft) Area(ac) Name: N.E.C. Inlet TW Base Flow(cfs): Init Stage(ft): Group: BASE Warn Stage(ft): Type: Time/Stage Time(hrs) Stage(ft) Name: S.R. 85 TW Base Flow(cfs): Init Stage(ft): Group: BASE Warn Stage(ft): Type: Time/Stage Time(hrs) Stage(ft) Name: South St. N DBI Base Flow(cfs): Init Stage(ft): Group: BASE Warn Stage(ft): Type: Stage/Area Stage(ft) Area(ac) Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 3 of 27

36 Pre Development Input Report Name: South St. S DBI Base Flow(cfs): Init Stage(ft): Group: BASE Warn Stage(ft): Type: Stage/Area Stage(ft) Area(ac) ========================================================================================== ==== Cross Sections ====================================================================== ========================================================================================== Name: Upland area Encroachment: No Group: BASE Station(ft) Elevation(ft) Manning's N ========================================================================================== ==== Pipes =============================================================================== ========================================================================================== Name: 1st Ave. 36" From Node: N.E.C. Inlet Length(ft): Group: BASE To Node: N.E.C. Inlet TW Count: 1 Friction Equation: Automatic UPSTREAM DOWNSTREAM Solution Algorithm: Most Restrictive Geometry: Circular Circular Flow: Both Span(in): Entrance Loss Coef: 0.50 Rise(in): Exit Loss Coef: 1.00 Invert(ft): Bend Loss Coef: 0.00 Manning's N: Outlet Ctrl Spec: Use dc or tw Top Clip(in): Inlet Ctrl Spec: Use dc Bot Clip(in): Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Name: 85 N 15" From Node: 85 curb inlet N Length(ft): Group: BASE To Node: S.R. 85 TW Count: 1 Friction Equation: Automatic UPSTREAM DOWNSTREAM Solution Algorithm: Most Restrictive Geometry: Circular Circular Flow: Both Span(in): Entrance Loss Coef: 0.50 Rise(in): Exit Loss Coef: 1.00 Invert(ft): Bend Loss Coef: 0.30 Manning's N: Outlet Ctrl Spec: Use dc or tw Top Clip(in): Inlet Ctrl Spec: Use dc Bot Clip(in): Stabilizer Option: None Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 4 of 27

37 Pre Development Input Report Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Name: 85 S 15" From Node: 85 curb inlet S Length(ft): Group: BASE To Node: S.R. 85 TW Count: 1 Friction Equation: Automatic UPSTREAM DOWNSTREAM Solution Algorithm: Most Restrictive Geometry: Circular Circular Flow: Both Span(in): Entrance Loss Coef: 0.50 Rise(in): Exit Loss Coef: 1.00 Invert(ft): Bend Loss Coef: 0.30 Manning's N: Outlet Ctrl Spec: Use dc or tw Top Clip(in): Inlet Ctrl Spec: Use dc Bot Clip(in): Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Name: Middle Dr. 1 From Node: South St. N DBI Length(ft): Group: BASE To Node: Middle Dr MH S Count: 1 Friction Equation: Automatic UPSTREAM DOWNSTREAM Solution Algorithm: Most Restrictive Geometry: Circular Circular Flow: Both Span(in): Entrance Loss Coef: 0.50 Rise(in): Exit Loss Coef: 0.00 Invert(ft): Bend Loss Coef: 0.66 Manning's N: Outlet Ctrl Spec: Use dc or tw Top Clip(in): Inlet Ctrl Spec: Use dc Bot Clip(in): Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Name: Middle Dr. 2 From Node: Middle Dr MH S Length(ft): Group: BASE To Node: Middle Dr MH N Count: 1 Friction Equation: Automatic UPSTREAM DOWNSTREAM Solution Algorithm: Most Restrictive Geometry: Circular Circular Flow: Both Span(in): Entrance Loss Coef: 0.50 Rise(in): Exit Loss Coef: 0.00 Invert(ft): Bend Loss Coef: 0.66 Manning's N: Outlet Ctrl Spec: Use dc or tw Top Clip(in): Inlet Ctrl Spec: Use dc Bot Clip(in): Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 5 of 27

38 Pre Development Input Report Circular Concrete: Square edge w/ headwall Name: Middle Dr. 3 From Node: Middle Dr MH N Length(ft): Group: BASE To Node: N.E.C. Inlet Count: 1 Friction Equation: Automatic UPSTREAM DOWNSTREAM Solution Algorithm: Most Restrictive Geometry: Circular Circular Flow: Both Span(in): Entrance Loss Coef: 0.50 Rise(in): Exit Loss Coef: 0.00 Invert(ft): Bend Loss Coef: 0.66 Manning's N: Outlet Ctrl Spec: Use dc or tw Top Clip(in): Inlet Ctrl Spec: Use dc Bot Clip(in): Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Name: South St. 18" From Node: South St. S DBI Length(ft): Group: BASE To Node: South St. N DBI Count: 1 Friction Equation: Automatic UPSTREAM DOWNSTREAM Solution Algorithm: Most Restrictive Geometry: Circular Circular Flow: Both Span(in): Entrance Loss Coef: 0.50 Rise(in): Exit Loss Coef: 0.00 Invert(ft): Bend Loss Coef: 0.66 Manning's N: Outlet Ctrl Spec: Use dc or tw Top Clip(in): Inlet Ctrl Spec: Use dc Bot Clip(in): Stabilizer Option: None Upstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall Downstream FHWA Inlet Edge Description: Circular Concrete: Square edge w/ headwall ========================================================================================== ==== Hydrology Simulations =============================================================== ========================================================================================== Name: 002Y001H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\002Y001H.R32 Storm Duration(hrs): 1.00 Rainfall File: Fdot-1 Rainfall Amount(in): Name: 002Y002H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\002Y002H.R32 Storm Duration(hrs): 2.00 Rainfall File: Fdot-2 Rainfall Amount(in): 3.00 Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 6 of 27

39 Pre Development Input Report Name: 002Y004H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\002Y004H.R32 Storm Duration(hrs): 4.00 Rainfall File: Fdot-4 Rainfall Amount(in): Name: 002Y008H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\002Y008H.R32 Storm Duration(hrs): 8.00 Rainfall File: Fdot-8 Rainfall Amount(in): Name: 002Y024H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\002Y024H.R32 Storm Duration(hrs): Rainfall File: Scsiii Rainfall Amount(in): Name: 003Y001H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\003Y001H.R32 Storm Duration(hrs): 1.00 Rainfall File: Fdot-1 Rainfall Amount(in): Name: 003Y002H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\003Y002H.R32 Storm Duration(hrs): 2.00 Rainfall File: Fdot-2 Rainfall Amount(in): Name: 003Y004H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\003Y004H.R32 Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 7 of 27

40 Pre Development Input Report Storm Duration(hrs): 4.00 Rainfall File: Fdot-4 Rainfall Amount(in): Name: 003Y008H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\003Y008H.R32 Storm Duration(hrs): 8.00 Rainfall File: Fdot-8 Rainfall Amount(in): Name: 003Y024H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\003Y024H.R32 Storm Duration(hrs): Rainfall File: Fdot-24 Rainfall Amount(in): Name: 003Y072H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\003Y072H.R32 Storm Duration(hrs): Rainfall File: Fdot-72 Rainfall Amount(in): Name: 005Y001H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\005Y001H.R32 Storm Duration(hrs): 1.00 Rainfall File: Fdot-1 Rainfall Amount(in): Name: 005Y002H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\005Y002H.R32 Storm Duration(hrs): 2.00 Rainfall File: Fdot-2 Rainfall Amount(in): Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 8 of 27

41 Pre Development Input Report Name: 005Y004H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\005Y004H.R32 Storm Duration(hrs): 4.00 Rainfall File: Fdot-4 Rainfall Amount(in): Name: 005Y008H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\005Y008H.R32 Storm Duration(hrs): 8.00 Rainfall File: Fdot-8 Rainfall Amount(in): Name: 005Y024H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\005Y024H.R32 Storm Duration(hrs): Rainfall File: Fdot-24 Rainfall Amount(in): Name: 005Y072H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\005Y072H.R32 Storm Duration(hrs): Rainfall File: Fdot-72 Rainfall Amount(in): Name: 010Y001H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\010Y001H.R32 Storm Duration(hrs): 1.00 Rainfall File: Fdot-1 Rainfall Amount(in): Name: 010Y002H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\010Y002H.R32 Storm Duration(hrs): 2.00 Rainfall File: Fdot-2 Rainfall Amount(in): 4.14 Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 9 of 27

42 Pre Development Input Report Name: 010Y004H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\010Y004H.R32 Storm Duration(hrs): 4.00 Rainfall File: Fdot-4 Rainfall Amount(in): Name: 010Y008H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\010Y008H.R32 Storm Duration(hrs): 8.00 Rainfall File: Fdot-8 Rainfall Amount(in): Name: 010Y024H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\010Y024H.R32 Storm Duration(hrs): Rainfall File: Fdot-24 Rainfall Amount(in): Name: 010Y072H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\010Y072H.R32 Storm Duration(hrs): Rainfall File: Fdot-72 Rainfall Amount(in): Name: 025Y001H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\025Y001H.R32 Storm Duration(hrs): 1.00 Rainfall File: Fdot-1 Rainfall Amount(in): Name: 025Y002H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\025Y002H.R32 Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 10 of 27

43 Pre Development Input Report Storm Duration(hrs): 2.00 Rainfall File: Fdot-2 Rainfall Amount(in): Name: 025Y004H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\025Y004H.R32 Storm Duration(hrs): 4.00 Rainfall File: Fdot-4 Rainfall Amount(in): Name: 025Y008H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\025Y008H.R32 Storm Duration(hrs): 8.00 Rainfall File: Fdot-8 Rainfall Amount(in): Name: 025Y024H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\025Y024H.R32 Storm Duration(hrs): Rainfall File: Fdot-24 Rainfall Amount(in): Name: 025Y072H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\025Y072H.R32 Storm Duration(hrs): Rainfall File: Fdot-8 Rainfall Amount(in): Name: 050Y001H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\050Y001H.R32 Storm Duration(hrs): 1.00 Rainfall File: Fdot-1 Rainfall Amount(in): Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 11 of 27

44 Pre Development Input Report Name: 050Y002H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\050Y002H.R32 Storm Duration(hrs): 2.00 Rainfall File: Fdot-2 Rainfall Amount(in): Name: 050Y004H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\050Y004H.R32 Storm Duration(hrs): 4.00 Rainfall File: Fdot-4 Rainfall Amount(in): Name: 050Y008H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\050Y008H.R32 Storm Duration(hrs): 8.00 Rainfall File: Fdot-8 Rainfall Amount(in): Name: 050Y024H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\050Y024H.R32 Storm Duration(hrs): Rainfall File: Fdot-24 Rainfall Amount(in): Name: 050Y072H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\050Y072H.R32 Storm Duration(hrs): Rainfall File: Fdot-72 Rainfall Amount(in): Name: 100Y001H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\100Y001H.R32 Storm Duration(hrs): 1.00 Rainfall File: Fdot-1 Rainfall Amount(in): 4.50 Time(hrs) Print Inc(min) Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 12 of 27

45 Pre Development Input Report Name: 100Y002H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\100Y002H.R32 Storm Duration(hrs): 2.00 Rainfall File: Fdot-2 Rainfall Amount(in): Name: 100Y004H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\100Y004H.R32 Storm Duration(hrs): 4.00 Rainfall File: Fdot-4 Rainfall Amount(in): Name: 100Y008H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\100Y008H.R32 Storm Duration(hrs): 8.00 Rainfall File: Fdot-8 Rainfall Amount(in): Name: 100Y024H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\100Y024H.R32 Storm Duration(hrs): Rainfall File: Fdot-24 Rainfall Amount(in): Name: 100Y072H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\100Y072H.R32 Storm Duration(hrs): Rainfall File: Fdot-72 Rainfall Amount(in): ========================================================================================== ==== Routing Simulations ================================================================= ========================================================================================== Name: 002Y001H Hydrology Sim: 002Y001H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\002Y001H.I32 Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 13 of 27

46 Pre Development Input Report Start Time(hrs): End Time(hrs): Name: 002Y002H Hydrology Sim: 002Y002H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\002Y002H.I32 Start Time(hrs): End Time(hrs): Name: 002Y004H Hydrology Sim: 002Y004H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\002Y004H.I32 Start Time(hrs): End Time(hrs): Name: 002Y008H Hydrology Sim: 002Y008H Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 14 of 27

47 Pre Development Input Report Filename: C:\Users\ypaguada\Desktop\W13900\Pre\002Y008H.I32 Start Time(hrs): End Time(hrs): Name: 002Y024H Hydrology Sim: 002Y024H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\002Y024H.I32 Start Time(hrs): End Time(hrs): Name: 003Y001H Hydrology Sim: 003Y001H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\003Y001H.I32 Start Time(hrs): End Time(hrs): Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 15 of 27

48 Pre Development Input Report Name: 003Y002H Hydrology Sim: 003Y002H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\003Y002H.I32 Start Time(hrs): End Time(hrs): Name: 003Y004H Hydrology Sim: 003Y004H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\003Y004H.I32 Start Time(hrs): End Time(hrs): Name: 003Y008H Hydrology Sim: 003Y008H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\003Y008H.I32 Start Time(hrs): End Time(hrs): Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 16 of 27

49 Pre Development Input Report Name: 003Y024H Hydrology Sim: 003Y024H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\003Y024H.I32 Start Time(hrs): End Time(hrs): Name: 003Y072H Hydrology Sim: 003Y072H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\003Y072H.I32 Start Time(hrs): End Time(hrs): Name: 005Y001H Hydrology Sim: 005Y001H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\005Y001H.I32 Start Time(hrs): End Time(hrs): Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 17 of 27

50 Pre Development Input Report Name: 005Y002H Hydrology Sim: 005Y002H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\005Y002H.I32 Start Time(hrs): End Time(hrs): Name: 005Y004H Hydrology Sim: 005Y004H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\005Y004H.I32 Start Time(hrs): End Time(hrs): Name: 005Y008H Hydrology Sim: 005Y008H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\005Y008H.I32 Start Time(hrs): End Time(hrs): Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 18 of 27

51 Pre Development Input Report Name: 005Y024H Hydrology Sim: 005Y024H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\005Y024H.I32 Start Time(hrs): End Time(hrs): Name: 005Y072H Hydrology Sim: 005Y072H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\005Y072H.I32 Start Time(hrs): End Time(hrs): Name: 010Y001H Hydrology Sim: 010Y001H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\010Y001H.I32 Start Time(hrs): End Time(hrs): Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 19 of 27

52 Pre Development Input Report BASE Yes Name: 010Y002H Hydrology Sim: 010Y002H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\010Y002H.I32 Start Time(hrs): End Time(hrs): Name: 010Y004H Hydrology Sim: 010Y004H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\010Y004H.I32 Start Time(hrs): End Time(hrs): Name: 010Y008H Hydrology Sim: 010Y008H Filename: C:\Users\ypaguada\Desktop\W13900\Pre\010Y008H.I32 Start Time(hrs): End Time(hrs): Group Run Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 20 of 27

Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 1 of 5

Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 1 of 5 ==== Basins ============================================================================== Name: 1A Node: Swale 1 Status: Onsite : Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh256 Peaking Factor: 256.0

More information

REPORT FOR: ISLAND LAKE ESTATES 4275 Placida Road Englewood, FL 34224

REPORT FOR: ISLAND LAKE ESTATES 4275 Placida Road Englewood, FL 34224 REPORT FOR: ISLAND LAKE ESTATES 4275 Placida Road Englewood, FL 34224 OWNER/APPLICANT: Edgewater Opportunity Fund II Contact: Ronald S Greenland 300 East Bay Heights Road Englewood, FL 34223 SUBMITTED

More information

DRAINAGE REPORT FOR ROCKY S CONVENIENCE STORE

DRAINAGE REPORT FOR ROCKY S CONVENIENCE STORE HYDRA ENGINEERING AND CONSTRUCTION, LLC C.A. #28124 DRAINAGE REPORT FOR ROCKY S CONVENIENCE STORE Wakulla County, Florida August 8, 2016 PREPARED FOR: The North West Florida Water Management District Hydra

More information

Stormwater Management Engineering Report

Stormwater Management Engineering Report March 12, 2018 Stormwater Management Engineering Report for Brighton Oaks Subdivision Cato Road Bay County, Florida Prepared for: DR Horton PO Box 958 Lynn Haven, Florida, 32444 Ph. 850.265.6979 Fax. 850.265.9942

More information

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226 RUN-ON/RUN-OFF CONTROL SYSTEM PLAN RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN St. Johns River Power Park Byproduct Storage Area B Phase I Development Submitted to: St. Johns River Power Park 11201 New Berlin

More information

Westshore Marina District Bridge Street Phase 2 (f.k.a. New Port Tampa Bay Phase 2) Stormwater Management Plan & Report

Westshore Marina District Bridge Street Phase 2 (f.k.a. New Port Tampa Bay Phase 2) Stormwater Management Plan & Report Westshore Marina District Bridge Street Phase 2 (f.k.a. New Port Tampa Bay Phase 2) Stormwater Management Plan & Report Prepared for BTI Partners 401 E. Las Olas Blvd, Suite 1870 Fort Lauderdale, FL 33301

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

WATER MANAGEMENT REPORT FOR PAGE ESTATES

WATER MANAGEMENT REPORT FOR PAGE ESTATES WATER MANAGEMENT REPORT FOR PAGE ESTATES SLB Consulting of SW Florida, LLC PO Box 2826 Bonita Springs, FL. 34133 Phone: 239-948-9566 sandra@slbconsult.com C.O.A. # 25395 September 1, 2014 Sandra L. Bottcher

More information

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example

More information

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) Stormwater Guidelines and Case Studies CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Goals and Challenges for Manual State Stormwater Policy More Widespread

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details Project Description File Name... 323 - Att Pond 3 East PIPES ONLY.SPF Project Options Flow Units... Elevation Type... Hydrology Method... EPA SWMM Infiltration Method... Link Routing Method... Enable Overflow

More information

CIVIL CONSULTING ENGINEERS

CIVIL CONSULTING ENGINEERS CIVIL CONSULTING ENGINEERS Table of Contents Table of Contents 1. Narrative... 4 2. Site Conditions... 4 2.1. Existing Conditions... 4 2.2. Proposed Conditions... 4 3. Land Use Summary... 5 3.1. Pre-Development

More information

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses

More information

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report September 6, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report

More information

ATTACHMENT A. STORMWATER MANAGEMENT REPORT Tamiami Trail East Ochopee, FL 34141

ATTACHMENT A. STORMWATER MANAGEMENT REPORT Tamiami Trail East Ochopee, FL 34141 ATTACMENT A STORMWATER MANAGEMENT REPORT 57985 Tamiami Trail East Ochopee, FL 34141 April 2nd, 2018 Seminole Tribe of Florida 6300 Stirling Road ollywood, FL 33024 Prepared By: 880 SW 145th Avenue Suite

More information

Continuing Education Course #101 Drainage Design with WinTR-55

Continuing Education Course #101 Drainage Design with WinTR-55 1 of 5 Continuing Education Course #101 Drainage Design with WinTR-55 1. WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the

More information

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 603 Park Point Dr. Suite 100 Golden, CO 80401 (303)-801-2900 June 29, 2015 Revised August 14, 2015 CERTIFICATE

More information

Stage Discharge Tabulation for Only Orifice Flow

Stage Discharge Tabulation for Only Orifice Flow Stage Discharge Tabulation for Only Orifice Flow DEPTH STAGE DISCHARGE (meters) (feet) (meters) (feet) (m 3 /s) (ft 3 /s) 0 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.7 1.3 2.0 2.6 3.3 3.9 4.6

More information

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229 Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

More information

Hydrology Study Report

Hydrology Study Report Hafeez Consulting www.hafeezconsulting.com Civil/ Structural Engineering, Design & Construction 1451 S. Hacienda St. Anaheim CA 92804 (714) 225-4565 Fax (714)917-2977 engineer@hafeezconsulting.com Hydrology

More information

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS By Thomas T. Burke, Jr., PhD, PE Luke J. Sherry, PE, CFM Christopher B. Burke Engineering, Ltd. October 8, 2014 1 SEMINAR OUTLINE Overview of hydrologic

More information

Chapter 5 CALIBRATION AND VERIFICATION

Chapter 5 CALIBRATION AND VERIFICATION Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic

More information

Chapter 10 - Sacramento Method Examples

Chapter 10 - Sacramento Method Examples Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer

More information

APPENDIX B DRAINAGE REPORT

APPENDIX B DRAINAGE REPORT APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,

More information

Stormwater Capacity Analysis for Westover Branch Watershed

Stormwater Capacity Analysis for Westover Branch Watershed Stormwater Capacity Analysis for Westover Branch Watershed Pimmit Run Little Pimmit Run, Mainstem Stohman's Run Gulf Branch Pimmit Run Tributary Little Pimmit Run, W. Branch Little Pimmit Run, E. Branch

More information

Preliminary Hydraulic Report

Preliminary Hydraulic Report Tarrant County, Texas Preliminary Hydraulic Report Prepared for: Texas Department of Transportation Fort Worth District Prepared by: AECOM Corporation Scott C. Williams, P.E. No. 101334, Date 2009 This

More information

Drainage Analysis. Appendix F

Drainage Analysis. Appendix F Drainage Analysis Appendix F Golden View Drive Elizabeth Street LMORE CREEK Ricky Road Rabbit Creek Road LITTLE RABBIT CREEK East 156th Avenue MOA Project #10-026 Golden View Drive Intersection

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

EROSION CONTROL NARRATIVE

EROSION CONTROL NARRATIVE EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment

More information

Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO

Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO 88th Avenue and Pecos Street Stormwater Drainage Design Report Reeve & Associates, Inc. Solutions You Can Build On for Maverik, Inc. 88th Avenue and Pecos Street Thornton, CO submitted to Reeve & Associates,

More information

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT TECHNICAL REPORT Prepared for: City of Livingston 411 East Callender Livingston, MT 59047 Prepared by: Clear Creek Hydrology, Inc. 1627 West Main Street, #294

More information

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Appendix E Guidance for Shallow Flooding Analyses and Mapping Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding

More information

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Autodesk Storm and Sanitary Analysis 2014 - Version 8.1.62 (Build 1) ----------------- *** Project Description *** File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Analysis Options Flow

More information

Final Drainage Report

Final Drainage Report Final Drainage Report Expo Rail Operations and Maintenance Facility Santa Monica, California Prepared for: Exposition Metro Line Construction Authority Prepared by: W2 Design, Inc. 50 S. De Lacey Avenue

More information

UPPER COSUMNES RIVER FLOOD MAPPING

UPPER COSUMNES RIVER FLOOD MAPPING UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe

More information

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number:

More information

Section 3.0 Existing Systems Hydrology and Hydraulics

Section 3.0 Existing Systems Hydrology and Hydraulics Section 3.0 Existing Systems Hydrology and Hydraulics This chapter summarizes the results and methodology of MACTEC s evaluation of the existing drainage systems and lakes for the City of Maitland, Florida.

More information

STORMWATER MANAGEMENT REPORT

STORMWATER MANAGEMENT REPORT STORMWATER MANAGEMENT REPORT THE FAIRWAYS AT EDGEWOOD LOTS 5 & 6, BLOCK 1201 TOWNSHIP OF RIVER VALE BERGEN COUNTY, NEW JERSEY PREPARED BY: DAPHNE A. GALVIN PROFESSIONAL ENGINEER LICENSE NO. 24GE03434900

More information

Hydrology and Hydraulics Design Report. Background Summary

Hydrology and Hydraulics Design Report. Background Summary To: National Park Services Montezuma Castle National Monument Richard Goepfrich, Facility Manager From: Multicultural Technical Engineers Date: Tuesday - February 13, 2018 Subject: 30% Hydrology and Hydraulics

More information

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)

More information

FHWA - HIGHWAY HYDROLOGY

FHWA - HIGHWAY HYDROLOGY The unit peak discharge is computed with Equation 5.6 by interpolating c 0, c, and c Table 5.5 using a type II distribution. The peak discharge is also calculated as follows. from Variable SI Unit U Unit.5444

More information

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By: HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI Project No.

More information

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation

More information

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design Scholars' Mine Masters Theses Student Theses and Dissertations Spring 2010 The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water. Design Manual Chapter - Stormwater D - Storm Sewer Design D- Storm Sewer Sizing A. Introduction The purpose of this section is to outline the basic hydraulic principles in order to determine the storm

More information

FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO

FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO October 14, 2016 Revised: March 30, 2017 JN: 15096 Prepared for: PCS Group, Inc. 1001 16 th Street #3 B-180 Denver, CO 80265 P: 303.561.4905

More information

3301 East 120 th Avenue Assited Living & Memory Care

3301 East 120 th Avenue Assited Living & Memory Care UTILITY REPORT FOR 3301 East 120 th Avenue Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 Prepared for: 3301 E. 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite

More information

HYDROLOGY REPORT Tentative Tract No. 5978

HYDROLOGY REPORT Tentative Tract No. 5978 ATTACHMENT 5 October 2016 HYDROLOGY REPORT Tentative Tract No. 5978 City of Simi Valley County of Ventura Prepared For: Landsea Holdings Corporation 7525 Irvine Center Drive Suite 200 Irvine, CA 92618

More information

Monitoring Considerations and Costs

Monitoring Considerations and Costs Monitoring Considerations and Costs Stormwater BMP Selection, Design, and Monitoring Florida Stormwater Association September 9, 2016 Harvey H. Harper, Ph.D., P.E. Environmental Research & Design, Inc.

More information

Hillcrest Residential Development Hollywood, Florida

Hillcrest Residential Development Hollywood, Florida August 19, 2015 Hillcrest Residential Development Hollywood, Florida Drainage Report For City of Hollywood Prepared by: Kimley-Horn and Associates, Inc. 445 24 th Street, Suite 200 Vero Beach, FL 32960

More information

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Raymond Rogozinski and Maged Aboelata The City of Bristol and Towns of Plainville and

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

Local Flood Hazards. Click here for Real-time River Information

Local Flood Hazards. Click here for Real-time River Information Local Flood Hazards Floods of the White River and Killbuck Creek are caused by runoff from general, and/or intense rainfall. Other areas of flooding concern are from the Boland Ditch and Pittsford Ditch.

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

Eastlake Assited Living & Memory Care

Eastlake Assited Living & Memory Care UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4 These calculations should be used when designing the outlet structures for extended wet and dry detention basins (Sections 4. 7 and 4.8). The water quality outlet size and the trash rack design will vary

More information

Objectives: After completing this assignment, you should be able to:

Objectives: After completing this assignment, you should be able to: Data Analysis Assignment #1 Evaluating the effects of watershed land use on storm runoff Assignment due: 21 February 2013, 5 pm Objectives: After completing this assignment, you should be able to: 1) Calculate

More information

Wellsgate Terrace SPECIFICATIONS.

Wellsgate Terrace SPECIFICATIONS. GRADING NOTES: 1. LOT GRADING SHALL BE COMPLETED TO PROVE SUFFICIENT DIRT ON EACH PAD TO ACHIEVE THE CRITICAL PAD GRADES AND SPOT GRADES ON EACH LOT. AFTER ACHIEVING CRITICAL PAD GRADES INDICATED ON THIS

More information

APPENDIX B HYDROLOGY

APPENDIX B HYDROLOGY APPENDIX B HYDROLOGY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROBABLE MAXIMUM PRECIPITATION (PMP)... 1 3.0 DESIGN FLOW CALCULATION... 1 4.0 DIVERSION CHANNEL SIZING... 2 5.0 REFERENCES... 4 LIST OF

More information

Basic Hydraulics June 2007

Basic Hydraulics  June 2007 Basic Hydraulics www.concrete-pipe.org June 2007 2007 Overview Open Channel Flow Manning Equation Basic Culvert Design Sanitary Sewer Design Flow, Velocity Stormwater Sewer Design Flow, Velocity 2 Open

More information

D.M. Wills Associates Limited PARTNERS IN ENGINEERING. Stormwater Management Report. City of Peterborough

D.M. Wills Associates Limited PARTNERS IN ENGINEERING. Stormwater Management Report. City of Peterborough Stormwater Management Report City of Peterborough P-20-12 Parkway Corridor Class Environmental Assessment Jackson Park Parkhill Road West to Chemong Road D.M. Wills Project No. 12-5061 D.M. Wills Associates

More information

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX STREAM RESTORATION 2016 AWRA Summer Specialty Conference, GIS and Water Resources IX Innovative Use of 2D Hydraulic Modeling in Stream Restoration Design Presented by: Li Gao, PE and Robert Scrafford,

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

PARADIGM ODP FORT COLLINS, CO 80525

PARADIGM ODP FORT COLLINS, CO 80525 DRAINAGE REPORT PARADIGM ODP FORT COLLINS, CO 80525 Prepared For: Paradigm Properties, LLC 2186 Knoll Drive Ventura, CA 93003 Prepared By Coffey Engineering & Surveying 4045 St. Cloud Drive, Suite 180

More information

The last three sections of the main body of this report consist of:

The last three sections of the main body of this report consist of: Threatened and Endangered Species Geological Hazards Floodplains Cultural Resources Hazardous Materials A Cost Analysis section that provides comparative conceptual-level costs follows the Environmental

More information

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

Caledon Villas Corporation

Caledon Villas Corporation Caledon Villas Corporation Functional Servicing Report Caledon Villas Residential Subdivision Town of Caledon Project No. L11-557 April 2014 Caledon Villas Corporation Town of Caledon Caledon Villas Residential

More information

DRAINAGE CALCULATIONS

DRAINAGE CALCULATIONS DRAINAGE CALCULATIONS NW 8 th Street and NW 8 th Terrace Roadway and Drainage Improvements City of Miami Project B-30745 And NW 14 th Court Roadway and Drainage Improvements City of Miami Project B-30746

More information

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215

More information

Urban Hydrology for Small Watersheds

Urban Hydrology for Small Watersheds United States Department of Agriculture Natural Resources Conservation Service Conservation Engineering Division Urban Hydrology for Small Watersheds TR-55 Technical Release 55 June 1986 To show bookmarks

More information

Rucker Pond. Background

Rucker Pond. Background Rucker Pond Background The Rucker Basin consists of two subbasins (East and West) that drain to a single area known as Rucker Pond. Both subbasins have the same hydraulic parameters, but have different

More information

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

Determination of Urban Runoff Using ILLUDAS and GIS

Determination of Urban Runoff Using ILLUDAS and GIS Texas A&M University Department of Civil Engineering Instructor: Dr. Francisco Olivera CVEN689 Applications of GIS to Civil Engineering Determination of Urban Runoff Using ILLUDAS and GIS Tae Jin Kim 03.

More information

EROSION CONTROL NARRATIVE

EROSION CONTROL NARRATIVE EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment

More information

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design City of Columbia BMP Manual Detailed Unified Sizing Criteria Example Wet Pond Design April 17, 2013 Wet Pond Example: Unified Sizing Criteria Methodology Base Data Location: Rome, GA Site Drainage Area

More information

Homework 10. Logan Dry Canyon Detention Basin Design Case Study Date: 4/14/14 Due: 4/25/14

Homework 10. Logan Dry Canyon Detention Basin Design Case Study Date: 4/14/14 Due: 4/25/14 Homework 10. Logan Dry Canyon Detention Basin Design Case Study Date: 4/14/14 Due: 4/25/14 Section 1: Case Study Introduction This case study serves as an integrative problem based learning exercise. In

More information

!"#$%&&'()*+#$%(,-./0*)%(!

!#$%&&'()*+#$%(,-./0*)%(! 8:30 Sign in Hoosic River Revival Coalition!"#$%&&'()*+#$%(,-./0*)%(! 12-#30+4/#"5-(60 9:00 Welcome and Introductions 9:15 Goals for Today s Program: A Description of the Planning Process 9:30 First Session:

More information

Stormwater Report Addendum #1 (City & SWFWMD Submittal)

Stormwater Report Addendum #1 (City & SWFWMD Submittal) Stormwater Report Addendum #1 (City & SWFWMD Submittal) Lakeland Circle K Lakeland, Florida Prepared for: Gryboski, Howe, Gravely 101 S. Bay Blvd., Suite B-3 Anna Maria, FL 34216 Prepared by: FBPR Certificate

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

Drainage Study for Civic Center Way

Drainage Study for Civic Center Way Drainage Study for 23401 Civic Center Way P.C.C.E. INC. CIVIL ENGINEERING AND DESIGN Drainage Study for 23401 Civic Center Way WHOLE FOODS AT THE PARK Prepared by: P.C.C.E. INC STEPHEN R. SMITH, P.E. 23801

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction

More information

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California Introduction Beginning in 1999, the University of California,

More information

HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for:

HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for: HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP Prepared for: KCI Technologies, Inc. Mechanicsburg, PA and Pennsylvania Department of Transportation Engineering

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario Report No. 12020-SWM August 27, 2012 Revised April 21, 2014 Revised December 9, 2014 Revised April 14, 2015 D. B. G R A Y E N G I N E E R

More information

Bushkill Creek 3 rd Street Dam Removal Analysis

Bushkill Creek 3 rd Street Dam Removal Analysis Bushkill Creek 3 rd Street Dam Removal Analysis HEC HMS Runoff and Routing Model Stephen Beavan, Melanie DeFazio, David Gold, Peter Mara and Dan Moran CE 421: Hydrology Fall 2010 December 15, 2010 Contents

More information

Villages at Riverdale Thornton, CO

Villages at Riverdale Thornton, CO FINAL UTILITY REPORT Villages at Riverdale Thornton, CO October 14, 216 Revised: March 29, 217 JN: 1539 Prepared for: PCS Group, Inc. 11 16 th Street #3 B-18 Denver, CO 8265 P: 33.531.495 Prepared by:

More information

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design DRAINAGE REPORT Ministry of Transportation and Infrastructure Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design December 14, 2017 Reviewed by: Amanda Rust, P. Eng. Senior Drainage

More information

Technical Memorandum No

Technical Memorandum No Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.10 Task: Evaluation of Four Watershed Conditions - Sediment To: PRWFPA Staff Working Group Prepared by: Gregory Morris and

More information

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS Routing MODULE - ROUTING METHODS Routing is the process of find the distribution of flow rate and depth in space and time along a river or storm sewer. Routing is also called Flow routing or flood routing.

More information